ID Task
Mode
Task Name Duration Start Finish
1 Move out of Peavy 22 days Wed 6/1/16 Thu 6/30/16
2 Abatement 22 days Fri 7/1/16 Mon 8/1/16
3 Predemolition Activities 21 days Mon 7/25/16 Mon 8/22/16
4 Install Temporary Fence 1 day Mon 7/25/16 Mon 7/25/16
5 Install Rock for Construction / FIR Trailers 2 days Tue 7/26/16 Wed 7/27/16
6 Prepare Jefferson Street Entrance 2 days Thu 7/28/16 Fri 7/29/16
7 Mobilize FIR Trailers 1 day Mon 8/1/16 Mon 8/1/16
8 Mobilize Construction Trailers 1 day Tue 8/2/16 Tue 8/2/16
9 Tree Protection 1 day Wed 8/3/16 Wed 8/3/16
10 Install Temporary Partition for Knuckle 15 days Tue 8/2/16 Mon 8/22/16
11 Demolition Activities 61 days Tue 7/26/16 Tue 10/18/16
12 Selective Sitework Demolition 2 days Mon 8/1/16 Tue 8/2/16
13 Disconnect and Isolate Peavy Elect/Mech/Plumbing/IT 10 days Tue 7/26/16 Mon 8/8/16
14 Selective Demo to Expose Additional Abatement Items 10 days Tue 8/9/16 Mon 8/22/16
15 Complete Abatement 5 days Tue 8/23/16 Mon 8/29/16
16 Peavy Demolition (Knuckle/Salvage Beams/Structure) 31 days Tue 8/23/16 Tue 10/4/16
17 Peavy Beam Salvage 15 days Tue 8/30/16 Mon 9/19/16
18 Peavy Above Grade Removal/Recycle 20 days Tue 8/30/16 Mon 9/26/16
19 Richardson Underpinning / Structural Reinforcing at Knuckle 31 days Tue 8/23/16 Tue 10/4/16
20 Step 1 - Install Upper and Middle Soil Anchors 7 days Tue 8/23/16 Wed 8/31/16
21 Step 2 - Remove Richardson Elevated Level 1 Conc Slab(At Knuckle) 3 days Thu 9/1/16 Mon 9/5/16
22 Step 3 - Demo Existing Peavy Floors 5 days Tue 9/6/16 Mon 9/12/16
23 Step 4 - Install Strong Backs (Steel) on Richardson 3 days Tue 9/13/16 Thu 9/15/16
24 Step 5 - Remove Existing Richardson Level 2 (At Knuckle) 7 days Fri 9/16/16 Mon 9/26/16
25 Step 6 - Install Lower Level Soil Anchors 3 days Tue 9/27/16 Thu 9/29/16
26 Step 7 - Remove Existing Peavy Tunnel Slab/Wall 3 days Fri 9/30/16 Tue 10/4/16
27 Peavy Below Grade Removal/Recycle 15 days Wed 9/14/16 Tue 10/4/16
28 Site Clean Up 10 days Wed 10/5/16 Tue 10/18/16
29
30 Students Arrive for Fall Term 0 days Mon 9/19/16 Mon 9/19/16
31 Fall Term 62 days Wed 9/21/16 Thu 12/15/16
Move out of Peavy
Abatement
Predemolition Activities
Install Temporary Fence
Install Rock for Construction / FIR Trailers
Prepare Jefferson Street Entrance
Mobilize FIR Trailers
Mobilize Construction Trailers
Tree Protection
Install Temporary Partition for Knuckle
Demolition Activities
Selective Sitework Demolition
Disconnect and Isolate Peavy Elect/Mech/Plumbing/IT
Selective Demo to Expose Additional Abatement Items
Complete Abatement
Peavy Demolition (Knuckle/Salvage Beams/Structure)
Peavy Beam Salvage
Peavy Above Grade Removal/Recycle
Richardson Underpinning / Structural Reinforcing at Knuckle
Step 1 - Install Upper and Middle Soil Anchors
Step 2 - Remove Richardson Elevated Level 1 Conc Slab(At Knuckle)
Step 3 - Demo Existing Peavy Floors
Step 4 - Install Strong Backs (Steel) on Richardson
Step 5 - Remove Existing Richardson Level 2 (At Knuckle)
Step 6 - Install Lower Level Soil Anchors
Step 7 - Remove Existing Peavy Tunnel Slab/Wall
Peavy Below Grade Removal/Recycle
Site Clean Up
Students Arrive for Fall Term
Fall Term
5/22 5/29 6/5 6/12 6/19 6/26 7/3 7/10 7/17 7/24 7/31 8/7 8/14 8/218/28 9/4 9/11 9/18 9/25 10/2 10/910/1610/2310/3011/611/1311/2011/2712/412/1112/1812/25 1/1 1/8 1/15 1/22 1/29 2/5 2/12
Jun Jul Aug Sep Oct Nov Dec Jan Feb
2017
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
OSU - College of Forestry
Peavy Hall Deconstruction Schedule
Richardson Hall Underpinning Schedule
PRELIMINARY
WALSH Construction Co
Page 1
Project: OSU College of Forestry - FSC
Date: Thu 6/16/16
below slab condition unclear.
differs between S2.1 and 2/A3.8
EXISTING WALLS INPROGRES.
MODELED AS GENERIC WALLS.
