OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT
Transcript
Page 1: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

OSBORNE HOLLOW CREEK

ROAD PROTECTION PROJECT

Page 2: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect NY State Highway 7, & Widen Road

Shoulder

Solution: Install Deeply-Keyed (weighted toe) Vegetated Riprap

Page 3: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Let’s think this thing through!!!!

OSBORNE HOLLOW CR. – DEC 12, 2006

Page 4: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

THE FIRST PLAN

Page 5: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Double Boil-UP Pools-Osborne Hollow Cr.-

Near Binghamton, NYPlanform View

Flow

Stable

Riprap with veg-1 ton/ft

Rip

rap

with

ve

g-3

tons

/ft

StableStable

Rip

rap

with

veg-

3 to

ns/ft

Riprap with veg-1 ton/ft

Dig Boil-Up Pool, 35 ft in diameter, 4 ft

deep

Dig Boil-Up Pool, 30 ft in diameter, 4 ft

deep

Riprap with veg-2 to

ns/ft

Rip

rap

with

veg-

1 to

n/ft

Page 6: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

THE LANDOWNER

BOO BOO

Page 7: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Osborne Hollow Cr.-Near Binghamton, NY

Planform View

FlowLandowner channel

StableStable Seve

re e

rosi

onSome erosion

Landowner levee

Landowner dredged area

Page 8: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Looking US at landowner dug channel in stream.

OSBORNE HOLLOW CR. – JUNE 24, 2007 - PIX BY DERRICK

Page 9: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Looking DS at landowner cutoff channel & levee

OSBORNE HOLLOW CR. – JUNE 24, 2007 - PIX BY DERRICK

Page 10: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Looking US from within landowner

cutoff channel. Note steep slope of bottom

of dug trench.

OSBORNE HOLLOW CR. – JUNE 24, 2007 -

PIX BY DERRICK

Page 11: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Landowner cutoff channel is aimed at his house, which is 35 ft from top bank!!

OSBORNE HOLLOW CR. – JUNE 24, 2007 - PIX BY DERRICK

Page 12: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Looking US. Headcuts migrating US thru the landowner cutoff channel.

OSBORNE HOLLOW CR. – DEC 20, 2007 - PIX BY DERRICK

Page 13: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

During our in-field meeting with the landowner, he felt his channel aimed at his house will work, so we decided

to abandon our first plan (double-boil-up pool) & go with a pure road

protection scheme. We will not touch the landowner’s work, in fact we photo-documented the site pre-

& post project construction

Page 14: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

THE SECOND

PLAN VEGETATED KEYS &

RIPRAP

Page 15: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Osborne Hollow Cr.-Near Binghamton, NY

Planform View

FlowLandowner channel

Stable

Stable Seve

re e

rosi

on

Some erosion

Landowner levee

Landowner dredged area

State Highway 7Vegetated keys & riprap

Page 16: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Looking DS. White painted line will be toe trench for riprap

OSBORNE HOLLOW CR. – JUNE 24, 2007 - PIX BY DERRICK

Page 17: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Gravel-Cobble Bed Stream–Install Soil-Choked Vegetated (Single-Row Bent Willow

Pole) Weighted-Toe Full-Bank Height Riprap

Pre-project profile view. Looking upstream

State Hwy 7

Varies between 6 & 13 ft

Page 18: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Let the actual construction

begin !!!! June 25, 2007

Page 19: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Looking DS at toe-down trench for riprap

OSBORNE HOLLOW CR. – JUNE 25, 2007 - PIX BY DERRICK

Page 20: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Looking US at toe-down trench for riprap

OSBORNE HOLLOW CR. – JUNE 25, 2007 - PIX BY DERRICK

Page 21: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Gravel-Cobble Bed Stream–Install Soil-Choked Vegetated (Single-Row Bent Willow

Pole) Weighted-Toe Full-Bank Height Riprap

Weighted toe trench dug 5 ft down & 4 ft wide

State Hwy 7

Page 22: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Gravel-Cobble Bed Stream–Install Soil-Choked Vegetated (Single-Row Bent Willow

Pole) Weighted-Toe Full-Bank Height Riprap

Bedload cobble-gravel used as fill material to provide a 2 on 1 slope

State Hwy 7

Page 23: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

700 STREAMCO WILLOW PLANTS WERE HARVESTED

BY NYS-DOT PERSONNEL FROM THE NRCS PLANT MATERIAL CENTER, BIG

FLATS, NY. AVERAGE PLANT SIZE WAS 12-15 FT LONG & 1-

1.5 INCH BUTT DIAMETER

Page 24: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Gravel-Cobble Bed Stream–Install Soil-Choked Vegetated (Single-Row Bent Willow

Pole) Weighted-Toe Full-Bank Height Riprap

12-16 ft long Streamco Willow placed @ a density of 5 stems/ft

State Hwy 7

Page 25: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Looking US. Placing streamco willow in toe-down trench

OSBORNE HOLLOW CR. – JUNE 26, 2007 - PIX BY DERRICK

Page 26: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Looking US. Installing a thick layer of willow & toe stone.

