+ All Categories
Home > Software > Oracle Primavera Roadmap 2015

Oracle Primavera Roadmap 2015

Date post: 24-Jan-2017
Category:
Upload: p6academy
View: 1,149 times
Download: 0 times
Share this document with a friend
29
Transcript

www.dangcorp.com.au

DC PS: Primavera Services

DC RS: Reporting Serviceshttp://bit.ly/dcreportingservices

DC P6 MR: Management Reporting Chartinghttp://bit.ly/dcp6charts

DC P6 RS: Reporting Services Dashboardshttp://bit.ly/dcp6dashboards

//Resources:

Solu%on  Overview  &  Strategic  Roadmap  for  Primavera  Solu%ons      Guy  Barlow  Director,  Industry  Strategy  Primavera  Global  Business  Unit  25  June  2015                        V2015.03  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

Safe  Harbor  Statement  The  following  is  intended  to  outline  our  general  product  direc%on.  It  is  intended  for  informa%on  purposes  only,  and  may  not  be  incorporated  into  any  contract.  It  is  not  a  commitment  to  deliver  any  material,  code,  or  func%onality,  and  should  not  be  relied  upon  in  making  purchasing  decisions.  The  development,  release,  and  %ming  of  any  features  or  func%onality  described  for  Oracle’s  products  remains  at  the  sole  discre%on  of  Oracle.  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

Oracle  Project  PorVolio  

Management  

Project  management    capabili%es  

Project  management    capabili%es  

Primavera  P6  

Primavera  Unifier   Primavera  Analy%cs  

Cost Management &

Control Budgeting & Forecasting

Contract Management

Insight & Performance

Primavera  Integrated  EPPM  PlaVorm  

Portfolio Management

3  

ERP,EAM,SCM,HCM  etc  Collaboration Predictability Mobility Visibility

Improve Project Profitability

Accelerate Project Delivery

Project Management &

Scheduling Risk

Management

Resource Management

Project Visualization

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

Primavera  15.1  

•  A  suite  of  integrated  products  

•  Built  upon  shared  infrastructure  and  technologies  

•  More  integra%on  

•  Tested  together  

•  Released  together  

•  Enabling  powerful  cross-­‐product  solu%ons    

 

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

Cloud  Primavera  Solu%on  

P6  

Unifier  

Analy%cs  

Gateway  

Prime  

Instan%s  

OPPM  

15.1   15.2   16.1  

15.1   15.2   16.1  

15.1   15.2   16.1  

9.0   15.1   15.2   16.1  

15.1   16.1  

15.1   15.2   16.1  

15.1   15.2   16.1  

CY 2015 CY 2016 CY 2017

16.2  

16.2  

16.2  

16.2  

16.2  

17.1  

17.1  

17.1  

17.1  

17.1  

16.2  

CM   14.1   14.2  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

Mobile   P6   Instan1s   P6   Instan1s   P6   Instan1s   Unifier  P6  

Instan1s  

2014   2015   2016  

Mobile  Solu%ons    

Unifier  

New  web  interface  

Offline  mode  for  iPhone  

New  na1ve  app  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

Primavera  P6  

7  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

Primavera  P6  EPPM  Ensure  Project  Delivery  Success  for  Your  Projects  and  Programs   •  Project  Management  –  Any%me,  anywhere  access  

•  Program  and  PorVolio  Management  –  Priori%zing    and  op%mizing  projects  

•  Planning  and  Risk  Management  –  Execu%ng  complex  projects  with  ease  

•  Resource  Management  –  Matching  people  with  projects  

•  Collabora%on  and  Content  Management  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

•  Con1nued  P6  &  Unifier  Integra1on  

•  Team  Member  Enhancements  −  Field  Configura%on  Op%ons  −  Mobile  Timesheets  

•  Ease  of  Use  −  Resource  Bucket  Planning  −  Enhanced  UN/CEFACT  support  −  Import/Export  Baselines  with  XML  −  Enhanced  Audi%ng  Capabili%es  

•  P6  Professional  −  64  bit  Visualizer  applica%on  −  Import/Export  Visualizer  layouts  

P6  EPPM  15  Release  1    New  Features  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

Primavera  Unifier  

10  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

Primavera  Unifier  Purpose-­‐built  to  support  the  specialized  needs  of  industry •  Cloud-­‐based  enterprise  project  porVolio  management  lifecycle  solu%on  

•  Configurable  Business  Process  Automa%on  to  drive  business  rules  and  visibility  

•  Best  in  class  Cost  Control  and  Project  Execu%on  capabili%es  

•  Document  Management  

•  Integra%on  with  P6  to  drive  Cash  Flows  and  Cost  Sheet  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

