+ All Categories
Home > Documents > originl.pdf

originl.pdf

Date post: 16-Jul-2015
Category:
Upload: pe-zhi-yong
View: 74 times
Download: 3 times
Share this document with a friend
26
1 Introduction To Construction Industry Final Project FNBE AUG 2014 INTAKE Lecturer : Ms Ann See Peng Pe Zhi Yong (0319765) Seet Tiong Hong (0320438) ICI Final Project
Transcript
Page 1: originl.pdf

1 Introduction To Construction Industry Final Project

FNBE AUG 2014 INTAKE

Lecturer : Ms Ann See Peng

Pe Zhi Yong (0319765)

Seet Tiong Hong (0320438)

ICI Final Project

Page 2: originl.pdf

2 Introduction To Construction Industry Final Project

Content No Description Page

1 Site Introduction 3

2 Zoning 4

3 Site Analysis & Observation 5-11

4 Proposal 12

5 Concept 13

6 Sketch Plan 14

7 Image of Idea 15-21

8 Rationale & Benefits 22

9 Maintenance 23

10 Costing 24-25

11 Reference 26

Page 3: originl.pdf

3 Introduction To Construction Industry Final Project

Site Introduction

• Bandar Sungai Long is a main township in Kajang, Selangor, Malaysia. The Universiti Tunku Abdul Rahman (UTAR) operates a campus in Bandar Sungai Long.It is currently under the administration of local council Majlis Perbandaran Kajang (MPKj).

• The Sungai Long Golf & Country Club is situated in this township. Bandar Sungai Long was designed for a population of 10,000 residents. It was built around the "leisure" living theme with residential homes surrounding an 18-hole golf course. High end detached houses were built around the golf course with semi-detached and terraced residential dwellings alongside condominiums, commercial properties and low cost low rise apartments on the outer edges of the development. The majority population in this township are Chinese.

Page 4: originl.pdf

4 Introduction To Construction Industry Final Project

Zoning

Residential Area

Commercial Area

Education Area

Picture above showed that the Sungai Long Gold & Country club is

surrounded by residential areas. There is 3 Educational Area, which is

primary school (under construction), secondary school (SMKBBSL),

and university (UTAR).

Page 5: originl.pdf

5 Introduction To Construction Industry Final Project

The site is surrounded by all residential area and each

residential area has its own recreational park. The site is

located at SL14 residential area which is being called as

“ASCARA RESIDENCY”. Ascara Residence is a freehold

gated and guarded semi-detached homes nestled in Bandar

Sungai Long. The residential development is developed by

SHL Consolidated under Sin Heap Lee Development

Group, and it was completed in 2005.

Site Analysis &Observation

Site Plan

Page 6: originl.pdf

6 Introduction To Construction Industry Final Project

ASCARA DEVELOPMENT COMPRISES:

• 66 semi-detached houses

• Built within parcel of 3.761 hectares (9 acres)

• Building blocks are arranged to avoid facing west

• Playground

• Concealed drains with walk paths

• Concealed telephone & streetlight cabling system

Page 7: originl.pdf

7 Introduction To Construction Industry Final Project

The Site

The site is located at Jalan SL 14, Bandar Sungai Long, Kajang,

Selangor. Which GPS Coordinated (3.038357, 101.799740). It is

surrounded by one of the main road in residential area and

houses. The Area of the site is amount 1216 m2.The amount of

traffic around is high and busy every morning and evening

Page 8: originl.pdf

8 Introduction To Construction Industry Final Project

D

B

A

C

Page 9: originl.pdf

9 Introduction To Construction Industry Final Project

Site Plan

• The site is surrounded by all residential area and each residential area has its own recreational park

Page 10: originl.pdf

10 Introduction To Construction Industry Final Project

Recreational Park

Around The Site • Located at SL 14

• Consists of playground ,bench and sidewalks

• Located at Taming Indah 1

• Consist of Playground, Gazebo, Football Field

Page 11: originl.pdf

11 Introduction To Construction Industry Final Project

• Located at SL 4

• Provided : playground, football field , garden

walk

Conclusion:

In a nutshell, most of the recreational parks do not have common

exercising area such as the basketball and badminton courts.

However, there's is a country club with comprehensive facilities,

which include Olympic sized swimming pool, tennis courts, squash

& badminton courts, bowling alley, gym, snooker and pool room,

coffee house and a beautiful 18-hole Jack Nicklaus-designed golf

course. Sadly, it is a private club which only welcomes its

members. Only club members are allow to enjoy those facilities in

the club.

