Optimizing the "Crunch" process Per Svedensten
Transcript
Page 1: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Optimizing the "Crunch" process Per Svedensten

Page 2: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� Methods to combine and simulate technical and economic performance

� Optimum crushing plant performance is difficult to achieve due the process characteristics. Different compared to all other industrial processes.

� Optimizing method for best performance

� Partly implemented in PlantDesigner 10

Optimizing the Process

Page 3: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Value adding chain

Drilling Blasting Loading and Hauling Primary Crushing Crushing and Screening

Page 4: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� Crushing stage� Crushing plant� Quarry process

� Today:� Optimizing a crusher� Optimize the feed� Optimize the process

Point of interestCrushing Plant Optimization

Page 5: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� Cone Crusher Optimization� Case Study: Optimal Blasting for Crushing Plant Performance� Crushing Plant Design� Case Study: Optimizing a Crushing and Screening Process

Agenda

Page 6: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� The crushers are the last size reduction stage in the value chain.

� Over crushing is common.

� The connection between crusher setting and yield is often unknown

� The rock cannot be repaired.

� We need to control the crusher carefully.

Optimization of a Final Crushing Stage

Page 7: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� Optimization of one parameter (CSS) can be done by sampling and analysis

� The invested time and lost production will quickly be repaid by increased productivity

� Combine product yield and economic aspects

� This can be done by taking samples and making the analysis in MS Excel

Optimization of a Final Crushing Stage Planning Sampling Analysis Optimization

Page 8: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� Material from crusher is sampled

� Measure the capacity at each crusher settings. CSS will effect the final product capacity, especially in a closed circuit.

� Production of 4 valuable products•2-4 mm

•4-8 mm•8-16 mm

•16-22 mm

� By-product with no value•0-2 mm

Run the crusher at different settings

Optimization of a Final Crushing StagePlanning Sampling Analysis Optimization

Page 9: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Planning Sampling Analysis Optimization

� Run the crusher at different settings

� Take at least one sample at each setting. (Multiple samples are often useful)

� Special Attention to Safety when taking samples!!

� Position of point were samples are taking.

� Ensure that the conveyor will not start by accident.

Optimization of a Final Crushing Stage

Page 10: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Planning Sampling Analysis Optimization

� Particle Size Distribution Plots

� If taking single samples on each CSS the risk of getting inconsistent results might make the graph look strange.

� Impossible to determine optimum setting by only using particle size distribution graphs

Optimization of a Final Crushing Stage

0

10

20

30

40

50

60

70

80

90

100

0.1 1 10 100

Pa

ssin

g [

%]

Sieve Size [mm]

Particle Size Distribution at different CSS

13 mm

14 mm

15 mm

16 mm

17 mm

18 mm

19 mm

20 mm

21 mm

22 mm

23 mm

24 mm

Page 11: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Planning Sampling Analysis Optimization

� Impossible to determine optimum setting by only using particle size distribution graphs

Optimization of a Final Crushing Stage

0

50

100

150

200

250

10 12 14 16 18 20 22 24

Ca

pa

city

[tp

h]

CSS [mm]

Crusher Capasity

Page 12: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

0

10

20

30

40

50

60

70

80

90

100

0.1 1 10 100

Pas

sing

[%]

sieve size [mm]

Particle Size Distribution

20…

� Combine the particle size distribution and capacity.

� Percentage of final product times the capacity gives the production capacity of each product.

� Example 2-4 mm at CSS 20mm:• Percentage of crusher production: 20% - 11% = 9%

• Crusher capacity 193 tph

• Total Production: 193 tph x 9% = 17 tph

Optimization of a Final Crushing StagePlanning Sampling Analysis Optimization

0

50

100

150

200

250

10 12 14 16 18 20 22 24 26

Ca

pa

city

[tp

h]

CSS [mm]

Crusher Capasity

Page 13: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Planning Sampling Analysis Optimization

� Entering all the values into MS Excel makes this easy to get production capacities.

