Visual 1.2TFR 2010
U S & R N a t i o n a l R e s p o n s e S y s t e m
H S E E P O v e r v i e w
Strategic Training PlanObjective 4.2
Integrate HSEEP guidelines into National US&R Response System exercises and evaluations.
Strategies
Strategy 4.2.1 Integrate HSEEP guidelines into the National US&R Response System using a phased implementation plan and timeline.
Strategy 4.2.2. Train and educate Task Force members on the HSEEP model through train-the-trainer and distance learning activities.
Performance Measures
Performance Measure 4.2.1.1. Convene an ad hoc group of US&R members to draft a US&R HSEEP implementation plan not later 4/1/2011
Visual 1.3TFR 2010
U S & R N a t i o n a l R e s p o n s e S y s t e m
H S E E P O v e r v i e w
Strategic Training PlanPerformance Measure 4.2.1.2. Submit a recommendation and
implementation plan to the Ops Group and Program Office no later than 7/1/2011.
Performance Measure 4.2.1.3. Task Force training managers complete three on-line independent study courses by 4/1/2011: IS120-A (Introduction to Exercises), IS130 (Exercise Evaluation and Improvement Planning), and IS-139 (Exercise Design).
Performance Measure 4.2.1.4. Task Force training managers complete the L/E -146 HSEEP Program by 7/1/2012.
Performance Measure 4.2.1.5. By 1/1/2013 national US&R will have in-place an HSEEP program for OREs and exercises, consistent with State, local and task force operational partners, consistent with the NRF to execute National Planning Scenarios
Visual 1.4TFR 2010
U S & R N a t i o n a l R e s p o n s e S y s t e m
H S E E P O v e r v i e w
Exercise & Evaluation Training
FEMA EMI Exercise Courses
IS-120 .a An Introduction to ExercisesIS-130 Exercise Evaluation and Improvement PlanningIS-139 Exercise Design
IS -775 EOC Management and Operations
Visual 1.5TFR 2010
U S & R N a t i o n a l R e s p o n s e S y s t e m
H S E E P O v e r v i e w
Homeland Security Exercise and Evaluation Program Exercise Types
• There are seven types of exercises defined, each of which is either discussions-based or operations-based. Discussions-based Exercises familiarize participants with current plans, policies, agreements and procedures, or may be used to develop new plans, policies, agreements, and procedures.
Visual 1.6TFR 2010
U S & R N a t i o n a l R e s p o n s e S y s t e m
H S E E P O v e r v i e w
Exercise Types
Types of Discussion-based Exercises include:
• Seminar
• Workshop
• Tabletop Exercise (TTX)
• Games
Visual 1.7TFR 2010
U S & R N a t i o n a l R e s p o n s e S y s t e m
H S E E P O v e r v i e w
Exercise Types
Types of Operations-based Exercises include:
• Drill
• Functional Exercise (FE)
• Full-Scale Exercises (FSE)
Visual 1.8TFR 2010
U S & R N a t i o n a l R e s p o n s e S y s t e m
H S E E P O v e r v i e w
Requirements
• Complete exercises must satisfy four distinct performance requirements:
• Conducting an annual Training and Exercise Plan Workshop and developing and maintaining a Multi-year Training and Exercise Plan.
• Planning and conducting exercises in accordance with the program directive.
• Developing and submitting a properly formatted After-Action Report/Improvement Plan (AAR/IP).
• Tracking and implementing corrective actions identified in the AAR/IP.
Complete exercises must satisfy four distinct performance requirements:
Visual 1.9TFR 2010
U S & R N a t i o n a l R e s p o n s e S y s t e m
H S E E P O v e r v i e w
Reporting
Operations Based Exercises
• Drills – Exercise Plan (ExPlan); Master Scenario Events List (MSEL)(if needed) After Action Report (AAR) [Quick-Look AAR Acceptable]; Improvement Plan (IP); Participant Sign-in Sheet
• Functional Exercise (FE) – Exercise Plan (ExPlan); Master Scenario Events List (MSEL)(if needed); After Action Report (AAR); Improvement Plan (IP); Participant Sign-in Sheet
• Full Scale Exercise (FSE) – Exercise Plan (ExPlan); After Action Report (AAR); Improvement Plan (IP); Participant Sign-in Sheet
Visual 1.10TFR 2010
U S & R N a t i o n a l R e s p o n s e S y s t e m
H S E E P O v e r v i e w
Evaluation and Improvement Planning Discussion Based Exercises
• Seminars – Exercise Objectives and Summary Report; Participant Sign-in Sheet
• Workshop – Exercise Objectives and Summary Report; Participant Sign-in Sheet
• Table Top (TTX) – Situation Manual; After Action Report (AAR) [Quick-Look AAR Acceptable]; Improvement Plan (IP); Participant Sign-in Sheet
• Games – Situation Manual; After Action Report (AAR) [Quick-Look AAR Acceptable]; Improvement Plan (IP); Participant Sign-in Sheet
Visual 1.11TFR 2010
U S & R N a t i o n a l R e s p o n s e S y s t e m
H S E E P O v e r v i e w
EEGs for Operations-Based Exercises
Operations -based exercises, Drills, Functional, & Full-Scales, the Planning Team should select EEGs that correspond to core capabilities under evaluation. The team may choose to exercise all objectives and tasks or a select number.
Visual 1.12TFR 2010
U S & R N a t i o n a l R e s p o n s e S y s t e m
H S E E P O v e r v i e w
Conferences Official Meetings held by a Planning Team to
Develop & Coordinate an exercise.
5 Types of Planning Conferences
Concept & Objectives Meeting (C&O) (maybe rolled into the Initial Planning Conference).
Initial Planning Conference (IPC) Mid-Term Planning Conference (MPC) Master Scenario Events List
(MSEL)Conference Final Planning Conference (FPC)
Visual 1.13TFR 2010
U S & R N a t i o n a l R e s p o n s e S y s t e m
H S E E P O v e r v i e w
AnalysisDiscussion-based exercises:
Debrief with the exercise planning team, facilitators, and evaluators is held immediately following the exercise
Facilitator/Evaluator debrief takes place and preliminary analysis of the exercise observations begins
The analysis is completed, outlining strengths & areas of improvement
The draft AAR/IP is developed
Visual 1.14TFR 2010
U S & R N a t i o n a l R e s p o n s e S y s t e m
H S E E P O v e r v i e w
Analysis
Operations-based exercises:
Hot wash held immediately following the exercise for players, facilitators, evaluators, and planning team
Controller/Evaluator debrief takes place and preliminary analysis of the exercise observations begins
Exercise event timeline is created
The analysis is completed, outlining strengths & areas of improvement
The draft AAR/IP is developed
Visual 1.15TFR 2010
U S & R N a t i o n a l R e s p o n s e S y s t e m
H S E E P O v e r v i e w
Improvement Planning
An After Action Conference with planning team, evaluators, controllers, and participating entities to discuss the draft AAR/IP is held
AAR/IP finalized at the After Action Conference
CAP shall be monitored for compliance
Visual 1.16TFR 2010