+ All Categories
Home > Documents > OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI...

OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI...

Date post: 20-Jan-2016
Category:
Upload: alyson-carpenter
View: 223 times
Download: 0 times
Share this document with a friend
Popular Tags:
32
OSI Users Conference March 2002 PSEG T&D CBM 1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith Pierce
Transcript
Page 1: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 1

PSE&G Condition-Based Maintenance with OSI

TechnologiesOSI 2002 Users Conference

Angela Rothweiler

Keith Pierce

Page 2: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 2

Introduction

Provide overview of PSE&G’s condition-based maintenance project

Discuss project, system architecture, implementation details

Review some lessons learned

Page 3: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 3

Background

PSE&G is one of the largest combined electric and gas companies in the nation

PSE&G currently serves about ¾ of the population of New Jersey across a 2,600 square mile service area

Recent implementation of SAP PM (last 2 years)

Computer Aided Dispatch via RF project

Page 4: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 4

Background

This project focused on the electrical transmission and distribution (T&D) arm of the Delivery organization

Primary assets are large transformers and breakers

Market deregulation PSE&G experience with OSI

technologies in other business areas

Page 5: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 5

Where Electricity Comes From

Generation

Transmission

Household

Outlet

Distribution

Page 6: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 6

Project Overview

Business Drivers• Determination of asset health

to focus maintenance activities• Provide an analysis platform for

engineering activities • Perform condition-based

maintenance• ROI in < 3 years

Capital Replacemen

tCorrective

Maintenance

Calendar-Based

Condition-Based

Capital Replacemen

tCorrective Maintenanc

e

Preventive Maintenanc

e

Page 7: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 7

Project Overview

Motivational Factors• Increased reliance on aging assets• Information on asset health in a variety of systems• Expensive replacement projects • Retention of expertise

Page 8: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 8

Project Scope

Asset Scope - T&D Substation• Transformers• Breakers• Related Equipment (Relays, LTC, etc)

Work Process Scope• Substation Inspections• Diagnostic Data Collection• Preventive Maintenance Prioritization

Page 9: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 9

Project Scope

System Interfaces• SAP PM historical data• SAP PM measurement documents (RLINK)• Transmission SCADA (PI-to-PI)• Distribution SCADA (ETL & PI Batch)• MV-90 Load Monitoring (ETL & PI Batch)• Lab Systems – DeltaX & Doble (ETL & PI Batch)

Condition Assessment• Equation Builder• Diagnostic Displays

Page 10: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 10

Project Scope

Condition-Based Maintenance Analysis• Counter-based Conditions• Volume Additions• Condition Indicator

Maintenance Program Effectiveness• Asset Cost Profile• Asset Maintenance Profile (performance)• Failure Code Analysis • Key Performance Indicators

Page 11: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 11

Functional Areas

Data Collection• Remote Time-Series Data Collection Application• Diagnostic and Inspection Data• Automated Interfaces• SAP Data Collection

Asset Analysis and Reporting• Condition Assessment• Preventive Maintenance Ranking• Reports

Maintenance Management• Measurement Points• Maintenance Plan Modifications

Data Collection

Analysis & Reporting

Maintenance Management

Raw data

Measurement points

Notification

Feedback

Page 12: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 12

System Model

Alarm Module

Alarm Definitions

Alarms MD Creation

Measurement Point Group Definition

Measurement Documents

SAP Measurement

Points

Measurement Point Definition

Orders

SAP Maintenance

Plans

AssetsTask List

Calendar Events

SAP Maintenance

HistoryCosts,Damage Codes,MP Updates,Etc.

Import

SCADALab Systems

Inspection & Diagnostic

Tag Definitions

Raw Values Function or Calculation

Equation Definitions

Composed Points

SAP ExtractsNormalized

DataRelational

DataCalculationAsset

Profiles

Reporting

KPIs

Capital ReplacementPM Ordering

Page 13: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 13

Conceptual Design

SAP Data

Refresh

SQLServer

Relational Data

PI RLINK Service

Measurement Doc I/F

Point Group to MP

Relationship

MP Results

Trans PI Server

MV90 DeltaX Doble

PI to PI

PI UDS

Dist SCADA

PI Batch

DataLink

WorkStation

ProcessBook

Route & WFlow Tables

PI

WorkStation

MDT

PI Manual Logger

Intranet Server

ActiveView

WorkStation

Browser

Measurement

Points

Order

AssetDefinitions

Maint Plans

Tasks

SAP PM

Order History

Page 14: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 14

SAP PM

PM Equipment Hierarchy

Functional Location Substation

Functional Location Transformer Pad

Equipment Transformer

Equipment LTC

Page 15: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 15

SAP MP Overview

Measurement Point Types• Qualitative (“Real Hot”)• Quantitative (> 220°F)

