CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD SAN FRANCISCO BAY REGION ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: SEWERAGE AGENCY OF SOUTHERN MARIN MILL VALLEY MARIN COUNTY This Order is issued in reference to an adjudicative proceeding initiated by the California Regional Water Quality Control Board, San Francisco Bay Region’s (Regional Water Board) issuance of Administrative Civil Liability Complaint No. R2-2008-0070, dated August 11, 2008 (Complaint), which proposed to assess a total of $1,600,000 against the Sewerage Agency of Southern Marin (SASM) for certain alleged discharges that occurred on January 25 and 31, 2008, in violation of Order No. R2-2007-0056 (NPDES No. CAOO37711). The parties to this proceeding are the Regional Water Board’s Prosecution Team and SASM (Parties). The Regional Water Board has been presented with a proposed settlement of the claims alleged in the Complaint, which has been developed during negotiations between the Parties. The Settlement Agreement is attached hereto as Attachment A. The proposed Settlement represents a mutually agreed-upon resolution of the Prosecution Team’s claims (Claims) through the payment of an administrative civil liability in the amount of $1,600,000 comprised of a cash payment to the State Water Resources Control Board’s (State Water Board) State Water Pollution Cleanup and Abatement Account in the amount of $800,000 and additional payments in the sum of $800,000 to support the Supplemental Environmental Programs (SEPs) set forth in Attachment B. The Parties recommend that the Regional Water Board issue this Order to effectuate their proposed Settlement. Having provided public notice of the proposed settlement and not less than thirty (30) days for public comment, the Regional Water Board finds that: 1. The Settlement is in the public interest and the proposed SEPs substantially comply with all essential requirements as set forth in the State Water Board’s Enforcement Policy for SEPs. 2. The Executive Officer has considered the exhibits and information in the record and comments provided by the Parties and the public and finds that SASM is subject to civil penalties. In determining the amount of civil liability to be assessed against the SASM, the Executive Officer has taken into consideration the factors described in California Water Code (CWC) Section 13385(e). The Executive Officer finds that the penalty amount agreed to by the Parties is reasonable based on the factors in CWC Section 13385(e). In addition to these factors, the civil liability recovers the costs incurred by the staff of the Regional
Transcript
Page 1: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full

CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD SAN FRANCISCO BAY REGION

ORDER NO. R2-2009-0026

ADMINISTRATIVE CIVIL LIABILITY FOR: SEWERAGE AGENCY OF SOUTHERN MARIN MILL VALLEY MARIN COUNTY This Order is issued in reference to an adjudicative proceeding initiated by the California Regional Water Quality Control Board, San Francisco Bay Region’s (Regional Water Board) issuance of Administrative Civil Liability Complaint No. R2-2008-0070, dated August 11, 2008 (Complaint), which proposed to assess a total of $1,600,000 against the Sewerage Agency of Southern Marin (SASM) for certain alleged discharges that occurred on January 25 and 31, 2008, in violation of Order No. R2-2007-0056 (NPDES No. CAOO37711). The parties to this proceeding are the Regional Water Board’s Prosecution Team and SASM (Parties). The Regional Water Board has been presented with a proposed settlement of the claims alleged in the Complaint, which has been developed during negotiations between the Parties. The Settlement Agreement is attached hereto as Attachment A. The proposed Settlement represents a mutually agreed-upon resolution of the Prosecution Team’s claims (Claims) through the payment of an administrative civil liability in the amount of $1,600,000 comprised of a cash payment to the State Water Resources Control Board’s (State Water Board) State Water Pollution Cleanup and Abatement Account in the amount of $800,000 and additional payments in the sum of $800,000 to support the Supplemental Environmental Programs (SEPs) set forth in Attachment B. The Parties recommend that the Regional Water Board issue this Order to effectuate their proposed Settlement.

Having provided public notice of the proposed settlement and not less than thirty (30) days for public comment, the Regional Water Board finds that:

1. The Settlement is in the public interest and the proposed SEPs substantially comply with all essential requirements as set forth in the State Water Board’s Enforcement Policy for SEPs.

2. The Executive Officer has considered the exhibits and information in the record and

comments provided by the Parties and the public and finds that SASM is subject to civil penalties. In determining the amount of civil liability to be assessed against the SASM, the Executive Officer has taken into consideration the factors described in California Water Code (CWC) Section 13385(e).

The Executive Officer finds that the penalty amount agreed to by the Parties is reasonable based on the factors in CWC Section 13385(e). In addition to these factors, the civil liability recovers the costs incurred by the staff of the Regional

Page 2: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full

Order No. R2-2009-0026 2

Water Board in evaluating the Claims and preparing the Complaint and related documents.

3. A notice of the Settlement Agreement and assessment of civil liability was published on the Regional Water Board’s website notifying the public of a 30-day review period and soliciting public comments on the terms of the proposed Settlement. The proposed Settlement supports the total assessment of administrative civil liability in the amount of $1,600,000 for the Claims and is in the public interest. This Order provides for the full and final resolution of each of the Claims.

