OperationalisingOperationalising Safe Lifting PlansSafe Lifting Plans
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building LivesMoving People ,Building Lives
@ 2011 Huationg Holding. All Right Reserved
OperationalisingOperationalising Safe Lifting PlansSafe Lifting Plans
Presentation by Presentation by Mr. Jimmy ChuaMr. Jimmy ChuaMr. Jimmy ChuaMr. Jimmy ChuaMr. Jimmy ChuaMr. Jimmy ChuaMr. Jimmy ChuaMr. Jimmy ChuaGroup General Manager of Group General Manager of HuationgHuationg
ViceVice--Chairman of SCAChairman of SCA
CONTENTS
Introduction Importance of planning Importance of planning Why do Lifting Operations fail? COP: Safe Lifting Operation in Workplaces The Lifting Plan
Key Factors to Consider Sample of Lifting Plan
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Sample of Lifting Plan Conclusion
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Importance of Planning
Reduces the probability of unexpected incidents occurringincidents occurring
Useful reference for Safe Lifting Operation in the case of any doubts
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
What happens What happens when you do not plan?
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
do not plan?
Why do Lifting Operations fail?
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Soft Ground
Possibility of Crane Accident
Soft Ground Resting of
Outrigger on Covered area
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Weather Elements
Possibility of Crane Accident
Improper use of
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
by-pass system
Video
Poor Maintenance
Possibility of Crane Accident
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Possibility of Crane Accident
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Out Riggernot fully extended Boom hit flare line
Poor Planning Poor Communication
Possibility of Crane Accident
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
http://www.craneaccidents.com/2012/05/report/crane-overturns-in-singapore/
Possibility of Crane Accident
No Barricading Demarcation Demarcation Lifting Zone
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Recent Case of Crane Toppling
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
http://news.asiaone.com/news/singapore/crane-topples-over-sbf-center-worksite-tanjong-pagar
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Video
COP: Safe Lifting Operations in the Workplaces
1. Factors affecting Safe Lifting Operations1. Factors affecting Safe Lifting Operations2. Lifting Plan3. Equipment4. Personnel Roles and Responsibilities5. Emergency and Contingency planning
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
5. Emergency and Contingency planning
The Lifting Plan
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
The Lifting Plan is a set of plans developed for use in any crane lifting operation
Lifting Supervisor will take hold of the lifting plan but the lifting team should be familiar with the Lifting Plan and ensure that the lifting operation is carried out according to plan
Any party who has the expertise and relevant knowledge can create the lifting plan. After which, both the occupier and the contractor have to agree upon the document
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Developing the Lifting Plan
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Key Factors to be Considered
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
1. Site Surrounding Conditions
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Environmental factors Environmental factors Location/Site Hazards Lighting Conditions Demarcation
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Generic Environmental Hazards to be Considered:
Indoors/Outdoors Indoors/Outdoors Suitability of lighting (Day/Night) Noise Weather conditions: Rain, Haze, Bright Sunlight,
Strong Winds, Thunderstorms, Lightning Ground stability
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Location
Mass Rapid Transit system (MRT) Public areas Public areas Build-up areas Near water bodies Overhead Restriction Underground Services
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Underground Services
Site Hazards
Access / Egress around lifting equipment clearly identified
Working at Heights Ground Stability and level Restricted area to establish outrigger supports
(mobile cranes) Blind spots during maneuvering of load and lifting
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Blind spots during maneuvering of load and lifting equipment.
Demarcation / Barrication
Area of maneuverability; when using equipment.
Area of maneuverability; when using equipment.
Lifting Zone Working within a confined space or tunnel Other activities on the work site
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
2. LOAD
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Description of Load to be Lifted Description of Load to be Lifted Details of Load to be Lifted
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Load Crucial Information
No load must be lifted without the following crucial information:
the load weight the load weight the overall dimensions (length, width and depth). indication of the position of centre of gravity. the lifting/slinging points the pickup radius the final location radius the height to which the load has to be lifted.
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
the height to which the load has to be lifted. the overall weight (load + all lifting accessories)
3. Risk Assessments
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
4. Lifting Equipment/ Gears
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Using the previously gathered information in conjunction with
Lifting Equipments / Gear
Using the previously gathered information in conjunction with crane manufactures duty charts it will allow the selection of a crane that is suitable with sufficient capacity to safely execute the lifting operation.