ASSEMBLY DOES NOT MATCH EXISTING DRAWINGS
TOTAL AREA - 17,100 SF
STORAGE - 2,120 SF
XX
XX
XX
XX
XX
X
NEW PEAVY
HALL
RICHARDSON
HALL
WET/DRY
LAB COURT
ENTRY PLAZA
EAST
SW JEFFERSON STREET
ATRIUM
DRYDEN
HALL
SW
30T
H S
TR
EE
T
VETERINARY
RESEARCH
LAB
LABORATORY
ANIMAL
RESOURCE
CENTER
DAIRY
BARN
SW WASHINGTON WAY
TRUCK ACCESS
(SEE CIVIL)
AWP
AWP ENTRY
PLAZA
WORK YARD
SW
30T
H S
TR
EE
T
ENTRY
PLAZA
WEST
ACCESS DRIVE
SW
35T
H S
TR
EE
T
FOREST SERVICE
LEASE LIMIT LINE
STORAGE
RICHARD-
SON
WORK
YARD
CO
RV
ALLIS
, O
RE
GO
N
© M
GA
| 2
01
5 MGA
OS
U C
OLLE
GE
O
F F
OR
ES
TR
Y
2015 12 31
NE
W P
EA
VY
B
UILD
IN
G
No. Description Date
The Miller Hull Partnership, LLP
Architecture and Planning
Polson Building
71 Columbia, Sixth Floor
Seattle, WA 98104
Phone 206.682.6837
Fax 206.682.5692
Contact Name
Issu
ed for 1
00%
S
D
Issued for 50% SD 2015 10 29
PLOT
TED:
12/23
/2015
4:42
PM
FILE
: E:\c
ad\os
u for
estry
sd-ca
2014
10.1\
2-sd
_100
%\pr
oduc
tion\L
1.00
Issued for 80% SD 2015 12 03
Issued for 100% SD 2015 12 31
LANDSCAPE PLAN
N
0 40' 80'
1" = 40'-0"
20'
L1.00
OVERALL
LANDSCAPE
PLAN
L1.01
L1.02
1. ALL EXISTING TREES NOTED AS RETAINED SHALL BE PROTECTED
IN PLACE AT EXISTING GRADES. SEE LT.00 TREE PROTECTION
PLAN. EXISTING VEGETATION TO REMAIN OR TO BE
TRANSPLANTED TO BE IDENTIFIED IN FIELD BY LANDSCAPE
ARCHITECT PRIOR TO START OF CONSTRUCTION. EXCAVATION IN
AREAS OF EXISTING LAWN SHALL BE PERFORMED BY HAND WITHIN
THE DRIP LINE OF EXISTING TREES TO REMAIN. AT NO TIME SHALL
EQUIPMENT OR MATERIALS BE STORED OR STOCKPILED WITHIN THE
DRIP LINE OF ANY EXISTING TREES TO REMAIN. CONTRACTOR SHALL
NOTIFY LANDSCAPE ARCHITECT IF ANY EXISTING TREES TO REMAIN
WILL BE NEGATIVELY IMPACTED BY ANY REQUIRED TREE REMOVALS
PRIOR TO START OF THAT WORK.
2. PROTECT ALL EXISTING SITE CONDITIONS NOT DESIGNATED FOR
REMOVAL OR SALVAGE. ANY DAMAGE TO THESE ELEMENTS SHALL
BE RESTORED BY THE CONTRACTOR AT THE CONTRACTOR'S OWN
EXPENSE TO THEIR ORIGINAL CONDITION.
3. REMOVAL OF EXISTING SITE ELEMENTS NOTED AS SALVAGED IN
PROJECT CONTRACT DOCUMENTS SHALL BE REMOVED AND
RELINQUISHED TO OSU FOR STORAGE PRIOR TO DEMOLITION.
CONTRACTOR SHALL REINSTALL SALVAGED SITE ELEMENTS PER
CONTRACT DOCUMENTS.
4. THE LOCATION OF UNDERGROUND UTILITIES ARE SHOWN PER
PHYSICAL FEATURES FOUND, RECORD INFORMATION OBTAINED
FROM AND MARKINGS PLACED BY UTILITY COMPANIES. THE EXACT
LOCATION OR COMPLETENESS OF UNDERGROUND INFORMATION
SHOWN IN THESE DRAWINGS CANNOT BE GUARANTEED.
CONTRACTOR TO VERIFY THE ACTUAL LOCATION OF ALL UTILITIES,
FACILITIES, AND STRUCTURES PRIOR TO CONSTRUCTION.
CONTRACTOR MUST CALL (1-800-424-5555) 72 HOUR IN ADVANCE OF
ALL SUBGRADE WORK FOR UNDERGROUND UTILITY LOCATIONS.
5. PEDESTRIANS SHALL BE PROTECTED FROM EXCAVATION AND WORK
AREAS AT ALL TIMES. PROVIDE SUITABLE BARRIERS AS REQUIRED.
DO NOT BLOCK WALKS WITH STORAGE OF CONSTRUCTION
EQUIPMENT OR MATERIALS.
6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO UNDERSTAND,
COORDINATE, AND SCHEDULE SEQUENCED PHASING OF
CONSTRUCTION AND SEQUENTIAL OCCUPANCY BY THE OWNER
WITH THE SCHEDULE AND INTENT INDICATED THROUGHOUT THE
DOCUMENTS.
7. ANY DISCREPANCIES BETWEEN WHAT IS SHOWN ON THE CONTRACT
DRAWINGS AND FIELD CONDITIONS SHALL BE BROUGHT TO THE
ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO COMMENCING
WORK IN THAT AREA.
8. ALL MATERIALS, CONSTRUCTION METHODS AND WORKMANSHIP
SHALL CONFORM TO THE APPLICABLE LAWS, RULES AND CODES OF
THE MUNICIPALITY, COUNTY, AND STATE.
9. SPECIFIC LOCATIONS OF CONSTRUCTION FENCES, GATES, AND
ENTRANCES SHALL BE COORDINATED WITH THE OWNERS
REPRESENTATIVE.
10. THE CONTRACTOR SHALL KEEP THE WORK SITE FREE FROM DEBRIS
AND ACCUMULATED REFUSE AND SHALL HAVE SOLE RESPONSIBILITY
FOR PROTECTING ALL DANGEROUS AREAS FROM ENTRY BY
UNAUTHORIZED PARTIES. PUBLICLY ACCESSIBLE AREAS WILL BE
LEFT BROOM CLEAN AT THE END OF EACH WORKING DAY.
11. THE CONTRACTOR SHALL BE REQUIRED TO LEGALLY DISPOSE OF
ALL DEBRIS AT A PERMITTED FACILITY.
12. SEE CIVIL DRAWINGS FOR SITE UTILITIES AND VEHICULAR AREA
PAVEMENTS.
13. SEE ELECTRICAL DRAWINGS FOR SITE LIGHTING.
14. SEE ARCHITECTURAL DRAWINGS FOR BUILDING LAYOUT.
15. SEE L1.01 AND L1.02 FOR GRADING.
16. SITE IRRIGATION SHALL BE A COMBINATION OF DRIP AND SPRAY
IRRIGATION OVER ALL PROPOSED PLANTING AREAS(EXCLUDES
EXISTING ARBORETUM AREA). IRRIGATION SHALL CONFORM TO
ALL OSU CONSTRUCTION STANDARDS.
