+ All Categories
Home > Documents > Othello Square Building C - Washington Square Building C...055000 metal fabrications 055100 metal...

Othello Square Building C - Washington Square Building C...055000 metal fabrications 055100 metal...

Date post: 22-Sep-2020
Category:
Upload: others
View: 5 times
Download: 0 times
Share this document with a friend
12
INSTRUCTIONS TO BIDDERS BID FORM EXHIBIT A Othello Square Building C 3939 S. Othello Street Seattle, WA 98118 ISSUE DATE: January 4, 2019 RESPONSE DUE: January 25, 2019 – 12:00 PM PROJECT DIRECTORY Owner (S+C) 39 th and Othello C/O Spectrum Development Solutions 1809 Seventh Avenue, Ste 501 Seattle, WA 98101 Owner (TI) Seattle Children’s Odessa Brown Children’s Clinic (OBCC) C/O Spectrum Development Solutions 4800 Sand Point Way NE Seattle, WA 98105 Designer (S+C) Weber Thompson 226 Terry Avenue N., Ste 200 Seattle, WA 98109 Builder Absher P.O. Box 280 Puyallup, WA 98371 1001 Shaw Road Puyallup, WA 98372
Transcript
Page 1: Othello Square Building C - Washington Square Building C...055000 metal fabrications 055100 metal stairs 055213 pipe and tube railings 057300 decorative metal railings division 06

INSTRUCTIONS TO BIDDERS

BID FORM

EXHIBIT A

Othello Square Building C 3939 S. Othello Street

Seattle, WA 98118

ISSUE DATE: January 4, 2019

RESPONSE DUE: January 25, 2019 – 12:00 PM

PROJECT DIRECTORY

Owner (S+C)

39th and Othello

C/O Spectrum Development Solutions

1809 Seventh Avenue, Ste 501

Seattle, WA 98101

Owner (TI) Seattle Children’s Odessa Brown

Children’s Clinic (OBCC)

C/O Spectrum Development Solutions

4800 Sand Point Way NE

Seattle, WA 98105

Designer (S+C) Weber Thompson

226 Terry Avenue N., Ste 200

Seattle, WA 98109

Builder Absher

P.O. Box 280

Puyallup, WA 98371

1001 Shaw Road

Puyallup, WA 98372

Page 2: Othello Square Building C - Washington Square Building C...055000 metal fabrications 055100 metal stairs 055213 pipe and tube railings 057300 decorative metal railings division 06

Othello Square Building C 2 of 11 Instructions to Bidders 50% CD Documents

GENERAL INFORMATION

Project Description

Spectrum Development Solutions has partnered with the Seattle Children’s Odessa Brown Children’s Clinic

(OBCC) on this unique project consisting of 176 units of workforce rental housing above 50,000 sf of OBCC

space.

Spectrum is the developer of the project and responsible for both the delivery of the residential and Shell and

Core space for OBCC, designed by Weber Thompson, as well as the Tenant Improvement (TI) delivery, for OBCC,

designed by NBBJ. The scope of this RFP is only for the Shell and Core at this juncture – a second MEPF RFP will

be issued for the TI portion of the project at a later date. The selected MEPF teams will have the opportunity

to submit for the TI as well.

The project is part of the larger Othello Square campus, which is a uniquely integrated, culturally competent,

and welcoming gateway center comprised of four development parcels. The Campus is designed to represent

the diverse and international nature of Southeast Seattle, a community where all residents and neighbors find

homes, educational and business development opportunities, family-wage jobs, health care, social services,

and a variety of small enterprises at which to shop, eat, and play. The convenient location, adjacent to the

Othello Light Rail station and other public transit hubs, allows easy to key resources for users from Northgate

to Angle Lake.

“Building C” is located on the NW corner of the main parcel of the Othello Square campus. The main parcel

has been subdivided to create independent project sites for each building. The adjacent project site to the

South of Building C will house a charter high school, while the site to the East of Building C will host an economic

opportunity center with housing above.

