1/16
BATTERY SWAP SurveyReport
TP-HUAWEI
Site ID:
Location:
Site ID/Location
Site Address:
Scene: (Urban/ rural/mountain)
BTS Type: (Indoor/Outdoor)
Site type:(Sharing or independentif sharing, with which operator)
RT(Building storeys )
Site Area (L*W*H):
Site Height (from GL):
Nearest Landmark:
Date :
Telenor Representative:
Huawei Representative:
- 1 -
TP
Confidential BTS Site Battery Swap Survey Report
8/3/2019 Onsite Survey Templt Tp-final(3)
2/16
Site Access
Item (Y/N) Remarks
Owner issue
Access Issue at Night
Society Issues
Keys Required
Guard Available (if yes mention
Contact No.)Existing Site is below road
level(M)Existing Site within 25 feet radius
of road Level(Distance)
Level of Pad from Gravel top(mm)
Access Issue For EquipmentDelivery(Any obstacle)
(i) Narrow Street
(ii) Crane usage (RT)
(iii) Stairs usage (RT)
(iv) Narrow Stairs Case orWide(RT)
(v) Equipment Can Easilypass through(RT)
(vi) High Power TransmissionLines (RT)
(vii) Any additional ToolsRequired for access andequipment entrance (e.g.
- 2 -
TP
Confidential BTS Site Battery Swap Survey Report
8/3/2019 Onsite Survey Templt Tp-final(3)
3/16
ladder/emergency lights)
Equipment Detail
Items Detail Remarks
DG Capacity (Rating)
DG Brand
DG Condition(working/faulty)Transformer Capacity
(Complete Detail)Number of Power Cabinets
on Site (Rectifier)Brand & Rating Power
System
(Rectifier)
Model of Power system
(Rectifier)
Numbers of RectifiermodulesOver All Site Load
(Distribution Current)Number of Working
Rectifier ModulesNumber of Faulty Rectifier
ModulesSpace Available for Extra
Rectifier ModulesExisting Battery Capacity
(Ah)
Number of Battery Banks
Battery Banks Model
Number of cells in each
battery bank
- 3 -
TP
Confidential BTS Site Battery Swap Survey Report
8/3/2019 Onsite Survey Templt Tp-final(3)
4/16
Availability of battery
temperature sensorGEM Installed
Battery circuit breakers/ fuses information on Rectifier
Fuse1 Fuse 2 Fuse 3 Fuse 4
Make of breaker/fuse
Model
Breaker/fuse
Capacity in Amp(A)
In use/Not in use
Total Battery MCB
Installed in Cabinet
(Brand & Rating)
MCB Installed in
Rectifier or With
Battery Shelve in
Cabinet
AC breakers information in ACDB
No of spare single phase
AC breaker in ACDB
Make of single phase AC
breaker in ACDB
single phase AC breaker
Capacity in Amp(A)
Wapda three phase Voltage
R-Y (Phase-Phase)
Y-B (Phase-Phase)
B-R (Phase-Phase)
R (Phase-Neutral)
- 4 -
TP
Confidential BTS Site Battery Swap Survey Report
8/3/2019 Onsite Survey Templt Tp-final(3)
5/16
Y (Phase-Neutral)
B (Phase-Neutral)
Required Material Detail
Items Detail Remarks(Details)
Power Cable Length From
Meter To MCCB(Wapda)Mark and measure the AC
cable route length from
existing ACDB to new
Battery Cabinet1 Dia PVC for AC cable
(Make cable routing in
layout)Mark and measure the DC
cable route length from
Rectifier to new Battery
CabinetRequirement of New
Duct(DC & PGND)New Cable Duct for Dc
Cables(RT & GF OPTION-1 &
6)New Cable Ladder for DC
Cable for GF site (Make
cable routing in layout)
Vertical
Horizontal
Check the existing Earthing
bus bar on equipment PadQuantity of spare holesCheck the existing Earthing
bus bar on DG Pad
Quantity of spare holesEarthing cable length (As
Per Requirement)
- 5 -
TP
Confidential BTS Site Battery Swap Survey Report
8/3/2019 Onsite Survey Templt Tp-final(3)
6/16
Earthing Cable from Pit to
Busbar (If Required)Earthing Cable from Busbar
to new Equipment bar (If
Required)Requirement of New Bus
Bar
Earthing Value()
Important Observations
Critical Issues Impact On SwapProposedSolution
- 6 -
TP
Confidential BTS Site Battery Swap Survey Report
8/3/2019 Onsite Survey Templt Tp-final(3)
7/16
- 7 -
TP
Confidential BTS Site Battery Swap Survey Report
8/3/2019 Onsite Survey Templt Tp-final(3)
8/16
Civil Work Part
Space for new Battery Cabinet: Battery rack size (W*D*H) 905mm*1125mm*2155mmOn existingequipmentPad
On DGPAD
Need toextendexistingpad
New PADrequired(L*W)2mx 1.5m
Acquisitionrequired fornew PAD
