• The 2016 Building a Better Future report details the objectives of the out-of-home care (OOHC) reform and key activities to achieve the reform.
• The Reforms are a suite of initiatives aligned to deliver against each defined objective:
• a system focused on the needs of the child; • a coordinated and flexible service system; • a safe system held to high quality standards; and • a legislative framework supporting best child outcomes.
• Through the OOHC reforms there will be greater accountability for the money associated with service provision of OOHC services delivered by community sector organisations (CSOs).
• Greater stability for CSOs.
Purpose of Today
Department of Communities 3
• Give an overview of the minimum number of care arrangements that will be procured in each region.
• Provide an overview of the prices of the OOHC service that will be
procured from CSOs. • Provide information on the Care Arrangement Support Costs (CASC)
model and the associated prices. • Detail the next steps.
Key Information to Note
• The Department is committed to maintaining the current budget allocated to children in CSO care arrangements.
• The work undertaken to develop the pricing has been completed over a
number of years. • Pricing at year 1 aligns to the West Australian (WA) Award rates. • We are only indicating the minimum number of care arrangements in
each region in this presentation. This allows flexibility to increase provision in areas required when contracts are awarded based on the current numbers of children in CSO care arrangements at that point in time.
• This aligns with our commitment to minimise any potential impact on children in a CSO care arrangements as a result of the procurement process.
• CASC is an allocation exclusively for supporting a child’s needs. It
cannot and should not be used to supplement operational costs.
• All prices presented will have any relevant escalation factors applied where applicable, including on the CASC element.
Department of Communities 4
OOHC – CSO Budget Overview
• $90m has been allocated to CSOs to provide OOHC in 2018/19. This is through recurrent funding and individualised contracts.
• This same investment will be used to procure the new OOHC care
arrangements. • More equitable distribution of resources via introduction of CASC
to support the child’s needs
Department of Communities 5
Current Care Arrangements with CSOs
Department of Communities 6
Care Arrangement Type **Number of Funded Care Arrangements
Type of Funding
General Foster Care 510 Recurrent funding
General Placements 65 Recurrent funding
Family Group Homes 160 Recurrent funding
Specialised Fostering Program
110 Individualised funding
Disability Placements 70 Individualised funding
Transitional High Needs 30 Individualised funding
Average occupancy rate for 2017/18: 71% **Approximate numbers
Future Care Arrangements with CSOs
Department of Communities 7
SERVICE BRIEF DESCRIPTION
TEMPORARY CARE HOUSES
A care arrangement provided in a Department property for up to 4 children. Primarily children aged up to 12 years with a NAT level 1-3. For children entering OOHC for a period of up to 3 months.
COMMUNITY FOSTER CARE
A care arrangement for children in CEO’s care. Normally provided in the carer’s home. All NAT Levels and children aged up to 18 years. There are no time limits on this care arrangement.
COMMUNITY GROUP CARE
A care arrangement provided in a Department property for up to 4 children. All NAT Levels and children aged up to 18 years. There are no time limits on this care arrangement.
COMPLEX COMMUNITY CARE
A care arrangement for children in CEO’s care aged 12-18 years with a NAT level of 5.
Future Care Arrangements with CSOs
Department of Communities 8
SERVICE PAC CASC CHILD SUPPORT COSTS
CARING ALLOWANCE
ASSETS
TEMPORARY CARE HOUSES Department
provided
COMMUNITY FOSTER CARE Not provided by
the Department
COMMUNITY GROUP CARE Department
provided
COMPLEX COMMUNITY CARE
Not provided by the Department
Financial Components of Service Models – Fixed Prices
Placement Administration Costs (PAC)
• The PAC represents the total operational cost per annum for a care arrangement
• The PAC may include the following: • Staffing expenses; • Carer recruitment and
training expenses; • Care arrangement
support and management;
• Contract Management and compliance;
• Administration, management and corporate requirements;
• Accommodation and office expenses;
• IT, cars and travel; • Overheads.
Care Arrangement Support Costs (CASC)
• CASC is the allowance provided to support the child or young person in their care arrangement, recognising their needs and complexities.