LANDSCAPE NOTES:
UP
Hazardous MaterialChemical
BLOCKED
BLOCKED
BLOCKED
STO
R
JAN
JAN
STOR
CLASSROOM O F F I C E CLASSROOM O F F I C E O F F I C E
STAIR -
HALLCLASSROOM
BREAK RM
HALL
O F F I C EO F F I C EO F F I C E
ENTRY
O F F I C EO F F I C EO F F I C EO F F I C EO F F I C E
HALL
O F F I C EO F F I C EO F F I C EO F F I C E
ENTRY
-
ELEVWOMEN
STAIR
PREP ROOM
CLASSROOM
P R O J E C T I O N
ENTRY
STAIR
-
MEN
JAN
WOMEN
O F F I C E
VAULT ENTRYBREAK ROOM
WORKROOM O F F I C E
HALL
O F F I C E
O F F I C E
O F F I C E
RECEPTION
STAIR
WOMEN
MENCONF
WAITING
RECEPTION
O F F I C E
O F F I C E
-
O F F I C E
O F F I C E
WORKRM
O F F I C E
A108 A106 A104 A102 A100
AS104 A11
4
AH101A101
A103A
AV103
A103BA103CA103C
AL101
A105A107A109A111A113
AH100
A115A117A119A121
A12
2
A123
AL102
A124
AE101A112
AS101
A130A
A130
A132
AL103
AS102
A13
9
A134
A135A136
A154
A154A AL156 A147
A154B A152
AH103
A146
A150D
A150C
A150B
A150
AS103
A144
A142A143
-
A140
A140A
A140B
A15
1
A154?
A154?
A154C
A141
-
RJRIRHRG
RK RN
R1
R2
R3
R4
R5
R7
RO RP
Px9
Px8
Px7
PxC
Px8a
Px7a
PxC1
MATCHLINE
EPA EPB EPB1 EPB2EPCEPC1 EPC2 EPD EPE EPF EPG EPH EPH1 EPI EPI1 EPJ EPK
EP10
EP9
EP8A
EP8
EP7A
EP7
EP6A
EP6
EP5
EP4
EP3A
EP3
EP2A
EP2
EP1
CREATE NEW OPENING FOR DOOR
DEMOLISH DOOR AND WALL;PREPARE FOR NEW WALL INFILL.
6' - 4"
EXISTING RH CMU WALL TOREMAIN. REFER TO STRUCTURAL.COORDINATE OPENINGS WITHARCHITECTURAL ISSUED FORCONSTRUCTION DRAWINGS.
DEMOLISHEXISTINGSTAIRSANDH.C. LIFT. EXISTING RH CMU WALL TO
REMAIN. REFER TO STRUCTURAL.COORDINATE OPENINGS WITHARCHITECTURAL ISSUED FORCONSTRUCTION DRAWINGS.
20' -
0"
EXISTINGELEVATORTOREMAINDIAGONAL HATCH - EXTENT
OF DEMOLITION OF EXISTINGFLOOR FINISH AT RH
KNUCKLE. PREP AND PROTECTFLOORS TO RECEIVE NEW
FLOOR FINISH.
CROSS HATCH - EXTENT OF DEMOLITIONOF EXISTING RAISED CONCRETE SLAB ANDSTAIRS AT RH KNUCKLE. REFER TOSTRUCTURAL DRAWINGS. PREP TO RECEIVENEW SLAB AND FLOOR FINISH.
EXISTING COLUMNS TOREMAIN. SEE KNUCKLESECTIONS AND REFER TOSTRUCTURAL DRAWINGS.
REMOVE EXISTING DOORS ATVESITBULE AND PREPAREOPENING FOR STRUCTURALINFILL.
CREATE NEW OPENINGFOR NEW FIRE SHUTTER.REFER TO ARCHITECTURALISSUED FORCONSTRUCTIONDRAWINGS.
9' - 9 1/2"
EXISTING WOODCOLUMNS AND BEAMSREFER TO INVETORY ONA060 FOR SALVAGE TYP.
DEMOLISH EXISTING EXTERIORSTAIRS AND CONCRETE PAD.REFER TO LANDSCAPE.
DEMOLISH FINISH AROUNDEXISTING ELEVATOR. PREPAREAND PROTECT SURFACE TORECEIVE NEW FINISH.
COLUMNS TO REMAIN PERSTRUCTURAL DRAWINGS, TYP.
DEMOLISH ARCHITECTURAL FINISHAROUND COLUMNS AND PREPARE
TO RECEIVE NEW FINISH, TYP.
3
A055
4
A055
1
A055
2
A055
EXTENT & DIMENSION OFCONTRUCTION PARTITIONSTO BE COORDINATED WITH
ARCHITECT
EXISTING DOORS REFER TO INVETORYLIST ON A066 FOR SALVAGE
EXTENT OF 1.2.3 WOOD PANEL REFER TOINVETORY LIST ON A066 FOR SALVAGE
NOTE:EXTENT OF PEAVYBUILDING AT BASEMENTLEVEL TO BE REMOVED.REFER TO A066 FOREXTENT
EXTENT OF EXISTING WOODWAINSCOATING REFER TOINVETORY LIST ON A066 FORSALVAGE
EXTENT OF EXISTING WOODWAINSCOATING REFER TO INVETORYLIST ON A066 FOR SALVAGE
1
1
E5--
6
7
A6011
2A602
1
2
3 4
-
---
-
---
RICHHALL
EXISTINGPEAVYHALL
SALVAGE + DEMOLITION GENERAL NOTES
1. DRAWINGS TO BE PLOTTED IN COLOR.
2. ARCHITECTURAL DEMOLITION DRAWINGS ILLUSTRATE AGENERAL SCOPE OF WORK, IT IS THE RESPONSIBILITY OF THECONTRACTOR TO DETERMINE THE FULL SCOPE OF THEDEMOLITION REQUIRED USING EXISTING SITE CONDITIONS ANDCONTRACT DOCUMENTS.