UndertheTower
OnExistingEmptyPad
Option-1 Option-2 Option-3 Option-4 Option-5 Option-6 Option-7
In case of any options selected above, please fill accordingly below:
Option-1Mention the position of new Battery Cabinet inLayout(mark the dimensions of available space) YES NOMark and measure the AC cable route length fromexisting ACDB to new Battery Cabinet (M)
1 Dia PVC for AC cable(Make cable routing in layout) (M)
Mark and measure the DC cable route length fromRectifier to new Battery Cabinet (M)
New Cable Ladder for DC Cable for GF site
(Make cable routing in layout)
Vertical
(M)
Horizontal
(M)4GI Duct for DC Cable for RT site(Make cable routing in layout) (M)Check the existing Earthing bus bar on equipment PadQuantity of spare holes (Nos)Check the existing Earthing bus bar on DG PadQuantity of spare holes
(Nos)If spare holes available, then mention Earthing cablelength from existing bus bar to new cabinet (M)If spare holes not available, then mention earthing cablefrom new bus bar to pit and form new bus bar to newcabinet. (M)
And form new bus bar to new cabinet. (M)
- 8 -
TP
Confidential BTS Site Battery Swap Survey Report
8/3/2019 Onsite Survey Templt Tp-final(3)
9/16
Special Remark
Option-2
Mention the position of new Battery Cabinet in Layout YES NOMark and measure the AC cable route length from
existing ACDB to new Battery Cabinet (M)1 Dia PVC for AC cable(Make cable routing in layout) (M)
Mark and measure the DC cable route length fromRectifier to new Battery Cabinet (M)
New Cable Ladder for DC Cable for GF site(Make cable routing in layout)
Vertical
(M)
Horizontal
(M)4GI Duct for DC Cable for RT site(Make cable routing in layout) (M)Check the existing Earthing bus bar on equipment PadQuantity of spare holes (Nos)
Check the existing Earthing bus bar on DG PadQuantity of spare holes (Nos)
Earthing cable length
Special Remark
- 9 -
TP
Confidential BTS Site Battery Swap Survey Report
8/3/2019 Onsite Survey Templt Tp-final(3)
10/16
Option-3
Mention the position of new Battery Cabinet in Layout YES NO
How much area need to be extend( On Existing Pad) (M^2)
Extended PAD size M x M
Sun shed is needed to extend or not YES NO
Mark and measure the AC cable route length fromexisting ACDB to new Battery Cabinet (M)
1 Dia PVC for AC cable(Make cable routing in layout) (M)
Mark and measure the DC cable route length fromRectifier to new Battery Cabinet (M)
New Cable Ladder for DC Cable for GF site(Make cable routing in layout)
Vertical
(M)
Horizontal
(M)4GI Duct for DC Cable for RT site(Make cable routing in layout) (M)Check the existing Earthing bus bar on equipment Pad
Quantity of spare holes (Nos)Check the existing Earthing bus bar on DG PadQuantity of spare holes (Nos)
Earthing cable length from existing bar to new bar
Earthing cable from new bar to sun shed
Earthing cable from new bar to New Equipment
Mark the North Direction
Special Remark
- 10 -
TP
Confidential BTS Site Battery Swap Survey Report
8/3/2019 Onsite Survey Templt Tp-final(3)
11/16
Option-4
Space available for new PAD (1.5mx2m) YES NO
Mention the position of new Battery Cabinet in Layout YES NO
New sun shed is required for new PAD YES NOMark and measure the AC cable route length fromexisting ACDB to new Battery Cabinet (M)
1 Dia PVC for AC cable(Make cable routing in layout) (M)
Mark and measure the DC cable route length fromRectifier to new Battery Cabinet (M)
New Cable Ladder for DC Cable for GF site(Make cable routing in layout)
Vertical
(M)
Horizontal
(M)4GI Duct for DC Cable for RT site(Make cable routing in layout) (M)Check the existing Earthing bus bar on equipment PadQuantity of spare holes (Nos)Check the existing Earthing bus bar on DG PadQuantity of spare holes (Nos)
Earthing cable length from existing bar to new bar
Earthing cable from new bar to sun shed
Earthing cable from new bar to New Equipment
North direction
Special Remark
- 11 -
TP
Confidential BTS Site Battery Swap Survey Report
