Symptoms
Configuring HA fails
Completes on the HA master, but fails on all HA slaves
You see the error:
Operation Timed out
In the /var/log/fdm.log file, you see entries similar to:
[ClusterManagerImpl::ConnectToMaster] Couldn't connect to master N7Vmacore16TimeoutExceptionE(Operation timed out)[ClusterManagerImpl::AddBadIP] IP <x.x.x.x> marked bad for reason Unreachable IP[ClusterElection::ChangeState] SlaveConnecting => Startup : SlaveConnectingStateFunc[ClusterManagerImpl::IsBadIP] <x.x.x.x> is bad ip
Why it happens?
This issue occurs when Jumbo Frames is enabled
on the host Management Network (VMkernel port
used for host management) and a network
misconfiguration prevent hosts communicating
using jumbo frames. It is supported to use jumbo
frames on the Management Network as long as
the MTU values and physical network are set
correctly.
Resolution
To resolve this issue, ensure that the network supports jumbo frames end-to-end. This should be verified by the local networking team.
To check the current MTU values set on the vSwitch and VMkernel network interface:
• In the vSphere Client, right-click the host in the cluster and then click the Configuration tab.
• Click Networking.
• Click Properties for Management Network on vSwitch0.
• Under the Ports tab, click vSwitch and then click Edit. • Ensure that the MTU value is set to 9000 and not 1500 and then click OK.
• Repeat this process for the Management Network under the Ports tab, click Management Network and then click Edit.
• Ensure that the MTU value is set to 9000 and not 1500 and then click OK.
• Click OK.
• Repeat this process for all hosts in the cluster.