Online Network Serviceschanging the world - one network at a time
Network Deployment – Quality Completion
Projects - Fully Managed Resource & Logistics
Operating Internationally – Global Environments
Professional Engineers (inc SC Cleared)
“Our Key Strengths”Highly Responsive - Rapid Mobilisation
Flexibility - Managing Change and Variation
Can Do Attitude - Delivering Customer Requirements
Online Network Services Ltd
Online Network Services Ltd
Atlantic House, Imperial Way, Reading, Berkshire, UK, RG2 0TDTel : 01189 036040 Fax : 01189 036100
Company Reg : 5953055
Operating Internationally UK, France, Japan, Hong Kong, Eire, Germany, Singapore, Papua New
Guinea, Sweden, Netherlands, Seychelles, Albania, Australia
Global Ground Operator (GO) support structure
Engineers Installation, Commissioning, Integration (+45)
Plus Additional Project to Project Variations
Based Reading, Berkshire, UK
OrganisationGeoff FinchChairman
Matthew WickensOperations
Director
David PennSales &
CommercialDirector
David TwynhamOperations Manager
David NorthAccountant
Tara TwynhamProject Mgr
Installation & CommissioningEngineers
Chris BishopProject Support
Mike NugentQuality Assurance
SalesTeam
Ben HallProject Mgr
Our Focus is IP Technology Fixed, Optical, Wireless Data Networks & Telecoms Implementation Managed Services & Bespoke Projects Project Managers, Engineers, Field Technicians and Project Support Emphasis on Quality & First Time Completion on Schedule
ONS Service Overview
Our Core Objective“First Time Completion”
Quality System
Qualified Persons List (QPL)
First Aid Appointed person
Health & Safety
Skills Assessment
Training
Field Audits
SC cleared staff
ResourcingInduction, Skills Assessment, Training, Reference, QPL, AuditTrainingCisco, Juniper, Ciena, Huawei, Navini, Nokia, AlvarionEffective Field ManagementLeadership, Expectations, Best Practice & Standards
Services Delivered
Reference Projects
1. 50Mb Broadband - UBR National Rollout2. Cisco Core Router - CRS1's I&C across Europe & Asia Pac3. Huawei FMSAN MSAN & EvoTAM Installation - BT21CN4. Juniper T Series & M Series - BT21CN5. Ciena - Fibre Network Deployment , Eire6. MVNO IP Core Network7. ISDN / ADSL Swap across Greater London
Broadband 50Mb Rollout Project
Primary Areas of Responsibility1. Project Management, including Customer Interface, Resource
Planning & Management, Controlling, and Closeout
2. ONS - Rollout ImplementationSurvey, Rollout Planning, Logistics, I&C, Integration, Acceptance
Documents, Installation Quality, Health & Safety
50Mb Broadband Network Implementation
Project Implementation has four primary functions Engineering Survey & Design:
Responsible for survey and design of engineering (Core, Access & Transmission).
Installation: Responsible for the operation of equipment installation.
Commissioning: Responsible for software testing and system integration.
Technical Support: Responsible for technical support and customer consultation during
equipment commissioning and operation.