•  Unifier  and  P6  integra%on  at  the  Ac%vity  level  

•  Analysis  and  Dashboards  via  Primavera  Analy%cs  

•  Custom  Prints  now  support  BI  Publisher  

•  BP  Enhancements  •  Auto-­‐crea%on  of  Change  Commits  •  Selec%on  of  winning  bids  and  

crea%on  of  contracts  

Unifier  15  Release  1    

Unifier  Project   P6  Project  

Gateway  Ac1vity  Sheet   Ac1vi1es  

Business  Process  Record  

Auto-­‐Populate  

Reverse  Auto-­‐Populate  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

Primavera  Analy%cs  

13  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

Primavera  Analy%cs  

•  Rich  business  intelligence  solu%on  for  project  centric  organiza%ons  

•  Insights  into  project  porVolio  performance  including  schedules,  resources,  cost,  and  business  processes  

•  Uncover  trends,  track  performance,  perform  root  cause  analysis,  and  forecast  costs  and  cash  flow    

•  Drive  efficiencies  in  your  project  processes  by  making  beher  decisions  

Deeper  visibility  into  your  Primavera  P6  and  Unifier  business  data  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

Announcing  Primavera  Analy%cs  15  Release  1    

•  Single  analy%cs  solu%on  for  P6  and  Unifier  

•  Key  metrics  for  Unifier  business  processes    

•  Analyze  cash  flow  across  the  enterprise    

•  Roll-­‐up  cost  sheets  across  hierarchy  

•  Compare  Unifier  cost  data  with  P6  project  schedule  data  side-­‐by-­‐side  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

Primavera  PorVolio  Management  

16  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

Primavera  PorVolio  Management  

•  Web-­‐based  enterprise  porVolio  management  •  Enables  strategy-­‐based  governance  •  Provides  one  version  of  the  truth  •  Manages  porVolios  of  investments  to  achieve  strategic  goals  •  Facilitates  visibility  and  collabora%on  across  the  enterprise  

Forms  Investor  Maps  

Scorecards  Workbooks  

Workflow  

Dashboards  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

Primavera  Gateway  

18  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

Primavera  Gateway  

•  Pre-­‐packaged  integra%on  connec%ons  for  variety  of  Primavera  internal  and  3rd  Party  applica%ons  

•  Java  applica%on  with  no  dependency  on  third  party  middleware  provides  extensible  integra%on  solu%on  

•  Combine  financial  management  and  asset  management  informa%on  with  project,  porVolio  and  resource  management  

•  Simple  integra%on  framework  allows  customers  and  partners  to  quickly  develop  and  adopt    Primavera  Gateway  for  integra%on  

Standard  data  integra%on  solu%on  to  streamline  EPPM  planning  and  execu%on  process  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

Announcing  Gateway  15.1  •  Enhanced  Oracle  EBS  Provider  

Support  for  “SOA  Gateway”  connec%on  type  

•  Enhanced  P6  and  Unifier  Providers  Support  for  Ac%vity  based  schedule  –  integra%on  with  Ac%vity  Sheet  Oracle  EBS  

Primavera  P6  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

 What’s  New  in  

 Gateway  15R1        

Primavera  

• Enhanced  OOTB  maps  with  support  for  Code  Descrip%on    

• Support  for  SAP  EHP  7  SAP  

• SOA  Gateway  support  –  connec%ng  to  EBS  via  WS;  • Extended  Data  Dic%onary  –  support  for  “flex”  fields    

• Project  ini%a%on  in  EBS  from    external  applica%on  • Annualized  (total  project)  budgets  and  actuals;    • Support  for  Financial  Structures  • ETrack  OOTB  flows  

EBS  

• Requires  integra%on  with  EBS  to  import  Material  items,  Projects  and  Tasks  

• Op%on  to  import  of  Material  Supply  for  “Non-­‐Primavera”  demand  as  Ac%vi%es  

• Bug  Fixes  

VCP  

• Project  synchroniza%on  between  two  instances  of  P6  

• New  global  data  –  Ac%vity  and  Resource  Codes  

• New  Filters  –  Ac%vity  and  Resource  Assignment  filters  

• Support  for  %me  zone  offset    in  %me  component  of  dates  

P6  

• Support  for  impor%ng  project  schedule  by  Ac%vi%es  into  Unifier  Ac%vity  Sheet  

• Project  Filter  Unifier  

ERP/SCM/EAM…  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

Looking  Forward  

22  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

1.  Heavy  emphasis  on  mobile    

2.  New  user  interfaces  3.  Reliance  on  “connectedness”  4.  More  geo  loca%on  features  and  visualiza%on    

5.  Con%nue  to  deliver  the  world’s  most  complex  projects  

Business  Interac%on  Across  Organiza%ons    

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

Cost  -­‐  Schedule  -­‐  Scope  

COST  

SCOPE  

SCHEDULE  

0%  

100%  

0%  

100%  

0%   100%  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

Copyright  ©  2015,  Oracle  and/or  its  affiliates.  All  rights  reserved.    |  

BUSINESS  Intelligence  

MOBILE  Access  

SOLUTION  Accelerators  

INTEGRATED  Solu1ons  

Major  Themes  for  2015  and  Beyond    


Recommended