3.REFER TO CONSULTANT DRAWINGS AND THE FOLLOWINGSPECIFICATION SECTIONS AND ALL RELATED SECTIONS FORADDITIONAL INFORMATION:• 01 56 39 – TREE AND PLANT PROTECTION• 02 41 13 – SELECTIVE SITE DEMOLITION• 02 41 19 – SELECTIVE DEMOLITION
4. RICHARDSON HALL BUILDING WILL BE OCCUPIED ON ALLLEVELS DURING PEAVY HALL SALVAGE AND DEMOLITION:• CONTRACTOR TO PROVIDE WATERPROOFING, TEMPORARY
ENCLOSURE AND SOUND ISOLATION TO ENSURE ZERO WATERINGRESS AND MAINTAIN WORKING INDOOR TEMPERATURE,AIR QUALITY AND ACOUSTIC CONDITIONS.
• EXTENT AND DIMENSION OF CONSTRUCTION PARTITIONS TOBE COORDINATED WITH ARCHITECT.
• EXISTING RICHARDSON HALL MECHANICAL, ELECTRICAL ANDLIFE SAFETY SYSTEMS TO REMAIN OPERATIONAL DURINGDEMOLITION AND CONSTRUCTION.
5. CONTRACTOR TO ENGAGE A SPECIALTY ENGINEER TOPREPARE A DEMOLITION PLAN. ENGINEER TO STAMP DRAWINGSAND COMPLETE A COMMITMENT TO GENERAL REVIEW FORM FORDEMOLITION.
6. CONTRACTOR TO ENGAGE SPECIALTY ENGINEER TO ENSURESTRUCTURES TO REMAIN ARE ADEQUATELY SUPPORTED PRIOR TOAND DURING SALVAGE AND DEMOLITION. CONTRACTOR TOMAKE GOOD ALL JUNCTIONS BETWEEN EXISTING STRUCTURESIDENTIFIED AS TO BE REMOVED AND EXISTING STRUCTURESIDENTIFIED TO REMAIN.
7. HAZARDOUS MATERIALS ARE REPORTED TO BE PRESENT IN THEEXISTING PEAVY HALL BUILDING. A REPORT ON THE PRESENCE OFHAZARDOUS MATERIALS IS ON FILE FOR REVIEW AND USE.• NOTE THAT WOOD BASED ELEMENTS - NOTED FOR SALVAGE
AND REINSTALL IN NEW CONSTRUCTION MAY BE REFERRED TOIN THIS REPORT.
8. PROTECT ALL CLADDING AND FLASHING CONDITIONS ATJUNCTION OF EXISTING RICHARDSON HALL FROM DAMAGE FORDURATION OF SALVAGE AND DEMOLITION.• ENSURE BUILDING ENVELOPE CONTINUITY IS MAINTAINED
THROUGHOUT DEMOLITION AND CONSTRUCTION.
9. NEW OPENINGS FOR SERVICE PENETRATIONS TO BECOORDINATED WITH MECHANICAL + ELECTRICAL PRIOR TODEMOLITION.
10. ALL DIMENSIONS ARE TO BE DETERMINED USING THEARCHITECTURAL ISSUED FOR CONSTRUCTION DRAWINGS ANDARE NOT TO BE INFERRED FROM THE DEMOLITION DRAWINGS.REFER TO ARCHITECTURAL IFC DRAWINGS FOR LOCATION ANDDIMENSION OF NEW OPENINGS FOR DOORS AND FIRE SHUTTERS.DIMENSIONS ON DEMOLITION DRAWINGS PROVIDED FORPRICING ONLY.
11. REFER TO A066 FOR INVENTORY LIST OF MATERIALS TO BESALVAGED AND USED IN NEW CONSTRUCTION:• CAREFULLY SALVAGE IN A MANNER TO PREVENT DAMAGE.• ITEMS INDICATED FOR REUSE WITHIN THE BUILDING TO BE
STORED BY THE CONTRACTOR / PREPARED FOR REFINISH ANDINSTALLATION. ALL OTHER ITEMS TO BE PROMPTLY RETURNEDTO THE OWNER.
• REFER TO EXISTING PEAVY HALL BUILDING DRAWINGS FOREXTENTS OF WOOD BASED MATERIALS.
• ONCE THE STRUCTURE IS EXPOSED, MGA AND EQUILIBRIUMCONSULTING SHALL REVIEW THE STRUCTURAL ELEMENTS INPERSON AND IN PLACE WITH THE CONTRACTOR TO PROVIDEFURTHER INSTRUCTION ON ELEMENTS THAT SHALL BESALVAGED FOR STRUCTURAL / ARCHITECTURAL APPLICATION.
• REFER TO A063 AND A064 FOR PHOTOGRAPHS SHOWINGHALLWAY ELEVATIONS AS INDICATED BY THE ELEVATIONMARKERS.
• REFER TO OSU_FSCSALVAGEDEMOAPPENDIX FOR ADDITIONALDOCUMENTATION OF ARTIFACTS AND WOOD ELEMENTSWIHTIN THE EXISTING BUILDING
• THIS PHOTOGRAPHIC DOCUMENTATION IS PROVIDED FORREFERENCE ONLY. CONTRACTOR TO PROVIDEDOCUMENTATION OF ALL SALAVAGED ITEMS AND ELEMENTSPER SPECIFICATION.
12. SUBMIT A LIST OF ITEMS THAT HAVE BEEN REMOVED ANDSALVAGED, INCLUDING DIMENSIONS AND CONDITIONS FOR ALLWOOD ELEMENTS INDICATED FOR POTENTIAL REUSE.• NOTIFY CONSULTANT OF ALL WOOD BASED MATERIALS
INDICATED FOR REUSE THAT MAY REQUIRE ABATEMENT.
13. CONTRACTOR TO MAKE EFFORTS TO MINIMIZE WASTE TOLANDFILL. CONTRACTOR TO TRACK THE WEIGHT OF ITEMS:• SALVAGED FOR USE IN NEW CONSTRUCTION• DIVERTED FROM LANDFILL / RECYCLED• ABATED MATERIALS• SENT TO LANDFILL
SALVAGE AND DEMO LEGEND
EXISTING TO REMAIN
EXISTING TO BE REMOVED
*REFER TO A066 FOR INVENTORYOF SALVAGED MATERIALS
EXTENT OF FLOORFINISH TO BE REMOVED
FLOOR FINISH AND STRUCTURETO BE REMOVED (SEE STRUCTURAL)
WOOD PANEL
WANSCOATING
Michael Green Architecture Inc.