Building C is a mixed-use project that will contain workforce housing above the commercial podium base

containing OBCC. OBCC was founded on providing healthcare to the underserved and underrepresented of the

local community. It is not simply a medical clinic, but a center for the community that promotes wellbeing

through healthcare and social services. Their goal is to set children up for success by addressing not just one

but all the determinants that contribute to wellbeing. The clinic is specific to the community it serves and seeks

to create the decades-long, generational connections that have made the Yesler clinic successful over the past

50 years.

The Building C site slopes approximately 6-7’ form the northwest corner up to the southeast corner. There are

no structures currently occupying the proposed project site. The adjacent site to the East of Building C has

known contaminants requiring remediation, which are not anticipated to impact Building C’s project site at this

time. Site C has no known contaminants requiring remediation.

Based on the preliminary due diligence information and document progression, the site and project

composition is as follows:

o Construction Type: five (5) levels of Type III Housing over two (2) levels of Type I podium (commercial)

over one (1) level below-grade parking garage. Modular construction will not be pursued.

o Building Height: limited by Construction Type to five (5) floor max over a two (2) level podium

o Site Area: approximately 39,000 SF

o Total Goss Building Area: approximately 228,000 SF

o Primary Housing Use: rental apartment units

o Number of Units: 176

Page 3: Othello Square Building C - Washington Square Building C...055000 metal fabrications 055100 metal stairs 055213 pipe and tube railings 057300 decorative metal railings division 06

Othello Square Building C 3 of 11 Instructions to Bidders 50% CD Documents

o Affordable Requirements: 20 percent of the units @ 80% AMI for 20 years

o Unit Mix: approximately 54% studio, 13% 1 bed/1 bath, 11% 1 bed/1 bath + den, 16% 2 bed/1 bath, 6%

3 bed/2 bath

o Parking: approximately 50 stalls for commercial use, 50 stalls for residential use

o Common Space/Amenities: include a combined entrance/amenity space, lobby, leasing office, package

room, bike room, fitness room, dog run, roof deck with BBQ’s and fire pit, community room with full

kitchen and entertainment.

o Sustainability: USGBC LEED for Homes Midrise Silver Certification, Energy Star Portfolio Manager Score

of 75

The form of agreement between Absher and the Owner will be a Cost of the Work plus Fee with a Negotiated

Guaranteed Maximum Price (AIA A201) and HUD-92442 Construction Contract.

Social Equity Goals

The goals for Social Equity for the project are extremely important and will be a key selection criterion. Already

the project team has been successful in ensuring that 65% of the design consultant team is comprised of WMBE

businesses.

Social equity and inclusion are extremely important components to all project partners. The project goals are

stated below:

CATEGORY GOAL

Subcontractor Diversity.

Percentage of total contract dollars

awarded to Disadvantaged Businesses.

25%

Apprenticeship Participation.

Percentage of apprentice project hours for

all project field labor.

15%

Regional Procurement.

Tracking of regional materials will be per

LEED for Homes-MR.

Per LEED

Hire Local.

General contractor and subcontractors will

track and report the number of hours of

employees from certain zip codes.

Report %

Milestone Schedule

1. Anticipated start of construction Q3, 2019

2. Anticipated substantial completion Q1, 2021

Page 4: Othello Square Building C - Washington Square Building C...055000 metal fabrications 055100 metal stairs 055213 pipe and tube railings 057300 decorative metal railings division 06

Othello Square Building C 4 of 11 Instructions to Bidders 50% CD Documents

Business Equity (Please include this form in your response, this page is in addition to page totals listed elsewhere)

The Owner and Absher are committed to providing the maximum practicable opportunity for participation in

contracting by small business entities (sbe), disadvantaged business enterprises as well as Minority Business

Enterprises (MBE), Women Business Enterprises (WBE), and Minority Women Business Enterprises (MWBE), state-

certified and non-state-certified, on public works projects. Participation may be either on a direct basis, or as a sub-

consultant, subcontractor, or supplier. The aspirational project goal of 25% combined sbe/dbe/MBE/WBE/MWBE

participation in the construction execution of the Othello Square Building C project. To achieve this goal, Absher

will implement a Participation Plan. All selected trade partners will be expected to participate in the

implementation and execution of this Plan. All trade partners shall also comply with the Business Equity

requirements set forth in the General Conditions of the Contract and the Prime Contract between Absher and

Owner.

