Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards
Transcript
Page 1: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

Overviewof

Texas REReliability Standards Process

and2008 Year in Review

Judith JamesManager, Reliability Standards

Page 2: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

2

Judith James, Manager, Reliability Standards

● Judith James with Texas RE since April 2008

● Manager, Reliability Standards since August 2008

● B.S. Chemical Engineering and J.D.

● Licensed Professional Engineer and Attorney

● 18 years in utility and related industry

● Primarily demand-side and environmental issues

Page 3: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

3

Sarah Hensley, Standards Development Coordinator

● Sarah Hensley with Texas RE since October 2008

● Standards Development Coordinator

● B.S. Business/Advertising

● 5 years business process and project coordinating

● Primarily semiconductor and utility industry

Page 4: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

4

What are reliability standards?

● Planning and operating rules that electric utilities follow to ensure the most reliable system possible.

● Developed by the industry using balanced, open, fair and inclusive process.

● Just and reasonable, not unduly discriminatory or preferential, and in the public interest.

● Technically sound, ensured by industry participation.

● Facilitated by NERC staff and managed by NERC committee.

Page 5: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

5

What are regional reliability standards?

● Standards that go beyond, add detail to or implement a NERC reliability standard, or that cover matters not addressed in NERC reliability standards.

● Example: SAR-002-TRE-01 UFLS Program

Page 6: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

6

What is a regional variance?

● Provides an alternative approach to meeting the same reliability objective as a NERC standard and is typically dictated by a physical difference.

● A regional standard that modifies a NERC

Reliability Standard to address a unique circumstance requiring an exception to the North American-wide standard. TRE Examples: SAR-003-TRE-01 CPS2 Waiver and

SAR-004-TRE-02 CIP Sabotage Reporting and all of the LSE SARs.

Page 7: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

7

Why do we need regional standards and variances?

● Everyone is subject to NERC continent-wide standard.

● For consistency across the nation, if you are on BPS, must adhere to the continent-wide standard.

● However, NERC recognizes that there are regional differences, and allows for those regional differences when: We are doing something better (more stringent) than the

continent-wide standard, or It is absolutely necessary due to the fact that we are so

different from other regions in how our system operates. We wish to supplement national standard with more detail.

Page 8: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

8

Regional Standards are not just MORE standards

● Regional Standards and Variances are actually a way to make the national standard BETTER for us in our region.

● Regional Standards and Variances are not just another layer of standards on top of existing national NERC standards. Not just more rules to follow.

● The regional standards development process is YOUR empowerment to make the continent-wide standards FIT our region better—within some limits of course.

Page 9: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

9

Texas RE Standards Development Process

Exhibit C of the delegation agreement is the Texas RE Reliability Standards Development Process.

Locate the Texas RE standards development process (SDP) in the Reliability Standards section, under Planning and Procedures.

Page 10: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

10

Texas RE Standards Development Process

● Development Process is facilitated and overseen by Texas RE and managed by the Reliability Standards Manager with the Reliability Standards Committee.

Page 11: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

11

Key Players in the Texas REStandard Development Process

● Originator of Standards Authorization Request (SAR)● Reliability Standards Committee (RSC)● Reliability Standards Manager (RSM)● Reliability and Operations Subcommittee (ROS) is

stakeholder group that addresses and focuses on reliability issues in the ERCOT Region

● Standard Drafting Team (SDT)● Registered Ballot Body (RBB) and Ballot Pool (BP)● Texas RE Board of Directors (BOD)● North American Electric Reliability Corp. (NERC)● Federal Energy Regulatory Commission (FERC)

Page 12: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

12

Texas RE Standards Development Process in Brief

SAR—Request for a regional standard—anyone impacted by BPS in ERCOT may request.

RSC approves SAR. SDT—Drafting team (made up of subject matter

experts) is nominated and then approved by ROS. The SDT drafts the standard. The public comments—anyone may comment. The Ballot Pool (sub group of RBB) votes. The Texas RE Board approves. NERC and FERC approve, and the standard is

implemented in the region.

Page 13: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

13

Texas RE Standards Development Process in Detail

Originator RSC Process Owner

ROS

Subject Matter Experts

SAR

RSM Oversees Everything

SDT

Page 14: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

14

Texas RE Standards Development Process in Detail

RSC

Posting for Public Comment

SDT

RSM Oversees Everything

Page 15: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

15

Texas RE Standards Development Process in Detail

RSC

Goes to RBB to form BP

SDT

RSM Oversees Everything

Page 16: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

16

Texas RE Standards Development Process in Detail

RSC

Texas RE BOD

BP Votes

RSM Oversees Everything

Page 17: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

17

Texas RE Standards Development Process in Detail

Page 18: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

18

Meetings in 2008

● Reliability Standards Committee 8● SAR-001 ERCOT ISO Voting 7*● SAR-002 UFLS 3● SAR-003 CPS2-BAL-001 8*● SAR-004 CIP-001 Sabotage Reporting 0● SAR-005, 006, 007 LSE 1● Workshops (with Compliance) 2

● Total 29

*Does not include meetings via phone only.

