OPERATIONAL PERFORMANCE NOVEMBER’13. Tonnage - MT. COMMODITY-WISE LOADING – FOR THE MONTH OF NOV’13. Tonnage in Lakhs. COMMODITY-WISE REVENUE – FOR THE MONTH OF NOVEMBER’13. ` - Crores. Commodity wise Net Revenue Including OH. ` - Crores. - PowerPoint PPT Presentation
11
OPERATIONAL PERFORMANCE NOVEMBER’13 Month Carried Tonnage Monthly Traffic projection based on ATP Variation % (Over 2012 – 13) 2013-14 2012- 13 For Nov 0.40 0.48 0.45 -17% Cumula tive – till Nov 3.51 2.82 2.90 24% Tonnage - MT
Transcript
Page 1: OPERATIONAL PERFORMANCE  NOVEMBER’13

OPERATIONAL PERFORMANCE NOVEMBER’13

Month Carried Tonnage Monthly Traffic projection based

on ATP

Variation % (Over 2012 – 13)2013-14 2012-13

For Nov 0.40 0.48 0.45 -17%

Cumulative – till Nov

3.51 2.82 2.90 24%

Tonnage - MT

Page 2: OPERATIONAL PERFORMANCE  NOVEMBER’13

COMMODITY-WISE LOADING – FOR THE MONTH OF NOV’13

Particulars Carried Tonnage 2013-14

Carried Tonnage 2012-13

Variation Over

Commodity Nov’13 Apr’13 - Nov’13

Nov’12 Apr’12- Nov’12

Las t Yr Nov’12

Last Yr

Apr’12 - Nov’12

Iron Ore/ Export

Domestic

Total

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0%

0%

0%

0%

0%

0%

Cement 0.90 7.87 0.64 6.34 41% 24%

Fertilizer 0.56 5.36 0.75 4.25 -25% 26%

Food Grains 0.38 3.69 0.40 1.35 -4% 172%

LPG/POL 0.19 1.60 0.28 2.23 -31% -29%

Coal 1.71 14.60 2.60 13.30 -34% 10%

Gypsum 0.23 1.62 0.15 0.70 50% 132%

Iron/Lime Stone 0.00 0.04854 0.00 0.00 0% 0%

Cont 0.02692 0.3029 0.0268 0.0371 0% 716%

Total 4.00 35.09 4.84 28.21 -17% 24%

Tonnage in Lakhs

Page 3: OPERATIONAL PERFORMANCE  NOVEMBER’13

COMMODITY-WISE REVENUE – FOR THE MONTH OF NOVEMBER’13

Particulars Gross Revenue

2013-14

Gross Revenue

2012-13

Variation % Over

Commodity Nov’13 Apr’13- Nov’13

Nov’12 Apr’12- Nov’12

Las t Yr Nov’12

Last Yr

Apr’12 - Nov’12

Iron Ore/ Export

Domestic

Total

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0%

0%

0%

0%

0%

0%

Cement 2.71 22.32 1.82 17.23 49% 29%

Fertilizer 1.48 12.43 1.74 9.22 -15% 35%

Food Grains 0.82 7.28 0.83 2.60 -2% 180%

LPG/POL 0.76 5.90 1.05 7.80 -28% -24%

Coal 5.13 40.35 6.99 34.47 -27% 17%

Gypsum 0.72 4.66 0.43 1.87 67% 149%

Iron/Lime Stone 0.00 0.09076 0.00 0.00 0% 0%

Cont 0.0379 0.41 0.02 0.09 61% 347%

Total 11.64 93.43 12.88 73.29 -10% 27%

` - Crores

Page 4: OPERATIONAL PERFORMANCE  NOVEMBER’13

Commodity wise Net Revenue Including OH

Particular November 2013 November 2012 Net Rev

Commodity

Gross Reve

O&M Cost `. 153/T

* Net Reve

Gross Reve

O&M Cost `.145/T

Net Reve

Variation %

Iron Ore/ Export

Domestic0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0%

0%

Cement 2.71 1.39 1.32 1.82 0.93 0.89 48%

Fertilizer 1.48 0.86 0.62 1.74 1.08 0.66 -7%

Food Grains

0.82 0.59 0.23 0.83 0.58 0.25 -10%

LPG/POL 0.76 0.29 0.47 1.05 0.40 0.65 -28%

Coal 5.13 2.61 2.52 6.99 3.76 3.23 -22%

Gypsum 0.72 0.35 0.37 0.43 0.22 0.21 75%

Iron/Lime Stone

0.00 0.00 0.00 0.00 0.00 0.00 0%

Cont 0.03792 0.04000 -0.002 0.02 0.04 -0.02 87%

TOTAL 11.64 6.13 5.51 12.88 7.01 5.87 -6%

` - Crores

•Nov’13 -Net Revenue Includes Def OH of ` 100 Lakhs ,O&M Cost Inclusive of Def OH- ` 178/T•Nov’12 –Net Revenue Includes Def OH of ` 116 Lakhs,O&M Cost Inclusive of Def OH- ` 169/T

Page 5: OPERATIONAL PERFORMANCE  NOVEMBER’13

Commodity wise Gross & Net Revenue Including OH (Per Tonne)

