The church started holding its services in one of the founding member’s apartment before acquiring and
relocating to a two-storey building located at 1545 6th Street NW,
Washington DC.
1992 was a trying period for the assembly due to an administrative conflict which later caused majority of the members to move out of 1545 6th St Church to
continue their services at Armstrong Adult Education center building on 3rd and O St, NW.
A couple of months later, the church was able to secure a space at African Methodist Episcopal
(AME) Church building on 11th and M street, NW Washington DC.
In October 1995, we moved out of AME Church as a tenant and moved in to our own building
located at 4909 Edmonston Road, Hyattsville, MD.
4909 Edmonston Road, Hyattsville, MD.
Since we moved into our present location, we have witnessed explosion in spiritual growth and numerical increase. To God be the glory,
all the various departments of the church have been doing so well. However, the church is not realizing the full potentials of these ministries as a result of the space challenges facing the
church.
Our Visions and Dreams are so great, but lack of space and related resources to convert them to realties has been a great challenge facing the
church.There was just not enough room to cater to the strength the congregation we had grown into.
Thus the race began for a new place of worship that will double or even triple the
current 500 seating capacity.
The leadership of the church deliberated upon a series of architectural designs and finally settled on what we now have. This design has two
phases.
The Church encountered so many obstacles in securing a Permit for the Building Project. It took us years to come through with it. By now the project would have been completed if not for our failure to get the permit in time. But we thank God that everything happens
at His appointed time.
Having waited for so long for
construction to begin, the
installation of this signboard, which
signaled the commencement of
the project, was greeted with
jubilations and thanksgiving to
God.
In order to raise money for the Project, the Building Committee came up with
some ideas on Fund Raising. One of these was
the sales of the Commemorative Spades for the Ground Breaking ceremony which raise
quite a lot of money for the project.
By the grace of God, the first phase is now completed with today’s dedication.
In this building, we have offices, meeting rooms, a multipurpose room with a capacity for 400 people. The cost to build this phase is estimated at $2.7M with all external works included. Members of this church have been so generous and COMMITTED to the
work of God and have determined that this first phase is completed successfully.
It is note-worthy to mention here that funds so far have come
from members of this church.
The second phase of this project would be the Sanctuary. This phase is scheduled to
start very soon. The estimated cost is over $3M.
We are appealing to you to be part of this project to glorify the name of God. As God lays it in your heart please
contribute generously towards this project. God has an agenda and we know you are in that agenda. Do you want to see what others cannot see? So bless the
Lord with your substance and he will surprise you. (2 Kings 6:17).
The Lord will continue to be your strength, your rock, and your shield and fortress.
If you would like to be a part of this project, donation can be made by:
Sending a check or money order to: Building Project
C.A.C Hose of Praise4909 Edmonston Road Hyattsville MD 20781
Donation can also be made by using our easy andSecured Online donation method at
www.cachouseofpraise.org
By clicking on our Project Link, you will be able to access the Project page where you could get more
information and status about the project.
You can make your donation using your credit card or account transfer by clicking the Donate Link.