50Mb Broadband Project Handover Documentation
Handover Pack comprises Survey Documentation Pre-Installation Bill of Materials Risk Assessment Method Statement Site Readiness Site Diary As-Built Document Red Line Drawings Inventory / Serial Numbers Test Results, Screen Shots & Logs Deficiencies Site Acceptance
Handover Docs
Project Critical Success Factors Project Management
Detailed Planning & Thorough Initialisation Requirements and Expectations Setting Responsibility Assignment Matrix (RAM)
Teamwork Shared Objectives Integrated Field Force Open Communications
Trusted Partner First Time Right Quality Critical Success
Factors
Reference Project #1 International Core Network
CISCO Carrier Routing System CRS-1 across Europe/Asia Dusseldorf, Tokyo, Amsterdam, Hong Kong, London, Frankfurt & Paris
Scope of Work Site Surveys, Installation and Commissioning, associated optical ODF's, Documentation
Requires focus on Site Management, Planning Work Flow, Quality Practices and Health & Safety
Team structure Lead Engineer, Senior Engineer, Installation Engineer
Reference Project #2BT 21CN Implementation
200,000 Lines Installed Field Management - Parallel Installations Site Implementation – 4 weeks to 16 weeks, 3 Stages BT / Huawei Site Build Guidelines & Quality Audit Team Leader + Engineers (team size flexible) Rack Installation , Power ,Test and Certify Commissioning of Equipment–
• Live Operation Centre Integration• Provision of test documentation
MSAN
Reference Project #3Juniper BT 21CN Implementation
ID Task Name1 Award / Puchase Order2 Customer Project Kick Off Meeting3 Deployment Planning4 Resourcing5 Project Induction & Training6 Site Surveys - Risk Assessment & Methods7 Purchasing8 Project Meeting - Pre-Rollout 9 Hardware Delivery to ONS10 Batch 111 Batch 212 Batch 313 Juniper Rollout14 Ashford15 Bishop Stortford16 Taunton Toneside17 Braintree18 Exeter TE19 Exeter Rougemont20 Ipswich21 Crownhill22 Plymouth23 Norwich West24 Barnstaple25 Norwich Russell Hse26 Portsmouth Trunk27 Bristol West28 Chichester29 Salisbury30 Brighton31 Aldershot32 Horsham33 Guildford TE 34 Canterbury35 London Esher36 Sheffield Eldon Hse37 Chesterfield38 Sevenoaks39 Newark On Trent 40 Tunbridge wells41 Chatham42 Maidstone43 Closeout44 Rollout Site Acceptance Packs45 Project Meeting - Closeout46 Customer Acceptance Sign-Off
03/09
Team 1Team 1Team 2
Team 1Team 2Team 2
Team 1Team 2Team 2
Team 1Team 2
Team 1Team 1Team 2
Team 1Team 2
Team 1Team 2
Team 1Team 2
Team 1Team 2
Team 1Team 1
Team 1Team 1
Team 1Team 1Team 1
02/11
03/09 10/09 17/09 24/09 01/10 08/10 15/10 22/10 29/10 05/11 12/1103 Sep '0710 Sep '0717 Sep '0724 Sep '0701 Oct '0708 Oct '0715 Oct '0722 Oct '0729 Oct '0705 Nov '0712 Nov '07
29 Exchanges Parallel Installations Gated by GE Availability 2 Teams Team Leader + Engineer Installation, Power, Test
• BS7671 IEE
Commissioning• JUNOS 8.2R3.5• NOC Integration• Test Results
CN 4200 FlexSelect Installation & Commissioning Rapid Deployment, 4 weeks, 7 day working ODF, Splicing, OTDR tests, Optical Spectrum Analyser validation
Reference Project #4Regional Core Network , Ireland
Huawei NGN Core Network InstallationSoftswitches (MSS) , MSOFTX3000Media Gateways (MGW), UMG8900IN Platform / VoicemailShort Message Service Centre (SMSC)Power installationODF / DDF connectivity3 person team (Lead + 3 Installers2 Sites, 17 Cabinets full build, cable and commission - 10 days
Reference Project #5Mobile Virtual Network Operator (MVNO )
2000 Site Programme, Virtual Access GW5310 ADSL Gateways Aggressive timescales and challenging environment 20 Engineers & Project Manager Project complete ahead of fixed deadline (ISDN Service withdrawn) Field Logistics and Resource Planning Technical Fault Finding and Resolution
Reference Project #6 ISDN / ADSL replacement programme
Public Transport Project ISDN to DSL Transition
TimePM Plan
Project implementation plan consists of 2000 network upgrades at bus stops
Objectives will be complete, 5 months from start date
Major challenges overcome = short notice schedule changes, site specific
configuration, short term peak
July 2008 Oct2008June 2008
Staging
Initiation
50
Design
Project Phases Completion On Schedule
Sept2008Aug2008
50
100
100
100
100
100
100
150
150
150
150
150
300
300
Summary
A Trusted Partner for Implementation Projects
We Take Responsibility for Rollout Deliverables
Fully Supported Engineering Teams
Managing Rollout & Demand Variations
Emphasis on Quality & Continuous Improvement
First Time Completion on Schedule