� Still difficult to determine the optimal setting

Optimization of a Final Crushing Stage

0

10

20

30

40

50

60

70

80

10 15 20 25

Pro

du

ct c

ap

aci

ty [

tph

]

CSS [mm]

Crusher Production

0-2 mm

2-4 mm

4-8 mm

8-16 mm

16-22 mm

Page 14: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

0

200

400

600

800

1000

1200

1400

1600

1800

15 17 19 21 23 25

Inco

me

[€]

CSS [mm]

Crusher Yield

0-2 mm

2-4 mm

4-8 mm

8-16 mm

� Use the price* per ton for all products:

•0-2 mm: € 0 (by-product)•2-4 mm: € 8.90•4-8 mm: € 10.00•8-16 mm: € 12.20•16-22 mm: € 7.80

� Make an income graph by combining prices with capacity

Optimization of a Final Crushing StagePlanning Sampling Analysis Optimization

*All prices are estimates based on publicly available data

Page 15: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

0

200

400

600

800

1000

1200

1400

1600

1800

15 17 19 21 23 25

Inco

me

[€]

CSS [mm]

Crusher Yield

0-2 mm

2-4 mm

4-8 mm

8-16 mm

� What difference does it make?

� Running the crusher 2 mm off:•Decrease the profit by 43€/h•Running the crusher at 1600 hours per year: 43*1600=68800 €

Optimization of a Final Crushing StagePlanning Sampling Analysis Optimization

1550

1560

1570

1580

1590

1600

1610

1620

1630

1640

1650

15 17 19 21 23 25

Inco

me

[€]

CSS [mm]

Crusher Yield

Income

Page 16: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Crusher Performance MapPlanning Sampling Analysis Optimization

0

10

20

30

40

50

60

70

80

10 15 20 25

Pro

du

ct c

ap

aci

ty [

tph

]

CSS [mm]

Crusher Production

0-2 mm

2-4 mm

4-8 mm

8-16 mm

16-22

mm

Page 17: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Crusher Performance Map from real dataCrusher Performance Map

-

5.00

10.00

15.00

20.00

25.00

30.00

35.00

40.00

5 7 9 11 13 15

Pro

duct

ion

[tph]

CSS [mm]

Crusher Performance Map, CH430 F

0-2

2-5,6

5,6-8

8-11,2

11,2-16

16-22,4

2-11,2

5,6-160%

10%

20%

30%

40%

50%

60%

70%

80%

90%

5 7 9 11 13 15

Pro

duct

ion

CSS [mm]

Crusher Performance Map, CH430 F

0-2

2-5,6

5,6-8

8-11,2

11,2-16

16-22,4

2-11,2

5,6-16

Page 18: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Crusher Performance Map from real dataCrusher Performance Map

0

20

40

60

80

100

120

5 7 9 11 13 15

Fla

kine

ss In

dex

CSS [mm]

Crusher Performance Map, CH430

2-5

5-6,3

6,3-8

8-10

10-12,5

12,5-16

16-20

Page 19: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]
Page 20: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

MinBaS IIOptimized blasting

� Field Study in Långåsen, Arlanda

� Aim: Evaluate the effect of using electronic blasting systems. Changes in particle size distribution and other benefits.

� Full scale testing. Four blasts blasted during 2008

� Based on the final report and my own observations

� All data and costs shown are estimates based on publically available data

Page 21: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

The Study

• Comparisons between the cost and earnings for different blasting strategies.

• Conclusions and recommendations

Page 22: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

The QuarryLångåsen, Arlanda

^éÜ~äí éä~í

`Cp=éä~åí

√léÉê~íÉÇ=Äó=k``=oç~Çë

√`~é~Åáíó=PMMJQMM=íéÜ

√^ÖÖêÉÖ~íÉë=~åÇ=̂ ëéÜ~äí=mêçÇìÅíáçå

√`çåíê~Åíçê=Ñçê=íê~åëéçêí~íáçå=çÑ=Ää~ëíÉÇ=ã~íÉêá~ä=

íç=éêáã~êó=ÅêìëÜÉê

√`çåíê~Åíçê=çïåë=~åÇ=çéÉê~íÉë=íÜÉ=`Cp=éä~åí

Page 23: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Blasted Material Test plan

Blast 1 Nonel Nonel

0.8 kg/m3 1.1 kg/m3

Blast 2 Nonel Nonel

1.1 kg/m3 0.8 kg/m3

Blast 3 Electronic Blasting System

0.8 kg/m3 10 ms between holes

Blast 4 Electronic Blasting System

0.8 kg/m3 5 ms between holes

Page 24: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

QMM=íçå=ë~ãéäÉ=ëáòÉ

Measuring the Particle Size DistributionBlasting result

Page 25: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Cost analysisBlasting result

Nonel norm. q

[€/ton]

Nonel high q

[€/ton]

EPD norm. q

[€/ton]

