10
ferroli Boiler Replacement Optimax 25C- Modena HE
Transcript
Page 1: Optimax 25C- Modena HE - FERROLI · BOILER REPLACEMENT: OPTIMAX 25C TO MODENA 32C HE 4. Disconnect and remove the flue from the existing boiler by undoing the four screws securing

ferroli

Boiler Replacement

Optimax 25C- Modena HE

Page 2: Optimax 25C- Modena HE - FERROLI · BOILER REPLACEMENT: OPTIMAX 25C TO MODENA 32C HE 4. Disconnect and remove the flue from the existing boiler by undoing the four screws securing

BOILER REPLACEMENT: OPTIMAX 25C TO MODENA 32C HE

The Installation must comply with the following;

Gas Safety (Installation & Use)Regulations

The Building Regulations

The Building Regulations (Scotland)

Building Regulations (Northern Ireland)

The Water Fittings Regulations or WaterByelaws in Scotland

The Current I.E.E. Wiring Regulations-------------------------------------------------------

BS 5440: Part 1 - Flues.

BS 5440: Part 2 - Ventilation.

BS 6798 - Installation of gas fired hotwater boilers

BS 7671: - Electrical wiring

BS 6891 - Gas Installation

BS 5546 - Installation of hot watersupplies for domestic purposes.

BS 5449 - Forced circulation hot watersystems

BS 7074 - Expansion vessels / sealedsystems

BS 7593 - Treatment of water in domesticcentral heating systems.

Introduction

The new Ferroli Modena 32C HE high efficiency condensing combination boiler is an ideal

replacement for the earlier Ferroli Optimax 25C.

The Ferroli Modena 32C HE is smaller, weighs less, has built-in frost protection and an IP protection

rating of IPX5D. This allows direct replacement wherever the existing boiler is legitimately installed

(i.e. Kitchen, Garage, Bathroom, etc.)

Although the actual position of the pipe-work connections differ slightly, the configuration remains

the same, thereby requiring only limited pipe-work alteration.

The electrical connection remains the same, i.e. all models supplied with a factory fitted three core fly - lead to provide a permanent live connection and all models use the same volt free contacts for any external system controls.

The flue connection the Optimax 25 C is to the right of centre but providing that there is a minimum clearance of 35mm to the right of the existing boiler, no alteration to the existing flue position is necessary.

-----------------------------------------------------------------------------------------------------------------------------

Please note:

This guide refers to the fitting of a replacement boiler with a standard horizontal flue application only (minor adjustments may be necessary for other flue applications – refer to boiler installation instructions)

The work procedures described in this document must

be completed strictly in accordance with the

manufacturer’s installation instructions, current

regulations and relevant standards, and only by

competent person/persons as stated in the Gas Safety

(Installation & Use) Regulations.

Prior to fitting the replacement boiler the entire system

must be thoroughly cleansed and flushed in accordance

with Building Regulations L1A/L1B & BS 7593.

Page 3: Optimax 25C- Modena HE - FERROLI · BOILER REPLACEMENT: OPTIMAX 25C TO MODENA 32C HE 4. Disconnect and remove the flue from the existing boiler by undoing the four screws securing

BOILER REPLACEMENT: OPTIMAX 25C TO MODENA 32C HE

Fig.1

Fig.2

Fig.3

Manual Handling

When lifting take suitable safety precautions: keep your back straight, bend knees, do not turn your

body, avoid bending forward or sideways and keep the load as close as possible to your body. Ideally

seek assistance in lifting the boiler.

If possible, use a trolley or other suitable means to carry the boiler to site. Use appropriate

protective clothing and gloves to avoid injury from any sharp edges etc.

REMOVING THE EXISTING OPTIMAX 25C

1. Remove the outer case by undoing the

two case securing screws (A) on the

underside of the boiler. Lower the ‘drop

down controls cover panel’ (B) to clear

the controls facia, ease the bottom of

outer case forward and lift off the

retaining lugs (Fig.1)

2. Safely isolate the electricity, gas and

water supplies to the appliance.

Completely drain the boiler and central

heating system and disconnect all existing

pipe-work connections from the

underside of the boiler (Fig.2)

3. Disconnect the electrical supply to the

boiler at the 3 pin plug or fused spur.

Undo the securing screw on the

underside of the boiler and remove the

cover to access the terminal block.

Disconnect the mains electrical supply

lead and any external controls

connections at the terminal block (Fig.3)

Fig.3

Page 4: Optimax 25C- Modena HE - FERROLI · BOILER REPLACEMENT: OPTIMAX 25C TO MODENA 32C HE 4. Disconnect and remove the flue from the existing boiler by undoing the four screws securing

BOILER REPLACEMENT: OPTIMAX 25C TO MODENA 32C HE 4. Disconnect and remove the flue from the existing boiler by

undoing the four screws securing the appliance bend to the top

of the boiler (Fig.4)

5. Ensure that all pipe connections are free, move

the base of the boiler forward and lift the boiler

off the hanging bracket tabs and unscrew the

hanging bracket from the wall. (Fig.5)

6. Finally, check that the wall surface is sound, flat and capable of supporting the weight of the

boiler. Make any necessary repairs before installing the new boiler.