In an effort to exceed the above stated aspirational goal, please complete the following and include this form in

your response. Please mark all that apply.

Minority-owned: 50%+ owned and controlled by persons who are Asian American, Black American, Hispanic

American, and/or Native American.

Woman-owned: 50%+ owned and controlled by persons who are women.

Small Business Entity (sbe): An entity licensed to do business in the state of Washington, including a sole

proprietorship, corporation or other legal entity, that

• Certifies, under penalty of perjury that it is owned and operated independently from all other

businesses and

• Conforms to the U.S. Small Business Administration Size Standards of the North American Industry

Classification System (NAICS Codes) in which the business entity is proposed to be engaged; or

• Is certified with the Washington State Office of Minority and Women Business Enterprises (OMWBE)

Disadvantaged Business Enterprise: Any business entity certified with the Office of Minority and Women’s

Business Enterprises.

None of the above

Decline to state

Firm Name

Signature/Title Date

Absher and the Owner provide equal employment opportunities to all employees, consultants and contractors without regard to race, color,

religion, gender, sexual orientation, gender identity, national origin, age, disability, genetic information, marital status, amnesty or status as

a covered veteran in accordance with applicable federal, state and local laws. Absher and the Owner comply with applicable state and local

laws governing nondiscrimination in employment and hiring in every location in which the company has facilities.

Page 5: Othello Square Building C - Washington Square Building C...055000 metal fabrications 055100 metal stairs 055213 pipe and tube railings 057300 decorative metal railings division 06

Othello Square Building C 5 of 11 Instructions to Bidders 50% CD Documents

DIVISIONS OF WORK TO BE CONSIDERED IN THIS SOLICITATION

DIVISION 03 - CONCRETE

033000 CAST IN PLACE CONCRETE

033003 UNDERSLAB VAPOR RETARDER

033513 CONCRETE FLOOR AND ARCHITECTURAL CIP FINISHING

033536 POLISHED CONCRETE FINISHING

033713 SHOTCRETE

033800 POST-TENSIONED CONCRETE

035400 CAST UNDERLAYMENT

DIVISION 04 - MASONRY

042000 UNIT MASONRY

DIVISION 05 - METALS

051200 STRUCTURAL STEEL

055000 METAL FABRICATIONS

055100 METAL STAIRS

055213 PIPE AND TUBE RAILINGS

057300 DECORATIVE METAL RAILINGS

DIVISION 06 – WOOD, PLASTIC AND COMPONENTS

061000 ROUGH CARPENTRY

061800 GLUED-LAMINATED CONSTRUCTION

062023 INTERIOR FINISH CARPENTRY

062026 EXTERIOR FINISH CARPENTRY

064100 ARCHITECTURAL WOOD CASEWORK

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

071413 HOT APPLIED RUBBERIZED ASPHALT WATERPROOFING

071700 BENTONITE SHEET WATERPROOFING

071800 TRAFFIC COATINGS

071900 WATER REPELLENTS

072100 THERMAL INSULATION

072500 WATER RESISTANT BARRIERS

072727 SELF-ADHERED SHEET AIR AND WATER BARRIERS

074213 METAL WALL PANELS

074623 WOOD SIDING

074646 FIBER CEMENT SIDING

075216 MODIFIED BITUMEN ROOFING

075400 THERMOPLASTIC MEMBRANE ROOFING

076200 SHEET METAL FLASHING AND TRIM

077200 ROOF ACCESSORIES

077273 VEGETATED ROOF SYSTEMS

077616 ROOF PAVERS

078053 IDENTIFICATION OF FIRE AND SMOKE ASSEMBLIES

078100 APPLIED FIREPROOFING

078400 FIRESTOPPING

079005 JOINT SEALERS

079513 ARCHITECTURAL JOINT COVER ASSEMBLIES

DIVISION 08 - OPENINGS

081113 HOLLOW METAL DOORS AND FRAMES

081214 PREFINISHED STEEL DOOR FRAMES

081416 FLUSH WOOD DOORS

081573 INTERIOR SLIDING DOORS

083100 ACCESS DOORS AND PANELS

083613 SECTIONAL DOORS

084313 ALUMINUM FRAMED ENTRANCES AND STOREFRONTS

085313 VINYL WINDOWS

088000 GLAZING

088300 MIRRORS

Page 6: Othello Square Building C - Washington Square Building C...055000 metal fabrications 055100 metal stairs 055213 pipe and tube railings 057300 decorative metal railings division 06

