Modular built packages Bespoke engineering solutions Project management of refurbishment upgrades On/off-site fabrication and site installation of pipework and process systems Off-site testing of pumping systems Company Portfolio 2015
Transcript
Page 1: On/off-site fabrication and site installation of pipework and … · Boiler room deck before refurbishment ... skid mounted design with various instrumentation. Engineered for: ...

Modular built packages

Bespoke engineering solutions

Project management of refurbishment upgrades

On/off-site fabrication and site installation of pipework and process systems

Off-site testing of pumping systems

Company Portfolio 2015

Page 2: On/off-site fabrication and site installation of pipework and … · Boiler room deck before refurbishment ... skid mounted design with various instrumentation. Engineered for: ...

Quality Management System

9001:2008

Environmental Management System

14001:2004

Occupational H&S

Management System

18001:2007 SAFEContractor Scheme

Utilities Verification & Assessment Scheme

Awards and Accreditations

Page 3: On/off-site fabrication and site installation of pipework and … · Boiler room deck before refurbishment ... skid mounted design with various instrumentation. Engineered for: ...

Customers

Page 4: On/off-site fabrication and site installation of pipework and … · Boiler room deck before refurbishment ... skid mounted design with various instrumentation. Engineered for: ...

Fabrication & Main Office Facilities

- 30,000 ft2 total

capacity with a 10t

overhead crane facility.

- Large outdoor area

currently used for site

simulation testing.

Page 5: On/off-site fabrication and site installation of pipework and … · Boiler room deck before refurbishment ... skid mounted design with various instrumentation. Engineered for: ...

Boiler room deck before refurbishment

New and refurbished equipment in the boiler room

BAE Systems Steam Barge

- £2 million refurbishment of the steam barge ‘Steamhammer’.

Engineered for:

Page 6: On/off-site fabrication and site installation of pipework and … · Boiler room deck before refurbishment ... skid mounted design with various instrumentation. Engineered for: ...

Lube Oil Flushing Rig

- Design and manufacture of a 2000 litre lube oil flushing rig.

- Stainless Steel tank, skid mounted design with various instrumentation.

Engineered for:

Page 7: On/off-site fabrication and site installation of pipework and … · Boiler room deck before refurbishment ... skid mounted design with various instrumentation. Engineered for: ...

Nuclear Submarine Test Loop

- Fabrication of a 60 Bar

seawater test loop.

- 100% Radiography.

- Supply of high

performance butterfly

valves.

Engineered for:

Page 8: On/off-site fabrication and site installation of pipework and … · Boiler room deck before refurbishment ... skid mounted design with various instrumentation. Engineered for: ...

Seawater Pump Replacement Engineered for:

- Six split case pumps providing seawater for the Astute class nuclear submarine

Existing Pump New Pump installed

The Problem

- High concentration of sandy seawater.

- Long periods of redundancy.

- Operating parameters of 43,000 l/min.

- History of problematic operation and maintenance.

The Solution

- Modified vertical upgrade split-case centrifugal pumps.

- Superior efficiency, easier maintenance.

- Design, supply and installation by NW Total.

- Ongoing data monitoring system.

New Motor New Pump delivery

Page 9: On/off-site fabrication and site installation of pipework and … · Boiler room deck before refurbishment ... skid mounted design with various instrumentation. Engineered for: ...

- Used in the Steel industry.

- One of many Degasser units built each year at our premises.

Degasser System Engineered for:

Page 10: On/off-site fabrication and site installation of pipework and … · Boiler room deck before refurbishment ... skid mounted design with various instrumentation. Engineered for: ...

- Dual liquid ring pump system, all

pipework vessels and frame

fabricated in house.

- Used in the Petrochemical

industry.

Simon Carves – Dual Pump Package Engineered for:

Page 11: On/off-site fabrication and site installation of pipework and … · Boiler room deck before refurbishment ... skid mounted design with various instrumentation. Engineered for: ...

Deaeration Pump Skids Engineered for:

- 1, 2, or 3 pump skids, with

baseframes fabricated in house

to offshore specifications.

- Pipework generally GRP,

Stainless Steel, Cupro-Nickel, or

Super Duplex.

Page 12: On/off-site fabrication and site installation of pipework and … · Boiler room deck before refurbishment ... skid mounted design with various instrumentation. Engineered for: ...

Ramsden Square Pipe Installation

- We are experienced in both

small and large scale site work.

- We regularly work on site for

the Utilities, Nuclear and

Pharmaceutical industries.

- A large amount of our site

work is carried out on a local

MoD site.

Engineered for:

Page 13: On/off-site fabrication and site installation of pipework and … · Boiler room deck before refurbishment ... skid mounted design with various instrumentation. Engineered for: ...

Condensate Recovery System

- Bespoke condensate recovery system with integrated level control.

- Complete removal of exiting system on site.

- Designed, manufactured, and commissioned by NW Total.

Engineered for:

Page 14: On/off-site fabrication and site installation of pipework and … · Boiler room deck before refurbishment ... skid mounted design with various instrumentation. Engineered for: ...

Industrial Water Booster Set

- Design and build of an Industrial Water Booster Set to rigid Sellafield standards.

Engineered for:

Page 15: On/off-site fabrication and site installation of pipework and … · Boiler room deck before refurbishment ... skid mounted design with various instrumentation. Engineered for: ...

Off-site Simulation Testing

- We have a large test facility capable of simulating on-site

conditions.

- This is becoming increasingly popular in the Nuclear industry.

Engineered for:

Page 16: On/off-site fabrication and site installation of pipework and … · Boiler room deck before refurbishment ... skid mounted design with various instrumentation. Engineered for: ...

Product Development Test Rigs

- Test rig manufactured to bespoke customer

requirements.

- PLC controlled with clean-in-place (CIP)

function.

Page 17: On/off-site fabrication and site installation of pipework and … · Boiler room deck before refurbishment ... skid mounted design with various instrumentation. Engineered for: ...

HAST Unblocking Rig Engineered for:

- Stainless steel pipework requiring radiography and NDT.

- Sellafield quality level 02 build.

- Fully function tested at NW premises.

Page 18: On/off-site fabrication and site installation of pipework and … · Boiler room deck before refurbishment ... skid mounted design with various instrumentation. Engineered for: ...

Engineered for:

Particle Test Rig

- A joint design with the customer to develop a test rig

for monitoring particles.

- Stainless steel welding and machined components.

- Borosilicate glass viewing window and infra red

camera.

Page 19: On/off-site fabrication and site installation of pipework and … · Boiler room deck before refurbishment ... skid mounted design with various instrumentation. Engineered for: ...

Modular built packages | Bespoke engineering solutions | Fabricated Pipework Systems

On-site installation and final commission | Off-site testing of pumping systems

Summary

NW Total Engineered Solutions are a multi-disciplined company specialising in the following areas…