63 E CordovaVancouver, BC V6A 1K3
Phone 604.336.4770
Issue Date:Drawn:Checked:MGA Project No.:
DateDescriptionNo.
NOT
FOR
CONS
TRUC
TION
C:\Users\sheatreacy\Documents\[email protected]
2014-022STJG
08 APRIL 2016
EXIST PEAVYL1
SALVAGE+DEMO
PEAV
Y B
UIL
DIN
G
A052
OSU
FO
RES
T SC
IEN
CE
CO
MPL
E XC
OR
V ALL
IS, O
REG
ON
BID
PA C
K AG
E 0 1
- SAL
V AG
E +
DE M
O0 8
AP R
IL 2
016
1/8" = 1'-0"A055
1 SALVAGE + DEMO LEVEL 1 FLOOR PLAN
1 : 1250
KEY PLAN
DN
DN
DN
OPEN COURT
DN
UP
UP 7 INCHES
UP 7 INCHES
UP 7 INCHES
UP 7 INCHES
UP 7 INCHES
CONFERENCE
COMP HELP DESKHELP DESK
O F F I C E
HAL
L
O F F I C E
O F F I C E
O F F I C E
LAB- COMPUTER
REFERENCE
O F F I C E
-
STAIR
STORLAB - COMPUTER
CONFERENCE
O F F I C EWORKROOM
CLASSROOM
CLASSROOM
HALL
WOMEN
STAIR
STOR
LAB
LAB - COMPUTER
LAB - COMP
CO
PY
STUDY
STOCKO F F I C E
MEETING STOCK
WORKROOM
PRODUCTION
STAIR
STOR
STORAGE
CLASSROOM
LAB
P R E P
LAB
STAIR
ROOF ACCESS
ELEVMEN
HALL
JAN
-
O F F I C E O F F I C E O F F I C E O F F I C E O F F I C E O F F I C E O F F I C E STOR
O F F I C E
O F F I C E
O F F I C E
O F F I C E
O F F I C E
O F F I C E
O F F I C E
O F F I C E
O F F I C E
HALL
O F F I C E
O F F I C E
O F F I C E
O F F I C E
HALL
O F F I C E
O F F I C E
O F F I C E
O F F I C E
O F F I C E
-
STOR
HELP DESK
-
-
- -
STOR
O F F I C E
O F F I C E
-
O F F I C E
A224
A222A218
A216
AH210
A210
A212
A214
A208
A204
A202
A202A
AS204
A200A284
A282
A280AA278
A276
A274
A272
AH204
A270
AS203
A258
A256
A254B
A254A254A
A252
A250BA250C
A250D A250A
A250
A248AS202
A244
A242A
A242
A240
A238
A236
AS201
A232
AE201A228
AH201
A217
A217A
A215 A213A A211 A207 A203 A201 A279 A277
A275
A273
A271
A269
A267
A265
A263
A261
A259
AH203
A237
A235
A233
A231
AH202
A229
A227
A225
A223
A221
A230
-
-
-
-
- -
-
-
-
-
A213B
UPUP
RJRIRH
RK RN
R1
R2
R3
R4
R5
R7
RO RP
Px9
Px8
Px7
PxC
Px8a
Px7a
PxC1
MATCHLINE
EPA EPB EPB1 EPB2EPCEPC1 EPC2 EPD EPE EPF EPG EPH EPH1 EPI EPI1 EPJ EPK
EP10
EP9
EP8A
EP8
EP7A
EP7
EP6A
EP6
EP5
EP4
EP3A
EP3
EP2A
EP2
EP1
3
A055
4
A055
1
A055
2
A055
DEMOLISHEXISTINGSTAIRSANDH.C. LIFT. CREATE NEW OPENING FOR DOOR
DEMOLISH DOOR AND WALL;PREPARE FOR NEW WALL INFILL.
6' - 4"
9' - 9 1/2"EXISTING RH CMU WALL TOREMAIN. REFER TO STRUCTURAL.COORDINATE OPENINGS WITHARCHITECTURAL ISSUED FORCONSTRUCTION DRAWINGS.
REMOVE EXISTING DOORS ATVESITBULE AND PREPAREOPENING FOR STRUCTURALINFILL. REFER TO STRUCTURAL
CREATE NEW OPENINGFOR DOORS. REFER TOARCHITECTURAL ISSUEDFOR CONSTRUCTIONDRAWINGS ANDSTRUCTURAL
8' - 3
"
EXISTING RH CMU WALL TOREMAIN. REFER TO STRUCTURAL.COORDINATE OPENINGS WITHARCHITECTURAL ISSUED FORCONSTRUCTION DRAWINGS.
COLUMNS TO REMAIN PERSTRUCTURAL DRAWINGS, TYP.DEMOLISH ARCHITECTURAL FINISHAROUND COLUMNS AND PREPARETO RECEIVE NEW FINISH, TYP.
AREA OPEN TO ABOVE.
DEMOLISH FINISH AROUNDEXISTING ELEVATOR. PREPAREAND PROTECT SURFACE TORECEIVE NEW FINISH.
EXISTINGELEVATORTOREMAIN
EXISTING COLUMNS ANDBEAMS TO REMAIN. SEESECTION A056 AND REFER TOSTRUCTURAL.
EDGE OFBEAMS BELOW
EXISTING DOOR ANDDOOR FRAME TOREMAIN. PROTECTAND PREPARE TORECEIVE NEW FLOORFINISH.
REMOVE EXISTING SMOKEBAFFLE AND PREPARE TORECEIVE CEILING FINISH(TO ALIGN WITH EXISTINGCEILING LEVEL).
REMOVE MILLWORKPANELS ANDPREPARE WALL TORECEIVE NEW FINISH.
