Orange Line BRT Sustainable Corridor Implementation Plan Steering Committee Meeting #2 January 11, 2012 The following presents potential land use changes in the identified Orange Line Transit Oriented Districts (the area within ½ mile of the each Orange Line station). While the majority of the Orange Line station areas are completely urbanized, there are opportunities for redevelopment and intensification through land use changes at specific locations along the corridor. Some of the land use changes may occur in the next few years while others may be much longer term and occur over the next 10 to 20 years. The redevelopment and intensification could increase the mix of uses and number of dwelling units and jobs within walking distance the Orange Line station. This could lead to a number of benefits including: increased transit use along the corridor and in the region; reduced driving; reduced GHG emissions; fewer trips by automobile; and increased health benefits as more people walk to transit and neighborhood services. For each station area, we have identified specific areas where land use underutilized or where redevelopment could occur over the next 20 years. For each area, we then present potential land use changes that could occur. Examples of images of the potential types of changes envisioned can be found at the back of this workbook. Please review the attached information and let us know if you think land use changes should occur in each area and what uses and intensities are desired. Following the land use exercise, we would like you to focus on two more general questions: 1. What is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place? 2. What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities and services and others? (Note: The Warner Center and Canoga stations are covered by the Warner Center Specific Plan and are not included in this discussion.) Land Use Alternatives Exercise
Transcript
Page 1: Orange Line BRT Sustainable Corridor Implementation Plan ...media.metro.net/projects_studies/sustainability/... · Orange Line BRT Sustainable Corridor Implementation Plan BALBOA

Orange Line BRT Sustainable Corridor Implementation Plan

Steering Committee Meeting #2January 11, 2012

The following presents potential land use changes in the identified Orange Line Transit Oriented Districts (the area within ½ mile of the each Orange Line station). While the majority of the Orange Line station areas are completely urbanized, there are opportunities for redevelopment and intensification through land use changes at specific locations along the corridor. Some of the land use changes may occur in the next few years while others may be much longer term and occur over the next 10 to 20 years.

The redevelopment and intensification could increase the mix of uses and number of dwelling units and jobs within walking distance the Orange Line station. This could lead to a number of benefits including: increased transit use along the corridor and in the region; reduced driving; reduced GHG emissions; fewer trips by automobile; and increased health benefits as more people walk to transit and neighborhood services.

For each station area, we have identified specific areas where land use underutilized or where redevelopment could occur over the next 20 years. For each area, we then present potential land use changes that could occur. Examples of images of the potential types of changes envisioned can be found at the back of this workbook. Please review the attached information and let us know if you think land use changes should occur in each area and what uses and intensities are desired.

Following the land use exercise, we would like you to focus on two more general questions:

1. What is your overall vision for the station area over the next 10 to 20 years? Will it generally

stay the same or will it change and transform to become a different type of place?

2. What physical and programmatic improvements are needed to achieve your vision of the

station area? Improvements could include pedestrian safety, parking, streetscape, transit

facilities and services and others?

(Note: The Warner Center and Canoga stations are covered by the Warner Center Specific Plan and are not included in this discussion.)

Land Use Alternatives Exercise

Page 2: Orange Line BRT Sustainable Corridor Implementation Plan ...media.metro.net/projects_studies/sustainability/... · Orange Line BRT Sustainable Corridor Implementation Plan BALBOA

Orange Line BRT Sustainable Corridor Implementation Plan

Area 1 Existing Uses: Agricultural land and open space owned and operated by Pierce College

Options:• Leave as is, in agricultural use

• Develop just the portions near transit station and along Desoto and Victory with mixed use development, employment and/or and multi-family/ student housing (2-5 stories in height)

• Create a new transit district covering most of Area 1, with main street retail, mixed use and employment uses

• Other _______________________________

DE SOTO STATION

1

Victory

de S

oto

QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?

What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.

Page 3: Orange Line BRT Sustainable Corridor Implementation Plan ...media.metro.net/projects_studies/sustainability/... · Orange Line BRT Sustainable Corridor Implementation Plan BALBOA

Orange Line BRT Sustainable Corridor Implementation Plan

PIERCE COLLEGE STATION

Area 1 Existing Uses: Park and ride lot

Options:• Leave as a parking lot

• Main street retail with neighborhood and student- oriented uses

• Multi-family/ student housing, employment and/or mixed use (2-5 stories)

Area 2 Existing Uses: Parking lot for Pierce College

Options:• Leave as a parking lot

• Main street retail with neighborhood and student-oriented uses

• Multi-family/ student housing, employment and/or mixed use (2-5 stories)

12

Victory

Win

netk

a

QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?

What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.

