Sheet 1 of 2
DETAIL 01
DETAIL 01DETAIL 05
DETAIL 03
DETAIL 04
DETAIL 02
DETAIL 03
DETAIL 06
KEY
DETAIL 02
DETAIL 03 DETAIL 04
Data Sheet N° 201Stainless steel and cable rail balustrade installation
On Decking Substructure
©© Copyright Greensquares Products Ltd 2013
Handrail End Cap
Apply a bead of high strength retainer (supplied) to the male insert part of the fittings.
Handrail bracket to be attached to pre drilled holes in the handrail using stainless steel screws supplied.
Turnbuckles and fixings are indicative and may vary from those illustrated.
End Post
Turnbuckles and fixings are indicative and may vary from those illustrated.Refer to seperate guidance for turnbuckle fixing.
Baseplate cover to slide over baseplate
Baseplate to to be fixed with 2 holes to inside of balustrading and 1 hole to outside.
Baseplate to sit on and fix through decking into double noggins on flat or trebbledup noggins.
Baseplate fixed to timber using 3N° stainless steel M8x100mm coach screws (not supplied).
Corner Post
Apply a bead of high strength retainer (supplied) to the male insert part of the fittings.
Handrail bracket to be attached to pre drilled holes in the handrail using stainless steel screws supplied.
Handrail corner connector.
Data Sheet N° 201
Sheet 2 of 2
DETAIL 05
DETAIL 01DETAIL 05
DETAIL 03
DETAIL 04
DETAIL 02
DETAIL 03
DETAIL 06
KEY
DETAIL 06
©© Copyright Greensquares Products Ltd 2013
Handrail
Apply a bead of high strength retainer (supplied) to the male insert part of the fittings.
Handrail bracket to be attached to pre drilled holes in the handrail using stainless steel screws supplied.
Cable to pass through pre drilled holes in centre posts.
Centre post
Cable to pass through pre drilled holes in centre posts.
Centre post
Baseplate cover to slide over baseplate
Stainless steel and cable rail balustrade installationOn Decking Substructure