Drilling and Blasting

0.67 0.92 0.72

Added cost for detonators

0.00 0,00 0.22

Bolder Management

0.22 0.16 0.11

Sum [€/ton] 0.89 1.08 1.05

Page 26: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� Loading and Hauling to primarycrusher

•Wheel loader carries the material from the muck pile tothe crusher

� Conducted studies

•Measurment of wheel loadedloading times

•Measurment of loaded material [tph]

•Manual timing during severaldays

Conditions and MeasurmentsLoading and Hauling

Page 27: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Cost analysisLoading and Hauling

Nonel norm. q Nonel high q EPD norm. q

Contractor [€/h] 333 333 333

Loading Capasity [tph] 298 316 313

Cost [€/ton] 1.12 1.05 1.06

Sum incl Drilling and Blasting [€/ton]

0.89+1.12=

=2.011.08+1.05=

=2.131.05+1.06=

=2.11

Page 28: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Plant Setup and Conditions for the StudyCrushing and Screening

MJVM=ãã HVM=ãã

Page 29: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Performed MeasurementsCrushing and Screening

MJVM=ãã HVM=ãã

mçïÉê=aê~ï=xâïÜz

`~é~Åáíó=xíéÜz

`~é~Åáíó=xíéÜz `~é~Åáíó=xíéÜz

Page 30: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Cost analysisCrushing and Screening

Nonel norm. q Nonel high q EPD norm. qPower Draw (kWh/ton) 0.3 0.25 0.35

Energy Cost (0.22 €/kWh) 0.07 0.06 0.08

Fixed Cost [€/h]

[€/ton]555

1.80

555

1.70

555

1.70

Cost [€/ton] 1.87 1.76 1.78

Sum incl D&B ochL&H [€/ton]

0.89+1.12+1.87=

=3.881.08+1.05+1.76=

=3.891.05+1.06+1.78=

=3.89

Page 31: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Total cost $/hQuarry Production

MJVM=ãã HVM=ãã

aáëíêáÄìíáçå=ÄÉíïÉÉå=MJVM=ãã=~åÇ=HVM=ãã=áë=

é~êíäó=ÅçåíêçääÉÇ=Äó=íÜÉ=Ää~ëíáåÖ=êÉëìäí

Nonel norm. q

Nonel high q

EPD norm. q

Production rate [tph] 298 316 313

Cost [€/h] 1343 1412 1425

Page 32: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Product PriceQuarry Production

Fraction [mm]

Price

[€/ton]

Crushing stage

Ave. Price

[€/ton]

0-90 8.89 1 (Prim.) 8.89

0-4 14.33

3-4 15.78

4-8 15.44

8-11 17.67

11-16 16.78

16-32 15

MJVM=ãã

UKUV=€Líçå

HVM=ãã

NRKTU=€Líçå

Page 33: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Revenue €/hQuarry Production

Nonel norm. q

Nonel high q

EPD norm. q

Production rate [tph] 298 316 313

Cost [€/h] 1343 1412 1425

Revenue [€/h] 3421 3567 3637

“Profit” [€/h] 2078 2155 2212Difference Nonelnorm q

[€/h]

[€/ton]

-

-

77

0.24

134

0.43

Page 34: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� From the tested blasting alternative Electronic Blasting System is the most beneficial.

� Extensive investigations and analysis are necessary in order to determine the optimal solution. Many areas are effected by the blasting result.

•Drilling and Blasting•Bolder Management•Loading and Hauling•Crushing and Screening

� Only studying the costs is not sufficient in order to optimize the process. Most expensive solution did also generate the most profit.

Conclusions

Page 35: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� Questions?

Page 36: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� Optimizing a single crusher can be done manually as seen earlier

� Optimizing several crushers?•Combination of equipment setting

•Production situation, what products are demanded and what are not?

What about Optimizing the Crushing and Screening Process?

Page 37: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Infrastructure for optimizationProcesses

Page 38: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� Putting Crusher and Screens together to form processes•Screening duties•Open and Closed Circuits•Benefits and disadvantages with different circuit configurations.•Special Circuits•Combining Circuits to form plants

Processes

Page 39: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

The different screening tasksProcesses

Scalping

Natural Fines Removal Closed

Circuit Screening

Final Product Screening

Process Screening

Page 40: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

The different screening tasksProcesses

ProcessProduct

Process

From a process point of view Process and Product Screens are the most interesting

Page 41: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� The material will not pass the crusher more then once

� Limited size of crushers and screens

� Material will have improved quality

� Top size control

� Primary and Secondary Applications

Open CircuitProcesses

Page 42: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� All or parts of the material will pass the crusher at least one time.