4. Issuance of this Order is exempt from the provisions of the California Environmental Quality Act (Public Resources Code Section 21000 et seq.) in accordance with section 15321, Chapter 3, Title 14, California Code of Regulations.

IT IS HEREBY ORDERED that:

1. Administrative civil liability under California Water Code Section 13385(c) is imposed upon SASM in the amount of $1,600,000 consisting of a payment of $800,000 to the State Water Pollution Cleanup and Abatement Account and implementation of the proposed SEPs valued at $800,000.

2 The SEPs that are supported by contributions from this Order are:

a. $200,000 to the Richardson Bay Audubon Sanctuary’s Aramburu Island Clean Up, Restoration, and Enhancement Project; and

b. $600,000 to the Private Lateral Replacement Program.

Details regarding each SEP and implementation requirements and time schedules following implementation are set forth in Attachment B.

3. Thirty (30) days following adoption of this Order by the Regional Water Board or approval by the Executive Officer under his delegated authority, SASM shall pay the sum of $800,000 to the State Water Pollution Cleanup and Abatement Account in accordance with the schedule contained in the Settlement Agreement. Thirty (30) days from adoption of this Order by the Regional Water Board or approval by the Executive Officer under his delegated authority, SASM shall commence implementation of the proposed SEPs. These activities shall be suspended during the time in which any review is sought by any third party under Water Code Sections 13320 or 13330.

4. The Executive Officer is authorized to refer this matter to the Office of the Attorney General for enforcement if SASM fails to comply with paragraphs 1, 2 and 3.

Page 3: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full

Order No. R2-2009-0026 3

5. Fulfillment of SASM’s obligations under this Order constitutes full and final satisfaction of any and all liability for each Claim in the Complaint.

Date: April 8, 2009 ________________________ Bruce H. Wolfe Executive Officer

Attachments: A. Settlement Agreement B. Supplemental Environmental Projects C. Spill Table

Page 4: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full

Attachment A

Page 5: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 6: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 7: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 8: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 9: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 10: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full

Attachment B

Page 11: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 12: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 13: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 14: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 15: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 16: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 17: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 18: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 19: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 20: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 21: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 22: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 23: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 24: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 25: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 26: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 27: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 28: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 29: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full

Tables and Figures

Page 30: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full

Tabl

e 1:

Bud

get S

umm

ary

Task

Tot

al

Bud

get

Pha

se 1

Pha

se 2

Req

uest

SEP

Req

uest

CU

&A

1S

ecur

edB

echt

elS

ecur

edTo

yota

Req

uest

Toyo

ta

Tota

lse

cure

d or

re

ques

ted

Con

cept

ual P

lann

ing

and

Des

ign

1D

ata

colle

ctio

n/an

alys

is a

nd p

lann

ing

35,0

00

35

,000

35,0

0035

,000

2Fe

asib

ility

ana

lysi

s an

d dr

aft/f

inal

C

once

ptua

l Enh

ance

men

t Pla

n31

,000

31,0

0031

,000

31,0

00

Per

mitt

ing/

envi

ronm

enta

l com

plia

nce

35,0

00

35

,000

35,0

0035

,000

210,

000

50,0

0016

0,00

012

0,00

050

,000

40,0

0021

0,00

0

Fina

l Des

ign

for P

hase

1 c

onst

ruct

ion

9,00

0

9,00

09,

000

9,00

0

Fina

l Des

ign

for P

hase

2 c

onst

ruct

ion

31,0

00

31

,000

31,0

0031

,000

Con

stru

ctio

n, P

hase

1

1B

ay b

each

and

san

d fla

t enh

ance

men

t

Tran

spor

t and

dep

osit

beac

h m

ater

ial

90,0

00

90

,000

90,0

0090

,000

Con

stru

ct b

each

mic

ro g

roin

s10

,000

10,0

0010

,000

10,0

00

2C

onst

ruct

ion

Mon

itorin

g5,

000

5,

000

5,00

05,

000

Con

stru

ctio

n, P

hase

2

3E

arth

wor

k

Equ

ipm

ent m

obili

zatio

n70

,000

70,0

0070

,000

70,0

00

Tida

l mar

sh e

nhan

cem

ent

65,0

00

65

,000

65,0

0065

,000

Sea

sona

l wet

land

cre

atio

n20

,000

20,0

0020

,000

20,0

00

Gra

ssla

nd e

nhan

cem

ent

75,0

00

75

,000

75,0

0075

,000

4W

oody

deb

ris p

lace

men

t10

,000

10,0

0010

,000

10,0

00

5V

eget

atio

n re

-est

ablis

hmen

t20

,000

20,0

0020

,000

20,0

00

6C

onst

ruct

ion

mon

itorin

g20

,000

20,0

0020

,000

20,0

00

Con

stru

ctio

n C

ontin

genc

y (3

5%)

134,

750

134,

750

134,

750

134,

750

Pos

t-con

stru

ctio

n ha

bita

t mon

itorin

g (3

yea

rs)