• The level of CASC is determined by taking into account the child’s needs which have been identified in the Needs Assessment Tool (NAT)
Caring Allowance (CA)
*in GFC these expenses are included in CSC and PAC
• The CA is the financial allowance Service Providers pay to carers to reimburse them for the general household (family) costs of raising a child
• This includes costs such as: • sport and recreation fees; • school fees, books/resources
and uniforms; • extracurricular activities; • pocket money; • child’s clothing; • food; • housing (wear and tear,
utilities); • transportation; • general healthcare (over the
counter medications and general prescription medication);
• child’s personal care (toiletries, haircuts, nappies etc.); and
• child’s gifts.
Child Support Costs (CSC)
• CSC relate to items and activities that may incur expenses in the course of raising a child in the CEO’s care.
• CSC may include the following:
• Housing • Minor health care (gap
payments etc.) • Education • Establishing the care
arrangements (car seat, bedding)
Key of Care Arrangements
28/03/2019 Department of Communities 10
Temporary care house Provider: CSO
Community foster care Provider: CSO
Community group care Provider: CSO
Complex community care Provider: CSO
Residential group homes Provider: Department
Family Care Family Care Provider: Department
Reunification Provider: Department
General foster care Provider: Department
Temporary Care Houses
11
Purpose – provide safe, stable and therapeutic care arrangements for children entering OOHC in the child’s community while the child’s needs are better assessed and a matched care arrangement can be identified. • Live-in foster care model. • Children with a NAT level 1-3. • Aged 0-12 years. • Four care arrangements – with capacity for
more children if sibling group. • Temporary care - three month length of care
arrangement. • Priority for sibling groups. PRICE: $383,733 per house p.a. (no CASC) (four care arrangements per house)
RGH CFC GFC Family Care
Dept. GFC
Community Foster Care
Department of Communities 12
RGH TCH GFC
Purpose – provide safe, stable and therapeutic care arrangements for children in CEO’s care. • Foster care model. • Children that are best cared for in a
carer’s home. • All NAT Levels (1-5). • Aged 0-17 years (18 years if completing
school). • Minimum 7 night requirement. • Preference for CSOs who can provide
emergency entry. • No maximum time limit on length of
care arrangement. Family Care
Family Care
Dept. GFC
Community Foster Care – Financial Model
3
4
5
2
1
$24,739 p.a. per care arrangement
$1,600
Caring Allowance (Paid across all NAT Levels)
NAT Level
Child Support Costs (paid across all NAT Levels)
Placement Administration Costs (paid across all NAT Levels)
CASC (p.a.)
$9,000
$36,000
$81,000
$171,000
Resources to support the child’s identified needs
Cost of raising a child in OOHC
$14,167 p.a. per care arrangement
$2,037 p.a. per care arrangement
Community Group Care
14
Purpose – provide safe, stable and therapeutic care arrangements for children in CEO’s care. • Live-in Foster care model. • Children best cared for in a group
care setting. • All NAT Levels (1-5). • Aged 0-17 years (18 years if
completing school). • Four care arrangements per house –
with discretion for more children if sibling group.
• Preference for CSOs who can provide emergency entry.
• No maximum time limit on length of care arrangement.
• Priority for sibling groups.
Family Care
Family Care
Dept. GFC
Dept. GFC
Community Group Care – Financial Model
3
4
5
2
1
$340,903 p.a. per house (4 care arrangements)
$1,600
NAT Level
Child Support Costs (paid across all NAT Levels)
Placement Administration Costs (paid across all NAT Levels)
CASC (p.a.)
$9,000
$36,000
$81,000
$171,000
Resources to support the child’s identified needs
$13,162 p.a. per house (4 care arrangements)
Complex Community Care
Department of Communities 16
Purpose – provide safe, stable and therapeutic care arrangements for children with exceptionally complex needs, who pose a significant risk to themselves and/or others. • Community care arrangements for children
with exceptionally complex needs. • Individual and/or group living options
dependent on needs of young person. • Flexibility to provide foster care model and/or
residential care model. • Recurrently ‘block funded’. PRICE: $452,885 per care arrangement p.a.
