Otter Tail County Roadway Safety PlanA County’s Point of View
Rick WestOtter Tail County Public Works Director/ Engineer
2012 National LTAP/TTAP ConferenceJuly 31, 2012
Plan Contents• Description of Safety Emphasis Areas.
• Identification of high priority, low cost
Safety Strategies.
• Documentation of at-risk locations on
roadway segments, horizontal curves, and
intersections based on crash data.
• Development of $7,200,000. of suggested
safety projects.
• Cost of plan development - $40,000.
Summary of Results from Prioritized Segments
Otter Tail County High Priority Segment Map
Otter Tail County Segment Project Summary
Sample Segment
Project Form
D4 County Intersection Lighting Project
• Scope– Six Counties– 30 Intersections– Install Overhead Lighting
at Intersections
• Cost– $360,000.
Otter Tail County Intersection Signing Upgrade Project
• Scope– County Wide– 91 Intersections– TH Junction Signs– Stop Ahead Markings– Stop Bars
• Cost– $158,000.
Otter Tail County CSAH Shoulder Paving/Rumble Stripe Project
• Scope– CSAH 9– 5.3 Miles– 4’ Paved Shoulder– 1’ Rumble– 6” Stripe
• Cost– $293,000.
Summary
• Provides information to educate the County Board and the public.
• Provides data sheets to insert in funding applications.
• Provides practitioners with a detailed, prioritized county-wide, safety plan to guide and support future safety investments.
Websites
• Otter Tail County Roadway Safety Plan: Mn/DOT Office of State-Aid: www.dot.state.mn.us/stateaid or [email protected].
• MN Best Practices and Policies for Safety Strategies on Highways and Local Roads: Same as above.
• Or my friend Google.
Thank You!