Othello Square Building C 6 of 11 Instructions to Bidders 50% CD Documents

089100 LOUVERS

DIVISION 09 - FINISHES

092116 GYPSUM BOARD ASSEMBLIES

092219 NON-STRUCTURAL METAL FRAMING

093000 TILING

095100 ACOUSTICAL CEILINGS

096433 LAMINATED WOOD FLOORING

096500 RESILIENT FLOORING

096800 CARPETING

09.8 ACOUSTICAL TREATMENT

098311 ACOUSTICAL COMPONENTS

099000 PAINTING AND COATING

DIVISION 10 - SPECIALTIES

101100 VISUAL DISPLAY SURFACES

101400 SIGNAGE

102600 WALL AND CORNER PROTECTION

102800 TOILET ACCESSORIES

104400 FIRE PROTECTION SPECIALTIES

105500 POSTAL SPECIALTIES

105723 CLOSET AND UTILITY SHELVING

DIVISION 11 - EQUIPMENT

110114 FALL ARREST & FALL RESTRAINT SYSTEM

113100 RESIDENTIAL APPLIANCES

DIVISION 12 - FURNISHINGS

122113 HORIZONTAL LOUVER BLINDS

122350 RESIDENTIAL CASEWORK

123600 COUNTERTOPS

124813 ENTRANCE FLOOR MATS AND GRILLES

129300 SITE FURNISHINGS

DIVISION 14 – CONVEYING SYSTEMS

142010 PASSENGER ELEVATORS

149100 FACILITY CHUTES

DIVISION 21 – FIRE SUPPRESSION – PREVIOUSLY AWARDED

DIVISION 22 – PLUMBING – PREVIOUSLY AWARDED

DIVISION 23 – HVAC – PREVIOUSLY AWARDED

DIVISION 26-28 – ELECTRICAL, COMM, SECURITY – PREVIOUSLY AWARDED

DIVISION 31 - EARTHWORK

312000 EARTHWORK

DIVISION 32 – EXTERIOR IMPROVEMENTS

321100 CRUSHED SURFACING

321200 ASPHALT CONCRETE PAVEMENT

321214 POROUS HOT MIX ASPHALT (PHMA) PAVING

321300 CEMENT CONCRETE PAVEMENT, CURBS, AND SIDEWALKS

321700 PAVEMENT MARKINGS

329300 PLANTING

329310 PRE-VEGETATED MATS

DIVISION 33 – SITE UTILITIES

331000 WATER DISTRIBUTION

333000 SANITARY SIDE SEWERS

334000 STORM DRAINAGE

334600 SUBDRAIN SYSTEM

Page 7: Othello Square Building C - Washington Square Building C...055000 metal fabrications 055100 metal stairs 055213 pipe and tube railings 057300 decorative metal railings division 06

Othello Square Building C 7 of 11 Instructions to Bidders 50% CD Documents

OTHELLO SQUARE BUILDING C

BID FORM

The following Bid Form should be completed in its entirety, and submitted in addition to your standard form of bid proposal.

This information will help Absher to review your proposal, and confirm specific project requirements are met.

1) This bid proposal is based on the: 10/05/2018 - 50% CD drawings provided by Weber Thompson, without deviation.

2) Davis Bacon Commercial Prevailing Wages apply to this project and are included in this bid.

3) For any subcontract bid proposals over $1,000,000, please include the name of your surety and bond rate.

a. Surety Firm____________________

b. Bond Rate____________________

4) Anticipated Notice to Proceed is expected in September, 2019 with a construction schedule of 20 months. Pricing

in this bid proposal assumes work to occur as far out as 2021. Escalated labor and material rates are included in this

bid proposal.