Family Care
Family Care
GFC
GFC
Dept. GFC
Dept. GFC
Justice Options
Secure Care
Mental Health Services
Additional Children in Temporary Care Homes or Community Group Care
• The number of care arrangements required to be provided per house may be extended beyond the four children in order to keep sibling groups together.
• If additional children enter either the Temporary Care Home or Community Group Care House the following will be paid whilst additional children reside in the house.
Department of Communities 17
Additional Child Funding (pro-rata p.a.)
5 children in the home (total) $61,041
6 children in the home (total) 5th child plus $23,494 TOTAL: $84,535
7 children in the home (total) 5th child plus $46,988 TOTAL: $108,029
Care Arrangement Minimum Numbers
Community Foster Care
Department of Communities 18
Minimum Number of Care Arrangements Regions
400 Across the Perth Metropolitan Area and South West
It is not intended to recurrently procure Community Foster Care (CFC) in regional areas. CFC will be contracted when a child and carer are matched and the care arrangement is confirmed. A contract variation will be made for individual children who are placed in a CFC care arrangement. These services will only be provided by CSOs procured to deliver Group Foster Care in the region. Pricing will be as detailed on slide 13.
All other regional areas
As at 1 July 2017 Perth Metropolitan area is inclusive of Peel
Care Arrangement Minimum Numbers
Community Group Care – 4 care arrangements per house
Department of Communities 19
Minimum Number of Houses Regions
10 Across the Perth Metropolitan Area and South West (1 per District)
16 2 per regional area (excluding South West)
As at 1 July 2017 Perth Metropolitan area is inclusive of Peel
Care Arrangement Minimum Numbers
Complex Community Care Temporary Care Homes
Department of Communities 20
Minimum Number of Care Arrangements
Regions
50 Across the Perth Metropolitan Area and South West
Minimum Number of Temporary Care Homes (4 care arrangements per home)
Regions
3 Across Perth Metropolitan Area
3 Across all other regional areas.
As at 1 July 2017 Perth Metropolitan area is inclusive of Peel
Compensation and Outcome Payments
• An allocation was earmarked for outcome and compensation payments.
• Feedback from recent consultations was that this money could be
better used to support the achievement of the OOHC reform outcomes. The Department is currently considering future use of this budget and aims to provide information in the Sector Engagement sessions later this month and in March.
Department of Communities 21
Next Steps
Approximate Date Activity
January - February Work with each CSO individually regarding the NATs for children in their care.
February - March
Share outcomes of the community consultations.
February Release the Registration of Interest for Complex Community Care.
Information will be provided as available through : • the Department’s website; • emails; and • information sessions.
Engagement Dates and Locations
Department of Communities 23
REGION SECTOR ENGAGEMENT Wheatbelt (Northam) 25 February Murchison (Geraldton) 26 February North Metro (Perth, Mirrabooka, Joondalup)
5 March
Great Southern (Albany) 7 March East Metro (Midland, Armadale, Cannington)
8 March
Goldfields (Kalgoorlie) 11 March South West (Bunbury) 13 March
South Metro (Peel, Rockingham and Fremantle)
15 March
Pilbara (Hedland) 18 March
Pilbara (Karratha) 22 March East Kimberley (Kununurra) 26 March Peel (Mandurah) 27 March West Kimberley (Broome) 29 March
Questions?
28/03/2019 Department of Communities 24
caw a-ii-o
A Government of Western AustraliaDepartment of Communities
Briefing Note
Minister for Child ProtectionMinisterial or Department Ref: 2019/1936
Subject: Out-pf-home care reforms update - secto enga ement sessions andfinancial components of care arrangement models
To provide an update regarding out-of-home care (OOHC) reforms, specificallycommunications and consultations about care arrangement models and the associatedfinancial components.
Background• On 21 August 2018, further to a presentation made by Jackie Tang, Assistant Director
General, Ser ice Delivery: Metropolitan Communities (SDMC) and Robyn Antenucci,then General Manager, Strategy and Reform,
• The presentation provided an over iew of the current OOHC system in WesternAustralia, specifically its unsustainability and inefficiencies in providing funding andsupports commensurate with the needs of individual children in care.
