Summary FP7-ICT and complementary ICT work programmes Overview of the draft 2009-2010 FP7-ICT work programme Brief overview of the draft 2009 ICT Policy Support work programme Irish Universities/Institutes of Technology and UL performance to date EI financial supports Sources of information, future events, contact details
Overview of FP7 ICT and complementary ICT work programmes
Time to Market
FP7-ICT
JTI’s* (ARTEMIS,
ENIAC)
ICT PSP**
Deployment2-3 Years5-10 Years
Technology Risk
Upstream R&D
Downstream R&D
Large scale trials (use existing technology)
*Joint Technology Initiatives (JTI’s)**Policy Support Programme (PSP)
FP7 ICT Draft Work Programme for 2009-2010 7 Challenges Future and Emerging Technologies (FETs) Horizontal support actions Each is divided into Objectives Calls (4, 5 and 6 ) for proposals address objectives Total budget of ~ €1.9 Billion
FP7 ICT Challenges
Funding schemes (“instruments”) Collaborative projects (CP)
Small or medium-scale focused research actions (STREP)Large-scale integrating projects (IP)
Networks of Excellence (NoE) Number of research organisations integrating activities in a given field Longer term cooperation.
Coordination and support actions (CSA) Support to activities aimed at coordinating or supporting research activities and
policies Two types of projects to be financed:
Coordination Actions (CA) Specific Support Actions (SA)
Challenge 1: Pervasive and Trustworthy Network and Service Infrastructures (30 %)
1.1 The Network of the Future (4,5) 1.2 Internet of Services, Software and Virtualisation (5) 1.3 Internet of Things and Enterprise environments (5) 1.4 Trustworthy ICT (5) 1.5 Networked Media and 3D Internet (4) 1.6 Future Internet experimental facility and experimentally-driven
research (5)
Challenge 2: Cognitive Systems, Interaction, Robotics (9%)
2.1 Cognitive Systems and Robotics (4,6) 2.2 Language-based interaction (4)
Challenge 3: Components, systems, engineering (20%)
3.1 Nanoelectronics technology (5) 3.2 Design of semiconductor components and electronic-based
miniaturised systems(4) 3.3 Flexible, organic and large area electronics (4) 3.4 Embedded Systems Design (4) 3.5 Engineering of Networked Monitoring and Control systems (5) 3.6 Computing Systems (4) 3.7 Photonics (4, 5) 3.8 Organic photonics and other disruptive photonics technologies (4) 3.9 Microsystems and smart miniaturised systems (5)
Challenge 4: Digital Libraries and Content (10%)
4.1 Digital libraries and digital preservation (6) 4.2 Technology-enhanced learning (5) 4.3 Intelligent information management (5)
Challenge 5: Towards sustainable and personalised healthcare (9%)
5.1 Personal Health Systems (4) 5.2 ICT for Patient Safety (4) 5.3 Virtual Physiological Human (6) 5.4 International Cooperation on Virtual Physiological Human (4)
Challenge 6: ICT for Mobility, Environmental Sustainability and Energy Efficiency (8%)
6.1 ICT for Safety and Energy Efficiency in Mobility (4) 6.2 ICT for mobility of the future (6) 6.3 ICT for energy efficiency (4) 6.4 ICT for environmental services and climate change adaptation (4) 6.5 Novel ICT solutions for Smart Electricity Distribution Networks -
(Joint Call ICT-Energy)
Challenge 7: ICT for Independent Living, Inclusion and Governance (4%)
7.1 ICT and Ageing (4) 7.2 Accessible and Assistive ICT (4) 7.3 ICT for Governance and Policy Modelling (4)
Future and Emerging Technologies (FETs): Two complementary schemes, FET Open and FET Proactive Address new and emerging ICTs and their applications FET Open new ideas and opportunities whenever they arise. FET Proactive aligned with economic and social challenges and
priorities
FET Open (3%) mission High-risk/high return foundational research relevant to future ICT Collaborative high quality and long-term research Multidisciplinary: builds bridges between ICTs and other disciplines Light, flexible and continuous submission schemes
Short STREP: continuous submission and evaluation CA and Full STREP: evaluation per batch
FET Open in 2009/10 Work Programme
7 May 08-2 Sept 08
3 Sept 08-6 Jan 09
7 Jan 09-5 May 09
6 May 09-8 Sept 09
Short STREPsubmission CA & full
STREP cutoff
20 Jan 09
26 May 09
22 Sept 09
26 Jan 10
Batch5
Batch 6
Batch 7
Batch 8
Indicative budget: 61 M€ for the 4 batches
