Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. Ramiro Andrés Cremaschi Julia Alejandra Perinetti Repsol YPF
Transcript
Page 1: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS.

Ramiro Andrés CremaschiJulia Alejandra PerinettiRepsol YPF

Page 2: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

2 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

Introduction - What is Repsol YPF?

• A multinational company leader in Spain and Argentina.

• Business activities in Exploration, Production, Refining, Distribution, Marketing, Chemicals, Gas and Power.

• Operations in four continents

• One of the world’s ten most important private oil companies.

Page 3: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

3 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

Introduction - What is Repsol YPF?• LPG business• Sales over 3 millions tones/year• Third largest company in the world.

• Over un million barrels of oil per day.

• Oil and gas reserves: more than 5 billion barrels of oil equivalent.

• Refining capacity: 1.2 million barrels per day

• Nine refineries.

Page 4: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

4 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

Introduction - Where is the Luján de Cuyo Refinery?• Next to Mendoza City in Argentina, South America, at the foot of the Andes mountains.

Page 5: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

5 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

Background – A lesson learned.• Two [DMC] controllers in 1992:• Fluid Catalytic Cracking Unit #2 (FCC II) • Delayed Coker Unit #2 (Coker II)

• Units’ operation conditions changed

• Lack of knowledge transfer

• System abandoned and dismantled

• Mixed feelings in console operators

Page 6: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

6 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

Background – A lesson learned.

• Reinstrumentation project in 1997

• Implementation of five multivariable control projects

• Developement of a group of specialists

• Work and training with Honeywell

• Growing responsibility and higher participation

Page 7: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

7 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

Connecting Honeywell and ABB DCS

EnterpriseHistorian

USER API

OPC Server

PHD SERVER

Profit ViewerProfit

Controller

OPCRDI

PHDAPI

NT ClientWorkstation

PHD Client

Profit Viewer

PHDAPI HCI API

Local Area Network(LAN, Ethernet)

Repsol YPF LAN(ongoing project)

ABB DCN (DistributedControl Network)

AdvaInfo software provided by ABB

Hardware platform provided by ABB

Software provided by Matrikon

PHD Client and Profit Viewer StationHardware provided by Repsol YPF

Hardware and Software providedby Honeywell Hi-Spec Solutions

Page 8: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

8 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

Connecting Honeywell and ABB DCS

• The interface:

• ABB: Enterprise Historian (EH)

• OPC server

• Honeywell: Process History Database (PHD)

Page 9: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

9 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

Connecting Honeywell and ABB DCS

• ABB DCS:

• Programs in TCL code to handle:

ON/OFF from console stations

Watch Dog

Set Point validation

Mode switching

• PID loops reconfiguration

Page 10: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

10 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

Connecting Honeywell and ABB DCS

• OPC Server• Developed by Matrikon (Canada)• Support from Honeywell, ABB and Repsol YPF

• PHD• Windup Status virtual configuration• RMPCT• Inferential calculations• Events detection

Page 11: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

11 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

The first five projects

• December 2000, FCC II Reactor, Regenerator and Main Fractionator

• March 2001, Coker II Furnaces, Main Fractionator and Gas Plant

• December 2001,

• Topping IV Crude Unit and Gas Plant.

• Vacuum Unit

• November 2002, Delayed Coker #1

Page 12: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

12 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

The FCC II gas plant – First in-house project

• ABB DCS platform

• Previous successful experience on this unit

• Interface reconfiguration

• Point building on the ABB DCS and PHD module

Page 13: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

13 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

The FCC II gas plant – First in-house project

• Gas plant hardware:

• High Pressure Separator (HPS)

• Naphtha Stripper

• Primary Absorber

• Secondary Absorber

• Debutanizer

• Depropanizer

Page 14: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

14 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

The FCC II gas plant – First in-house project

• Gas Plant Products:

• Stabilized Naphtha

• Butane

• Propane/Propilene

• Fuel Gas

Page 15: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

15 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

The FCC II gas plant – First in-house project

• Advance Control Objectives:

• Minimize the propane content in the fuel gas stream

• Minimize the butane content in the propane stream

• Minimize the propane content in the butane stream.

• Minimize the Reid Vapor Pressure of the stabilized naphtha

• Eliminate gas recycle problem

• Steady the product stream flows

Page 16: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

16 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

RDI ExecutionC2_READ_LO

(00")

K2_READ_LO(25")

K2_READ_MD(35")

K2_READ_HI(40")

K2_WRITE(55")

C2_WRITE(30")

K2HT_CTL(44")

K2GP_CTL(51")

K2MF_CTL(48") C2GP_CTL

(14")

C2RR_CTL(18")

C2_READ_HI(10")

C2_READ_MD(05")

RDIClock

Page 17: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

17 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

The FCC II gas plant – First in-house project

Page 18: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

18 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

Inferential Calculations• Cromatographer delay: 45 minutes.• Inferentials have been built for:• Propane content in Fuel Gas stream (C3 in FG).• Propane content in Butane stream (C3 in C4).• Butane content in Propane stream (C4 in C3).• Naphtha’s Reid Vapor Pressure (RVP).

Page 19: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

19 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

Results Evaluation (C4 in C3)• Butane content before controller implementation

• Butane content after controller implementation

Page 20: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

20 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

Results Evaluation (C3 in FG)• Propane content before controller implementation

• Propane content after controller implementation

Page 21: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

21 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

Results Evaluation (RPV)• Reid Vapor Pressure before controller implementation

• Reid Vapor Pressure after controller implementation

Page 22: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

22 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

Gas recycle: Stripper-HPS-Primary absorber

• Wet gas composition, to the HPS, change due to:

• FCC reactor conditions

• External LPG streams

• Over absorption of light components in the primary absorber.

• High temperature at the stripper’s bottom: naphtha over stripping.

• Low temperature of the primary absorber outlet gas

• Low temperature of the wet gas

• Low temperature of the absorbent stream (debutanized naphtha).

Page 23: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

23 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

Gas recycle: The Solution

• Manipulation of :

• Gas flow from the stripper

• Naphtha absorbent

• Control:

• Differential temperature inside the Stripper

• C3 purge into the FG

Page 24: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

24 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

The FCC II gas plant – Conclusions

• Utilization Index: 98%

• High degree of satisfaction (Operations)

• All objectives met

• Nine-month execution period

Page 25: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

25 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

Topping III: 2004 – Project in progress.

• Crude Distillation Unit

• Ongoing work – Step Test phase

• Commissioning before end of 2004

• Hands on training of new members of the team

Page 26: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

26 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

Summary and Conclusions

Clues to Success:

• High degree of commitment from the Management.

• Deep knowledge and comprehension of the process.

• Simulation and off-line tuning.

Page 27: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

27 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

Summary and Conclusions

• Training of console and field operators, supervisors, plant managers and process engineers.

• A scheduled and systematic monitoring activity.

• Continuous coaching to other members of the control group.

• Extensive documentation on each stage of development.

Page 28: Overcoming the Challenge of Implementing Profit Controller ... · Overcoming the Challenge of Implementing Profit Controller on a Third Party DCS. ... • Delayed Coker Unit #2 ...

28 2004 Users Group Americas Symposium • Partners in Innovation

Ramiro A. Cremaschi & Julia A. Perinetti

Questions?

You can contact us at:[email protected]

[email protected]


Recommended