® The propose OOHC service models will strengthen and promote the Aboriginal andTorres Strait Islander Child Placement Principles) with the Contractual requirement todemonstrate cultural competency.
• Service models will also reflect incorporation of recommendations resulting from theRoyal Commission on Institutional Responses to Child Sexual Abuse, whichunderscored the risks posed by not addressing the grow ng needs of children in care.
ore broadly, the reforms will provide an opportunity for the Department ofCommunities (the Department) to:
o strengthen the provision of culturally safe and responsive care arrangements;o better utilise resources within the system by fundin actual service provision, not
unoccupied placements;o emphasise the requirement for place-based services; ando increase the footprint of Aboriginal Community Controlled Organisations
(ACCOs) within the sector.• Additional background information has been provided in (Attachment 1).
Current situationIn recent months, the Department has been refining and testing critical elements of theservice models, including the:
o matching framework;o Needs Assessment Tool (NAT);o financial components; ando potential financial impact on current service providers (Attachment 2).
Between November and December 2018, the Department re-commencedconsultations, as promised, with Community Sector Organisations (CSOs), peakbodies, ACCOs, Elders and community representatives to obtain feedback and inputregarding the requirements for OOHC service models in WA (Attachment 3).During the same timeframe, refresher workshops were held across WA for bothDepartment frontline staff and existing service providers regarding the NAT; includingthe importance of completing the NAT, using a consultative approach with the Care
ISieJEHWSu n.n
BY: C.
Page 1 of 3
Team for each child, and its intrinsic role in current and particularly, future servicemodels.Department staff subsequently reviewed and quality assured NAT reports for childrenin care arrangements provided by GSOs to gauge the accuracy and consistency of itsapplication.Detailed analysis of these care arrangements has affirmed several pertinent issuesincluding:
o the number of care arrangements paid for but not provided; ando the average spread of NAT levels of children in CSO placements which are
notably low in the case of some providers (Attachment 4).The Department has been working to improve relationships with CSOs and establishmore open, direct channels of communication. A CSOs currently contracted toprovide OOHC services have been invited to meet with the Department to discuss theNAT reviews and wor through any other issues or concerns. D scussions havetrans ired with all of these CSOs, including the following parties:
o Parkerville: Jo Collins, Director Out-of-Home Care; Johnathan Rylatt ProgramManager Family Group Homes; and Shenali Manuel Program Manager GeneralFoster Care;
o AccordWest: Nicole Gibbs, Chief Executive Officer (CEO); and Jacqui Davis,Manager Out-of-Home Care;
o Yorganop: Jodie Geurinoni, Manager Corporate Services; Elizabeth Cramer,Executive Manager; and Angela Thornhill, Operations Manager;
o Centrecare: Catherine Spini, General Manager; and Elizabeth Wortham,Executive Manager;
o Safe Places: Kelly Gill, State Manager; and Ruaidhri, Area Manager;o Key Assets: Judith Wilkinson, State Director; and Brenda Yelland, Director;o MercyCare: Rose Hayden, Manager Family and Community Services; Lyn
Millett, Executive Director Family and Community Services;o Lifestyle Solutions: Hazel Holland, Senior Manager Child and Family;o MacKillop: Jennifer Hannan, State Director WA;o Foundations Care: Danielle Veivers, Chief Executive; and Shona Robertson,
Therap ut c Practice anager;o UnitingCare West: Michael Chester, Head of Service Operations; and Fiona
Cafferty, Practice Lead Children s Services; ando Wanslea: Tricia Murray, Chief Executive Officer; Stephan Lund, Executive
Manager Out-of-Home Care and Specialist Sen/ices; and Charlotte Cain,Operations Manager.