Future and Emerging Technologies: FET Proactive (6%)
Fixed calls and on specific long term research topics Basic research level before mainstream industrial research
Multidisciplinary work at frontier of ICT Early ground breaking work already demonstrated Build critical mass and focus efforts
Future and Emerging Technologies: FET Proactive (6%)
8.1 Concurrent Tera-Device Computing (4) 8.2 Quantum Information Foundations and Technologies (4) 8.3 Bio-chemistry-based Information Technology (4) 8.4 Human-Computer Confluence (5) 8.5 Self-Awareness in Autonomic Systems (5) 8.6 Towards Zero-Power ICT (5) 8.7 Molecular Scale Devices and Systems (6) 8.8 Brain Inspired ICT (6) 8.9 Coordinating Communities, Plans and Actions in FET Proactive Initiatives
(4,5,6) 8.9 Identifying new research topics, assessing emerging global Science and
Technology trends in ICT for future FET proactive initiatives (4, 5, 6)
Horizontal support actions International cooperation
Strategic research partnerships with third countries Achieving upstream global consensus for interoperability and standardisation Strengthening business co-operation between industries of third-countries and European
ICT International Cooperation between ongoing FP7 ICT projects with “partner-projects”
funded by third countries Joint results, exchange of knowledge or use of each other’s facilities
General Accompanying Measures Coordination of ICT R&D skills in Europe Coordination of shared research facilities or excellence centres
Strengthening cooperation in ICT R&D in an enlarged Europe Secondment of PhD or post-graduate students and researchers
Horizontal support actions (1%) 9.1 Horizontal support actions for international cooperation (4) 9.2 Supplements to support International Cooperation between ongoing
projects (4,6) 9.3 General Accompanying Measures (4) 9.4 Strengthening cooperation in ICT R&D in an enlarged Europe (4)
ICT PSP Draft Work programme 2009 (~100 M€) The following themes will be implemented using Pilots, Thematic
Networks and Best Practice Networks where appropriate Theme 1: ICT for health, ageing and inclusion (15%) Theme 2: Digital Libraries (25%) Theme 3: ICT for government and governance (18%) Theme 4: ICT for energy efficiency and environment (8%) Theme 5: Multilingual Web (14%) Theme 6: Public Sector information (9.5%) Theme 7: Internet evolution and security (including RFID) (6%) Theme 8: Open innovation, user experience and living labs (4%)
Work programmes 2009-2010: Draft call plan all ICT areas
FP7-ICT
ICT PSP
JTI’s,(TBC)
Q4
Call5
ICT PSP ICT PSP
JTI’s
Q2 Q3 Q4 Q1 Q2 Q3 Q4Q1
2008 20102009
Call 4 Call 6
FET OPEN (Jan’09-Dec’10)
JTI’s
ICT/Energy
FP7 ICT Draft Call schedules
Call Open Close
Joint ICT-ENERGY 8th December 2008 31st March 2009
Call 4 18th November 2008 7th April 2009
Call 5 June/July 2009 September/October 2009
Call 6 24th November 2009 13th April 2010
FET Open (Continuously open) 1st January 2009 31st December 2010
Irish University and Institute of Technology funding In Calls 1 and 2
Organisation Projects funding (M€)WIT 11 3.98UCC 12 2.7TCD 6 2.36UCG 6 1.94DCU 2 0.8UCD 2 0.5Maynooth 1 0.5UL 2 0.3CIT 1 0.3
University of Limerick performance to date
ICT Calls 1, 2 and 3 10 proposals in total No Co-ordinators 4 proposals passed evaluation 2 proposals funded ~ €318k in funding
Enterprise Ireland supports
Travel grant Up to €1,000 per trip
Co-ordinator grant The maximum grant is €25,000 for preparation of the proposal for
submission to the EC
http://www.fp7ireland.com/Page.aspx?SP=225
Useful sources of information http://cordis.europa.eu/fp7/home_en.html
Useful sources of information www.fp7ireland.com
Future Events FP7 Legal & Financial Workshop 18th & 19th September, Dublin
http://www.fp7ireland.com/Events.aspx?WCI=htmEvent&WCU=EVENT_PKEY=48
2nd Concertation Meeting of ICT-FP7-FP6 The Network of the Future 30th Sept – 2nd Oct.http://cordis.europa.eu/fp7/ict/future-networks/event-080930_en.html
How to write a Competitive Framework Proposal, 2nd October, Dublinhttp://www.fp7ireland.com/Events.aspx?WCI=htmEvent&WCU=EVENT_PKEY=47
ICT 2008, 25-27 November, Lyonhttp://www.fp7ireland.com/Events.aspx?WCI=htmEvent&WCU=EVENT_PKEY=37
Contact detailsStephen O’Reilly
021 4800217087 9281449
Gerard Kennedy061 429952