Date post: | 17-Jan-2016 |
Category: |
Documents |
Upload: | cathleen-whitehead |
View: | 212 times |
Download: | 0 times |
Opequon Targeted Opequon Targeted Watershed Watershed
Partner’s Meeting – Partner’s Meeting – BMPsBMPs
Cully Hession, Jim Lawrence, and Cully Hession, Jim Lawrence, and Andrea LudwigAndrea Ludwig
October 19, 2007October 19, 2007
Opequon Creek Basin - Opequon Creek Basin - BMPsBMPs
Cattle Fencing
Bioretention Basin
Constructed Floodplain Wetland
Water Quality Swale
Constructed Floodplain Wetland
Pocket Wetland
Hedgebrook Farm Hedgebrook Farm Constructed Floodplain Constructed Floodplain
WetlandWetland Development Development
upstreamupstream Cattle accessCattle access High stream banksHigh stream banks
Opequon Creek Floodplain
Wetland
Existing palustrine wetland
Hedgebrook Farm Hedgebrook Farm Constructed Floodplain Constructed Floodplain
WetlandWetland
Hedgebrook Farm Hedgebrook Farm Constructed Floodplain Constructed Floodplain
WetlandWetland
Constructed Floodplain Constructed Floodplain Wetland CostsWetland Costs
Planning and design costsPlanning and design costs Site visitationsSite visitations Engineering timeEngineering time
Construction costsConstruction costs $7K in groundwork$7K in groundwork Grooming and seeding Grooming and seeding
Fencing and planting costsFencing and planting costs DOF funding for wetland plantsDOF funding for wetland plants
Maintenance costsMaintenance costs Watering systemWatering system
Town Run Town Run Floodplain Floodplain WetlandWetland
Inlet flow path
Flow
Cedarmeade Pocket Cedarmeade Pocket WetlandWetland
Enhancement of stormwater drainage Enhancement of stormwater drainage areas to detain and treat runoffareas to detain and treat runoff
Stormwater flow route
ISCO samplers
Check dams
Grass Waterway
Shenandoah University Shenandoah University
Bioretention
Shenandoah University Shenandoah University (alternative)(alternative)
McCann Farm Cattle McCann Farm Cattle Fencing Fencing
SummarySummary
ProposedProposed 10 Wetlands10 Wetlands
6 floodplain6 floodplain 4 pocket4 pocket
10 WQ Swales10 WQ Swales 32,000’ fencing32,000’ fencing
Built or In ProcessBuilt or In Process 3 Wetlands3 Wetlands
2 floodplain2 floodplain 1 pocket1 pocket
1 WQ Swale 1 WQ Swale (planning)(planning)
NoneNone Add’lAdd’l
Bioretention Bioretention (planning)(planning)