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Details of the Lifting EquipmentDetails of the preferred Lifting equipment(s) to be used must be recorded within the Method Statement and must include: Make and model; Capacity Validation of Certification Maximum ground bearing capacity Configuration Weight of the crane
Details of the Lifting Gears Capacity
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Capacity Validation of Certification Types (Shackles, Wire Rope, Belt etc)
5. Communications
Pre-Lift BriefingPre-Lift BriefingToolbox/DiscussionEquipmentCommunication methods
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
6. Roles and Responsibilities
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Factory Owners Factory Owners Contractors Authorized Examiner Lifting Team
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Lifting Team
Lifting SupervisorLifting Supervisor Crane OperatorCrane Operator
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
RiggerRigger Signal ManSignal Man
Lifting Supervisor
Nominated by the appointed person and appointed in writingand appointed in writing
In charge of actively supervising the lifting operation
Responsible for planning lifting operations in accordance to the Lifting Plan
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Lifting Plan
Roles and Responsibilities: Ensure that only registered personnel participate in any lifting operation Ensure lift operation is conducted in a safe manner Brief all personnel on the safe lifting procedures If any unsatisfactory incidents are reported to him, take measures to
rectify them Monitor equipment maintenance and inspection Check on the set up of equipment and ensure that equipment are
properly set up before lifting operation commences
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Roles and Responsibilities: To be responsible for the lifting job carried out by him Do daily crane inspection prior to the lifting operation and to report
any findings
Crane Operator
any findings Record daily operation log Ensure cranes are properly set up before lifting operation commences To adhere to instructions given by Lifting Supervisor Check and ensure that the load is correctly secured, rigged and sling
before lifting Check the clearance of the path to be taken by the load and any part
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Check the clearance of the path to be taken by the load and any part of the crane
Report any accident/incident/dangerous occurrence and unsafe act/conditions
Rigger & SignalmanRoles and Responsibilities: Ensure lifting operation is not undertaken without suitable
and sufficient appropriate risk assessment and that lifting equipment is not used without prior training and appropriate equipment is not used without prior training and appropriate supervision
Carry out pre-use checks of lifting equipment, to ensure equipment is in good working condition
Report any damages to the equipment or any accident/incident/dangerous occurrence and unsafe act/conditions to the Lifting Supervisor as soon as is reasonably practicable
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
reasonably practicable Ensure proper set up of equipment before lifting operation
commences
7. Classifications of Lift
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
1. Routine Lift
Lifting operations may be executed under a basic lift plan. These plans must clearly define the lift plan. These plans must clearly define the limitations on the loads, lifting methods and areas of operation. A Risk Assessment will be required in each case, and authorized prior to commencement. A Non-Routine may also be completed using similar documents but will require greater detail. Prior to any lifting operation commencing, a review of the lift plan
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
will be conducted.
A Routine Lift is a lift which conforms to the following factors: Within the normal operating parameters of the crane Lifting over non-sensitive areas Suitable environmental conditions Load has known and evaluated weight, shape and centre of gravity Standard rigging arrangements Routine repetitive lifting operations using the same equipment Single function or series of functions repeated manually or automatically Order of function repeated Same equipment Same competent Crane Operators Load under 75% of rated load of the load chart Centre of gravity below the lifting hook Use of a certified lifting point Single lifting machine
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Single lifting machine Unlikely to be affected by changing environmental conditions Standard rigging arrangements Suitable lay-down area available
2. Non9Routine Lift
All remaining categories which fall under Non-Routine will require a more detailed Lifting Plan Routine will require a more detailed Lifting Plan containing all of the elements as described above. The plan will have to be approved by a Responsible Person prior to commencement of any Lifting Operation and any deviation requirement identified from the plan, must also get the approval of the Responsible Person prior to commencement of the lifting operation.
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
commencement of the lifting operation.
Conforms to the following factors: Use of two or more Lifting Appliances, Tandem Lift With sensitive, difficult or restricted areas Lifts from one offshore vessel to another Lifts from one offshore vessel to another Continuation of a lifting operation with different people Lifting of machinery without lifting points In environmental conditions likely to affect equipment performance Load with unknown/difficult to estimate weight and/or centre of
gravity Non-standard rigging arrangements
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Load lowered into or lifted from a confined space Weight of load in excess of 75% rated load of the load chart
SAMPLE LIFTING PLAN
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
PLAN
LIFTING PLANLIFTING PLANLoad Chart
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Load ChartLIFTING PLANLIFTING PLAN
Maximum Radius Corresponding SWL
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
LIFTING PLANLIFTING PLAN
Details of Lifting Plan
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
LIFTING PLAN SAMPLELIFTING PLAN SAMPLE
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
LIFTING PLAN SAMPLELIFTING PLAN SAMPLE
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
LIFTING PLAN SAMPLELIFTING PLAN SAMPLE
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
LIFTING PLAN SAMPLELIFTING PLAN SAMPLE
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
LIFTING PLAN SAMPLELIFTING PLAN SAMPLEOutrigger force at different swing location with load
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
LIFTING PLAN SAMPLELIFTING PLAN SAMPLE
Maximum Outrigger forceMaximum Outrigger force
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
LIFTING PLAN SAMPLELIFTING PLAN SAMPLECalculation for Ground Bearing Capacity
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
*On Site soil bearing
Conclusion A proper planned operation reduces the risks of crane-related
accidents and minimizes costs Make sure all lifting operations are planned according to the lifting Make sure all lifting operations are planned according to the lifting
plan and make sure lifting operations do not deviate from lifting plan Stop all lift operations if there is deviation Safety is the most important aspect
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives
Thank youThank youThank youThank you