Page 4: Orange Line BRT Sustainable Corridor Implementation Plan ...media.metro.net/projects_studies/sustainability/... · Orange Line BRT Sustainable Corridor Implementation Plan BALBOA

Orange Line BRT Sustainable Corridor Implementation Plan

Area 1

Exisiting Uses: Retail and office

Options:

• Leave as office and retail

• Main street retail

• Mixed use area with retail and residential (2-5 stories)

• Employment

Area 2

Existing Uses: Single family uses

Options:• Leave as single family

• Convert to a multi-family corridor with town house/rowhouse and apartment buildings (2-3 stories)

• Convert to a mixed use corridor (2-5 stories)

Area 3

Existing Uses: Zoned “Agricultural: Suburban” - Single family homes on large lots

Options:• Leave as low density “Agricultural:

Suburban”

• Intensify with townhouse/rowhouse development and small- scale multi-family development (2-3 stories)

Area 4Existing Use: Retail shopping centerOptions:

• Leave as auto-oriented retail shopping center

• Create a mixed use center with retail and residential uses (2-5 stories)

• Convert to multi-family housing (2-5 stories)

TAMPA STATION

1

2

3

4

Oxnard

Tam

pa

QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?

What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.

Page 5: Orange Line BRT Sustainable Corridor Implementation Plan ...media.metro.net/projects_studies/sustainability/... · Orange Line BRT Sustainable Corridor Implementation Plan BALBOA

Orange Line BRT Sustainable Corridor Implementation Plan

RESEDA STATIONArea 1 Existing Uses: Manufacturing, industrial and commercial

Options:• Leave as manufacturing, industrial and

commercial

• Convert to a mixed use district with retail and residential (2-5 stories)

• Keep as employment but with higher intensity uses (2-5 stories)

Area 2 Existing Uses: Manufacturing, industrial and commercial

Options:• Leave as manufacturing, industrial and

commercial

• Convert to a mixed use district with retail and residential (2-5 stories)

• Keep as employment but with higher intensity uses (2-5 stories)

Area 3

Existing Uses: Commercial and retail

Options:

• Leave as commercial and retail

• Main street retail

• Allow mixed use (2-5 stories)

1

32

Res

eda

OxnardTopham

QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?

What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.

Page 6: Orange Line BRT Sustainable Corridor Implementation Plan ...media.metro.net/projects_studies/sustainability/... · Orange Line BRT Sustainable Corridor Implementation Plan BALBOA

Orange Line BRT Sustainable Corridor Implementation Plan

BALBOA STATION

Area 1 Existing Uses: Open space owned and operated by the federal government.

Options:• Leave as is

• Develop a portion of the land along Victory and Balboa (leaving the interior and river front as open space) with mixed use development

• Create a new transit district covering most of Area 1, with main street retail, mixed use and employment uses, clearing the river front as visable open space.

1

Victory

Bal

boa

QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?

What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.

Page 7: Orange Line BRT Sustainable Corridor Implementation Plan ...media.metro.net/projects_studies/sustainability/... · Orange Line BRT Sustainable Corridor Implementation Plan BALBOA

Orange Line BRT Sustainable Corridor Implementation Plan

WOODLEY STATION

Area 1 Existing uses: 1 story auto-oriented retail

Options:• Leave as is

• Mixed use area with ground floor retail and multi-family housing (2-5 stories)

Area 2Existing Uses: Publicly owned land with uses that include a National Guard facility, a Los Angeles public works corps yard and open space.

Options:• Leave as is

• Develop only the portion immediately adjacent to the Orange Line station with mixed use (2-5 stories) or employment (2-5 stories)

• Create a new transit district on the entirety of the area with main street retail, mixed use (2-5 stories) and employment uses (2-5 stories)?

1

2

Victory

Woo

dley

QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?

What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.

Page 8: Orange Line BRT Sustainable Corridor Implementation Plan ...media.metro.net/projects_studies/sustainability/... · Orange Line BRT Sustainable Corridor Implementation Plan BALBOA

Orange Line BRT Sustainable Corridor Implementation Plan

SEPULVEDA STATIONArea 1 Existing Uses: Diversity of retail including shopping center with Costco.

Options:• Leave as is

• Mixed use corridor with retail and multi-family residential uses (2-5 stories)

• Employment corridor (2-5 stories)

Area 2Existing Uses: Mix of manufacturing, industrial and commercial

Options:• Leave as is

• Mixed use district with retail and multi-family housing (2-5 stories)

• Employment district (2-5 stories)

Area 3Existing Uses: Industrial and a car dealership

Options:• Leave as is

• Mixed use corridor with retail and multi-family residential uses (2-5 stories)

• Employment corridor (2-5 stories)

1

2

3

Oxnard

Sepu

lved

a

Victory

QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?

What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.