5) Multiple sources of funding are being utilized in the financing of Othello Square Building C. As a result, specific cost

tracking accounting is required. Exhibit A graphically illustrates the specific locations where cost breakouts are

needed. The area index can be found in the lower right hand corner of Exhibit A plan sheets. Work will not be

contracted independently per area, however costs should be isolated based on the location of the work within the

project as defined by Exhibit A.

a. COMMERCIAL __________________________________________________________________________

b. COMMERCIAL – EXTERIOR ________________________________________________________________

c. RESIDENTIAL UNITS _____________________________________________________________________

d. RESIDENTIAL UNITS – EXTERIOR ___________________________________________________________

e. SHARED AREA #1 _______________________________________________________________________

f. SHARED AREA #2 _______________________________________________________________________

g. SHARED AREA #3 _______________________________________________________________________

h. SHARED AREA #4 _______________________________________________________________________

i. SHARED AREA #5 _______________________________________________________________________

j. TOTAL BASE BID ________________________________________________________________________

Page 8: Othello Square Building C - Washington Square Building C...055000 metal fabrications 055100 metal stairs 055213 pipe and tube railings 057300 decorative metal railings division 06

16145 SF

COMMERCIAL TENANT(UNDER SEPARATE PERMIT)940 SF

TRASH ROOM

269 SF

ELECTRICAL

656 SF

TRANSFORMER VAULT(VENT ABOVE)

120 SF

BIO-WASTE(TENANT IMPROVEMENT)

82 SF

MED GAS(TENANT IMPROVEMENT)

63 SF

COMM. ENTRY ROOM

211 SF

STAIR

41 SF

GARAGEVENT

766 SF

LOADING BERTH

426 SF

TRASH STAGING

1690 SF

RAMP DOWN 15%

139 SF

EGRESS STAIR

2676 SF

EXTERIOR COMMERCIALTENANT

(UNDER SEPARATE PERMIT)

1065 SF

SHARED BIKE ROOM

1338 SF

SHARED ENTRY FOYER

2144 SF

COMMERCIAL TENANT(UNDER SEPARATE PERMIT)

900 SF

RESIDENTIAL ENTRY /LEASING

861 SF

FITNESS

217 SF

STAIR

98 SF

RES ELEV94 SF

SHARED ELEV

100 SF

COMM ELEV

659 SF

MECH MEZZANINE

72 SF

GAS METER

89 SF

ENTRYVESTIBULE

74 SF

TOILET

113 SF

MANAGER'S OFFICE100 SF

BOH

366 SF

MAILROOM

242 SF

BIO RETENTION PLANTER

11144 SF

EXTERIOR LANDSCAPEDAREA

203 SF

ENTRYVESTIBULE

375 SF

COMMERCIAL TENANT(UNDER SEPARATE PERMIT)

311 SF

STORAGE

356 SF

Area

525 SF

SHARED BIKE ROOM

153 SF

ENTRYVESTIBULE

103 SF

RES ELEV

103 SF

COMM ELEV

26547 SF

COMMERCIAL TENANT(UNDER SEPARATE PERMIT)