� Screens placed in order to return over size material to crusher.

� Top size control.

Closed Circuit

Processes

Page 43: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� Pre crusher screening

•Finished material removed before crusher

•Consider the quality of the by passed material

Closed CircuitProcesses

Page 44: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� Post Crusher Screening•Large crusher needed•Will improve the product quality•More material in the crusher generates more wear

•Closed side setting will have a great effect on the circulating load, might effect overall circuit capacity

Closed CircuitProcesses

Page 45: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� When designing crushing plats a combination of different crushing circuits are needed.

� Combining Crushing Stages to optimum performance is very difficult.

� Saving in one stage might cost more in the next.

� Simulation program is needed.

Open and Closed Circuits

Processes

Page 46: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Ope

n C

ircut

eC

lose

d C

ircut

eP

re-S

cree

nC

lose

d C

ircut

eP

ost-

Scr

een

Pre ProductScreen

Post ProductScreen

Double ProductScreens

No ProductScreen

1 2 3

5 6 6b

7 8 9 10

4

Mad

e by

Per

Sve

dens

ten

+ Limited size of crushers and screens+ Material will have improved quality- No Top size control

+ Smaller sized crusher can be used-/+ Some quality improvment in all material+ Top size control

+ Material will have improved quality

- Bigger sized crusher is needed

+ Top size control

- Only one product +Improved quality in all material

- Cost for screens- By-pass material will not improve in quality

Note: Quality is defined as strenght and average shape

- By-pass material will not improve in quality

Selecting and Combing Circuits Processes

Page 47: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Ope

n C

ircut

eC

lose

d C

ircut

eP

re-S

cree

nC

lose

d C

ircut

eP

ost-

Scr

een

Pre ProductScreen

Post ProductScreen

Double ProductScreens

No ProductScreen

1 2 3

5 6 6b

7 8 9 10

4

Mad

e by

Per

Sve

dens

ten

+ Limited size of crushers and screens+ Material will have improved quality- No Top size control

+ Smaller sized crusher can be used-/+ Some quality improvment in all material+ Top size control

+ Material will have improved quality

- Bigger sized crusher is needed

+ Top size control

- Only one product +Improved quality in all material

- Cost for screens- By-pass material will not improve in quality

Note: Quality is defined as strenght and average shape

- By-pass material will not improve in quality

Selecting and Combing Circuits Processes

Page 48: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Ope

n C

ircut

eC

lose

d C

ircut

eP

re-S

cree

nC

lose

d C

ircut

eP

ost-

Scr

een

Pre ProductScreen

Post ProductScreen

Double ProductScreens

No ProductScreen

1 2 3

5 6 6b

7 8 9 10

4

Mad

e by

Per

Sve

dens

ten

+ Limited size of crushers and screens+ Material will have improved quality- No Top size control

+ Smaller sized crusher can be used-/+ Some quality improvment in all material+ Top size control

+ Material will have improved quality

- Bigger sized crusher is needed

+ Top size control

- Only one product +Improved quality in all material

- Cost for screens- By-pass material will not improve in quality

Note: Quality is defined as strenght and average shape

- By-pass material will not improve in quality

Selecting and Combing Circuits Processes

Page 49: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Special CircuitsProcesses

� Selection screen•Combining two crusher in one stage.•Increases flexibility and makes process adjustment easier.

� Parallel Crushers•Flexibility in capacity•Run at different settings to get a wide curve•Better shaped material in a wide part of the product.

Page 50: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Screening Stages

Processes

Final screening in order to make several productsConsider possibilities for re-crushing products

Page 51: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� Equipment performance is the starting point for process performance.•Selecting the right equipment for the right task

� Processes and plants can be configured in many ways•Understanding the pros and cons of processes and how to combine processes is important.

� Different types of circuits•Open/Closed•Product Screen / Process Screen•Screening before / after crusher

Summary and ConclusionsProcesses

Page 52: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� To optimize the crushing plant using computer optimization

� Use sampling to calibrate the computer model in order to increase model accuracy

� Optimize with the goal to maximize gross profit

Objective of projectCrushing plant optimization using TCO

Page 53: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Crushing plant model

Simulation

Optimisation

Economy

Yield the most profitable production strategy and meet the market demand

Modelling

Production units Rock material Customer demands

Page 54: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� A method to estimate the life cycle cost of equipment.