EXISTING DOORS REFER TO INVETORYLIST ON A066 FOR SALVAGEEXISTING WOOD COLUMNS AND
BEAMS REFERT TO INVENTORY LIST ONA066 FOR SLAVAGE
NOTE:EXISTING GLULAM PURLINS + DECKINGREFER TO INVETORY LIST ON A066 FORSALVAGE
EXISTINGRICHARDSON
HALL
1
E6--
-
2
1E9-2- -
1E7-2- -
1
E8--
-
2
EXTENT OF 1.2.3 WOOD PANEL REFER TOINVETORY LIST ON A066 FOR SALVAGE
EXTENT & DIMENSION OFCONTRUCTION PARTITIONSTO BE COORDINATED WITH
ARCHITECT
NOTE:EXTENT OF PEAVYBUILDING AT BASEMENTLEVEL TO BE REMOVED.REFER TO A066 FOREXTENT
-
---
-
---
RICHHALL
EXISTINGPEAVYHALL
SALVAGE + DEMOLITION GENERAL NOTES
1. DRAWINGS TO BE PLOTTED IN COLOR.
2. ARCHITECTURAL DEMOLITION DRAWINGS ILLUSTRATE AGENERAL SCOPE OF WORK, IT IS THE RESPONSIBILITY OF THECONTRACTOR TO DETERMINE THE FULL SCOPE OF THEDEMOLITION REQUIRED USING EXISTING SITE CONDITIONS ANDCONTRACT DOCUMENTS.
3.REFER TO CONSULTANT DRAWINGS AND THE FOLLOWINGSPECIFICATION SECTIONS AND ALL RELATED SECTIONS FORADDITIONAL INFORMATION:• 01 56 39 – TREE AND PLANT PROTECTION• 02 41 13 – SELECTIVE SITE DEMOLITION• 02 41 19 – SELECTIVE DEMOLITION
4. RICHARDSON HALL BUILDING WILL BE OCCUPIED ON ALLLEVELS DURING PEAVY HALL SALVAGE AND DEMOLITION:• CONTRACTOR TO PROVIDE WATERPROOFING, TEMPORARY
ENCLOSURE AND SOUND ISOLATION TO ENSURE ZERO WATERINGRESS AND MAINTAIN WORKING INDOOR TEMPERATURE,AIR QUALITY AND ACOUSTIC CONDITIONS.
• EXTENT AND DIMENSION OF CONSTRUCTION PARTITIONS TOBE COORDINATED WITH ARCHITECT.
• EXISTING RICHARDSON HALL MECHANICAL, ELECTRICAL ANDLIFE SAFETY SYSTEMS TO REMAIN OPERATIONAL DURINGDEMOLITION AND CONSTRUCTION.
5. CONTRACTOR TO ENGAGE A SPECIALTY ENGINEER TOPREPARE A DEMOLITION PLAN. ENGINEER TO STAMP DRAWINGSAND COMPLETE A COMMITMENT TO GENERAL REVIEW FORM FORDEMOLITION.
6. CONTRACTOR TO ENGAGE SPECIALTY ENGINEER TO ENSURESTRUCTURES TO REMAIN ARE ADEQUATELY SUPPORTED PRIOR TOAND DURING SALVAGE AND DEMOLITION. CONTRACTOR TOMAKE GOOD ALL JUNCTIONS BETWEEN EXISTING STRUCTURESIDENTIFIED AS TO BE REMOVED AND EXISTING STRUCTURESIDENTIFIED TO REMAIN.
7. HAZARDOUS MATERIALS ARE REPORTED TO BE PRESENT IN THEEXISTING PEAVY HALL BUILDING. A REPORT ON THE PRESENCE OFHAZARDOUS MATERIALS IS ON FILE FOR REVIEW AND USE.• NOTE THAT WOOD BASED ELEMENTS - NOTED FOR SALVAGE
AND REINSTALL IN NEW CONSTRUCTION MAY BE REFERRED TOIN THIS REPORT.
8. PROTECT ALL CLADDING AND FLASHING CONDITIONS ATJUNCTION OF EXISTING RICHARDSON HALL FROM DAMAGE FORDURATION OF SALVAGE AND DEMOLITION.• ENSURE BUILDING ENVELOPE CONTINUITY IS MAINTAINED
THROUGHOUT DEMOLITION AND CONSTRUCTION.
9. NEW OPENINGS FOR SERVICE PENETRATIONS TO BECOORDINATED WITH MECHANICAL + ELECTRICAL PRIOR TODEMOLITION.
10. ALL DIMENSIONS ARE TO BE DETERMINED USING THEARCHITECTURAL ISSUED FOR CONSTRUCTION DRAWINGS ANDARE NOT TO BE INFERRED FROM THE DEMOLITION DRAWINGS.REFER TO ARCHITECTURAL IFC DRAWINGS FOR LOCATION ANDDIMENSION OF NEW OPENINGS FOR DOORS AND FIRE SHUTTERS.DIMENSIONS ON DEMOLITION DRAWINGS PROVIDED FORPRICING ONLY.
11. REFER TO A066 FOR INVENTORY LIST OF MATERIALS TO BESALVAGED AND USED IN NEW CONSTRUCTION:• CAREFULLY SALVAGE IN A MANNER TO PREVENT DAMAGE.• ITEMS INDICATED FOR REUSE WITHIN THE BUILDING TO BE
STORED BY THE CONTRACTOR / PREPARED FOR REFINISH ANDINSTALLATION. ALL OTHER ITEMS TO BE PROMPTLY RETURNEDTO THE OWNER.
• REFER TO EXISTING PEAVY HALL BUILDING DRAWINGS FOREXTENTS OF WOOD BASED MATERIALS.
• ONCE THE STRUCTURE IS EXPOSED, MGA AND EQUILIBRIUMCONSULTING SHALL REVIEW THE STRUCTURAL ELEMENTS INPERSON AND IN PLACE WITH THE CONTRACTOR TO PROVIDEFURTHER INSTRUCTION ON ELEMENTS THAT SHALL BESALVAGED FOR STRUCTURAL / ARCHITECTURAL APPLICATION.
• REFER TO A063 AND A064 FOR PHOTOGRAPHS SHOWINGHALLWAY ELEVATIONS AS INDICATED BY THE ELEVATIONMARKERS.
• REFER TO OSU_FSCSALVAGEDEMOAPPENDIX FOR ADDITIONALDOCUMENTATION OF ARTIFACTS AND WOOD ELEMENTSWIHTIN THE EXISTING BUILDING
• THIS PHOTOGRAPHIC DOCUMENTATION IS PROVIDED FORREFERENCE ONLY. CONTRACTOR TO PROVIDEDOCUMENTATION OF ALL SALAVAGED ITEMS AND ELEMENTSPER SPECIFICATION.