Feedback from these discussions has been positive, and in the vast majority of cases,CSOs have agreed with the NAT levels of children in their care, as assessed by theDepartment.On 22 January 2019, in response to requests from the sector for more informationregarding the financial components of care arrangement services to be procured, aninvitation was extended to the sector to attend an information session on13 February 2019.This session was streamed on-line for CSOs located outside the metropolitan area,and will be available on the Communities’ website. The focus of the session was to:
o explain the financial components of the four (4) models (for details seeAttachments);
o reassure the sector that money currently provided for CSO provision of OOHCservices will not be reduced;
o clarify upfront block funding (Placement Administration Costs) as a percentageof total contract value (approximately 60 per cent for Community Foster Care
and 70 per cent for Group Foster Care), with Care Arrangement Support Costs(CASC) comprising the remainder; and
o assure the sector that cost projections include remuneration in accord nce withWestern Australian award rates (Social and Community Serv ces Award) andtake into account the Fair Work Australia 2012 Equal Remuneration Order(ERO) requirements.
• Engagement sessions have been strategically scheduled to take place in late Februaryand March 2019 (Attachment 6), in. order to provide feedbacks furthe information and asummary of key issues and the es r ised at the consult tions held in late 2018 andthe information session regarding financial components - 13 February 019(Attachment 7). ,
• Before the end of February 2019, a registration of interest will be issued for Co plexCommunity Care via Tenders WA, which will assist the Department to continueobtaining input fro the sector in developing what will become the final service modelsand Requests for Tender for the provision of: Comple Co unity C re; andCommunity Foster and Group Care.
• The Request for Tender for Complex Community Care will be released rior to theCommunity Foster and Group Care equest for Tender, and will cater for childrenassessed at NAT level five (5). Consequently, care provision by. Communit Fosterand Group Care service pro iders will focus on children asses ed with NAT levels one(1) to four (4), and the majority of current OOHC service providers. ill not need to
• expan thejr capacity beyond what they currently provide, except where this allowssibling to be in the same care arrangements. : .
o Over the past 10 days, Communities has twice met with the Department of Finance toexplore procure ent options. Discussions are continuing, and an update on theoutcome will be provided to the inister in coming weeks. ; ,
Recornmendat on/ActionThat you note thi update on delivering the OOHC reform and a personal briefing can beprovided for further information.
Noted
Jaokie'iangssistartt Director General
Ser ice Delivery: MetropolitanCommunities
HON SIMONE oGURK MLAINISTER FOR CHIL PROTECTION; WO EN S
INTERESTS; PREVENTION OF FAMILY ANDDOMESTIC VIOLENCE; COMMUNITY SERVICES
- / 2.019 <) /cTZ 7 2019Min/! )opt Ref: ATI 039607Contact: Jane Simmons, General Manager, Strategy and Reform Teh 9222 2518 ob: 0437 158 635Drafting Officer: A anda nCurry an oniqua Rampono . •
Attachment 1 cowAdditional background information
In April 2016, the former Department for Child Protection and Family Support (DCPFS)commenced a five-year reform agenda with the release of Building a Better Future:Out-of-Home Care Reform in Western Australia (the plan). The plan outlined a seriesof reform actions to create a more effective OOHC system and deliver more positive,consistent life outcomes for children in care. Key deliverables included:
o reducing the number of children entering care, particularly Aboriginal children;o providing more effective and culturally appropriate services and care
arrangements to Aboriginal children;o providing supports within the system to achieve better life outcomes for all
children in OOFIC; ando more effectively and equitably applying finite resources.
Reform Action 42 identified the need for a complete system re-design, and for allfunded OOHC ser ices to be re-aligned and procured.Extensive consultations were undertaken by DCPFS over a number of years, acrossWestern Australia (WA), with peak bodies, advocacy groups, community servicesorganisations (CSOs), Aboriginal community controlled organisations (ACCOs),Aboriginal community including Elders, and potential service users to develop:
o a costing model for the new service system;o service specifications and key elements for each service; ando tools and guides to support the sector.
On 31 May 2017, an Early Tender Advice was published on Tenders WA with9 October 2017 as the Request for Tender release date.On 11 September 2017, this date was withdrawn.
. The delay in releasing the OOHC Requests for Tender provided an opportunity tofurther refine service models; investigate synergies across branches within a newlyamalgamated Department of Communities; and review recommendations from theRoyal Commission into Institutional Responses to Child Sexual Abuse.in early 2018, service agreements with all existing service providers were extendedand, further to consultation with service relevant service providers, are currently due toexpire on 30 June 2020.