Page 12: originl.pdf

12 Introduction To Construction Industry Final Project

Proposal – Recreational Area

In this 1216 m2 land, we have decided to develop a mini sports

and recreational area (MSRA) that would benefits the residence of

Ascara Residence, Kajang, Selangor in terms of health and

relationship between the residence. This MRSA consists of a 420

m2 basketball court, two 105 m2 badminton courts, bicycle stop

and an exercise area.

Considering that most of the user would be the children and

teenagers, the bicycle stop is being introduced. The bicycle stop

also encourages the residences to be more active in exercising

which promotes good health.

Besides, bleachers are provided to watch competitions that are

especially being organized by the authorities of the Ascara

Residence. 2 benches are also being provided in between 2

badminton courts as most of the players tend to be very tired after

the intensive game and they could keep their eye open on their

belongings that are being placed on the benches.

Moreover, there will be one mini garden that the residence could

exercise and also relax at as the gazebo is being provided. The

senior residences could spend most of their time to keep their

minds alert.

Next, the sporting net will be built around the proposed MRSA

to prevent the ball from getting out of the court for safety purposes.

There will be two entrances in the park. The first one would be the

entrance near the mini garden and the other one would be near the

basketball courts.

Page 13: originl.pdf

13 Introduction To Construction Industry Final Project

Concept – Green Materials

The Mini Sport and Recreational Park will be designed on a

40 m X 30 m site in Kajang, Ascara Residence. The proposed

MRSP will be built using mainly green or sustainable materials

such as the green concrete. The production of normal concrete

produces large amount of carbon dioxide. The badminton and

basketball courts will be built mainly using green concrete. By

using this material, I could cut the overall construction cost and it’s

more sustainable. Besides, the gazebo is being included in the park

so that the senior residence is able to keep their minds alert by

communicating with each other.

Page 14: originl.pdf

14 Introduction To Construction Industry Final Project

Sketch Plan

2

4

3 5

1

6

4

4

4

2

1

3

4

6

4

4

4

5

Gazebo

Bench Bleacher

Badminton Court

Basketball Court

Bicycle Stop

Bin Spotlight Yellow Flame Tree

Legend

Page 15: originl.pdf

15 Introduction To Construction Industry Final Project

Image Of Idea Bleacher

Bench

Purpose: To encourage residence to take

part in any activities at the park (support

or take part).

Other Uses: Place where spectators will

cheer for their teams whenever there is a

competition.

Purpose: To let the residence put their

belongings (bag, towel) to take a rest and

also to wait for their turns in the

activities.

Other Uses: Place to have conversation.

Page 16: originl.pdf

16 Introduction To Construction Industry Final Project

Sporting Net

Gazebo

Purpose: To prevent the ball from

getting out of the court.

Other Uses: To prevent the players from

falling onto the ground.

Purpose: To gather the residence

especially the senior one.

Other Uses: As a place where residence

meeting is being held at.

Page 17: originl.pdf

17 Introduction To Construction Industry Final Project

Stainless Bin

LED Spotlight

Purpose: Keep the park clean.

Other Uses: Witstand adverse weather

conditions. Easy to maintain.

Purpose: To keep the park in visible at

night.

Other Uses: To prevent someone from

hiding in the park.

Page 18: originl.pdf

18 Introduction To Construction Industry Final Project

Facilities Basketball

A 420 m2 basketball court is being included in the

plan. The basketball court will be constructed using

green concrete. This is court is being built is because

we have found out that the surrounding

neighborhoods do not have any basketball court. So,

by building it, it helps basketball players and those

who are interested to improve their health and also

skills as well as unite them.

Page 19: originl.pdf

19 Introduction To Construction Industry Final Project

Badminton Court

After doing few researches around the neighborhoods,

we have also found out that those neighborhoods are

lacked of badminton courts. We have planned to

construct two badminton courts at the site to

encourage healthy lifestyle and clearer minds.

Page 20: originl.pdf

20 Introduction To Construction Industry Final Project

Bicycle Stop

We have also proposed bicycle stop in the recreation

park at Ascara Residence. The reason we proposed

bicycle stop is that we estimate that most of the user

would be the teenagers and children of the Ascara

residence. Therefore, most of them would use bicycle

to travel to the park. Moreover, adults are also

encouraged to cycle to improve their health.