215 SF

STAIR

42 SF

TRASH CHUTE

217 SF

STAIR

211 SF

STAIR

252 SF

TERRACE

183 SF

BIO RETENTION PLANTER

103 SF

SHARED ELEV

2147 SF

Area

392 SF

TI MECHANICAL EQUIPMENT

892 SF

D1 - 2 BR

517 SF

A1 - STUDIO TYPE A

517 SF

A1 - STUDIO

517 SF

A1 - STUDIO

517 SF

A1 - STUDIO

517 SF

A1 - STUDIO

517 SF

A1 - STUDIO

517 SF

A1 - STUDIO

517 SF

A1 - STUDIO

517 SF

A1 - STUDIO

520 SF

A1 - STUDIO

600 SF

B1 - 1 BR TYPE A

935 SF

D2 - 2 BR

588 SF

B1.1 - 1 BR

588 SF

B1.1 - 1 BR

833 SF

D3 - 2 BR

835 SF

D3 - 2 BR

576 SF

B1.2 - 1 BR

877 SF

C2 - 1 BR + DEN

517 SF

A1 - STUDIO

776 SF

C1 - 1 BR + DEN

517 SF

A1 - STUDIO

776 SF

C1 - Type A

517 SF

A1 - STUDIO

779 SF

C1 - 1 BR + DEN

816 SF

D4 - 2 BR

900 SF

D5 - 2 BR

517 SF

A1 - STUDIO

517 SF

A1 - STUDIO

517 SF

A1 - STUDIO

673 SF

B4 - 1 BR

182 SF

ELEC

69 SF

STORAGE

114 SF

TRASH

1103 SF

E2 - 3 BR

1210 SF

E1 - 3 BR

195 SF

STAIR

218 SF

STAIR

3811 SF

TERRACE

105 SF

SHARED ELEV

2298 SF

CORRIDOR

97 SF

PATIO

97 SF

PATIO

94 SF

PATIO

95 SF

PATIO

92 SF

PATIO

81 SF

PATIO

97 SF

PATIO

81 SF

PATIO

98 SF

PATIO98 SF

PATIO

98 SF

PATIO

96 SF

PATIO

177 SF

PATIO

517 SF

A1 - STUDIO

517 SF

A1 - STUDIO

517 SF

A1 - STUDIO

179 SF

BIO RET. PLANTER353 SF

BIO RET. PLANTER

353 SF

BIO RET. PLANTER

353 SF

BIO RET. PLANTER

524 SF

BIO RET. PLANTER

91 SF

RES ELEV

892 SF

D1 - 2 BR

600 SF

B1 - 1 BR - TYPE A

935 SF

D2 - 2 BR

592 SF

B1.1 - 1 BR

1104 SF

INTERIOR RESIDENTIALAMENITY

688 SF

C3 - 1 BR + DEN

517 SF

A1 - STUDIO776 SF

C1 - 1 BR + DEN

517 SF

A1 - STUDIO776 SF

C1 - 1 BR + DEN

517 SF

A1 - STUDIO779 SF

C1 - 1 BR + DEN

900 SF

D5 - 2 BR

517 SF

A1 - STUDIO

517 SF

A1 - STUDIO

517 SF

A1 - STUDIO

675 SF

B4 - 1 BR

1614 SF

EXTERIOR RESIDENTIALAMENITY

81 SF

RESTROOM

95 SF

RES ELEV

120 SF

TRASH

67 SF

MECH

812 SF

D4 - 2 BR

2394 SF

CORRIDOR

43 SF

BALCONY43 SF

BALCONY

43 SF

BALCONY

43 SF

BALCONY

44 SF

BALCONY

43 SF

BALCONY

199 SF

PET RELIEF

83 SF

ELEV EQUIP

517 SF

A1 - STUDIO

517 SF

A1 - STUDIO

517 SF

A1 - STUDIO517 SF

A1 - STUDIO

517 SF

A1 - STUDIO

517 SF

A1 - STUDIO517 SF

A1 - STUDIO

517 SF

A1 - STUDIO517 SF

A1 - STUDIO

520 SF

A1 - STUDIO

517 SF

A1 - STUDIO

517 SF

A1 - STUDIO

517 SF

A1 - STUDIO

1097 SF

E2 - 3 BR

1207 SF

E1 - 3 BR

109 SF

SHARED ELEV

201 SF

Area

217 SF

Area

98 SF

RES ELEV

95 SF

COMM ELEV

33678 SF

PARKING GARAGE

221 SF

BOILER

221 SF

STAIR

455 SF

DOMESTIC WATERSPRINKLER ROOM

2120 SF

RAMP DOWN 15%

234 SF

ELEVATOR LOBBY

217 SF

STAIR

99 SF

SHARED ELEV

BOMA LEGEND

COMMERCIAL

COMMERCIAL-EXTERIOR

RESIDENTIAL UNITS

RESIDENTIAL UNITS-EXTERIOR

SHARED 50/50

SHARED 50/50-EXTERIOR

SHARED 62/38

SHARED 72/28

SHARED 72/28-EXTERIOR

225 SF

SHARED BIKE ROOM

22158 SF

ROOF

52 SF

REFUSE CHUTEVENTILATION

205 SF

ELEV LOBBY

2624 SF

GREEN ROOF

Project:

Client:

Issue:

Phase:ClientApproval:

QualityAssurance:

Schematics

Design Dev.