BN 2019/1936 1
Finan ial Overview. Current Care Arrangements vs New Service Model
Prn rttr . .CufrentP ie sniTypea .: M wfchiiiMi. *SP>*r# . . wiwie.cur entA nuaV'Fondln . . .
: Fflnvf Qrc-j Home t5 Moirar f sjrtJ/Giwp Horr s
ttoitfiysst ;Sotrl>Vi eUrGeneraf Foster Caro 1 s 2.S5J.MTMi etro, Fool and Se«h West n 45t.« ff3r S odaHed roster Cere
. t InrtY tjj sed Fr r'va mm 7&5.02465: 7&ta!i ¦ 5 4 1SJS128Sj Fan? /Grou Homes
. j ti'et/o S BM.nsw
. • DiowamMa V $ 7.6?7.37l,WCenlrtCaie Tote 3.«£6.63«tOG;G{neraiFosterCi/e] est Kiribe tsv m 7S3.8S5CO
¦ iGwve/a3F Jt}.'C5re. EastKirpieftflY mm s 482,021,C4
FouniJiU jM Cara Ud . . «er reJ Foster Cr;o' . t.t4( o mm s 273,306 00
: SfKdaTsed Foster Cara1 Iritf di tsed Friiiiv) B * 33.643JM'Tote s • •| General Foster Caro Serv s
: U&St) ami General Foster Cara Services
1. 1 CastKtr-terie > General Foster Cere Services
Hi 5 f,4Z2,4573M
Ke AaitU | South West.tEmeraew
. ; Dtsabr s Foster Care1 i
¦413,175<M«J,44 G3
- truSvaiolTsed Prki jiSpe etisd Foster Care
m m 5 1.770.630 W; fftdMtkiiSsed Piter T ats' m $ 3.SJ3.35t >
t FaraTy G rou om s. lEasIKbiserter
Fa T GiUt j Home aiGtealSou era
Itfeityli SoIuUoni : am>y Grou Homes' ¦ PYSa a BFanvTy G oup Homes
s VAeafte.l 4,358.01800. ¦ Ge ra) Foste CareWbeafcit' Totals mm 5 liinota,
SCSSiig-CO!' i F r /Grrlp Hor s
. {GoWEeSds'. 'iFam-tyGrw pMOfres E
JWeslhM>:t?er. Gene alFeaterCare
5 2,713.18300etro i Soutfi We U
| General Foster Carem HS S &33.0J4.00
Ufe WHhai/t BtnUrt ¦ JGotaSeasandV eatbeit mi $ 533405.00a) ?is V*.<h AaavnodaScn. Se vie t,0».2t700jEmemency $ tM.343M: Spedstsei Fssto Cara| Irdr/dueSsed PrWn-i
. i D'S-aHVias Foste CsreJ 3.755.40 .10
i tndrri*j aised Hheiro• eyais H $ 3W3,?2640ine ra! oitirCjreprua a
iCer-fral Foster Cere « &t 3.3 200I Metro sreJ Soolh W st| Ernu eacY
Speda5se>5 Foster Care B & 1.310,775 00188.938.0
| fnS'/idue rted PricitgTotals" HH 857,859.50
7.713 rWViW
f t<cyCm •5 Fair y G es r H*r s¦Met o Qj n; e cy F&cetnent Service m¦; et oTobis B mil 2,032.480.00 j
5. 5193 .001
Pirkf ®! C u dftnaftdy6utKcart!