Page 21: originl.pdf

21 Introduction To Construction Industry Final Project

Softscape Name: Peltophorum Pterocarpum (Yellow Flame Tree)

Height: 15-16m

Spacing: 12m

Colour: Yellow

Begins To Flower: 4 years

Distribution: Australasia, Sri Lanka, Thailand,

Vietnam, Indonesia, Malaysia, Papua New Guinea and Philippines.

Propagation Method: Seeds, Direct Planting

Uses: Ornament Tree

1) Wood – Cabinet-making

2) Foliage - Fodder

Page 22: originl.pdf

22 Introduction To Construction Industry Final Project

Rationale & Benefit We found that the surrounding area of Ascara Residence do not

have enough sport facilities. In order to take part in sport activities

(basketball), one has to travel out from the neighborhood. By doing

so, it not only will affect the safety of the residence but also their

health. (Intake of CO2 from vehicles)

The site is an abandoned space. As a result, the site is currently

purposeless. Therefore, in order to fully utilize the space in the

residential area, a park is being built for win-win situation.

This Mini Sport and Recreational Park is being built for several

reasons and benefits. First and foremost, it is to promote healthy

lifestyle to the Ascara Residence.

The courts are being included in the construction plan is mainly

to empower and motivate the youth. Sports will not only keep their

minds at the top form but also neutralize youth with higher energy.

The park also

Besides, the park is being built to unite the Ascara residence.

By taking part in those activities that could be done in the park will

improve the bond between the residence which leads to a safer

residential area. Everyone will take care and cooperate with each

other.

Page 23: originl.pdf

23 Introduction To Construction Industry Final Project

Maintenance Maintenance Cost

Labour cost RM/Mth

1 labourer @ RM 50/day X

4 times a month. 200

1 supervisor @ RM 65/day X

4 times a month. 260

Transportation – lorry @ RM 100/day X

4 times a month 400

Material cost

Fertiliser; once a month 100

Replacement of dead plants. 100

Total 1060

Add profit & overhead 20% 332

RM 1,392/Month

Page 24: originl.pdf

24 Introduction To Construction Industry Final Project

Costing Hardscape Cost RM

• Green concrete paver @

RM 150 X 630 m2 94,500

• Sporting net @

RM 0.36 X 1216 m2 437.76

• Basketball goal @

RM 1,000 X 2 2,000

• Badminton net @

RM 32 X 2 Nos 64

• LED Spotlight @

RM 98 X 11 Nos 1,078

• Bleacher @

RM 1000 X 1 Set 1,000

• Bench @

RM 100 X 2 Nos 200

• Gazebo @

RM 5000 X 1 No 5,000

• Stainless Steel Bin @

RM 80 X 2 Nos 160

• Steel Gate @

RM 400 X 2 Nos 800

Total 105,239.76

Page 25: originl.pdf

25 Introduction To Construction Industry Final Project

Softscape Costing RM

• Yellow Flame Tree @

RM800 X 5 4,000

• Shrubs @ RM 50 X 50 2,500

• Taiwan grass @

RM 30 X 600 m2 18,000

Total RM 24,500

Summary

RM

• Hardscape Costs 105,239.76

• Softscape Costs 24,500.00

• Maintenance 1,392.00

Total Amount 131,131.76

Page 26: originl.pdf

26 Introduction To Construction Industry Final Project

Reference

Articles from:

• http://www.myweather2.com/City-Town/Malaysia/Sungai-Long-Golf-And-Country-Club.aspx

• http://en.wikipedia.org/wiki/Bandar_Sungai_Long • http://www.bbc.com/news/magazine-17818223 • http://www.thestar.com.my/story/?file=%2f2012%2f11%2f14%2fcentral%2f12

294699&sec=central • http://www.bandarsungailong.com/ • http://www.shlcb.com.my/bsl/bsl_smd.html

Pictures from: • http://i.dailymail.co.uk/i/pix/2009/01/16/article-1119504-

03146CB7000005DC-593_468x542.jpg • http://static.guim.co.uk/sys-

images/Guardian/Pix/pictures/2009/4/15/1239831052790/Free-outdoor-gym-equipmen-001.jpg

• http://news.bbcimg.co.uk/media/images/59877000/jpg/_59877917_adult_playground_624.jpg

• http://www.kcrenterprisesllc.com/wp-content/uploads/2013/07/Tennis-court-and-basketball-court.jpg

• http://www.flexcourt.com/images/layouts/layout-multi-30x64.png • http://www.falco.co.uk/bestanden/600x600/1140.jpg