OSBORNE HOLLOW CR. – JUNE 26, 2007 - PIX BY DERRICK

Page 27: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Gravel-Cobble Bed Stream–Install Soil-Choked Vegetated (Single-Row Bent Willow

Pole) Weighted-Toe Full-Bank Height Riprap

Trench & bank toe area filled with DOT graded

“Heavy” riprap

State Hwy 7

Page 28: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Looking US. Filling toe-down trench with DOT heavy stone

OSBORNE HOLLOW CR. – JUNE 26, 2007 - PIX BY DERRICK

Page 29: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Looking DS. Willows in place, setting riprap toe stone

OSBORNE HOLLOW CR. – JUNE 26, 2007 - PIX BY DERRICK

Page 30: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Looking US. Weighted-toe trench almost filled with stone.

OSBORNE HOLLOW CR. – JUNE 26, 2007 - PIX BY DERRICK

Page 31: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

THE “SINGLE ROW” BENT WILLOW POLE METHOD

Willow placed at a density of 5 stems/ft.

Page 32: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Gravel-Cobble Bed Stream–Install Soil-Choked Vegetated (Single-Row Bent Willow

Pole) Weighted-Toe Full-Bank Height Riprap

Log

Using an available log held in the bucket of the

trackhoe, willows are pulled streamward

State Hwy 7

Page 33: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

A long 2 by 4 was used to bend willows away from the bank.

OSBORNE HOLLOW CR. – JUNE 26, 2007 - PIX BY DERRICK

Page 34: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Stone was then placed from above onto the upper section of the bank.

OSBORNE HOLLOW CR. – JUNE 26, 2007 - PIX BY DERRICK

Page 35: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Gravel-Cobble Bed Stream–Install Soil-Choked Vegetated (Single-Row Bent Willow

Pole) Weighted-Toe Full-Bank Height Riprap

Using the front end loader, riprap is placed on mid & upper bank areas {landward of the

willows}

State Hwy 7

Page 36: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Placing stone on mid & upper sections of bank.

OSBORNE HOLLOW CR. – JUNE 26, 2007 - PIX BY DERRICK

Page 37: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Gravel-Cobble Bed Stream–Install Soil-Choked Vegetated (Single-Row Bent Willow

Pole) Weighted-Toe Full-Bank Height Riprap

Bedload cobble-gravel is used to choke all riprap.

This resulted in a 2 to 3 ft wider road

shoulder.

State Hwy 7

Page 38: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Stone is then “choked” with bed material from stream, then compacted.

OSBORNE HOLLOW CR. – JUNE 26, 2007 - PIX BY DERRICK

Page 39: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Looking US. Stone & choke material results in a wider highway shoulder.

OSBORNE HOLLOW CR. – JUNE 26, 2007 - PIX BY DERRICK

Page 40: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Gravel-Cobble Bed Stream–Install Soil-Choked Vegetated (Single-Row Bent Willow

Pole) Weighted-Toe Full-Bank Height Riprap

Seed or hydroseed all

disturbed areas

State Hwy 7

Page 41: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

THE US KEY IS A STONE KEY WITH DEEPLY

PLANTED VEGETATION

Page 42: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Looking US. Placing DOT graded “heavy” stone in US key

OSBORNE HOLLOW CR. – JUNE 26, 2007 - PIX BY DERRICK

Page 43: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Looking DS at US key. Note angle of key to stream.

OSBORNE HOLLOW CR. – JUNE 27, 2007 - PIX BY DERRICK

Page 44: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Looking DS at US key.

OSBORNE HOLLOW CR. – JUNE 27, 2007 - PIX BY DERRICK

Page 45: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Looking DS at US key. Key construction is complete.

OSBORNE HOLLOW CR. – JUNE 27, 2007 - PIX BY DERRICK

Page 46: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

WHAT HAPPENS OVER TIME ??? 5

MONTHS LATER

Page 47: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Looking US at willow & stone protection by the road.

OSBORNE HOLLOW CR. – DEC 20, 2007 - PIX BY DERRICK

Page 48: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Looking US at willow & stone protection.

OSBORNE HOLLOW CR. – DEC 20, 2007 - PIX BY DERRICK

Page 49: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

Looking US at stream & road.

OSBORNE HOLLOW CR. – DEC 20, 2007 - PIX BY DERRICK

Page 50: OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.

CLEOPHUS SPEED ELVIS DERRICK, AT RESTQuestions?