� NOT for deciding to invest!

� One method to calculate and compare cost for products or processes

� Purpose•Mean production cost per ton•Compare and evaluate different equipment solutions•Crushing Plant Optimization•Total analysis of quarry operation, combine with other processes

Total Cost of Ownership

Page 55: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� Some costs are more visual then others

� Often other costs and performance figures will have a bigger impact on the ownership cost and earnings. Investment cost is just the top of the iceberg.

� TCO will bring light on the entire Iceberg, not just the normally visible top.

Relations between costsTotal Cost of Ownership

Page 56: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� Includes equipment performance

� Divided into: Ownership and operating costs.•Ownership typically fixed costs•Operating cost typically variable

� Even more powerful when used on systems of equipment.•Crushing and Screening Plant•Load and haul systems

� Considers Availability and Utilization

Total Cost of Ownership

Page 57: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� Aimed at the crushing and screening process

� Vehicles needed for plant operation is in the boarder area for the calculation

� Most difficult to handle is how the plant is operated.

•Maintenance policy –Repairs

Area of interestIncluded in the TCO calculation

Page 58: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� It is important to establish the correct level of details when estimating costs

� To detailed: •Enormous amount of work•The extra work will give little benefit•Small changes or uncertainties will ruin the work

� Not detailed enough:•Changes in production will not affect the costs. Optimization and other analysis are not possible.

Area of interestIncluded in the TCO calculation

Page 59: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Product Profit Analysis

0,00

10,00

20,00

30,00

40,00

50,00

60,00

70,00

80,00

90,00

100,00

0-18 0-32 0-50 0-2 2-5 5-8 8-11 11-16 16-32 32-90 18-200

Product

[sek

]

Net Sales Price

Average Production Cost

The Difference between getting it right and wrongCost Calculation

Product Profit Analysis

0,00

10,00

20,00

30,00

40,00

50,00

60,00

70,00

80,00

90,00

100,00

0-18 0-32 0-50 0-2 2-5 5-8 8-11 11-16 16-32 32-90 18-200

Product

[sek

]

Net Sales Price

Real Production Cost

Average Production Cost

Using Average CostThe production cost is summed up and divided equally

Using “real” production cost

Page 60: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� Included in cost the calculation•Raw material•Depreciation •Interest •Energy cost•Wear parts replacement•Service cost•By-product production•Personnel

TCO and Gross Profit

� Income calculation•Sellable products•Product demand

� Other factors included that effects the gross profit

•Availability•Utilization

Page 61: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� Some parts are difficult

� Strategy: Do your best, make estimations and guesses, and you will be close to the actual cost!

Does in look difficult?TCO and Gross Profit

Page 62: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Plant ChallengesCrushing plant optimization using TCO

Capacity

By-product Highly desired

What is the best trade-off between capacity and reduction?

Page 63: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

In normal production following CSS are utilized:Secondary crusher CSS 44 mmTertiary crusher CSS 16 mmQuaternary crusher CSS 13 mm

Products:0-2 mm2-5 mm5-8 mm8-11 mm11-16 mm16-22 mm

Test plantCrushing plant optimization using TCO

Page 64: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Objectives for the first test session:

� Measure particle size distribution to calibrate the model

� CSS at original settings

Test planCrushing plant optimization using TCO

Page 65: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Model CalibrationCrushing plant optimization using TCO

Page 66: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

The computer tool automatically finds the best solution using an optimization algorithmThe solution that yields the best profit:

� Secondary crusher CSS 50 mm (44)� Tertiary crusher CSS 20 mm (16) � Quaternary crusher CSS 14 mm (13)

Running the TCO optimization moduleCrushing plant optimization using TCO

Page 67: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

Crushing plant optimization using TCO

Increased Capacity

Reduced fines ratio Increased total production

Result: +11 % in Calculated Gross Profit

Page 68: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

� Optimization must be a combination of technical and economic analysis

� Computer optimization can improve productivity

� Model calibration increases accuracy

� Minimizing cost does not necessarily maximize profit

� Combined performance of different machines should be considered. Solves the trade-off between capacity and reduction

Crushing plant optimization using TCO

Page 69: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]
Page 70: Optimizing the Crunch process · Flakiness Index CSS [mm] Crusher Performance Map, ... Test plan Blast 1 Nonel Nonel ... Cost analysis Blasting result Nonel norm. q [€/ton]

www.quarryacademy.com


Recommended