8/3/2019 Onsite Survey Templt Tp-final(3)
12/16
Option-5
Check the possibilities of space for acquiring Available
Not Available
Mention the position of new Battery Cabinet in Layout YES NO
New sun shed is required for new PAD YES NOMark and measure the AC cable route length fromexisting ACDB to new Battery Cabinet (M)
1 Dia PVC for AC cable(Make cable routing in layout) (M)
Mark and measure the DC cable route length fromRectifier to new Battery Cabinet (M)
New Cable Ladder for DC Cable for GF site(Make cable routing in layout)
Vertical
(M)
Horizontal
(M)4GI Duct for DC Cable for RT site(Make cable routing in layout) (M)Check the existing Earthing bus bar on equipment PadQuantity of spare holes (Nos)
Check the existing Earthing bus bar on DG PadQuantity of spare holes (Nos)
Earthing cable length from existing bar to new bar
Earthing cable from new bar to sun shed
Earthing cable from new bar to New Equipment
Special Remark
- 12 -
TP
Confidential BTS Site Battery Swap Survey Report
8/3/2019 Onsite Survey Templt Tp-final(3)
13/16
Option-6Mention the position of new Battery Cabinet inLayout(mark the dimensions of available space) YES NOMark and measure the AC cable route length fromexisting ACDB to new Battery Cabinet (M)
1 Dia PVC for AC cable(Make cable routing in layout) (M)
Mark and measure the DC cable route length fromRectifier to new Battery Cabinet (M)
New Cable Ladder for DC Cable for GF site(Make cable routing in layout)
Vertical
(M)
Horizontal
(M)4GI Duct for DC Cable for RT site(Make cable routing in layout) (M)Check the existing Earthing bus bar on equipment PadQuantity of spare holes (Nos)Check the existing Earthing bus bar on DG PadQuantity of spare holes
(Nos)If spare holes available, then mention Earthing cablelength from existing bus bar to new cabinet (M)If spare holes not available, then mention earthing cablefrom new bus bar to pit and form new bus bar to new
cabinet. (M)
And form new bus bar to new cabinet. (M)
Special Remark
- 13 -
TP
Confidential BTS Site Battery Swap Survey Report
8/3/2019 Onsite Survey Templt Tp-final(3)
14/16
Option-7Mention the position of new Battery Cabinet inLayout(mark the dimensions of available space) YES NOMark and measure the AC cable route length fromexisting ACDB to new Battery Cabinet (M)
1 Dia PVC for AC cable(Make cable routing in layout) (M)
Mark and measure the DC cable route length from
Rectifier to new Battery Cabinet (M)New Cable Ladder for DC Cable for GF site(Make cable routing in layout)
Vertical
(M)
Horizontal
(M)4GI Duct for DC Cable for RT site(Make cable routing in layout) (M)Check the existing Earthing bus bar on equipment PadQuantity of spare holes (Nos)Check the existing Earthing bus bar on DG PadQuantity of spare holes
(Nos)If spare holes available, then mention Earthing cablelength from existing bus bar to new cabinet (M)
If spare holes not available, then mention earthing cablefrom new bus bar to pit and form new bus bar to newcabinet. (M)
And form new bus bar to new cabinet. (M)
Special Remark
- 14 -
TP
Confidential BTS Site Battery Swap Survey Report
8/3/2019 Onsite Survey Templt Tp-final(3)
15/16
Site Snaps(obligatory)
1. Complete site view from main entrance (2 to 3 snaps) from differentangles.
2. Complete site view from tower 6 m height.
3. Site level from road level
4. Narrow Street (For Crain usage)
5. Stairs usage (RT)
6. Proposed Equipment space covering the surroundings (marked all four
directions).
7. Existing DG PAD.
8. Existing Battery Bank.
9. Battery Bank Brand/Rating
10. Existing BTS & PAD snaps from appropriate distance (cover whole
scenario of pad).
11.Transformer Snap
12.ACDB/ATS.
13.Rectifier with open door from front.
- 15 -
TP
Confidential BTS Site Battery Swap Survey Report
8/3/2019 Onsite Survey Templt Tp-final(3)
16/16
14.1 Rectifier modules rating snaps.
15. Equipment & DG pad earthing bus bar snaps.
16. . Earthing Value Snaps.
17. . Earhting pit snap.
18. Wapda Voltage (P/P-01) & (P/N-03)