+ All Categories
Home > Documents > Overview ET-PLC (Intro, Update) Opportunity Key points to review.

Overview ET-PLC (Intro, Update) Opportunity Key points to review.

Date post: 14-Dec-2015
Category:
Upload: julian-harris
View: 221 times
Download: 3 times
Share this document with a friend
Popular Tags:
7
Transcript

Overview

• ET-PLC (Intro, Update)• Opportunity• Key points to review

Product Intro

• Fans and Drives • Refrigeration Motors• Controls• Battery Packs• Interface Products• PCB/ Flex PCB• Cable Assemblies • LED Lighting/ PSUs

Update

• £8M of new business Identified.• Engineering lead projects with completion

time from 3 months to 2 years.• Hybrid contract being drafted to supply

Europe in all markets.• Customer Successes.

Opportunity

• Targeting 2% of £2BN market. • £250K investment required.• Limited Time for Investment.

Key Points

• Key Customers already identified.• Coca Cola/Lu-Ve• ERP 2015/Energy efficient ratings.

Thank you.Any Questions?


Recommended