12. SUBMIT A LIST OF ITEMS THAT HAVE BEEN REMOVED ANDSALVAGED, INCLUDING DIMENSIONS AND CONDITIONS FOR ALLWOOD ELEMENTS INDICATED FOR POTENTIAL REUSE.• NOTIFY CONSULTANT OF ALL WOOD BASED MATERIALS
INDICATED FOR REUSE THAT MAY REQUIRE ABATEMENT.
13. CONTRACTOR TO MAKE EFFORTS TO MINIMIZE WASTE TOLANDFILL. CONTRACTOR TO TRACK THE WEIGHT OF ITEMS:• SALVAGED FOR USE IN NEW CONSTRUCTION• DIVERTED FROM LANDFILL / RECYCLED• ABATED MATERIALS• SENT TO LANDFILL
SALVAGE AND DEMO LEGEND
EXISTING TO REMAIN
EXISTING TO BE REMOVED
*REFER TO A066 FOR INVENTORYOF SALVAGED MATERIALS
EXTENT OF FLOORFINISH TO BE REMOVED
FLOOR FINISH AND STRUCTURETO BE REMOVED (SEE STRUCTURAL)
WOOD PANEL
WANSCOATING
Michael Green Architecture Inc.
63 E CordovaVancouver, BC V6A 1K3
Phone 604.336.4770
Issue Date:Drawn:Checked:MGA Project No.:
DateDescriptionNo.
NOT
FOR
CONS
TRUC
TION
C:\Users\sheatreacy\Documents\[email protected]
2014-022STJG
08 APRIL 2016
EXIST PEAVYL2
SALVAGE+DEMO
PEAV
Y B
UIL
DIN
G
A053
OSU
FO
RES
T SC
IEN
CE
CO
MPL
E XC
OR
V ALL
IS, O
REG
ON
BID
PA C
K AG
E 0 1
- SAL
V AG
E +
DE M
O0 8
AP R
IL 2
016
1/8" = 1'-0"A055
1 SALVAGE + DEMO LEVEL 2 FLOOR PLAN
1 : 1250
KEY PLAN
RICHHALL
EXISTINGPEAVYHALL
RJRIRH
RK
RN
R1
R2
R3
R4
R5
R7
RO
Px9
Px8
Px7
Px8a
Px7a
EPA EPB EPB1 EPB2EPCEPC1 EPC2 EPD EPE EPF EPG EPH EPH1 EPI EPI1 EPJ EPK
EP10
EP9
EP8A
EP8
EP7A
EP7
EP6A
EP6
EP5
EP4
EP3A
EP3
EP2A
EP2
EP1
RICHARDSON HALL
A6513
3
A055
4
A055
1
A055
2
A055
CREATE NEW OPENING FOR DOOR. REFER TOARCHITECTURAL ISSUED FOR CONSTRUCTIONDRAWINGS & STRUCTURAL DRAWINGS
DEMOLISH FINISH AROUNDEXISTING ELEVATOR. PREPAREAND PROTECT SURFACE TORECEIVE NEW FINISH.
EXISTINGELEVATORTOREMAIN
DEMO CONCRETE SLAB BELOW AND ALLROOF ELEMENTS ABOVE - REFER TOEXISTING RH DRAWINGS FOR EXTENT -SEE A506 FOR SECTION
REMOVE FRAMING ANDFINISH UP TO BASE OFEXISTING GLULAMSTRUCTURE ABOVE
REMOVE AND SALVAGE ALLWOOD PANELLING IN RHKNUCKLE STAIRWELL
MAINTAIN WALL PANELLINGUP TO THIS POINT DURINGPEAVY AND KNUCKLEDEMOLITION
REMOVE STAIR STRUCTUREFLUSH TO FACE OF BEAM
MAIL ROOM TOREMAINUNCHANGED
OPE
N TO
BEL
OW
RICHARDSON HALL BUILDING WILL BE OCCUPIEDDURING ROOF REMOVAL ON ALL LEVELS. PROVIDEWATERPROOFING, TEMPORARY ENCLOSURE ANDSOUND ISOLATION TO ENSURE ZERO WATERINGRESS AND MAINTAIN WORKING INDOORTEMPERATURE AND ACOUSTIC CONDITIONS.
EXTENT & DIMENSION OFCONTRUCTION PARTITIONSTO BE COORDINATED WITH
ARCHITECT
OPEN TO COURTYARD BELOW
EXISTING PEAVY ROOF TOBE REMOVED REFER TOA066 FOR INVENTORY LISTFOR SALVAGE
WOOD WALK
EXISTING PEAVY ROOFSTRUCTURE REFER TOA066 INVENTORY LISTFOR SALVAGE
8
-
---
-
---
SALVAGE + DEMOLITION GENERAL NOTES
1. DRAWINGS TO BE PLOTTED IN COLOR.
2. ARCHITECTURAL DEMOLITION DRAWINGS ILLUSTRATE AGENERAL SCOPE OF WORK, IT IS THE RESPONSIBILITY OF THECONTRACTOR TO DETERMINE THE FULL SCOPE OF THEDEMOLITION REQUIRED USING EXISTING SITE CONDITIONS ANDCONTRACT DOCUMENTS.
3.REFER TO CONSULTANT DRAWINGS AND THE FOLLOWINGSPECIFICATION SECTIONS AND ALL RELATED SECTIONS FORADDITIONAL INFORMATION:• 01 56 39 – TREE AND PLANT PROTECTION• 02 41 13 – SELECTIVE SITE DEMOLITION• 02 41 19 – SELECTIVE DEMOLITION
4. RICHARDSON HALL BUILDING WILL BE OCCUPIED ON ALLLEVELS DURING PEAVY HALL SALVAGE AND DEMOLITION:• CONTRACTOR TO PROVIDE WATERPROOFING, TEMPORARY
ENCLOSURE AND SOUND ISOLATION TO ENSURE ZERO WATERINGRESS AND MAINTAIN WORKING INDOOR TEMPERATURE,AIR QUALITY AND ACOUSTIC CONDITIONS.
• EXTENT AND DIMENSION OF CONSTRUCTION PARTITIONS TOBE COORDINATED WITH ARCHITECT.