Particular November 2013 November 2012 Net Rev

Commodity Gross Rev

O&M Cost /T

Net Rev

Gross Rev

O&M Cost /T

Net Rev Variation %

Iron Ore

Export

Domestic

0

0

0

0

0

0

0

0

0

0

0

0

0%

0%

Cement 299 153 146 283 145 138 6%

Fertilizer 263 153 110 234 145 89 24%

Food Grains 214 153 61 208 145 63 -3%

LPG/POL 396 153 243 377 145 232 5%

Coal 301 153 148 269 145 124 19%

Gypsum 311 153 158 279 145 134 18%

Iron/Lime Stone

0 0 0 0 0 0 0%

Cont 88 153 -65 88 145 -57 -14%

Amt - `

•Nov’13 - Net Revenue Includes Def OH of ` 25/T , O&M Cost Inclusive of Def OH - ` 178/T•Nov’12 – Net Revenue Includes Def OH of ` 24/T, O&M Cost Inclusive of Def OH - ` 169/T

Page 6: OPERATIONAL PERFORMANCE  NOVEMBER’13

Operating Ratio for the month of November 2013For Nov

2013To End of - Nov 2013

Gross Revenue 11.64 93.43

Total Income 11.64 93.43

Operating Expenses

O&M Costs (Inc of Def. OH) 7.79 66.96

Administrative Expenses 0.08 0.64

Depreciation 2.92 23.36

Total Expenses (i) 10.79 90.96

Operating Ratio (%) 93% 97%

Cost of Maintenance works (ii) 0.91 3.18

Total Expenses (I) + (II) 11.70 94.14

Operating Ratio (Cumulative) 100% 101%

Surplus/Deficit -0.06 -0.07

Surplus % -0.50% -0.76%

` - Crores

NOTE : In O&M costs, cost of fuel is calculated as per service & direction wise

Page 7: OPERATIONAL PERFORMANCE  NOVEMBER’13

COST OF FUEL (SERVICE WISE/ DIRECTION WISE) for November’13

Cost of Fuel From April ’13 – Nov’13 – 29.86 Cr

Particulars No of Wagons Cost of Fuel ` - Crores

Total ` - Crores

Wagon Type UP DN UP DN UP + DN

BCN Load 1217 1674 0.72 0.35 1.07

BOXN Load 2937 0 1.35 0 1.35

BTPG Load 477 0 0.26 0.00 0.26

BTPN Load 50 0 0.02 0.00 0.02

BLCA Load 40 45 0.02 0.01 0.03

BCNHL Ld 175 0 0.08 0.00 0.08

BOXN Empty 0 3411 0.00 0.22 0.22

BTPG Empty 0 541 0.00 0.11 0.11

BTPN Empty 0 512 0.00 0.08 0.08

BCN Empty 252 0 0.04 0.00 0.04

BRN Empty 0 40 0.00 0.01 0.01

Cost of Fuel of CLE + Other (UP+DN) 0.01

TOTAL 3.28

Cost of Lube Oil + Others 0.21

TOTAL 3.49

Page 8: OPERATIONAL PERFORMANCE  NOVEMBER’13

Line Capacity Utilization for the month of November’13 :

Direction Loaded Empties Total No of Trains

*CLE *Others Total

UP Trains 99 6 105 37

(55)

4

(8) 274Down Trains 42 86 128

141 92 233 37 4 274

Permissible Capacity : 340

Utilized : 274

Percentage of Utilization : 81%

Percentage of Utilization Loaded : 41%

Engine Hour Cost : 74 Lakhs

NOTE:

* Moved between SKLR-SBHR-SKLR

Page 9: OPERATIONAL PERFORMANCE  NOVEMBER’13

WAGON DAYS – NOVEMBER 2013

No of Days

TotalUP Down

Actual 2903 2572 5474

Abnormal Detention

419 29 449

Rate per Day in terms of 8 wheeler : ` 1038.80

Wagon Hire Charges (Actual) : ` 57 Lakhs

Wagon Hire Charges for Abnormal : ` 5 Lakhs

Detention (Avoidable)

*Abnormal Detention : Time taken for completing the journey > 15 Hrs

Page 10: OPERATIONAL PERFORMANCE  NOVEMBER’13

Details of Payments Received from Mysore Division after adjusting O&M Costs

Months Due Date Actual date of Receipt

Amount Rs - Cr

Prov. Pay Final Pay (Prov Pay)

April ’13 05.05.13 31.05.13 04.06.13 5.55

May ’13 05.06.13 30.06.13 29.06.13 5.51

June’13 05.07.13 30.07.13 01.08.13 7.40

July’13 05.08.13 30.08.13 31.08.13 4.75

Aug’13 05.09.13 30.09.13 03.10.13 4.46

Sept’13 05.10.13 31.10.13 05.11.13 3.04

Oct’13 05.11.13 30.11.13 30.11.13 3.60

Nov’13 05.12.13 31.12.13

Dec’13 05.01.14 31.01.14

Jan’14 05.02.14 28.02.14

Feb’14 05.03.14 31.03.14

Mar’14 05.04.14 30.04.14

Page 11: OPERATIONAL PERFORMANCE  NOVEMBER’13

Details of Payments made by HMRDC to SWR

Particulars For the month of Nov’13

To the End

(Crores)

Contractual payment for maintenance works (Provisional bill from --)

0.91 3.18


Recommended