Permit Doc.

Bid Doc.

Const.Doc.

Drawn By:

Project Manager:Principal In Charge:

Project Number:

Corporate Members of the American Institute of Architects

Acceptance of the electronic file version of this drawing acknowledges the receipt and consent to the terms of the Weber Thompson Electronic Media Receipt Agreement© Copyright Weber Thompson 2018

Construction Revision:

225 Terry Ave N, Suite 200225 Terry Ave N, Suite 200Seattle, WA 98109p 206.344.5700f 206.508.3507www.weberthompson.com

AREA RESERVED FOR CITY OF SEATTLE DCI PERMIT STAMP

11/6

/201

8 1

2:1

8:2

4 P

M

OTHELLOSQUAREBUILDING C3939 S. OTHELLO ST.,SEATTLE WA 98118

SPECTRUMDEVELOPMENTSOLUTIONS

17-065

11.0

5.2

018 P

RO

GR

ES

S D

RA

FT

Author

BOMA PLANS

G0.10

11.05.2018 PROGRESSDRAFT

SCALE: 1" = 20'-0"1

BOMA_LEVEL 1

SCALE: 1" = 20'-0"2BOMA_LEVEL 2

SCALE: 1" = 20'-0"3BOMA_LEVEL 3

SCALE: 1" = 20'-0"4

BOMA_LEVEL 7

SCALE: 1" = 20'-0"5

BOMA_LEVEL P1

SCALE: 1" = 20'-0"6

BOMA_ROOF

Area Schedule (Boma gross) ExteriorLevel Area Area Categories

LEVEL 1

LEVEL 1 2676 SF COMMERCIAL-EXTERIOR

LEVEL 1 11144 SF SHARED 50/50-EXTERIOR

LEVEL 1 242 SF SHARED 72/28-EXTERIOR

14062 SF

LEVEL 2

LEVEL 2 392 SF COMMERCIAL-EXTERIOR

LEVEL 2 252 SF SHARED 50/50-EXTERIOR

LEVEL 2 183 SF SHARED 72/28-EXTERIOR

827 SF

LEVEL 3

LEVEL 3 5112 SF RESIDENTIAL UNITS-EXTERIOR

LEVEL 3 1761 SF SHARED 72/28-EXTERIOR

6873 SF

LEVEL 4

LEVEL 4 44 SF RESIDENTIAL UNITS-EXTERIOR

44 SF

LEVEL 5

LEVEL 5 256 SF RESIDENTIAL UNITS-EXTERIOR

256 SF

LEVEL 6

LEVEL 6 214 SF RESIDENTIAL UNITS-EXTERIOR

214 SF

LEVEL 7

LEVEL 7 2069 SF RESIDENTIAL UNITS-EXTERIOR

2069 SF

ROOF

ROOF 22158 SF SHARED 50/50-EXTERIOR

ROOF 2624 SF SHARED 72/28-EXTERIOR

24782 SF

Area Schedule (Boma gross) InteriorLevel Area Area Categories

Not Placed

Not Placed 0 SF SHARED 50/50

0 SF

LEVEL P1

LEVEL P1 316 SF COMMERCIAL

LEVEL P1 98 SF RESIDENTIAL UNITS

LEVEL P1 36932 SF SHARED 50/50

LEVEL P1 99 SF SHARED 62/38

LEVEL P1 217 SF SHARED 72/28

37663 SF

LEVEL 1

LEVEL 1 22394 SF COMMERCIAL

LEVEL 1 1741 SF RESIDENTIAL UNITS

LEVEL 1 7312 SF SHARED 50/50

LEVEL 1 94 SF SHARED 62/38

LEVEL 1 217 SF SHARED 72/28

31758 SF

LEVEL 2

LEVEL 2 29011 SF COMMERCIAL

LEVEL 2 144 SF RESIDENTIAL UNITS

LEVEL 2 103 SF SHARED 62/38

LEVEL 2 428 SF SHARED 72/28

29686 SF

LEVEL 3

LEVEL 3 26335 SF RESIDENTIAL UNITS

LEVEL 3 105 SF SHARED 62/38

LEVEL 3 413 SF SHARED 72/28

26853 SF

LEVEL 4

LEVEL 4 26333 SF RESIDENTIAL UNITS

