WHY ARE WE HERE?
PLANNING APPLICATION
CONSULTATION
Stewart Milne Homes are considering plans
for a residential development to the West
of East Linton in Orchardfield with a view to
submitting a detailed planning application
for approximately 120 houses
A Proposal of Application Notice was
submitted on the 4th December 2015 to East
Lothian Council, and this provides the
statutory context for pre-application
consultation with the local community and
other interested parties
This exhibition is part of that process, and
we are seeking your views on the proposals
that are on display. We are also consulting
with the Council and other agencies to
ensure that we are taking all relevant
matters into consideration
We genuinely welcome your attendance
today and the receipt of any comments that
you might have. This will help us better
understand local issues and respond to
these as far as we can when finalising the
proposals
Comments about the proposed
development should be made in writing on
the Feedback Forms available at the
exhibition or in writing by 18th March 2016
to:-
HolderPlanning
5 South Charlotte Street
Edinburgh
EH2 4AN
Tel no: 0131 538 2290
E-mail:
Planning Context:
East Lothian Council has agreed the content of the Proposed East Lothian Local Development Plan (LDP). Within this
document, the Orchardfield site (DR8 described as ‘Pencraig Hill’) is zoned for housing development. Also, the Council
has recently approved guidance in respect to dealing with applications for housing development in the context of their
identified shortage of land for housing in East Lothian. The Council has identified that there is a shortfall of
approximately 1,600 homes over the next 5 years, and the new guidance identifies the criteria against which proposals
such as Orchardfield will be considered.
In our view, the current planning policy framework supports the development of new housing on the Orchardfield site,
and our proposals will be prepared in co-operation with the Council to ensure that their detailed policy objectives will
be achieved, including those relating to design, landscaping, open space and accessibility to pedestrian and vehicles.
The comments received in response to this public consultation will also be an important consideration.
The information displayed at this exhibition explains how Stewart Milne Homes would like to design and develop the
site, in line with the guidelines and requirements from the adopted East Lothian Design Guidance and current National
Planning Policies.
1. Introduction
ABOUT US
STEWART MILNE GROUP
Stewart Milne Group is one of the UK’s
leading independent house builders with
5 star status from the Home Builders
Federation for customer satisfaction.
Originally established in Aberdeen in
1975, the business has grown and now
has offices in Aberdeen, Glasgow,
Edinburgh, Manchester and Oxford.
We are one of Scotland’s leading
providers of quality homes and each year
build over 500 properties from luxury city
apartments and townhouses to family
homes.
Our market leading position is based
firmly on our expertise, innovation and
quality along with our commitment to
providing the best service to our
customers.
Proposed Residential
Development,
Orchardfield
East Linton
Site
Orchardfield – East Linton
North
DR8
2. Site Location & Context
Fig 5. Panoramic view of site with gentle slopes towards the East – distant view of Belhaven Bay
Fig 4. Open views to the South – (Traprain Law)
Proposed Residential
Development,
Orchardfield
East Linton
Fig 2. View from existing field access – looking East
Fig 3. Open views to the North – (North Berwick Law)
Fig 6. Haddington Road looking East
Fig 1. View to the East
looking over (Core Path)
Aerial View. (11th May 2009) not to scale
North
Completed Residential Development
(Miller Homes)
Orchardfield
Site
St Andrews ChurchClock Tower
(c) Getmapping plc 2016
KEY:
Development arrival
Heart of site
Frontage
Rear gardens
Existing tree planting
SUDS basin
KEY:
Informal lanes
Linear streets
Link roads
KEY:
Localised high point
Localised low point
Viewpoints
Existing tree planting
St. Andrews Church
The Clock Tower
KEY CONSIDERATIONS
• Treatment of Boundaries
• Rural Setting
• Village Character
• Landscape Connections
• Height of Buildings
• Footpath Connections
• Community
• Open Space
• Integration
• Accessibility
• East facing slope (views)
• Affordable Housing
KEY:
Development arrival
Open space
Frontage
Rear gardens
Ridgeline landscape
Existing tree planting
3. Design Principles
Roads and lanes characterised by hedge and tree
planting to act as traffic calming and ensure
development integrates with rural environment.
Layout oriented to suit existing contours to achieve
views to and from the development.
Use of feature buildings and landscaping will
strengthen the village character.
Existing and newly planted trees scattered along
eastern boundary.