7. It is suggested that where possible the existing pipe-work is cut back approximately 200mm - 300mm for ease of connecting the existing pipe-work to the new valves (Fig. 6)

If a stand-off bracket has been used and the pipe-work runs behind the boiler, then a new stand-off bracket will need to be fitted and pipes extended to the new valve positions (see below; paragraph 3-Fig.5)

Fig.4

Fig.6

Page 5: Optimax 25C- Modena HE - FERROLI · BOILER REPLACEMENT: OPTIMAX 25C TO MODENA 32C HE 4. Disconnect and remove the flue from the existing boiler by undoing the four screws securing

BOILER REPLACEMENT: OPTIMAX 25C TO MODENA 32C HE

Boiler Pack Contents

INSTALLING THE NEW MODENA C HE

Modena 32C HE Dimensions

1. Check the existing flue terminal position

with regard to possible nuisance “pluming”.

2. Unpack the boiler and check the contents are complete and undamaged (see opposite)

Please note: The new flue kit is sold separately

3. Align the fixing template on the wall with

the existing flue hole, ensuring it is level both horizontally and vertically. Check for required minimum clearances then mark the most suitable fixing points for the hanging bracket. It is advisable to mark the position of the gas, water and heating pipes at this point (Fig.5)

4. Drill the wall and fix the hanging bracket

using the wall plugs and fixings provided. Make sure the bracket is level before tightening the fixing screws

1 x Modena C HE Boiler

1 x Installation Instructions

1 x Hanging Bracket

1 x Filling Loop

1 x Valve Pack

1 x Condensate Bowl/Hose

1 x Paper Template

Fig.5

Page 6: Optimax 25C- Modena HE - FERROLI · BOILER REPLACEMENT: OPTIMAX 25C TO MODENA 32C HE 4. Disconnect and remove the flue from the existing boiler by undoing the four screws securing

BOILER REPLACEMENT: OPTIMAX 25C TO MODENA 32C HE

Fig.6

5. Lay the boiler on its back. Remove the front casing panel by undoing the two securing screws on the underside of the case. Ease the lower edge of the panel forward to clear the controls display and lift upwards off the frame.

6. Lift the boiler onto the hanging bracket making

sure the lugs on the bracket locate correctly with

the two support brackets on the boiler frame (Fig. 6)

FOR STANDARD HORIZONTAL TELESCOPIC FLUE INSTALLATIONS

UNPACK THE NEW TELESCOPIC FLUE KIT: CODE - 041049G0

7. Remove the protective adhesive cover from the top of the boiler to expose the flue/fixing holes. Secure the new appliance flue bend to the top of the boiler using the screws and gasket provided

8. Level

8. From the outside, push the flue terminal length through the existing hole in the building fabric and align with the appliance bend. Lubricate the seal with a suitable silicone grease and push the flue pipe fully into the into the appliance bend.

Ensure the flue terminal is fitted level.

Page 7: Optimax 25C- Modena HE - FERROLI · BOILER REPLACEMENT: OPTIMAX 25C TO MODENA 32C HE 4. Disconnect and remove the flue from the existing boiler by undoing the four screws securing

BOILER REPLACEMENT: OPTIMAX 25C TO MODENA 32C HE

9. Remove the condensate bowl and hose from theboiler fittings pack. Undo plastic nut (Fig.9-A) and fitthe condensate bowl and washer. Push on therubber condensate hose to the trap outlet (Fig.9-B).

10. Connect the safety valve outlet (Fig.9-C) to theexisting 15mm discharge pipe and then connect theexisting condensate pipe to the rubber hose outlet.Check that both terminate in accordance with – BS6798.

Take care not to interfere with the new routes for gas, water and heating pipe connections

11. Fit the valve kit to the connections on theunderside of the boiler using the washersprovided (Fig 10) and reconnect to the existingpipe-work.

12. Connect the temporary filling loop betweenthe cold water inlet and the C H return pipeas close to the boiler as is practical (Fig.11)Open the CH isolation valves; fill and ventthe system and flush using a commissioningcleanser. During final filling add a suitablecorrosion inhibitor as per BS 7593.

Check for leaks

A CH FLOW B HOT WATER OUTLET C GAS D COLD WATER INLET F CH RETURN

Fig 10

Fig.9

A B C

Condensate bowl,

washer and rubber

hose connection

Fig.11

CH HW GAS COLD CH

FLOW OUTLET WATER RETURN

Temporary filling

loop between

cold inlet &

heating return

Page 8: Optimax 25C- Modena HE - FERROLI · BOILER REPLACEMENT: OPTIMAX 25C TO MODENA 32C HE 4. Disconnect and remove the flue from the existing boiler by undoing the four screws securing

BOILER REPLACEMENT: OPTIMAX 25C TO MODENA 32C HE

13. Open the cold water isolation valve and thoroughly flush the cold/hot water pipe-work byopening all the hot taps.

14. Reinstate the gas supply, purge and test in accordance with BS 6891 and IGE/UP/1.

15. Connect the boiler to the electrical supply;the boiler is provided with a 1m cable andplug. Reconnect any external controls tothe volt free terminal block in the boiler.