• EXISTING RICHARDSON HALL MECHANICAL, ELECTRICAL ANDLIFE SAFETY SYSTEMS TO REMAIN OPERATIONAL DURINGDEMOLITION AND CONSTRUCTION.
5. CONTRACTOR TO ENGAGE A SPECIALTY ENGINEER TOPREPARE A DEMOLITION PLAN. ENGINEER TO STAMP DRAWINGSAND COMPLETE A COMMITMENT TO GENERAL REVIEW FORM FORDEMOLITION.
6. CONTRACTOR TO ENGAGE SPECIALTY ENGINEER TO ENSURESTRUCTURES TO REMAIN ARE ADEQUATELY SUPPORTED PRIOR TOAND DURING SALVAGE AND DEMOLITION. CONTRACTOR TOMAKE GOOD ALL JUNCTIONS BETWEEN EXISTING STRUCTURESIDENTIFIED AS TO BE REMOVED AND EXISTING STRUCTURESIDENTIFIED TO REMAIN.
7. HAZARDOUS MATERIALS ARE REPORTED TO BE PRESENT IN THEEXISTING PEAVY HALL BUILDING. A REPORT ON THE PRESENCE OFHAZARDOUS MATERIALS IS ON FILE FOR REVIEW AND USE.• NOTE THAT WOOD BASED ELEMENTS - NOTED FOR SALVAGE
AND REINSTALL IN NEW CONSTRUCTION MAY BE REFERRED TOIN THIS REPORT.
8. PROTECT ALL CLADDING AND FLASHING CONDITIONS ATJUNCTION OF EXISTING RICHARDSON HALL FROM DAMAGE FORDURATION OF SALVAGE AND DEMOLITION.• ENSURE BUILDING ENVELOPE CONTINUITY IS MAINTAINED
THROUGHOUT DEMOLITION AND CONSTRUCTION.
9. NEW OPENINGS FOR SERVICE PENETRATIONS TO BECOORDINATED WITH MECHANICAL + ELECTRICAL PRIOR TODEMOLITION.
10. ALL DIMENSIONS ARE TO BE DETERMINED USING THEARCHITECTURAL ISSUED FOR CONSTRUCTION DRAWINGS ANDARE NOT TO BE INFERRED FROM THE DEMOLITION DRAWINGS.REFER TO ARCHITECTURAL IFC DRAWINGS FOR LOCATION ANDDIMENSION OF NEW OPENINGS FOR DOORS AND FIRE SHUTTERS.DIMENSIONS ON DEMOLITION DRAWINGS PROVIDED FORPRICING ONLY.
11. REFER TO A066 FOR INVENTORY LIST OF MATERIALS TO BESALVAGED AND USED IN NEW CONSTRUCTION:• CAREFULLY SALVAGE IN A MANNER TO PREVENT DAMAGE.• ITEMS INDICATED FOR REUSE WITHIN THE BUILDING TO BE
STORED BY THE CONTRACTOR / PREPARED FOR REFINISH ANDINSTALLATION. ALL OTHER ITEMS TO BE PROMPTLY RETURNEDTO THE OWNER.
• REFER TO EXISTING PEAVY HALL BUILDING DRAWINGS FOREXTENTS OF WOOD BASED MATERIALS.
• ONCE THE STRUCTURE IS EXPOSED, MGA AND EQUILIBRIUMCONSULTING SHALL REVIEW THE STRUCTURAL ELEMENTS INPERSON AND IN PLACE WITH THE CONTRACTOR TO PROVIDEFURTHER INSTRUCTION ON ELEMENTS THAT SHALL BESALVAGED FOR STRUCTURAL / ARCHITECTURAL APPLICATION.
• REFER TO A063 AND A064 FOR PHOTOGRAPHS SHOWINGHALLWAY ELEVATIONS AS INDICATED BY THE ELEVATIONMARKERS.
• REFER TO OSU_FSCSALVAGEDEMOAPPENDIX FOR ADDITIONALDOCUMENTATION OF ARTIFACTS AND WOOD ELEMENTSWIHTIN THE EXISTING BUILDING
• THIS PHOTOGRAPHIC DOCUMENTATION IS PROVIDED FORREFERENCE ONLY. CONTRACTOR TO PROVIDEDOCUMENTATION OF ALL SALAVAGED ITEMS AND ELEMENTSPER SPECIFICATION.
12. SUBMIT A LIST OF ITEMS THAT HAVE BEEN REMOVED ANDSALVAGED, INCLUDING DIMENSIONS AND CONDITIONS FOR ALLWOOD ELEMENTS INDICATED FOR POTENTIAL REUSE.• NOTIFY CONSULTANT OF ALL WOOD BASED MATERIALS
INDICATED FOR REUSE THAT MAY REQUIRE ABATEMENT.
13. CONTRACTOR TO MAKE EFFORTS TO MINIMIZE WASTE TOLANDFILL. CONTRACTOR TO TRACK THE WEIGHT OF ITEMS:• SALVAGED FOR USE IN NEW CONSTRUCTION• DIVERTED FROM LANDFILL / RECYCLED• ABATED MATERIALS• SENT TO LANDFILL
SALVAGE AND DEMO LEGEND
EXISTING TO REMAIN
EXISTING TO BE REMOVED
*REFER TO A066 FOR INVENTORYOF SALVAGED MATERIALS
EXTENT OF FLOORFINISH TO BE REMOVED
FLOOR FINISH AND STRUCTURETO BE REMOVED (SEE STRUCTURAL)
WOOD PANEL
WANSCOATING
Michael Green Architecture Inc.
63 E CordovaVancouver, BC V6A 1K3
Phone 604.336.4770
Issue Date:Drawn:Checked:MGA Project No.:
DateDescriptionNo.
NOT
FOR
CONS
TRUC
TION
C:\Users\sheatreacy\Documents\[email protected]
2014-022Checker
SM08 APRIL 2016
EXIST PEAVYROOF + RH L3
SALVAGE+DEMO
PEAV
Y B
UIL
DIN
G
A054
OSU
FO
RES
T SC
IEN
CE
CO
MPL
E XC
OR
V ALL
IS, O
REG
ON
BID
PA C
K AG
E 0 1
- SAL
V AG
E +
DE M
O0 8
AP R
IL 2
016
1 : 1250
KEY PLAN
1/8" = 1'-0"A055
1 SALVAGE + DEMO ROOF PLAN