+ All Categories
Home > Documents > OPEN CUT - · PDF fileOpen Cut mine and associated infrastructure started. Glencore began...

OPEN CUT - · PDF fileOpen Cut mine and associated infrastructure started. Glencore began...

Date post: 28-Mar-2018
Category:
Upload: lamthuan
View: 218 times
Download: 1 times
Share this document with a friend
2
BOWEN Location Collinsville Open Cut Newlands Rockhampton Mackay Gladstone Oaky Creek Coal Rolleston Open Cut Ownership Glencore manages operations at Clermont Open Cut on behalf of a joint venture between Glencore and Sumitomo Corporation (25.05% each), Mitsubishi Development Pty Ltd (31.4%), J-Power Australia Pty Ltd (15%) and J.C.D. Australia Pty Ltd (3.5%). Our History Construction of the Clermont Open Cut mine and associated infrastructure started. Glencore began operational management of Clermont Open Cut mine from 1 June 2014 after the successful completion of a deal that saw Glencore and Sumitomo Corporation acquire Rio Tinto Australia’s 50.1% shareholding in the mine. CLERMONT OPEN CUT 2007 2014 2010 The first shipment of coal was delivered in April. FAST FACTS Clermont Open Cut is a large scale open-cut operation, located approximately 12 kilometres from the town of Clermont in central Queensland. 577 STAFF Our people Clermont Open Cut Abbot Point Coal Terminal Bowen Roma Wandoan Coal Project Emerald
Transcript
Page 1: OPEN CUT -  · PDF fileOpen Cut mine and associated infrastructure started. Glencore began operational management of Clermont Open Cut mine from 1 June 2014 after the successful

BOWEN

LocationCollinsville Open Cut

Newlands

Rockhampton

Mackay

Gladstone

Oaky Creek Coal

Rolleston Open Cut

Ownership

Glencore manages operations at Clermont Open Cut on behalf of a joint venture between Glencore and Sumitomo Corporation (25.05% each), Mitsubishi Development Pty Ltd (31.4%), J-Power Australia Pty Ltd (15%) and J.C.D. Australia Pty Ltd (3.5%).

Our History

Construction of the Clermont Open Cut mine and associated infrastructure started.

Glencore began operational management of Clermont Open Cut mine from 1 June 2014 after the successful completion of a deal that saw Glencore and Sumitomo Corporation acquire Rio Tinto Australia’s 50.1% shareholding in the mine.

CLERMONTOPEN CUT

2007

2014

2010 The first shipment of coal was

delivered in April.

FAST

FA

CT

SClermont Open Cut is a large scale open-cut operation, located approximately 12 kilometres from the town of Clermont in central Queensland.

577STAFF

Our people

Clermont Open Cut

Abbot Point Coal TerminalBowen

Roma

Wandoan Coal Project

Emerald

Page 2: OPEN CUT -  · PDF fileOpen Cut mine and associated infrastructure started. Glencore began operational management of Clermont Open Cut mine from 1 June 2014 after the successful

Operation Clermont Open Cut is a truck and shovel operation. The major seam mined is the Wolfang seam, typically between 35-40 metres.

After processing at Clermont Open Cut, coal is transported by an overland conveyor to the stockpile and rail loading facilities at the nearby Blair Athol mine.

The coal is exported primarily to Japan through the Dalrymple Bay Coal Terminal.

Total JORC Reserves are approximately 172 million metric tonnes, giving the mine an expected life of approximately 13 years.

2015 SALEABLE COAL

13.1 million tonnes

CLERMONTOPEN CUT

Community

Clermont Open Cut contributes to the local community through a number of partnerships, including the Wangan & Jagalingou People, the Clermont Community Development Fund, the Clermont Aboriginal Community Development Fund, the Koala Venture Research Partnership, with the University of Queensland and other community support groups.

Contact information:Ph: (07) 4980 2500 | http://www.glencore.com.au/EN/who-we-are/clermont/Pages/default.aspx | www.glencore.com

CLERMONT OPEN CUT~ ACHIEVEMENTS ~

• 2015 Queensland Resources CouncilResources Awards for Women

– RunnerUp-OutstandingQueensland Tradeswoman/operator/techniciansectionMelissaBrown,TeamLeader–Haulage

• 2013 Australian Mining Prospect Awards

– HighlyCommended–CoalMineoftheYear

– Finalist–AustralianMineoftheYear

– Finalist–MineralsProcessingoftheYear

– Finalist–CommunityInteraction• 2009 Queensland Resources Council

– BestCompanyInitiative

Total managed land ofClermont Open Cut

16,307ha

Environmental Management

Clermont Open Cut mine has a comprehensive Environmental Management System (EMS) in place. The EMS provides a framework for dealing with environmental managementissuesatthemine,inasystematicway.Itbrings together all aspects of environmental management on the mine site.

The EMS covers the design, development, production, maintenance and rehabilitation of the operation and its infrastructure. The principal objectives of the EMS are to ensure that the company adopts a continuous improvement approach to environmental management issues at the site and wherever practical and economic, implement best practice environmental management. The EMS also serves to ensure that activities at the operations are controlled, such that the company either prevents or minimises any environmental impacts associated with the operation.

Annual Production for Clermont Open Cut

• ƖƔƕƙɯ ÜÚÛÙÈÓÐÈÕɯ,ÐÕÐÕÎɯ/ÙÖÚ×ÌÊÛɯ ÞÈÙËÚ6ÐÕÕÌÙɯɪɯ,ÈÕÈÎÌÙɯÖÍɯÛÏÌɯ8ÌÈÙȯɯ#ÈÞÐËɯ/ÙÌÛÖÙÐÜÚ %ÐÕÈÓÐÚÛɯɪɯ"ÖÈÓɯ,ÐÕÌɯÖÍɯÛÏÌɯ8ÌÈÙ %ÐÕÈÓÐÚÛɯɪɯ"ÖÔÔÜÕÐÛàɯ(ÕÛÌÙÈÊÛÐÖÕ


Recommended