+ All Categories
Home > Documents > Overview - Amazon Web Services · • Replace the existing traffic signal at Woodland Hills Drive...

Overview - Amazon Web Services · • Replace the existing traffic signal at Woodland Hills Drive...

Date post: 09-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
1
Overview The Utah Department of Transportation (UDOT) is planning roadway improvements to SR-198 from Arrowhead Trail Road to Woodland Hills Drive between Spanish Fork and Salem. The planned improvements will include the following: • Additional travel lane in each direction • Multi-use trail along the eastside of the road • Center turn lane • Upgrades to drainage facilities • Replace the existing traffic signal at Woodland Hills Drive These improvements will reduce congestion, address future travel demand and enhance safety and trail connectivity. Proposed Cross Section Project Schedule 2017 2018 2019 Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter Design Property Acquisition Construction Contact Information Phone: 385-275-2111 Email: [email protected] Website: udot.utah.gov/go/sr198improved ARROWHEAD TRAIL RD WOODLAND HILLS DR SPANISH FORK WEST PARK DR VOLUNTEER DR N 198 /BIKE LANE /BIKE LANE
Transcript
Page 1: Overview - Amazon Web Services · • Replace the existing traffic signal at Woodland Hills Drive These improvements will reduce congestion, address future travel demand and enhance

OverviewThe Utah Department of Transportation (UDOT) is planning roadway improvements to SR-198 from Arrowhead Trail Road to Woodland Hills Drive between Spanish Fork and Salem. The planned improvements will include the following:

• Additional travel lane in each direction• Multi-use trail along the eastside of the road• Center turn lane• Upgrades to drainage facilities• Replace the existing traffic signal at Woodland Hills Drive

These improvements will reduce congestion, address future travel demand and enhance safety and trail connectivity.

Proposed Cross Section

Project Schedule

2017 2018 2019Spring Summer Fall Winter Spring Summer Fall Winter Spring Summer Fall Winter

Design

Property Acquisition

Construction

Contact Information Phone: 385-275-2111 Email: [email protected] Website: udot.utah.gov/go/sr198improved

ARROWHEAD TRAIL RD

WOODLAND HILLS DR

SPANISH FORK

WEST PARK DR

VOLUNTEER DR

N

198

/BIKE LANE /BIKE LANE

Recommended