Orange Line BRT Sustainable Corridor Implementation Plan
Steering Committee Meeting #2January 11, 2012
The following presents potential land use changes in the identified Orange Line Transit Oriented Districts (the area within ½ mile of the each Orange Line station). While the majority of the Orange Line station areas are completely urbanized, there are opportunities for redevelopment and intensification through land use changes at specific locations along the corridor. Some of the land use changes may occur in the next few years while others may be much longer term and occur over the next 10 to 20 years.
The redevelopment and intensification could increase the mix of uses and number of dwelling units and jobs within walking distance the Orange Line station. This could lead to a number of benefits including: increased transit use along the corridor and in the region; reduced driving; reduced GHG emissions; fewer trips by automobile; and increased health benefits as more people walk to transit and neighborhood services.
For each station area, we have identified specific areas where land use underutilized or where redevelopment could occur over the next 20 years. For each area, we then present potential land use changes that could occur. Examples of images of the potential types of changes envisioned can be found at the back of this workbook. Please review the attached information and let us know if you think land use changes should occur in each area and what uses and intensities are desired.
Following the land use exercise, we would like you to focus on two more general questions:
1. What is your overall vision for the station area over the next 10 to 20 years? Will it generally
stay the same or will it change and transform to become a different type of place?
2. What physical and programmatic improvements are needed to achieve your vision of the
station area? Improvements could include pedestrian safety, parking, streetscape, transit
facilities and services and others?
(Note: The Warner Center and Canoga stations are covered by the Warner Center Specific Plan and are not included in this discussion.)
Land Use Alternatives Exercise
Orange Line BRT Sustainable Corridor Implementation Plan
Area 1 Existing Uses: Agricultural land and open space owned and operated by Pierce College
Options:• Leave as is, in agricultural use
• Develop just the portions near transit station and along Desoto and Victory with mixed use development, employment and/or and multi-family/ student housing (2-5 stories in height)
• Create a new transit district covering most of Area 1, with main street retail, mixed use and employment uses
• Other _______________________________
DE SOTO STATION
1
Victory
de S
oto
QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?
What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.
Orange Line BRT Sustainable Corridor Implementation Plan
PIERCE COLLEGE STATION
Area 1 Existing Uses: Park and ride lot
Options:• Leave as a parking lot
• Main street retail with neighborhood and student- oriented uses
• Multi-family/ student housing, employment and/or mixed use (2-5 stories)
Area 2 Existing Uses: Parking lot for Pierce College
Options:• Leave as a parking lot
• Main street retail with neighborhood and student-oriented uses
• Multi-family/ student housing, employment and/or mixed use (2-5 stories)
12
Victory
Win
netk
a
QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?
What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.
Orange Line BRT Sustainable Corridor Implementation Plan
Area 1
Exisiting Uses: Retail and office
Options:
• Leave as office and retail
• Main street retail
• Mixed use area with retail and residential (2-5 stories)
• Employment
Area 2
Existing Uses: Single family uses
Options:• Leave as single family
• Convert to a multi-family corridor with town house/rowhouse and apartment buildings (2-3 stories)
• Convert to a mixed use corridor (2-5 stories)
Area 3
Existing Uses: Zoned “Agricultural: Suburban” - Single family homes on large lots
Options:• Leave as low density “Agricultural:
Suburban”
• Intensify with townhouse/rowhouse development and small- scale multi-family development (2-3 stories)
Area 4Existing Use: Retail shopping centerOptions:
• Leave as auto-oriented retail shopping center
• Create a mixed use center with retail and residential uses (2-5 stories)
• Convert to multi-family housing (2-5 stories)
TAMPA STATION
1
2
3
4
Oxnard
Tam
pa
QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?
What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.
Orange Line BRT Sustainable Corridor Implementation Plan
RESEDA STATIONArea 1 Existing Uses: Manufacturing, industrial and commercial
Options:• Leave as manufacturing, industrial and
commercial
• Convert to a mixed use district with retail and residential (2-5 stories)
• Keep as employment but with higher intensity uses (2-5 stories)
Area 2 Existing Uses: Manufacturing, industrial and commercial
Options:• Leave as manufacturing, industrial and
commercial
• Convert to a mixed use district with retail and residential (2-5 stories)
• Keep as employment but with higher intensity uses (2-5 stories)
Area 3
Existing Uses: Commercial and retail
Options:
• Leave as commercial and retail
• Main street retail
• Allow mixed use (2-5 stories)
1
32
Res
eda
OxnardTopham
QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?
What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.
Orange Line BRT Sustainable Corridor Implementation Plan
BALBOA STATION
Area 1 Existing Uses: Open space owned and operated by the federal government.
Options:• Leave as is
• Develop a portion of the land along Victory and Balboa (leaving the interior and river front as open space) with mixed use development
• Create a new transit district covering most of Area 1, with main street retail, mixed use and employment uses, clearing the river front as visable open space.
1
Victory
Bal
boa
QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?
What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.
Orange Line BRT Sustainable Corridor Implementation Plan
WOODLEY STATION
Area 1 Existing uses: 1 story auto-oriented retail
Options:• Leave as is
• Mixed use area with ground floor retail and multi-family housing (2-5 stories)
Area 2Existing Uses: Publicly owned land with uses that include a National Guard facility, a Los Angeles public works corps yard and open space.
