+ All Categories
Home > Documents > Opening Remarks Alex Dzierba GlueX/Hall D Collaboration meeting - Jlab - Dec 11-13, 2003.

Opening Remarks Alex Dzierba GlueX/Hall D Collaboration meeting - Jlab - Dec 11-13, 2003.

Date post: 14-Dec-2015
Category:
Upload: della-hodge
View: 213 times
Download: 0 times
Share this document with a friend
Popular Tags:
18
Opening Remarks Alex Dzierba GlueX/Hall D Collaboration meeting - Jlab - Dec 11-13, 2003
Transcript

Opening RemarksAlex Dzierba

GlueX/Hall D Collaboration meeting - Jlab - Dec 11-13, 2003

Welcome

Prof. Hara PertidouU of Thessaloniki - Greece

Prof. Jim PinfoldU of Alberta - Canada

Prof. Marco ReyesU of Guanajuato - Mexico

.. And other visitors and thanks to our JLab hosts

Good News

20-yr Plan

From Congress

Senate

Reviews

Electronics - July 2003 Calorimetry & Tracking Software Theory? Lehman review (~ 1 yr)

Software Issues

PWA and phenomenology NSF PWA center - GlueX/CLEO-c Other proposals

Simulations/Reconstruction Ed Brash/Richard Jones/Maciej Swat Lehman review preps

GRID Coordinate with Lab G. Fox

DAQ Coordinate with Lab/Tim Smith?

System Requirements

Funding

Coordinated NSF/DOE supplementals CDRF and ISTC - US/Russia Joint Canada/Mexico/US Requests for R&D to JLab Theory requests Computer science

Collaboration Commitment

Nature of MOU’s Physicists Technical Staff Other experiments

Adding/Removing Collaborators Guidelines Implementation

Equipment that Could be Completed

Magnet End-plate holes? Energize at IUCF?

LGD Evaluate glass/pm’s Frame, wall, monitor Electronics

Projects that could be completed soon

Development of amplitude parameterization

isobar model Deck effect unitarity, analyticity, particular attention to incident photons

Equipment Issues

Tracking Design & manpower? Vertex region

Calorimetry Barrel readout Prototypes Upstream

Particle I.D. Re-visit Cerenkov TOF - OK Magnetic issue Forward/Cal - TOF - Cerenkov package

Infrastructure

Building Can we go to architect?

Beam Beam line design Tagger design Tagger magnet Coherent multiple scattering?

Subsystem Integration Use BarBar as paradigm

Schedule

Current schedule is painfully slow Build the Hall and beamline before upgrade Investigate physics at lower energy Stage equipment installation

Analysis/Phenomenology

Amplitude Analysis Understand ambiguities Improve algorithms/throughput Analysis of extant data

Phenomenology Critique of isobar model Model for backgrounds Understand ‘theory’ systematic errors

Conclusions

There’s a lot to do

Let’s get busy


Recommended