r fm3/ G»cvp Mcm4SFamfyGitcp wnisK urtliiswTl>f/sput«Cfife Pfsa amCffifralFoitif CuaftteboG«fis/BJ Foj'fifCsja SiiVcesr urchbw sM VA*a'i«S
C-e- fTiMil Youth PfoqiflynsThtia ?? Ca/e P/cgram -Kes-yenW
S o-aaSsM Fostsr Ca einft.tfiii ivi P<kk>$Tote
: ToUi
Yrans »F»fnJI/3««l?ei
: iFamS Qroupibfnos. I ttel-a. IfolwesIspociatltdFoiterCEie
. | [rrfriWuaSitit Pt5ch | CXiabJ. iiS Fostsf Ca (rtSriJuaSsed PiteiTc aU
' ) FostftfCw* Ssrvioai General F05 tef C a¦ Great Sovtwn-; EnKWiWfi Spetta sd rostei c»e
•.; Wf A'a sod Prior. iTrrteii ' ' ' ¦ '
I -
$ ¦i.ois w
$ tJi3.6S5.CCS 65i.076,M
i 9H.C60.M
5 .3«.75t-«
5 u coS t.0l9.tM.«i 2J05.661M
V4 il 6f«W!>tFwtdSI»
;; Yofflaras Pta«/wf* Ser. to.: O orflency• To»a.*t '
: OiSib StifS FO'.ltf C5f55 irtdfvWuiS ted Pridr t
Government of Western Austral!Department of Communities
Attachment 3
Sector Consultation Summary- November - December 2018
LOCATION DATE AUDIENCEKununurra 5 November 2018 ACCOs, Aboriginal Community and EldersKununurra 6 November 2018 Community Services SectorEast Metropolitan Area 12 November 2018 Community Services SectorSouth Metropolitan Area 12 ovember 2018 Community Services SectorNorth Metropolitan Area 13 November 2018 Community Services SectorPort Hedland 20 November 2018 ACCOs, Abori inal Community and EldersPort Hedland 21 November 2018 Community Services SectorKarratha 23 November 2018 Community Services SectorAlbany 22 November 2018 ACCOs, Abori inal Community and EldersAlbany 23 November 2018 Community Services SectorMerriden 26 November 2018 ACCOs, Aboriginal Community and EldersMerriden 27 November 2018 Community Services SectorNortham 29 November 2018 Community Services SectorKalgoorlie 29 November 2018 ACCOs, Aboriginal Community and EldersKalgoorlie 30 November 2018 Community Services SectorGeraldton 3 December 2018 ACCOs, Aboriginal Community and EldersGeraldton 4 December 2018 Community Services SectorBunbury 5 December 2018 ACCOs, Aboriginal Community and EldersBunbury 6 December 2018 Community Services SectorBroome 10 December 2018 ACCOs, Aboriginal Community and EldersBroome 11 December 2018 Community Services SectorPerth and Mandurah 3-20 December 2019 ACCOs, Aboriginal Community and Elders
Key Findings
The consultations focused on seven (7) key principles the Department of Communities(the Department) is considering including in the care arrangement service models. Theprinciples and the response from participants is summarised below:
Principle Response Actions RequiredProvision of care arrangementsacross all 5 NAT levels and carearrangement stability.
The response was positive. Therewere some concerns regardingcurrent specialised services andhow they will be able to expand toprovide for all five NAT levels.All participants agreed that carearrangement stability wasnecessary and a priority.
Incorporate this into service models.Message to be communicated: thatspecialised service provider canpartner with other service providersif they desire.
Working in partnership withCommunities using the Care TeamApproach.
This was well received. Allparticipants agreed that working inpartnership was necessary toachieve outcomes for the child.Some concerns were raised abouthow this will be embedded in
Incorporate this into service models.Undertake further work internally toembed this approach acrossCommunities.
BN 2019/1936
1
Communities.Carer registration and carerdefinitions, including the use of theCross-Sector Foster Carer Paneland requirement for all carersincluding employee carers to be onthe Carer Directory.
This was contentious. The sectoroppose the use of the cross sectorfoster carer panel and have raisedsome concerns regarding potentialIndustrial Relations issues ifemployees are required to be onthe foster carer directory.
Further work with Communitieslegal team is occurring tounderstand and overcome anyIndustrial Relations issues.Communit es is awaiting directionand advice from the Department ofPremier and Cabinet regarding theRoyal Commission intoInstitutionalised Sexual Abuserecommendations and actions, inrelation to carer directory andassessments.
Planned entering and exiting ofcare arrangements and inability torefuse care arrangements or exit achild in a crisis.
