Definición sacada de Wikipedia• The EPC method was developed within the framework of ARIS by
Prof. Wilhelm-August Scheer at the Institut für Wirtschaftsinformatik at the Universität des Saarlandes in the early 1990s. It is used by many companies for modeling, analyzing, and redesigning business processes. As such it forms the core technique for modeling in ARIS, which serves to link the different views in the so-called control view, which will be elaborated in section of ARIS Business Process Modeling.
• "An EPC is an ordered graph of events and functions. It provides various connectors that allow alternative and parallel execution of processes. Furthermore it is specified by the usages of logical operators, such as OR, AND, and XOR. A major strength of EPC is claimed to be its simplicity and easy-to-understand notation. This makes EPC a widely acceptable technique to denote business processes."
Diagramas EPC: Event Driven Process Chain
Funciones• Una función es una tarea técnica, un procedimiento
y/o una actividad relaizada sobre un objeto para apoyar uno o más objetivos de la compañía.
• La función involucra tiempos y costos.• Las funciones representan lugares /momentos en el
proceso donde ocurren cambios.• Las funciones se nombran usando verbo objeto
Verbo ObjetoPreparar Reporte de gastosRevisar Reporte de gastosEnviar Cheque de reembolso
otros ejemplos….
Eventos• Un evento describe una ocurrencia en un objeto que es
relevante para el negocio que controla o influencia la continuación del proceso.
• Los Eventos representan un estatado o status en el proceso
• Los Eventos actúan como gatillantes de actividades, pero tamién están basados en las funciones precedentes y por eso describen un evento.
• Los Events se nombran usando Objeto V erbo en pasadoObjeto verbo en pasadoGasto IncurridoReporte de Gastos AprobadoFormulario Completado
Give us your example….
Componentes EPC
PrepareExpense Report
Verbo
Objeto
ExpenseIncurred
Objeto
Verbo pasado
Evento
Función
Flujos• Los Diagramas EPC siguen una estructura
evento-función-evento• Los Diagramas EPC deben comenzar con un
evento
• Ramificaciones lógicas están representadas en el flujo cronológico de un proceso por reglas en la forma de operadores lógicos (AND, OR, XOR)
• Se hacen con 3 tipos de conectores: • AND• OR• XOR (exclusive OR)
Layout básico de un diagrama EPC
ExpenseIncurred
PrepareExpense Report
Expense ReportCompleted
MailExpense Report
Expense ReportReceived
Secuencia de eventos y funcionesintercalados, partiendo y terminandocon un evento
SolicitudReciboreserva
Evento Evento
Chequeosolicitudreserva FunciónFunción
Solicitud Reserva chequeda EventoEvento
Crear reservavuelo FunciónFunción
Reserva de vuelo creada EventoEvento
Ofrecer vueloalternativo
Vuelo alternativocreado
Evento gatilla función Evento gatilla función
Función genera eventoFunción genera evento
Tabla de Conectores
CONECTOR OR
ProcessPayment
SalespersonNotified
Sales ManagerNotified
Conector OR
Conector ANDEnter
Expense Report
Expense ReportRecorded
Hard CopyFiled
CONECTOR AND
Conector XOR
ReviewExpense Report
ApprovedNot
Approved
CONECTOR XOR
TripCompleted
WeekEnds
PrepareExpense Report
Conector OR con dos eventos gatillantes
Combinaciones posibles de conectores y gatillantes
Event
Function
>
Event
Event
Function
>
Event
Event
Function
x
Event
Event
Function
>
Event
Event
Function
>
Event
Event
Function
x
Event
Function
>
Event
Function
Function
>
Event
Function
Function
x
Event
Function
AND
OR
XOR
Event
Function
>
Function
No Permitido
No Permitido
Evento Gatillante Función Gatillante
Unico Multiple Unico Multiple
Separando y consolidando rutas en el proceso
ExpenseIncurred
CheckInternet
Availability
InternetAvailable
InternetNot Available
PrepareOnline Report
