Description:
HIL System and ECU Testing with Fault-insertion unit, by Pickering and OPAL-RT
19
The 7th International Conference on Real-Time Simulation Technologies Montreal | 9-12 June, 2014 1 Bob Stasonis Pickering Interfaces, Inc. [email protected] HIL System and ECU Testing with Fault-insertion unit
Transcript
Page 1: OPAL-RT RT14 Conference: HIL system & ECU testing

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

1

Bob StasonisPickering Interfaces, Inc.

[email protected]

HIL System and ECU Testing with

Fault-insertion unit

Page 2: OPAL-RT RT14 Conference: HIL system & ECU testing

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

2

• Who is Pickering Interfaces?• History

• Products

• ECU Testing

• Hands-on Demonstration

• Pickering Roadmap• New design FIU and BOB

• Conclusions

Agenda

Page 3: OPAL-RT RT14 Conference: HIL system & ECU testing

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

3

Who are Pickering?

Global Presence

8 Direct Sales/Support Offices

Wide Network of Local Reps

Pickering Electronics

Reed Relays from 1968

Pickering Interfaces

Switching Systems from 1988

2 Factories (UK & Czech Republic)

All Design & Manufacturing In-House

Pickering HQ(Clacton-on-Sea, England)

Page 4: OPAL-RT RT14 Conference: HIL system & ECU testing

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

4

Who are Pickering?

Experts in Switching

Most Major T&M Platforms

Only Switching Manufacturer with In-House Reed Relay Production

Key PXI Player Since Early Days

Products since 1998

Quickly Established Largest Range of PXI Switching

Lead Maintained for 16 Years!

Page 5: OPAL-RT RT14 Conference: HIL system & ECU testing

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

5

Pickering Interfaces – Switching & Simulation

Sponsor Members of PXISA & LXI Consortium

Close Ties to Industry Requirements

Long Term Support

Still sell products designed in 1980’s

Strong Customer Focus

COTS & Custom

Widest Choice

E.g. 600+ PXI Modules

Page 6: OPAL-RT RT14 Conference: HIL system & ECU testing

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

6

Leaders in Switching Technology Switch Solutions for Most Major Test Platforms

GPIB, PXI, PCI & LXI

Every Key Relay Technology

Highest Quality Pickering Reed Relays

Electro-Mechanical Relays (EMRs)

Solid-State Relays (SSRs)

Special Purpose

Microwave to 65GHz

Optical MEMS

Page 7: OPAL-RT RT14 Conference: HIL system & ECU testing

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

7

Leaders in Switching Technology

Every Key Switch Configuration

Uncommitted Relays

Multiplexer

Matrix

Fault Insertion

Special Purpose (Telecoms, ARINC 608A…)

Page 8: OPAL-RT RT14 Conference: HIL system & ECU testing

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

8

Leaders in Programmable Resistance

More Than 60 Modules

Simulate Operation of Remote Sensors

Engine Management Systems & Process Controllers

Large Range

Simple Resistor Ladders

Precision Resistors

RTD Simulation

Strain Gauge Simulation

Fixed Value Selectable Resistors

High Power

Special Features

Short/Open Simulation, Calibration Facility, Custom Builds…

Page 9: OPAL-RT RT14 Conference: HIL system & ECU testing

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

9

Pickering Interfaces Drivers

• Fully compliant with Major Programming Languages• NI LabWindows/CVI & LabVIEW

• Microsoft Visual Basic/Visual C++

• Marvin ATEasy

• IVI & VISA compliant Drivers

• Compatible with NI Switch Executive

• Linux Drivers for Many Versions

• Real Time Applications like LabVIEW RT

• Register Level Programming for Non-standard OS

Page 10: OPAL-RT RT14 Conference: HIL system & ECU testing

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

10

Cabling• Low Cost Cables, Connectors,

Breakout Boxes• Large catalog

• Defined for All Pickering switching products

• Custom Services Available

Page 11: OPAL-RT RT14 Conference: HIL system & ECU testing

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

11

Fault Insertion

• Nine Year History in FI Applications

• Fault Injection for HILS Application

• High Density Matrices

• Lower Cost Straight Through Switching

• Multiple Fault Busses

Page 12: OPAL-RT RT14 Conference: HIL system & ECU testing

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

12

Battery Simulation

• 6 battery simulators in a single PXI slot• Only multi-channel in PXI

• Up to 200 mA output per simulator

• Battery charging emulation

• Uses backplane power sources

• HIGH Isolation - >750 Volts per module

• Safety Interlock

Page 13: OPAL-RT RT14 Conference: HIL system & ECU testing

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

13

Alexandre LeboeufOPAL-RT TECHNOLOGIES INC.

[email protected]

Product Demonstration

Page 14: OPAL-RT RT14 Conference: HIL system & ECU testing

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

14

New Design FIU and BOB

Page 15: OPAL-RT RT14 Conference: HIL system & ECU testing

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

15

• Two Separate Entities

• Fixed Configuration

• Limited Channel Count

• Manual Resistance Control

• Upgrading and Serviceability Limited

Current Opal-RT Offering

Page 16: OPAL-RT RT14 Conference: HIL system & ECU testing

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

16

• Combined BOB & FIU• Shorter cabling for better signal integrity

• Multiple FI Module Types• Low, medium, and high current• Fault bus options• Mix and match to Unit Under Test Requirements

• Programmable Resistance Option• Speeds Test• Improves repeatability (replaces manual potentiometer)

• Uses Industry Standard PXI chassis• Future design features Industrial PC for lower cost

Pickering Proposal

Page 17: OPAL-RT RT14 Conference: HIL system & ECU testing

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

17

• Plug in BOB Modules• Easier to customize to test program requirements

• Uses same shorting plugs as present Opal-RT BOB

• System Will be More Flexible and Cost Effective • Field Upgradable

• Serviceability

• Pricing similar or less than present offering

Pickering Proposal

Page 18: OPAL-RT RT14 Conference: HIL system & ECU testing

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

18

Conclusion

• Long History in Test

• By far the largest range/choice for switching & programmable resistance

• Flexibility for customizing & introducing new designs for key requirements• Roadmap for Opal-RT Customer Requirements

Page 19: OPAL-RT RT14 Conference: HIL system & ECU testing

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

19pickeringtest.com

Thank you for your time

Any Questions?