This was well received by majorityof participants who agree plannedentry and exit is always beneficialfor the child.
Incorporate this into service models.
Place-based service provision This was well received, particularlyby the Aboriginal community.Participants strongly agreed thatchildren should remain in theircommunity wherever possible.
Incorporate this into service models.
Culturally responsive carearrangements
This was well received, particularlyby the Aboriginal community, Astrong sentiment for children tohave a deep and meaningfulunderstanding of their culture andthe importance of remainingconnected to their community wasstressed. Many participantsincluding current service providersacknowledged this currently is notdone well.
Incorporate this into service models.
Outcome and co pensationpayments
This was not well received. Remove this from service models.Consider other options that werepresented that better support theother principles and desiredoutcomes. In particular this may bere-directed to support culturallyappropriate service provision andthe development of the ACCOfootprint in OOHC through provisionof funding to the partnershiparrangement.
2
Attachment 4 (continued
Number of Children in a CSO Care Arrangement by NAT Level {as at 16 January 2019)
Number of care arrangements provided: 840Number of CSOs: 22Average NAT Level for all CSO care arrangements: 2.32
BN 2019/1936 CONFIDENTIAL - NOT FOR DISTRIBUTION
verage NAT Level
Attachment 4
5.00 Outcarelnc
My Place
Cam Can
. bilit Centre4.00 4 - Nuisen Hlsven
4 Sense ¦ Teem Treasure
Distribution of Average NAT Levels Across all CSO s
4 Safe Place
Units ngCa re West
3.00Enable SW
' Sa Ivati on Army
Foundations Care ,4AccordWe t
> Centrecare
" Lifest le Solutions Key Assets
2.00
¦- -Averagerof-a -eS s-
4 MacfCillop4 MercyCare Park rville
Life Without Barrier
¦ > Yorganop
Wanslea
1.00
0 10 20 30 40 50 60 70 80 30 100 110 120 130
Number of Care Arrangements Provided
BN A11039607 CONFIDENTIAL - NOT FOR DISTRIBUTION
Attachment 5
Indicative Costs and Care Arrangement Numbers
Summary
Budget 2019-20 Variance$90,233,465 -$6,201,010
Temnorarv Care House Cost Complex Com unity Care Cost Group Foster Care Cost Community Foster Care Cost
$6,636,530 $23,644,238 $29,253,289 $36,855,418
Carearranements Care arrangments Care arranements Care arrangments
68 SO 223 559
BN 2019/1936 CONFIDENTIAL - NOT FOR DISTRIBUTION Page 1 of 1
Attachment 6
Sector Engagement February - March 2019
LOCATION DATE AUDIENCEPerth (videoed for regional WA)
OOHC financial components13 February 2019 CSOs
Geraldton 26 February 2019 Community Services Sector, ACCOs,Aboriginal Community and Elders
Northam 25 February 2019 Community Services Sector, ACCOs,Aboriginal Community and Elders
North Metropolitan Area 5 March 2019 Community Services Sector, ACCOs,Aboriginal Community and Elders
Albany /March 2019 Community Services Sector, ACCOs,Aboriginal Community and Elders
East Metropolitan Area 8 March 2019 Community Services Sector, ACCOs,Abori inal Community and Elders
Kalgoorlie 11 March 2019 Community Services Sector, ACCOs,Aboriginal Community and Elders
Bunbury 13 March 2019 Community Services Sector, ACCOs,Aboriginal Community and Elders
South etropolitan Area 15 March 2019 Community Services Sector, ACCOs,Aboriginal Community and Elders
Port Hedland 18 March 2019 Community Services Sector, ACCOs,Aboriginal Community and Elders
Karratha 22 March 2019 Community Services Sector, ACCOs,Aboriginal Community and Elders
Kununurra 26 March 2019 Community Services Sector, ACCOs,Abori inal Community and Elders
Mandurah 27 March 2019 Community Services Sector, ACCOs,Abori inal Community and Elders
Broome 29 March 2019 Community Services Sector, ACCOs,Abori inal Community and Elders
BN 2019/1936 1