PreparePaper Report
ReportSubmitted
ReportMailed
ReviewExpense Report
Se debe usar el mismo conector
para separar y unir la ruta
Combinación de conectores
No se permiten varias conexiones entrantes y salientes de un mismo conector
Resumen de las reglas para modelar en EPC
• Un EPC empieza y termina con un evento• Se debe seguir una secuencia evento-función-evento
(puede ser sólo interrumpido por conectores lógicos) Se pueden omitir eventos triviales en el medio del proceso
• Los conectores se usan para modelar varias rutas en el proceso
• Los conectores tiene o una conexión de entrada y varias de salida o varias de entrada y una de salida
• Para consolidar (unir) varias rutas en una debe usarse el mismo conector que generó la ramificación
• Un conector OR o XOR no puede seguir a un solo evento
Diagramas Event Process Chain Extendidos (eEPC)
• Modelan el proceso con información adicional• Incluyen vistas de datos, información y
organización
Datos en Diagramas eEPC
Datos del Cliente
DatosDatos
Datos del vuelo
DatosDatos
Datos son procesadosen funciones
Datos son procesadosen funciones
SolicitudReciboreserva
Chequeosolicitudreserva
Solicitud Reserva chequeda
Crear reservavuelo
Reserva de vuelo creada
Ofrecer vueloalternativo
Vuelo alternativocreado
Personas en Diagramas eEPC
R. Alvarez
EmpleadoEmpleado
Sr. Gonzalez
EmpleadoEmpleado
S. Urrutia
EmpleadoEmpleado
Personas (Empleados) Reponsables de Funciones
Personas (Empleados) Reponsables de Funciones
Datos del Cliente
DatosDatos
Datos del vuelo
DatosDatos
SolicitudReciboreserva
Chequeosolicitudreserva
Solicitud Reserva chequeda
Crear reservavuelo
Reserva de vuelo creada
Ofrecer vueloalternativo
Vuelo alternativocreado
eEPC Diagrams
Disponibilidad Vuelos
Unidad Organiza-
cional
Unidad Organiza-
cional
Callcenter
Unidad Organizacional
Unidad Organizacional
Disponibilidad vuelos
Unidad Organiza-
cional
Unidad Organiza-
cional
Solicitud dereserva
Chequeo desolicitud
Solicitud de Reserva
chequeada
Sr. Alvarez
Sr. Urrutia Sr. Gonzales
Employees are assigned to organisational units
Employees are assigned to organisational units
Ofreceralternativa
CrearReserva
vuelo
Reserva creada
Alternativaofrecida
Datos de vuelo
Datos cliente
eEPC diagram
Ticketsvuelodocumento
documento
Listadovuelos
alternativos documentodocumento
Solicitudreservadocumento
documento
Formulario reservadocumento
documentoSolicitud reserva
Chequeo solicitudreserva
Solicitud reserva
chequeada
Callcenter
Disponibilidadvuelos
Disponibilidadvuelos
Funciones Generan y procesan documentosFunciones Generan y
procesan documentos
Ofertavuelos
alternativos
Crearreservavuelo
ReservaVuelocreada
Vuelos Alternativos
ofrecidos
Datos vuelo
Datos cliente
Sr. Alvarez
R. Urrutia Sr. Gonzalez
Actividad 4
• Modele su proceso con Ares y EPC
UML(Unified Modeling Language)
UML
UML es un lenguaje para
– Visualizar
– Especificar
– Construir
– Documentar
artefactos de sistemas intensivos de software
DIAGRAMAS UML
Diagramas estáticos
• Diagrama de clases
• Diagrama de objetos
• Diagrama de componentes
• Diagrama de estructura compuesta
• Diagrama de paquetes
• Diagrama de despliegue
Diagrama de clases
Muestra un conjunto de clases, interfaces, colaboraciones y sus relaciones
Diagrama de objetos
Muestra una instantánea de un conjunto de objetos y sus relaciones
Diagrama de componentes
Muestra la organización y
dependencias entre un
conjunto de componentes, la
vista de implementación de
un sistema.
Están relacionados a diagramas
de clases en donde un
componente se corresponde
con una o más clases,interfaces
o colaboraciones.
Diagrama de estructura compuesta(Composite Structural Diagram)
Muestra la estructura
interna (incluyendo
partes y conectores) de
un clasificador o una
colaboración estructurada.