Existing natural stone boundary walls delineate
the site to the Western and Southern
boundaries.
Access road leading from B1407 aligned to retain
existing access point within stone boundary walls.
Primary access road to be designed to ensure
pedestrian linkage is maximised and landscape
connection is enhanced with neighbouring
development.
Possible use of 1½ to 2½ storey housing to ensure
views are maximised.
Roads and footpaths designed to maintain views
through the site and allow views into the
development.
Masterplan.
Open space creates a welcoming entrance to the
development.
Shared surface roads and village lanes provide a
varying width of enclosure.
Footpath arrival vantage points created along
existing core path.
Movement.
Roads designed to follow existing contours with
lanes to create village character and views to the
North, South and East.
Pedestrian links provided through the site with the
opportunity to connect with the core path to the
north linking the development with the village.
Constraints.North Berwick Law can be seen in the distance
to the North and Traprain Law to the South.
Uniform slope from West to East (12m level
difference).
Opportunities.
New planting to Western boundary and
ridgeline plantation to enhance and retain existing
landscape connections and screen development.
Key Frontage along the A199 respected to maximise
views to the South and not characterised with rear
fences and screen planting.
Proposed Residential
Development,
Orchardfield
East Linton
Vehicular Movement & Connections
• East Linton Rail Halt (proposed)
• Wallyford Park and Ride – 15.0 miles
• Straiton Park and Ride – 23.0 miles
• Hermiston Park and Ride – 30.4 miles
• Edinburgh Airport – 32.2 miles
*Future
Rail Halt
CHARACTER ZONES:
1. - The Village Edge
4. Indicative Layout
OVERVIEW
The development will comprise of
approximately 120 residential dwellings
varying from 1 bedroom coach houses, 3
bedroom terraced houses to 5 bedroom
detached family houses.
Onsite affordable housing to meet East
Lothian Council requirements.
The use of 1½ to 2½ storey housing to
utilise East facing slopes and maximise
views in and out of the site.
Access to the site is achieved with
existing farm access from Haddington
Road to retain existing trees and enhance
existing natural stone boundary walling.
Attractive open space created centrally
within the development with connection
to existing footpaths and open space
network.
Complements the village character and
creates a new defined planted boundary
to the village edge.
Low level soft landscaping and feature
buildings within each character zone will
strengthen the site’s rural character.
Building materials to reflect the existing
character of the village and provide an
attractive development.
Indicative Layout (not to scale).
Proposed Residential
Development,
Orchardfield
East Linton
1
2
3
2. - The Rural Edge
3. - The Courtyard
5. Proposed Development
Aerial photo – not to scale.
WHAT HAPPENS NEXT?
Thank you for attending this exhibition and
we welcome your comments on what you
have seen. All of your comments will be
considered as we finalise the detailed
planning application.
We anticipate submitting a detailed
planning application to East Lothian Council
in early April 2016. At that stage you will
have the opportunity to submit
representations to the Council. They will
take these into account in making their
decision on the application.
Prior to our submission of the application
we will be meeting with Dunpender
Community Council to discuss our emerging
plans and the feedback we have received
from this exhibition and other
consultations.
Please complete one of the Feedback Forms
available at this exhibition so that we have
a record of your views, and do not hesitate
to ask any questions of the Stewart Milne
Homes team present today. Alternatively
contact HolderPlanning (telephone 0131
538 2290 or email
Proposed Residential
Development,
Orchardfield
East Linton
The layout in context shows how the new residential
site will merge with the surrounding area.
Proposed Masterplan.
Aerial photo: 11th May 2009 (not to scale).
North
(c) Getmapping plc 2016
Local issues being considered:Affordable Housing – “25% affordable housing will be accommodated within our detailed design proposals.”
Existing Stone Walls– “Existing natural stone wall to the Southern and Western boundaries will be retained.”
Existing Habitat – “Will be strengthened and enhanced as part of the overall development.”
Rail Halt - “Additional development helps strengthen the argument for a rail connection to East Linton, improving transport connections to the village.”Road Safety – “To slow traffic passing the village, reduce road noise and improve safety to the existing A199 junction; we propose the introduction of a
40mph limit to the A199 at Pencraig Hill and an extension of the existing 30mph limit to the current A199 junction.”
Drainage – “We are liaising with Scottish Water and East Lothian Council to ensure sufficient capacity is present within the existing drainage network to
service the proposed development.”