60,0

00

60

,000

60,0

0060

,000

Aud

ubon

Edu

catio

n/ou

treac

h pr

ogra

ms

20,0

00

20

,000

20,0

0020

,000

SFE

P O

vers

ight

20,0

00

20

,000

20,0

0020

,000

Tota

l pro

ject

bud

get

970,

750

28

5,00

068

5,75

020

0,00

064

5,75

035

,000

50,0

0040

,000

970,

750

Not

es1)

RW

QC

B C

lean

Up

& A

bate

men

t

Aud

ubon

Pro

ject

Pla

nnin

g, M

anag

emen

t, Im

plem

enta

tion

Bud

get P

hasi

ngS

ecur

ed o

r Req

uest

ed F

undi

ng

pros

pect

us-b

udge

t-FIN

AL2

_200

9-02

06da

gP

age

1 of

1

Page 31: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 32: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 33: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 34: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full
Page 35: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full

Photographs of Existing and Proposed Conditions

Page 36: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full

�1��

Section�1:�Existing�Site�Conditions�

Photo�1:�heavily�goose�grazed�grasslands�(photo�by�Dan�Gillenwater,�1/12/2009)�

Photo�2:�non�grazed�grasslands�(photo�by�Christina�Toms,�1/29/2009)�

Photo�3:�oak�grove�at�north�end�of�island�(photo�by�Dan�Gillenwater,�1/12/2009)�

Page 37: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full

�2��

Photo�4:�wave�cut,�erosional�eastern�shoreline�(photo�by�Peter�Baye,�1/12/2009)�

Photo�5:�gravel�point�bar�and�back�barrier�tidal�marsh�(photo�by�Peter�Baye,�1/12/2009)�

Page 38: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full

�3��

Section�2:�Reference�Sites�for�Proposed�Conditions�

Photo�6:�small�barrier�beach�composed�of�coarse�grained�shell�fragments�and�gravels�eroded�from�artificial�fill�sources�along�the�Bayshore�Freeway.��Location:�Brisbane/Candlestick�spit,�San�Mateo�County.�(photo�by�Peter�Baye)�

Photo�7:�eroded,�compacted,�wave�scoured�upland�fill�in�the�high�tide�line,�exposing�rubble�and�gravel�embedded�in�heavy�sandy�clay,�supports�sparse�pickleweed�and�abundant�salt�marsh�bird’s�beak.�Location:�Pohono�St.�Marsh,�North�Sausalito,�

Marin�County.�(photo�by�Peter�Baye)�

Page 39: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full

�4��

Photo�8:�meadow�sedge�forms�pure�stands�that�grade�down�to�tidal�marsh�edges�of�Point�Pinole.�One�large�colony�has�spontaneously�established�at�Arumburu�Island,�indicating�high�feasibility�of�active�establishment.�Location:�Point�Pinole,�

Contra�Costa�County.�(photo�by�Peter�Baye)�

Photo�9:�seasonally�flooded�shallow�pools�form�in�depressions�in�consolidated,�desalinized�Bay�Mud.�Dabbling�ducks,�shorebirds,�and�egrets�forage�in�them�during�flood�periods�when�they�produce�many�prey�items,�including�tree�frogs�

tadpoles,�and�other�aquatic�invertebrates.�Location:�Bahia�wetlands,�Novato.�(photo�by�Peter�Baye)�

Page 40: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full

�5��

Photo�10:�heron�perched�on�large�woody�debris�in�tidal�marsh.�Location:�Pickleweed�Island�(adjacent�to�Aramburu�Island).�(photo�by�Peter�Baye)�

Page 41: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full

Attachment C

Page 42: ORDER NO. R2-2009-0026 ADMINISTRATIVE CIVIL LIABILITY FOR: … · 2015. 1. 26. · Order No. R2-2009-0026 3 5. Fulfillment of SASM’s obligations under this Order constitutes full

ATTACHMENT C: Spill Table (January 1, 2001 through September 30, 2008) Sewerage Agency Of Southern Marin ACL Complaint No. R2-2008-0070 Treatment Plant/Sewer Overflows

No. Date Location GallonsDischarged

GallonsRecovered

Overflow Destination Cause

1 12/27/04 Miller Ave. Mill Valley MH # AR6

6,000 0 Pickleweed Inlet Extreme weather conditions/I&I and incomplete cleaning project (contractor’s equipment failed)

2 12/27/04 Almonte Blvd & Wisteria Lane, Mill Valley MH# A11

1,200 0 Pickleweed Inlet Extreme weather conditions/I&I and incomplete cleaning project (contractor’s equipment failed)

3 12/27/04 Almonte Blvd north of Shoreline Highway MH #A24

600 0 Pickleweed Inlet Extreme weather conditions/I&I and incomplete cleaning project (contractor’s equipment failed)

4 12/30-31/2005

Equalization Pond

1,400,000 0 Pickleweed Inlet Extreme weather conditions. A state of emergency was declared in Marin County due to wide spread flooding.

5 1/25/2008 Equalization Pond

2,450,000 0 Pickleweed Inlet Large winter storm.

6 1/31/2008 Wastewater Treatment Plant

961,000 500 Some captured on paved surface

Storm/inadequate number of pumps functioning to handle flows/alarm error.

Total Gallons 4,818,800 500