Agenda
• Organization• SG Conformity• SG Communications• SG Systems• SG Security
SG Conformity• Key accomplishments
– Defined scope and charter with unanimous agreement – Established guiding principles – Agreed on formation and prioritization of 3 TFs:
• Edge Conformity (ADE/ADR/HAN) • SG Security Conformity • AMI ENT Conformity (Not currently prioritized)
• Next steps– kick off task forces and establish weekly calls and
SG Communications• Key accomplishments
– OpenSG PAP #1 and #2 requirements• Identified 21 top level SG applications and 15 potential
actors for each• Worked through 4 of the applications end to end and
created over 100 high level functional requirements
– Organization• Scope/Charter discussion
SG Communications• Next steps
– OpenSG PAP #1 and #2• Complete walkthrough of top level actions• Align requirements by actor interfaces• Distill communications requirements • Face to face at Grid-Interop in Denver (mid November)
– Organization• Task Groups per Knoxville session discussion• Weekly conference calls
• Next encounter data/time (tele./webinar/f2f)
SG Systems• Key accomplishments
– Updated SharePoint– Electronic Balloting Process – Task Forces (next slides)
• Next steps– (Next Slides)
SG-Systems WGChair: Brent Hodges
Co Chair: Greg Robinson
Use Case Team Chair: Ralph Martinez Co-Chair: Kay Stefferud
Interoperability Testing Team Chair: Randy Lowe Co-Chair: Xiaofeng Wang
Service Definitions Team Chair: Jerry Gray Co-Chair: Shawn Hu
SRS Team Chair: Joe Zhou
Security Team Chair: Darren Highfill
AMI-Ent TFChair: Wayne Longcore
Co-Chair: Greg Robinson
OpenADE TFChair: Dave Mollerstuen
Co-Chair: Steve Van Ausdall
OpenADR TFChair: Albert Chiu Co-Chair: Ed Koch
OpenHAN TFChair: Erich Gunther
Co-Chair:
SG-Systems Task Forces & Service Teams
Planning
Underway
Underway
Underway
Underway With NAESB
CollaborationWith SE 2.0
CollaborationWith SE 2.0
& OASISPlanning
Planning
Underway With NAESB
Underway
CollaborationWith SE 2.0
& OASIS
CollaborationWith SE 2.0
& OASIS
CollaborationWith SE 2.0
CollaborationWith SE 2.0
SG Systems – AMI-Enterprise• Key accomplishments
– Industry Best Practice Approved:• Use Cases• System Requirements Specification (SRS)• Methodology• Services• Ready to submit to SDO (IEC TC57 WG14)
• Next steps• Participate in IEC61968-9 interoperability testing• Analyze and incorporate security requirements• Update and ballot next release
Service Definition Team• Key accomplishments
– Approval of the Service Definition Artifacts
• Next steps – Build the roadmap• Open a model for access/collaboration• Baseline the artifacts• Plan new work, e.g. OpenADE, sharing with WG14
SG Systems - OpenADE• Key accomplishments
– Agreement on 1.0 version of Use Case document
• Next steps– Work on SRS, service definitions– Reference / prototype implementations
• Next encounter data/time (tele./webinar/f2f)– Weekly meetings, every Thursday @noon Mtn.
SG-Systems - OpenHAN• Leadership
– Chair and co-chair – lead teleconferences• Chair – Mary Zientara (Reliant)• Co-chair – Steve Van Ausdall (Xtensible)• Co-chair – Charles (Google)• Co-chair – Charlie (GE)
• Define scope and charter• Use cases – common team
– Focused on format and capture• but still need content and selection for our purposes in OpenHAN
• Business level requirements – in OpenHAN?• Provide input to SEP 2.0 (and others as requested)• Analysis – update SRS requirements table• Conformance tasks• Security tasks
Use Case Development Accomplishments
Use Case # Use case description Note
4.2 Notify DR Event SD and Interaction - Completed
4.2.1 Advanced Notification for DR SD and Interaction - Completed
4.2.2 Update a DR Event SD and Interaction - Completed
4.2.3 Cancel a DR Event SD and Interaction - Completed
4.2.4 DR Resource Confirmation SD and Interaction - Completed
4.7 Direct Load Control SD and Interaction - Completed
4.7.1 Monitor DR Event SD and Interaction - Completed
DR Use Case Discussion Topics• 4.4 Broadcast “Pricing” (Retail) for DR Purpose – The
term pricing will change to more generic• Reference Architecture• DR acknowledgement and confirmation• Advanced Notification for DR• Adding testing use case• DR Resource Confirmation (DR Resource, Asset,
PHEV)• Direct Load Control – randomization, monitor
protocol
Next steps and next encounter date/time
• Next steps– Refine use cases developed– Provide draft use cases to sub-group leader (Joe) by Friday, October
21st
– Refine combined retail and wholesale use cases in the next two weeks– Finalized use case and framework document by first week of
November– Continue to work with NAESB, NIST and OASIS on SRS and Service
Definition• Next encounter date/time
– Every Thursday joint conference call with NAESB (12-2:00 central time)
– NAESB SGTF sub-group F2F meeting in New England
UtiliSec• Status:
– Suite of 4 deliverables completed in 2008• AMI Security Risk Assessment• AMI System Security Requirements (incorporates Architectural Description)• AMI Security Component Catalog• AMI Security Implementation Guide
– AMI System Security Requirements document ratified December, 2008 (“1.0”)
• Current Participation:– 200+ Subscribers to Listserv across 8 countries and 4 continents– More than a dozen major North American utilities actively engaged– Broad mix of utilities, vendors, government, and academia
Next Meeting• Host is Florida Power & Light• Juno Beach, FL• January 18-21, 2010
– Boot camps on January 18– Parallel sessions January 19-21