Page 9: Orange Line BRT Sustainable Corridor Implementation Plan ...media.metro.net/projects_studies/sustainability/... · Orange Line BRT Sustainable Corridor Implementation Plan BALBOA

Orange Line BRT Sustainable Corridor Implementation Plan

VAN NUYS STATIONArea 1 Existing Uses: low intensity retail and car dealers

Options:• Leave as is

• Mixed use corridor with retail and multi- family residential uses (2-5 stories)

• Main street retail and urban retail with limited residential development

Area 2Existing Uses: Mix of commercial and industrial

Options:• Leave as is

• Mixed use district with retail and multi-family housing (2-5 stories)

• Employment district (2-5 stories)

Area 3Existing Use: Orange Line park and ride lot

Options:• Leave as is

• Mixed use district with retail and multi-family housing (2-5 stories)

• Residential area with townhouse/rowhouse development

Area 4: Existing Uses: Mix of commercial and industrialOptions:

• Leave as is

• Mixed use district with retail and multi-family housing (2-5 stories)

• Employment district (2-5 stories)

1

23

4

Van

Nuy

s

Bessemer

QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?

What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.

Page 10: Orange Line BRT Sustainable Corridor Implementation Plan ...media.metro.net/projects_studies/sustainability/... · Orange Line BRT Sustainable Corridor Implementation Plan BALBOA

Orange Line BRT Sustainable Corridor Implementation Plan

WOODMAN STATION

Area 1 Existing Uses: Retail

Options:• Leave as is

• Main street retail district

• Mixed use district with residential and retail (2-5 stories)

1

Oxnard

Woo

dman

QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?

What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.

Page 11: Orange Line BRT Sustainable Corridor Implementation Plan ...media.metro.net/projects_studies/sustainability/... · Orange Line BRT Sustainable Corridor Implementation Plan BALBOA

Orange Line BRT Sustainable Corridor Implementation Plan

VALLEY COLLEGE STATION

Area 1 Existing Uses: Parking lot owned by Valley College

Options:• Leave as is

• Employment/academic building (2-5 stories)

• Mixed use area with housing and retail (2-5 stories)

Area 2Existing Uses: Retail and some public uses

Options:• Leave as is

• Mixed use corridor with retail and multi-family residential/ student housing uses (2-5 stories)

• Main street retail and urban retail with limited residential development

1

2

Burbank

Fult

on

QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?

What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.

Page 12: Orange Line BRT Sustainable Corridor Implementation Plan ...media.metro.net/projects_studies/sustainability/... · Orange Line BRT Sustainable Corridor Implementation Plan BALBOA

Orange Line BRT Sustainable Corridor Implementation Plan

LAUREL CANYON STATION

Area 1 Existing Uses: Mostly small-scale retail, some in a main street format and some with surface parking

Options:• Leave as is

• Mixed use corridor with retail and multi-family residential uses (2-5 stories)

• Main street retail and urban retail with limited residential development

Area 2Existing Uses: Single family

Options:• Leave as is

• Residential area with townhouse/rowhouse development

• Multifamily housing (2-3 stories)

1

2

Chandler

Laur

el C

anyo

n

Burbank

QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?

What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.

Page 13: Orange Line BRT Sustainable Corridor Implementation Plan ...media.metro.net/projects_studies/sustainability/... · Orange Line BRT Sustainable Corridor Implementation Plan BALBOA

Orange Line BRT Sustainable Corridor Implementation Plan

NORTH HOLLYWOOD STATIONArea 1 Existing Uses: Mostly retail, some with large surfaceparking lots

Options:• Leave as is

• Mixed use corridor with retail and multi- family residential uses (2-5 stories)

• Main street retail and urban retail with limited residential development

• Employment corridor (2-5 stories)

Area 2Existing Uses: Mostly retail, some with large surface parking lots

Options:• Leave as is

• Mixed use corridor with retail and multi- family residential uses (2-5 stories)

• Main street retail and urban retail with limited residential development

• Employment corridor (2-5 stories)

Area 3Existing Uses: industrial and commercial, some on large parcels

Options:• Leave as is

• Mixed use district with retail and multi-family residential uses (2-5 stories)

• Urban retail and shopping district with a mix of national and local retailers

• Employment district (6+ stories)

1

3

2

Chandler

Lankershim

Burbank

QuestionsWhat is your overall vision for the station area over the next 10 to 20 years? Will it generally stay the same or will it change and transform to become a different type of place?

What physical and programmatic improvements are needed to achieve your vision of the station area? Improvements could include pedestrian safety, parking, streetscape, transit facilities, bicycle facilities, and services and others.

Page 14: Orange Line BRT Sustainable Corridor Implementation Plan ...media.metro.net/projects_studies/sustainability/... · Orange Line BRT Sustainable Corridor Implementation Plan BALBOA

Single-Family Home

Multi-Family Housing or Apartment Building

Mixed-Use Corridor or District (6-10 stories)

Mixed-Use Corridor or District (2-5 stories)

Townhouse/ Rowhouse

Main Street Retail Area

Urban Retail Area

Employment Corridor or District (2-5 stories)

Employment Corridor or District (6+ stories)

REFERENCE PHOTOGRAPHS FOR POTENTIAL LAND USE CHANGES

Orange Line BRT Sustainable Corridor Implementation Plan

The following photographs show the range of potential land use changes that could occur at the station areas. These images are intended to show the type of use, scale of building and design that could occur in different areas.


Recommended