Overview of All Tasks March 27 - 30, 2001 - Milan, Italy
Transcript
Page 1: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

Overview of All Tasks

March 27 - 30, 2001 - Milan, ItalyMarch 27 - 30, 2001 - Milan, Italy

Page 2: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

Task 1 - Monitoring

• Monitoring Methods

• Conventional methods completed

• Need to add fiber optics

• Need to finalize PLTs• Need to improve

fractured monitoring• Need to incorporate

specific Best Practices –suggestions?

Page 3: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

Task 1 - Monitoring

• Fracture Models • Audit and Summary Completed

• Add “high-level” comparison to Best Practices

• Any missing models?

Page 4: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

Task 1 - Monitoring

• Well Performance • Prepared introductory level presentation on Well Performance for Injectors

• Radial flow completed

• Wellbore Hydraulics Completed – more on restrictions

• Completions

Page 5: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

Task 2 – Matrix Injection

• Methods for Performance Assessment

• Methods for Mitigating Plugging

• Integrated with Tasks 3 and 4

• Incorporate in Best Practices

• Finalize Stimulation Selection Tool

• Evaluate recent Chevron dataset (also Soft Formations)

Page 6: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

Task 2 – Matrix Injection

• Radial Damage Modeling

• PWRAD• Damage

Exponents• Characteristic

Signatures

Page 7: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

Task 3 – Soft Formations

• Data Evaluation

• Models

• Weyburn data remains to be considered?

• Document prepared and needs to be added to Best Practices site

Page 8: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

Task 3 – Soft Formations

• Theory

• Data Evaluation

• Models

• Overview document is in Toolbox

• Weyburn data remains to be considered?

• Document prepared and needs to be added to Best Practices site

Page 9: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

Task 3 – Soft Formations

• CompletionsWorksheet

• Completions Skin

• Version in ToolBox “works” with Toolbox

• Laurence Murray version works properly

• Version that is having Help integrated.

• Document prepared and has been added to Best Practices site

Page 10: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

Task 4 – Stimulation and Mitigation

• Introductory Document on Methods

• Signatures• Stimulation Selection

Routine

• Surface Systems

• Economics?

• In Best Practices - needs peer review

• Draft Version in ToolBox

• Needs section in Best Practices

• Upcoming Release

• ?????

Page 11: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

Task 5 – Layered Formations

• Is still weak.• Some mitigation methods from

Workshop.• Some monitoring methods.

Page 12: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

Task 6 – Horizontal Injectors

• Analysis methods PowerPoint presentation. Needs to be written up for Best Practices

• Some data analysis• Needs to incorporate examples

and methods particularly for bringing wells on line.

Page 13: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

Task 7 – Database

• All electronic numerical data has been entered except Weyburn and complete Maersk data set.

• However, Maersk data set has and continues to be used extensively for Stimulation Task.

• PC version available.• Need to integrate databases.

Page 14: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

Task 8 – Field Validation

• Update summary spreadsheet.• Process recent Heidrun data set.• Process other new examples.

Page 15: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

How is the Project Consolidated?

• Best Practices• ToolBox• Database

Page 16: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

How is the Project Consolidated?

• Best Practices– Web and CD based product– Based on provided recommendations– Incorporates Workshops and Minutes– Tied to ToolBox and Database– Real Need for Mentors at this point!

Page 17: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

How is the Project Consolidated?

• Best Practices – Categories No Longer Task-Based– Well Construction– Operational Issues– Performance– Management– Related Topics– Documents, References, Forms

Page 18: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

How is the Project Consolidated?

• Best Practices – Categories No Longer Task-Based– Well ConstructionWell Construction

•Drilling•Completion•Soft Formations•Surface Facilities

Page 19: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

How is the Project Consolidated?

• Best Practices – Categories No Longer Task-Based– Operational IssuesOperational Issues

•Monitoring•Stimulation•Surface Water Treatment•Matrix vs Fractured•Surface Facilities

Page 20: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

How is the Project Consolidated?

• Best Practices – Categories No Longer Task-Based– PerformancePerformance

• Monitoring• Layered Formations• Horizontal Injectors• Matrix vs Fractured• Pilots• Surface Facilities

Page 21: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

How is the Project Consolidated?

• Best Practices – Categories No Longer Task-Based– ManagementManagement

•Environmental Issues•Economics•Others

Page 22: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

How is the Project Consolidated?

• Best Practices – Categories No Longer Task-Based– Related TopicsRelated Topics

• Tools• Database• Workshops/Minutes• Field Trials• PEA-23• Cavity Completions• Other Articles/Links

Page 23: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

How is the Project Consolidated?

Best Practices

Page 24: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

How is the Project Consolidated?

• Best Practices• ToolBox

– Data Management, PWRAD, restricted access to PWFRAC, Completions Worksheet, Crossflow, “Multilaterals/Multiple Fractures,” Stimulation Selection, Others, Economics?

• Database

Page 25: Overview of All Tasks March 27 - 30, 2001 - Milan, Italy.

How is the Project Consolidated?

• Best Practices• ToolBox• Database

– Web-based version– PC-based version– Integrated with Toolbox


Recommended