LEVEL 4 105 SF SHARED 62/38

LEVEL 4 412 SF SHARED 72/28

26850 SF

LEVEL 5

LEVEL 5 26316 SF RESIDENTIAL UNITS

LEVEL 5 105 SF SHARED 62/38

LEVEL 5 429 SF SHARED 72/28

26850 SF

LEVEL 6

LEVEL 6 26316 SF RESIDENTIAL UNITS

LEVEL 6 105 SF SHARED 62/38

LEVEL 6 428 SF SHARED 72/28

26850 SF

LEVEL 7

LEVEL 7 24424 SF RESIDENTIAL UNITS

LEVEL 7 109 SF SHARED 62/38

LEVEL 7 501 SF SHARED 72/28

25034 SF

ROOF

ROOF 52 SF RESIDENTIAL UNITS

ROOF 205 SF SHARED 62/38

256 SF

DRAFT

DRAFT

Rob.Kuemper
Text Box
COMMERCIAL
Rob.Kuemper
Text Box
COMMERCIAL - EXTERIOR
Rob.Kuemper
Text Box
RESIDENTIAL UNITS
Rob.Kuemper
Text Box
RESIDENTIAL UNITS - EXTERIOR
Rob.Kuemper
Text Box
SHARED AREA #1
Rob.Kuemper
Text Box
SHARED AREA #3
Rob.Kuemper
Text Box
SHARED AREA #2
Rob.Kuemper
Text Box
SHARED AREA #4
Rob.Kuemper
Text Box
SHARED AREA #5
Rob.Kuemper
Text Box
BID PROPOSAL AREA COST BREAKOUTS
Rob.Kuemper
Image
Rob.Kuemper
Text Box
Rob.Kuemper
Text Box
EXHIBIT A
Page 9: Othello Square Building C - Washington Square Building C...055000 metal fabrications 055100 metal stairs 055213 pipe and tube railings 057300 decorative metal railings division 06
tanyak
Rectangle
tanyak
Rectangle
tanyak
Rectangle
tanyak
Rectangle
tanyak
Polygon
tanyak
Image
kaitlin
Polygon
kaitlin
Text Box
NORTH ELEVATION
tanyak
Polygon
tanyak
Polygon
Rob.Kuemper
Image
Rob.Kuemper
Text Box
EXHIBIT A
Page 10: Othello Square Building C - Washington Square Building C...055000 metal fabrications 055100 metal stairs 055213 pipe and tube railings 057300 decorative metal railings division 06
tanyak
Polygon
tanyak
Rectangle
tanyak
Rectangle
tanyak
Image
kaitlin
Polygon
kaitlin
Text Box
EAST ELEVATION
Rob.Kuemper
Image
Rob.Kuemper
Text Box
EXHIBIT A
Page 11: Othello Square Building C - Washington Square Building C...055000 metal fabrications 055100 metal stairs 055213 pipe and tube railings 057300 decorative metal railings division 06
tanyak
Polygon
tanyak
Rectangle
tanyak
Rectangle
tanyak
Image
tanyak
Text Box
SOUTH ELEVATION
kaitlin
Polygon
kaitlin
Polygon
kaitlin
Polygon
Rob.Kuemper
Image
Rob.Kuemper
Text Box
EXHIBIT A
Page 12: Othello Square Building C - Washington Square Building C...055000 metal fabrications 055100 metal stairs 055213 pipe and tube railings 057300 decorative metal railings division 06
tanyak
Polygon
tanyak
Image
kaitlin
Polygon
kaitlin
Polygon
kaitlin
Polygon
kaitlin
Text Box
WEST ELEVATION
kaitlin
Polygon
Rob.Kuemper
Image
Rob.Kuemper
Text Box
EXHIBIT A

Recommended