Page 19: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

19

Texas RE Standards Activities for 2008

● Posted SARs:

SAR-001: Process Change to Give ERCOT Vote in Process SAR-002: UFLS Regional Program SAR-003: FERC Order to Replace ERCOT CPS2 Waiver SAR-004: CIP-001 Sabotage Reporting SAR-005: Remove LSE from EOP-002 SAR-006: Remove LSE from MOD-017-018 SAR-007: Remove LSE from MOD-019-021

Page 20: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

20

SAR-001: Provision to Give ERCOT a Vote in the Standards Development Processes

In the original standards process that was approved in the delegation agreement, ERCOT did not have a vote in the processes along with other impacted stakeholders.

SAR-001 addresses this process change by allowing ERCOT to vote.

RSC in December voted to accept for moving forward to RBB with ¼ vote.

SAR-001 also makes some other typographical changes and edits for clarification.

This standard is posted for voting to begin January 19, 2009.

Page 21: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

21

SAR-002: Development of a Regional Under Frequency Load Shedding Program

Fulfills a NERC directive to develop the technical details of the UFLS regional standard to support a new continent-wide standard (PRC-300-CWS-1).

In addition, this team reviewed and commented appropriately on the continent-wide standard on behalf of the region.

On hold until continent-wide decision is made on whether to proceed with continent-wide or regional.

Page 22: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

22

SAR-003: Replace ERCOT Waiver for CPS2

Addresses the FERC-directed modification to the ERCOT regional difference to Requirement 2 in Reliability Standard BAL-001-0, Real Power Balancing Control Performance, CPS2 Waiver.

The detail of the determination is found in FERC Order No. 693, paragraphs 313 through 315.

Initial work product of the SDT is posted. Next meeting of the team is February 5, 2009. Expect posting of draft standard for public comment

in first quarter 2009.

Page 23: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

23

SAR-004: CIP-001 Sabotage Reporting

Proposed to apply to additional entities GO, TP, and TO to disallow for any possible communication gap and prevent absence of reporting in the case of such an event.

This SAR was presented twice to the RSC, but was not approved for moving forward to public comment because of claimed duplicate coverage under ERCOT Protocols and Guides. TRE disagreed.

TO issue will be addressed by planned registration of TOs as LSEs for CIP-001.

SAR-004 to be re-drafted and re-presented to the 2009 RSC with more emphasis on potential reliability gap where GOP does not own generating facility, so GO needs to be in the loop.

Page 24: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

24

SAR-005, 006, 007: Remove LSE Applicability-- Background

FERC Order requiring LSE registration: October 16, 2008 Order in the Direct/Sempra/Strategic registration cases (Docket Nos. RC07-4, 6 and 7).

NERC’s short term solution was to register DPs as LSEs. Because, Texas State Law: “transmission and distribution

utility shall not provide competitive energy services”; therefore, certain LSE requirements cannot be performed by the DP.

LSE requirements are fulfilled for these standards by other entities who are already registered and have committed to fulfilling these requirements and take complete responsibility for them e.g. ERCOT as single BA for region.

Page 25: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

25

SAR-005, 006, and 007 Remove LSE Applicability

● Therefore, Texas RE Regional Variance is proposed to remove LSE Applicability from six NERC standards, MOD-017-021 and EOP-002.

● MOD-017-018--ERCOT as the single Planning Authority (PA) and Resource Planner (RP) provides the data required by MOD-017 and 018 to NERC and the Texas RE for the entire ERCOT Interconnection. The process for ERCOT to obtain the data from the market participants is in the ERCOT Protocols and Operating Guides. ERCOT has accepted responsibility for all requirements in these standards.

Page 26: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

26

SAR-005, 006, and 007 Remove LSE Applicability

● MOD-019-021--ERCOT is the only TOP for the ERCOT Interconnection, and as such, receives information directly from the TPs through their meters and not the DPs. TPs in the ERCOT Interconnection are already registered for this standard and are currently performing the requirements of these standards and accept responsibility for them.

● EOP-002--Only ERCOT has the information available to them to initiate EEAs for the region, and accepts responsibility for these requirements. ERCOT is already registered for this standard as the single BA and RC for the region.

Page 27: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

27

Reliability Standards Tracking Site Launched in 2008

Page 28: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

28

SARs on Reliability Standards Tracking Site

Page 29: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

29

SARs on Reliability Standards Tracking Site

Page 30: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

30

Reliability Standards Informational Page Revised

Page 31: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

31

Regional Standards Information Revised

Page 32: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

32

Reliability Standards Committee Page Revised

Page 33: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

33

Standard Drafting Team Information Revised

Page 34: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

34

Standard Drafting Teams Pages Added

Page 35: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

35

Texas RE Web Site Roll-out—First Quarter 2009

● Texas RE will have its own Website in 2009.

● Roll-out expected in the next couple of months.

● If you have suggestions of standards information that you would like to see on the new Website, please email those to [email protected]

Page 36: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

36

Future Proposed Standards – On Hold

● Disturbance Monitoring● Special Protection Systems● Operating Reserves

● These were put forth at the Regional Reliability Standards Working Group in 2007 as Standards that would possibly need regional counterpart (along with UFLS Program).

● On hold with continent-wide SDTs leaning in direction of continent-wide standard with a variance only.

Page 37: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

37

Other Things RSM has Planned for Standards 2009

● Write Regional Standards Process Manual

● Hold Standards Training Workshop (separate from Compliance Workshop)

● More participation in NERC Standards Committee to stay abreast of NERC Standards Projects and Standards Under Development

● More standards presentations to industry groups and trade organizations.

● Open to suggestions.

Page 38: Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.

Questions?