• Kees Brinkman: ManagingDirector MechanicalEngineerworkingintheenergyfieldfor20+years EMANZAccreditedEnergyAuditor
• Enercon is an Energy and Utility Consultancy BasedinChristchurch Sixstaff,alldegreedengineers
3/24
DURING THIS PRESENTATION…
1. Why focus on reducing energy and carbon emissions?
2. Energy Management
3. Potential benefits of an Energy Audit Whatarethepotentialsavings? Ourexperiencewithcommercialandindustrialclients
4/24
1. Why Focus on Energy and Carbon Emissions?
5/24
REASONS TO FOCUS ON ENERGY?
• The economics are attractive! Energypricesareincreasingallthetime Anyreductioninenergycostdirectlyimpactsonthebottomline
• Once an Energy Audit is implemented, the cost of the audit is typically paid back in less than 100 days!
6/24
INCREASING ENERGY PRICES
7/24
REDUCING CARBON EMMISSIONS
• Reasons to reduce carbon emissions: EmissionsTradingSchemeleadstoincreasedcosts Combatsglobalwarming
• Ways to significantly reduce carbon emissions: Improveenergyefficiency(mostcommonandeconomicallyattractive)
Switchtorenewablefuels/suppliers
8/24
ENERGY MANAGEMENT SERVICES AVALIABLE TO IMPROVE THE BOTTOM LINE
• Main Services ScopingandFeasibilityStudies EnergyAudits TariffAnalysisandTendering MonitoringandTargetingSystems
9/24
FURTHERMORE…
• Additional Services GreenhouseGasAssessments FuelSwitchingFeasibilityStudies OngoingEnergyManagement AuditImplementationandProjectManagement ConceptDesignReviews DemandSideManagementAnalysis CogenerationSystemAnalysis
10/24
3. Energy Management
0
50
100
150
200
250
300
350
-
50,000
100,000
150,000
200,000
250,000
Degr
ee D
ays
Heat
ing
(bas
e 20�C
)
Mon
thly
Con
sum
ptio
n (k
Wh)
Energy Consumption and Degree Days
Gasconsumption Electricityconsumption DDH
11/24
WHERE TO START…
• Energy Audit Scoping Study Reviewtheconsumptionofallsitesandoperations Benchmarkthefigurestodeterminethemostefficientpath IdentifysitesinneedofLevel2EnergyAudit
-
50
100
150
200
250
300
350
400
450
500
Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Site 7 Site 8 Site 9 Site 10 Site 11 Site 12 Site 13 Site 14
Nor
mal
ised
Con
sum
ption
(kW
h/m
2)
Normalised Energy Consumption Across Sites
Coal & Wood Gas LPG Diesel Electricity
12/24
LEVEL 2 ENERGY AUDIT – PROCESS
1. Energy Use Analysis Calculatehistoricenergyuseandreviewbills Determinewhere/whenenergyisconsumed Findtargetareasforenergyreduction
Lighting25.4%
Downtown Chiller5.6%
Downtown Electric Boilers10.8%
Fans4.8%
Domestic Hot Water7.5%
Miscellanious6.7%
Electric Heating26.3%
Pumping4.6%
Office Equipment8.3%
Electricity Split by Equipment Type
Total Consumption: 3,571,600 kWh/yearTotal Cost: $452,700/ year
13/24
LEVEL 2 ENERGY AUDIT – PROCESS
2. Site Visit Kick-offmeeting Day-timeinspections,includingmeteringwhereappropriate Afterhoursinspections Closuremeeting
14/24
LEVEL 2 ENERGY AUDIT – PROCESS
3. Technical Analysis Performanenergysplittodeterminewhereenergyisused CalculatesavingsfromEnergyManagementOpportunities Contactcontractorstoobtaincapitalcosts
EMO Action Capital Cost
Annual savings
Simple Payback
1.1 ReducethesiteCapacityCharges Low $6,700 Immediate
1.4 ImproveCoolingTowercontrols $9,000 $15,900 0.5years
1.7 Turnoffequipmentatnight Education $1,400 Immediate
6.1a Installlightingcontrols-T1 $2,500 $4,800 0.5years
$11,500 $28,800 0.4 yearsTotal – T1
15/24
LEVEL 2 ENERGY AUDIT – PROCESS
4. Draft report Clienthasopportunitytoreview
5. Review Meeting
6. Final Report
16/24
THE NEXT STEP…
• Monitoring and Targeting Monthlyreviewenergyconsumptionandbillsforeachsite Compareconsumptionandcostagainstpredicted Makerecommendationstowardschangesneeded
• Perform Tariff Reviews Ensurethemostcosteffectivetariffisutilised
17/24
4. Potential Benefits…
18/24
ENERGY AUDIT POTENTIAL SAVINGS…
•Opportunities; less than one year payback Typically2–10%energysavings
•Opportunities; between one and three year payback
Typically2–10+%energysavings
•Opportunities; greater than three years Dependsontheprocess Arestillinvestigateddespitethelongpayback Mayhaveproductionadvantages
19/24
CASE STUDY – Large MDF Plant
• Total Identified Savings $1.4millionenergysavingsannually 0.5yearaveragesimplepayback Reducedannualcarbonemissionsof2,000tonnes(11%)
20/24
CASE STUDY – Office Building
• Total Identified Savings 13.2%energysavingsannually 2.8yearaveragesimplepayback
• Major Opportunities Found ImproveAHUcontrolandlightingefficiency
21/24
CASE STUDY – Canterbury Museum
• Kelvin Nolly Couldnotbeheretoday
• Total Identified Savings $79,000energysavingsannually(36.9%) $2,500implementationcost
22/24
CASE STUDY – Canterbury Museum
• Opportunities OptimisingtheelectricitydemandcontrolsontheBMS Reducingfreshairbeingsuppliedtospaceswhennotrequired Switchingoffplantatnight FixingthehumiditycontrolsforAHU9
Lighting26%
Miscellaneous4%
UnderFloorHeating6%
ElectricHeating(AHUs)42%
Fans&Pumps13%
Cooling6%
Humidifiers3%
Canterbury Museum - Energy Split
Consumption:1,840,000kWh/yrCost:$188,000/yr
23/24
CASE STUDY – Canterbury Museum
• Daily Load Profile1.Underfloorheating2.Officeloads3.Spaceheating4.Baseload5.Daylighting
0
50
100
150
200
250
300
350
400
0:00:00
2:00:00
4:00:00
6:00:00
8:00:00
10:00:00
12:00:00
14:00:00
16:00:00
18:00:00
20:00:00
22:00:00
Elec
tric
ity D
eman
d (k
VA)
Canterbury Museum - Average Daily Electricity Demand Profile
WinterWeekDays SummerWeekDays WinterWeekends SummerWeekends
1
4
2
3
5
24/24
CASE STUDY – Canterbury Museum
• Optimising BMS electricity demand controls Saved$34,000 BMSloadshedHVACsystemstoavoidControlPerioddemandcharges
AnotherprogramwasinstalledtoavoidspotpriceswhichconflictedcausinglargeNetworkCharges
Solvedbyprioritisingprogramsoravoidingspotmarket