Diagrama de paquetes
Muestra ladescomposición delmodelo en unidades deorganización y susdependencias.
Diagrama de despliegue
Muestra los enlaces decomunicación físicaentre elementos dehardware y las relacionesentre máquinas físicas yprocesos: qué se ejecutay dónde
Diagramas UML
Diagramas de comportamiento• Diagramas de casos de uso• Diagrama de secuencia• Diagrama de colaboración• Diagrama de estados• Diagrama de actividades• Diagrama cronológico • Diagrama general de interacciones
Diagrama de casos de uso
Muestra un conjunto de casos de uso y actores y susrelaciones
Diagrama de secuencia
Es un diagrama deinteracción que muestra losobjetos y actores queparticipan en unacolaboración poniendo elénfasis en el ordenamientoen el tiempo de losmensajes
Diagrama de colaboración
Un diagrama de interacción que pone el énfasis en la organización estructural de los objetos o roles que envían y reciben mensajes.
Diagrama de estados
Muestra un autómata que consiste de estados, transiciones, eventos y actividades
Diagrama de actividadesMuestra la estructura deun proceso u otro cálculocomo el flujo de controly datos paso a paso en elcálculo.
Starting and Stopping
. The solid circle indicates the beginning of the sequence of activities. The circle with an X represents an end of a "flow" but not the end of the entire use case. In other words, some subtask completes, but the entire use case is not yet complete. The "target" indicates that the entire use case is complete.
Subcase (Sub-Activity)
• The "rake" symbol indicates that the "activity" is complex enough to merit its own activity diagram. In use-case analysis, this is a "subcase"---a stand-alone activity that occurs in more than one use case but is not large enough to be a use case in its own right.
Synchronization (Fork/Join)Used either when several activities can go
on in parallel or when the order in which a set of activities execute is immaterial. The heavy bar at the top is a fork. After the fork, all activities can (but are not required to) go on in parallel. Progress cannot continue past the bar on the bottom (the join) until all the activities that feed into the join complete.
You can label the join with a constraint (e.g. {joinspec= (A and B) or C}) to specify the condition that allows progress to continue. If there's no constraint, AND is assumed.
Decision (Branch/Merge).
A decision activity, the guard labels the decision that was made. The diamond with outgoing arrows (the branch) specifies an OR operation, with a condition imposed by the guard. The diamond with incoming arrows (a merge) simply provides an end to the OR operation. A merge can occur without an associated branch if the diagram has multiple start states.
Guards
• This path is used only if the text in the brackets is true.
Signals (Events)
• Generating signals: sent to outside process (Request Payment at left).
• Accepting signals: received from outside process (Payment Received at left).
• Timer signals: received when time elapses or a set time arrives (30 days... at left).
Exceptions.
• Extraordinary errors that you typically don't detect with explicit tests are indicated with a "lightning bolt."
Object FlowIdentifies objects that are created by
activities (box with outgoing arrow) or used by activities (box with incoming arrow). In the example at left, The invoice object is created during the receive-invoice activity and used by the process-invoice activity. The check object is created in the cut-check activity and is used by the send-payment activity. In this second case, you can also put boxes at both ends of the line. You can indicate exactly how the object is used with aconstraint. (e.g. {create}, {store}, etc.)
Swim LanesActivities are arranged into vertical
or horizontal zones delimited with lines. Each zone represents a broad area of responsibility, typically implemented by a set of classes or objects. For example, the swim lane labeled accounting could represent objects of several classes (Bookkeeper, Clerk, MailRoom, Accountant) working in concert to perform the single "cut paycheck" activity.
Diagrama cronológico(Timing Diagram)
Es un diagrama deinteracción que muestratiempos a lo largo dediferentes objetos oroles, y no secuenciasrelativas de mensajes
Diagrama de interacciones general(Interaction Overview Diagram)
Es un híbrido de diagramas de actividady de secuencia.
Las gráficas fueron extraídas de los siguientes textos:
Booch, G., Rumbaugh, J., Jacobson, I. The Unified Modeling Language. User Guide. Addison Wesley. (2005)
Stevens, P. Pooley R. Utilización de UML en Ingeniería del software con objetos y componentes (2002)