To access the connections remove the securing screw and hinge the controls cover to the left. Connect the external controls to terminal block (72) as shown in Fig. 12.

Grommets to accept wiring from external controls are found on the right underside of the boiler.

Please note:

All electrical work must be in accordance with IEE Wiring Regulations - BS 7671:

External controls need to be compliant with Building Regulations L1A/L1B; further information is available from the “Domestic Building Services Compliance Guide”

Fig.12

Page 9: Optimax 25C- Modena HE - FERROLI · BOILER REPLACEMENT: OPTIMAX 25C TO MODENA 32C HE 4. Disconnect and remove the flue from the existing boiler by undoing the four screws securing

BOILER REPLACEMENT: OPTIMAX 25C TO MODENA 32C HE

Fig.13

Fig.14

Fig. 15

Sample points: 1 = Air / 2 = Flue Gas

16. Commissioning the boiler:(see 3.3 of the Modena C HE Installation Instructions)

Connect a manometer to the inlet test point of the gas valve (Fig.13)

Set the boiler to operate at maximum by selecting ‘TEST MODE’ and check that the operational (working) pressure at the gas inlet pressure test point is 20 mbar. To enter and exit ‘TEST MODE’, press the CH + & - buttons simultaneously for 5 seconds (Fig.14)

A pressure of 20 mbar should be obtained with all other gas appliances operating.

Please note: there may be a pressure loss across the isolation valve to the gas valve inlet test point of up to 1.3 mbar at maximum.

Remove the manometer & re-tighten the inlet test point.

17. Measure the gas rate of the boiler and check against thefollowing table;

18. Connect the flue gas analyser to the flue sample point(Fig.15); with the boiler still in TEST MODE check that thereadings are within the tolerances set out in the tablebelow;

If the readings are satisfactory, replace the boiler front cover.

Test the correct operation of the boiler, central heating system and DHW.

Advise the customer on the operation of the new boiler and any new controls.

Complete the “Benchmark Log Book

Page 10: Optimax 25C- Modena HE - FERROLI · BOILER REPLACEMENT: OPTIMAX 25C TO MODENA 32C HE 4. Disconnect and remove the flue from the existing boiler by undoing the four screws securing

ferroli

Ferroli Limited

Lichfield Road

Branston Industrial

Estate Burton on Trent

DE14 3HD

www.ferroli.co.uk

Boiler replacement

Calls to the above numbers are charged at national rate from BT landlines. Calls from mobile networks may be considerably more.Whilst every effort is taken to ensure the accuracy of the information contained within the brochure, the details are offered in good faith and Ferroli Ltd. accepts no liability for matters arising as a result of errors and/or omissions. The information in this brochure was correct at the time of printing, however specifications and designs may be changed owing to Ferroli’s policy of continuous product research and development. The technical specifications in the product instruction manual supersedes and should always be referred to during installation and maintenance. Reproduction of this publication, or any part, is not permitted without the written consent of Ferroli Ltd at [email protected]. The statutory rights of the consumer are not affected.

CONTACT US IN THE UK

SALES 0843 479 [email protected]

SERVICE AND TECHNICAL 0843 479 0479 [email protected]@ferroli.co.ukGENERAL ENQUIRIES

0843 479 0009 [email protected]

TWITTERtwitter.com/ferroliuk

Training Well trained installers are the key to a safe and efficient heating system. We offer a choice of training and product awareness courses on our key product range, including the Modena HE, at Ferroli’s fully equipped training centre in Burton-upon-Trent and at specialist training locations across the UK. Courses are aimed at engineers of all levels to ensure that everyone comes away with the skills and knowledge needed to deliver the first class service that customers expect and deserve. For more details visit www.ferroli.co.uk/training or ring 0843 479 0009.

Ferroli Domestic Boilers Offering gas wall mounted units with outputs of up to 50kW, Ferroli’s stylish, compact domestic boilers provide maximum comfort with minimal fuel usage. With a choice of conventional, condensing and combi technologies, there’s a boiler to match the heating and hot water requirements of every home.

Ferroli Commercial and Industrial Boilers Ferroli commercial boilers for pressure jet oil, forced air gas or dual fuel are factory matched with high efficiency burners to provide outputs of up to 12,350kW, whilst meeting the strictest emissions demands.

Ferroli Spares The popularity of Ferroli as first choice for both domestic and commercial installations means that heating parts stockists offer readily available spares for Ferroli boilers. Ferroli has a UK-based fully stocked warehouse enabling same-day despatch of just about any part needed to keep your Ferroli boiler running.

Optimax 25C-Modena HE


Recommended