Company Overview
UNITED TECHNOLOGIES CORPORATION
Large Engines
Space Propulsion
Aftermarket Services
Military Engines
Small Engines
Power Systems
LargeEngines
SmallEngines
Mobile PowerIGT Parts & Services
FT8
FT8 POWERPAC
Small & Midsize Engines400 kW - 16 MW
Large Engines25 - 60 MW
25
40
50
60
MW
500
2000
4000
10000
kWFT8 MOBILEPAC®
FT8SWIFTPAC
Portfolio
FT8 Marine
Small EngineMarine
FT8 Mechanical Drive
Small EngineMechanical Drive
Small EngineTransportation
FT8 Global Presence
Turkey
Malaysia
Trinidad & Tobago
Romania
UK
Saudi Arabia
Colombia
United Arab Emirates
EcuadorVenezuela
IndonesiaPeru
Mexico
Russia
India
China
Brazil
Thailand, Cambodia, Laos & Vietnam
Israel
Germany
Japan
Argentina 4Brazil 8Colombia 2Chile 6
Canada 3
Canary Islands 5
Virgin Islands 1Jamaica 1
CT 1FL 10MA 2NC 22NY 6PA 10VA 10WV 12
Japan 17
China 19
Finland 5Norway 13Germany 14Austria 1France 9Spain 7Georgia 4
Togo 1 Benin 1
CA 10OR 4WA 5NV 24
IL 14IN 8MI 2MO 16MN 2NE 4OH 8WI 2
PWPS Sales Managers
PWPS Representatives& Licensees
FT8 Installations
Over 2.0 Million FT8 Fleet Hours!
Ireland 8
Iraq 3
NewZealand 6Tasmania 6
Russia 12
GAS TURBINE ENGINE PEDIGREE
FT8-2 1998
FT8-3 2004
Over 14,000 JT8D Engines Built since 1964 – Over 500 Million Hours!
FT8 / JT8D Common Design Philosophy
FT8 Upgrades Benefit from Recent Commercial Engine Experience
JT8D1964
JT8D-200 1980
JT8D Provides Solid Base for Industrial Derivatives
FT8 Design Evolution
FT8-1 1991
J52 1960s
Power Output28.1 MW*
30.8 MW**
62.0 MW**
Heat RateBTU/kWh (LHV)
8761
9259
9213
ThermalEfficiency (%)
38.9
36.9
37
ISO, no losses* Shaft power, dry** Generator terminal, water injected
FT8® Performance
Simple Cycle
Synchronous Condenser Operation
Available on standard Aero-Derivative Designs with Free Power Turbines
Synchronous Condenser Mode Either From Shut Down Mode or Generation Mode
Shift from Synchronous Condenser Mode to Generating Mode by Simply Flipping a Switch
FT8® POWERPAC Gas TurbineThe FT8 POWERPAC is designed and stocked for fast
delivery, installation and commissioning.
Packaging Options
FT8® SWIFTPAC® Gas TurbineThe FT8 SWIFTPAC is a transportable unit, able to be setup
in several weeks
FT8® MOBILEPAC® Gas TurbineThe FT8 MOBILEPAC is a mobile unit, able to be setup in 8
hours (site ready).
FT8 2x1 Combined CyclePower Generation Facility
Gas Turbine Power
• 2 x 60,650 KW = 121,300 KW
Steam Turbine Power
• 43,500 KW
HRSG Steam Generation (Each Unit)
• 153,505 lbs/hr HP; 49,082 lbs/hr LP
Expected Part Load Performance (1 GT & ST)
• Gross Power Output 80,550 KW
• Gross Heat Rate 7,041 BTU/KWH
(LHV)
SWIFTPAC Products are designed for:
1. Mobility2. Rapid Installation (under 30 days)3. Lowest Installed Cost
SWIFTPAC Products are designed for:
1. Mobility2. Rapid Installation (under 30 days)3. Lowest Installed Cost
SWIFTPAC Products
60 MW
Financial Performance
• Field Cost reduced by $1M• Program on Budget and Schedule• Significant Savings on Turnkey Projects
Inst
alla
tion
Cos
t
Tech Advisers
General Operators
Electrician
Millwright
Pipe fitter
Rigger
Conventional SWIFTPAC
ISO Output 60 MWUS Transport Time 6 DaysFoundation 3’ ConcreteInstallation 3 weeksNoise 65 dBA @ 400’NOx/CO (w/ CO Converter) 25/10Fuel DualFrequency 50/60Hz
SWIFTPAC
25 MW of Power on Wheels
FT8 MOBILEPAC
MOBILEPAC Features
• Power 25 MW ISO• Base Engine FT8• Footprint 21 x 9 m• Number of Trailers 4• Installation 8 hours (site ready)
• Noise 90 dBA at 1 m• NOx / CO 50/100 mg/m3• Grid 50 or 60 hertz• Fuel Liquid or Gas
MOBILEPAC
Trailers are designed for air shipments.