Measurement Point Definition• Type• Association • Unit of Measure

Measurement Document• Absolute vs. Differential• Notification Generation

Page 16: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 16

SAP PM - RLINK Interface

FLOC or Equipment

Measurement Document

Maintenance Plan

Measurement Point

Notificationor Order

Calendar Event

RLINK Configuratio

nPI - UDS

RLINK Service

Alarms & Current Value

Tag references

RLINK Configuration

-Alarm tag for when to send MD

-Tag value for MP

-Generate Notification with MD

-Text, priority, type of Notification

Page 17: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 17

PI RLINK Overview

Approximately 1,000 measurement points 1 Equation tag for each MP driven by RLINK 1 Equation Tag for each rate change check 1 Equation Tag for each limit check Functional Uses

• Counter Readings• LTC Movements• Runtime Hours• Breaker not operating• LTC not crossing neutral• Rate of Change

Page 18: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 18

MP Use at PSE&G

2 0 1 201 StateTime Check

MD

PE Tag CounterAlarm TagCounter Tag

Tag Value

PE Tag Value

PE Cycle

Alarm Tag Value

RLINKMD

Rate Check Y

Notification Tag

1. Tag changes state

2. PE Tag is evaluated on next cycle

3. PE tag changes state

4. Alarm changes state

5. PE Tag resets on next cycle

6. If rate check test positive, notification set

Page 19: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 19

PI RLINK Configuration Screen

Page 20: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 20

PI Manual Logger

Substation Inspections 300 Substations – Weekly and Peak Inspections 20 – 500 points per station Scheduled in SAP PM Dispatched using CAD Dispatch over RF and CDPD XML file transfers of tour definition and data Equipment Oriented Point Collection

Page 21: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 21

Inspection Design Overview

Job and Status

Route and Values

Point Values

Point Definitio

ns

Route Request

s

Completion Records

Orders

SAP PM Module

CAD Module

PI UDS

PI Archive

XML

MDT

CAD PI

Chief Operato

r

Operator

Engineer doing analysis

PI Manual Logger

ML Database

XML

CDPD over RF1. Create SAP Order

2. Create CAD job

3. Get PI-ML Tour

4. Send Job to MDT

5. Accept Job

6. Send Tour

7. Conduct Tour

8. Send Tour to CAD

9. Complete order in SAP

10.Send Tour to PI-ML

11.Update PI UDS

Page 22: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 22

PI-ML Sample Screen

Page 23: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 23

PI Module Database

PI Module Overview• Define Module

• Descriptive Information

• Properties• Tag Alias

Page 24: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 24

PI Module Database Screen

Define Module Taxonomy• Define Hierarchies• Each level has a

parent-child relationship

• Any module can appear many times in the hierarchy

• Load the hierarchies

Page 25: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 25

PI Module Database Display

Page 26: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 26

Condition Assessment Overview

Equations

• CA = F1(M1) + F2(M2) + F3(M3) + …

Example factors include:• Average Load over time period• Last oil test results• Maintenance cost data• Number of operations

Factor components dependent on peer group Multiplier used to weight the factor result Must be flexible in terms of definition and composition

Page 27: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 27

Condition Assessment

Our Use of PI Module• Module for each level of the SAP PM hierarchy

and installed functional locations and equipment• Defined peer groups and installed equipment

modules• Defined factors and equations • Created Module for each equation and for each

equation factor• Developed displays using PI Module

Page 28: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 28

PI Module Database Factor 1

Average MVA (load) factor• Type: PI Calc • Alias: Load in MVA• Start Time = *• End Time = *-30d• Mode: Average• Case: Assign value to

factor• Multiplier = 0.2

Page 29: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 29

PI Module Database Factor 2

Last Oil Test Result Factor• Type: DeltaX CV• Select: equipcond• From: equipment• Where: serialnum =

‘&Serial Number’• Case: Assign value to

factor• Multiplier = 0.25

Page 30: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 30

Condition Assessment Sample

Page 31: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 31

Lessons Learned

Helps to have good vision Concepts are difficult for many users Data, data, data – start early with knowledgeable, dedicated

resources Lots of data required for meaningful representations – consider

backfile It’s going to change, start with a flexible foundation – don’t fixate

on initial equations, displays or reports Train on Displays, not ProcessBook – Use ActiveView or ICE Many spin-offs from initial deployment, hard to manage scope

creep The software is not the issue, culture and data are

Page 32: OSI Users Conference March 2002 PSEG T&D CBM1 PSE&G Condition-Based Maintenance with OSI Technologies OSI 2002 Users Conference Angela Rothweiler Keith.

OSI Users ConferenceMarch 2002

PSEG T&D CBM 32

Q&A


Recommended