Options:• Leave as is
• Develop only the portion immediately adjacent to the Orange Line station with mixed use (2-5 stories) or employment (2-5 stories)
• Create a new transit district on the entirety of the area with main street retail, mixed use (2-5 stories) and employment uses (2-5 stories)?
1
2
Victory
Woo
dley
QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?
What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.
Orange Line BRT Sustainable Corridor Implementation Plan
SEPULVEDA STATIONArea 1 Existing Uses: Diversity of retail including shopping center with Costco.
Options:• Leave as is
• Mixed use corridor with retail and multi-family residential uses (2-5 stories)
• Employment corridor (2-5 stories)
Area 2Existing Uses: Mix of manufacturing, industrial and commercial
Options:• Leave as is
• Mixed use district with retail and multi-family housing (2-5 stories)
• Employment district (2-5 stories)
Area 3Existing Uses: Industrial and a car dealership
Options:• Leave as is
• Mixed use corridor with retail and multi-family residential uses (2-5 stories)
• Employment corridor (2-5 stories)
1
2
3
Oxnard
Sepu
lved
a
Victory
QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?
What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.
Orange Line BRT Sustainable Corridor Implementation Plan
VAN NUYS STATIONArea 1 Existing Uses: low intensity retail and car dealers
Options:• Leave as is
• Mixed use corridor with retail and multi- family residential uses (2-5 stories)
• Main street retail and urban retail with limited residential development
Area 2Existing Uses: Mix of commercial and industrial
Options:• Leave as is
• Mixed use district with retail and multi-family housing (2-5 stories)
• Employment district (2-5 stories)
Area 3Existing Use: Orange Line park and ride lot
Options:• Leave as is
• Mixed use district with retail and multi-family housing (2-5 stories)
• Residential area with townhouse/rowhouse development
Area 4: Existing Uses: Mix of commercial and industrialOptions:
• Leave as is
• Mixed use district with retail and multi-family housing (2-5 stories)
• Employment district (2-5 stories)
1
23
4
Van
Nuy
s
Bessemer
QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?
What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.
Orange Line BRT Sustainable Corridor Implementation Plan
WOODMAN STATION
Area 1 Existing Uses: Retail
Options:• Leave as is
• Main street retail district
• Mixed use district with residential and retail (2-5 stories)
1
Oxnard
Woo
dman
QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?
What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.
Orange Line BRT Sustainable Corridor Implementation Plan
VALLEY COLLEGE STATION
Area 1 Existing Uses: Parking lot owned by Valley College
Options:• Leave as is
• Employment/academic building (2-5 stories)
• Mixed use area with housing and retail (2-5 stories)
Area 2Existing Uses: Retail and some public uses
Options:• Leave as is
• Mixed use corridor with retail and multi-family residential/ student housing uses (2-5 stories)
• Main street retail and urban retail with limited residential development
1
2
Burbank
Fult
on
QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?
What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.
Orange Line BRT Sustainable Corridor Implementation Plan
LAUREL CANYON STATION
Area 1 Existing Uses: Mostly small-scale retail, some in a main street format and some with surface parking
Options:• Leave as is
• Mixed use corridor with retail and multi-family residential uses (2-5 stories)
• Main street retail and urban retail with limited residential development
Area 2Existing Uses: Single family
Options:• Leave as is
• Residential area with townhouse/rowhouse development
• Multifamily housing (2-3 stories)
1
2
Chandler
Laur
el C
anyo
n
Burbank
QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?
What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.
Orange Line BRT Sustainable Corridor Implementation Plan
NORTH HOLLYWOOD STATIONArea 1 Existing Uses: Mostly retail, some with large surfaceparking lots
Options:• Leave as is
• Mixed use corridor with retail and multi- family residential uses (2-5 stories)
• Main street retail and urban retail with limited residential development
• Employment corridor (2-5 stories)
Area 2Existing Uses: Mostly retail, some with large surface parking lots
Options:• Leave as is
• Mixed use corridor with retail and multi- family residential uses (2-5 stories)
• Main street retail and urban retail with limited residential development
• Employment corridor (2-5 stories)
Area 3Existing Uses: industrial and commercial, some on large parcels
Options:• Leave as is
• Mixed use district with retail and multi-family residential uses (2-5 stories)
• Urban retail and shopping district with a mix of national and local retailers
• Employment district (6+ stories)
1
3
2
Chandler
Lankershim
Burbank
QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?
What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.
Single-Family Home
Multi-Family Housing or Apartment Building
Mixed-Use Corridor or District (6-10 stories)
Mixed-Use Corridor or District (2-5 stories)
Townhouse/ Rowhouse
Main Street Retail Area
Urban Retail Area
Employment Corridor or District (2-5 stories)
Employment Corridor or District (6+ stories)
REFERENCE PHOTOGRAPHS FOR POTENTIAL LAND USE CHANGES
Orange Line BRT Sustainable Corridor Implementation Plan
The following photographs show the range of potential land use changes that could occur at the station areas. These images are intended to show the type of use, scale of building and design that could occur in different areas.