PWPS EngineeringServices/Capabilities
• Complete Gas Turbine and Combined Cycle Engineering and Design
• Construction Management and System Commissioning
• Operations and Maintenance Services Structured to Specific Customer Needs
• Turnkey Project Services
FT8 Mechanical Drive
Pipeline
Recompression
Reinjection
Pump
Process Compressor Drive
Advantages
– High Reliability & Availability
– Modular and On-condition Maintenance Minimize Downtime
Mechanical DriveFT8 34690 6615 5500.0 19.5 9.0 85.5 458.0FT8 Plus 37940 6580 5500.0 20.2 9.0 87.7 481.0
Model Power rating
Heat Rate Power Shaft speed
Pressure Ratio
Number of Combustors
Inlet Temp Exhaust Flow
Exhaust Temp
FT8 Marine
Program
FT8 Marine
MHI Techno Super Liner / Kibo
Statistics:• MHI built• Powered by twin FT8s• Operation to 50 Knots• Commercial service 3
years• 5,000 hours of
operation• Certified by Japanese
Government (JG)
Marine DriveFT8 33415 6625 3600.0 18.8 9.0 83.2 461.0FT8 Plus 36825 6570 3600.0 19.7 9.0 86.1 482.0
Model Power rating
Heat Rate Power Shaft speed
Pressure Ratio
Number of Combustors
Inlet Temp Exhaust Flow
Exhaust Temp
FT8 Marine Advantages
Increased Performance Efficiency, Decreased Fuel
Consumption / Maintenance
Compact
Light Weight
35,000 shp
High Efficiency
Improved Maintainability
High-temperature, corrosion-resistant materials and coatings improve durability
Improved large-capacity oil system
Advanced Cooling
Controlled Diffusion Airfoils
On-Condition and Modular Maintenance Minimize Downtime for Maximum Availability
P&WC (A’ASIA) Pty. Ltd.
Brisbane, Australia
PT6A
P&WC (SEA) Pte. Ltd.. Loyang, Singapore
PT6A +PT6T +
P&W Engine Services, Inc.Bridgeport, West VirginiaPT6A -
Pratt & Whitney Canadado Brasil Ltd. Sorocaba, Brazil +PT6A PT6T ST6 ST18
Pratt & Whitney Canada Corp.St-Hubert, Quebec, CanadaPT6A PT6B PT6TST6 ST18
P&W Canada Customer Service Center Europe GmbHSouthampton, EnglandPT6T P&W Canada Customer Service Center Europe GmbH
Ludwigsfelde, GermanyPT6A
O/H Capability Heavy Maintenance
Line Maintenance
Parts Distributor
PWPS Global Facilities
+
Industrial Gas Turbine Services
Pratt & Whitney Capabilities
A Quality ControlledDesign to Delivery Process Infrastructure…
…Combined with KeyEnabling Technologies
High Temperature
Cooling
Materials -Alloy
Technologies
Metallic & Thermal Barrier
Coatings
Systems Analysis
Multi-Disciplinary
Optimization
Developed Supply Chain
PARAMETER 1
PARA
MET
ER 2
AERO
STRESS
THERMALVIBE
COST
Computational Fluid Dynamics
Durability Analysis
Structural Analysis
Finite Element Heat Distrib.
Analysis
Materials and Coatings
Enhance Design / System
Integration
CMM Technology
Optical Technology
Wax Molding
SOAPP Analysis
Reverse Engineer Existing parts &
Engine Equipment
A B D
Manufacture & Sourcing
ProductionPWPS PWPS
SalesSales
Market Data & Source for Parts
Production Qualification Processing
Manufacturing Development
Testing and Producibility
Validation
C
• Multiple Disciplinary Optimization allows for extensive exploration of design options while monitoring many design constraints.
• Iterations take 6 hours instead of 1 week.
P&W Design Toolbox:
P&W Experience and Technology Differentiates Us From CompetitionP&W Experience and Technology Differentiates Us From Competition
Part Design Process
PWPS Redesigned Parts
Available parts:
• 6B 1st Stage
• 6FA 2nd Stage
• 7EA 1st Stage
• 7FA and 7FA+e 1st, 2nd & 3rd Stage Blades and Shroud Blocks,
• 7FA+e 1st & 2nd Stage Nozzles (3rd
Stage available 2008)
Frame 7FA+e 1st Stage Blade
PWPS Redesigned Parts
Improvements over the OEM– Proprietary P&W Alloys
– Advanced Coating Systems
– Optimized Cooling Hole Size & Location
– Platform Cracking Fix
– Thermal Barrier Coatings
– Life Cycle Cost Guaranteed
Repair Capabilities
Pratt & Whitney Has Extensive High Temperature Repair Experience
Repair Techniques Have Transferred Successfully for F-class Buckets
Turbine Module Design Centers Provide Support for Advanced Repairs
Product Modifications to Improve Life• Frame 7EA FSB Platform
Cracking• Frame 7FA FSB Trailing Edge
Cutback• W501D5A FSV Cooling Hole
Cracking
501D5 1st Stage Blade
501D5A 1st Stage Vane
• Low Pressure Plasma Spray
• Air Plasma Spray
• Pack, Slurry and Vapor Phase Aluminide
• High Velocity Oxygen Fuel
• Electron Beam Physical Vapor Deposition
Coating Capabilities
Match the coating to the application Match the coating to the application
Industrial Gas TurbineField Services
On Site Field Services
CapabilitiesProject managementTechnical advisorsTurbine mechanicsMaintenance support
servicesPlanned/unplanned
maintenance scheduling
ServicesFT4, FT8 Frame 3, 5, 6, 7, & 9 191, 251, 301, and 501 V84 & V94Type 10 and 11 modelsLM2500, LM5000, LM6000GT10, 11, 24All Generator TechnologiesAll Boiler/HRSG technologiesTrouble Shooting and Testing
Outage Scope
• Combustion Inspections• Hot Gas Path Inspections• Major Inspections• Pre and Post Peak Season Inspections• Planning/Scheduling:
– Mobilization and Outage execution plan– Parts and consumables planning and procurement– Mid-outage progress meeting/report out– Parts repair/refurbishment and return to customer
inventory• Additional Options
– Borescope Inspections– Control System Calibration– DLN Tuning– Balance Of Plant (BOP) Maintenance
PWPS Offers Complete Power PWPS Offers Complete Power Generation Solutions including Generation Solutions including
Service through the entire product Service through the entire product life cycle.life cycle.