Overview of the main events related to TS equipment during 2007 Definition Number and category of...

Date post: 17-Jan-2018
Category:
Upload: gregory-gibson
View: 217 times
Download: 0 times
Share this document with a friend
Description:
Number and category of the events ATC/ABOC days 21, 22 and 23 January 2008
16
Overview of the main events related to TS equipment during 2007 •Definition •Number and category of the events •Events and measures taken for each machine •Conclusion Gerard Cumer – Rui Nunes – Serge Deleval
Transcript
Page 1: Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.

Overview of the main events related to TS equipment during 2007

•Definition•Number and category of the events•Events and measures taken for each machine•Conclusion

Gerard Cumer – Rui Nunes – Serge Deleval

Page 2: Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.

Definition

• The presentation is based on the Major Event Reports emitted by CCC• Only events which affected accelerators or experimental areas (no LHC or other users) • 35 events during the run 2007• 176 hours

Rem : Time = from the stop, until the beam is back as it was before the problem.

ATC/ABOC days 21, 22 and 23 January 2008

Page 3: Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.

Number and category of the events

Cooling; 14

Electricity; 19

Others (smoke detection,...); 2

Leak (user side); 4

Pump breakdown;

4PLC problem; 2

fan; 1

Human error; 1

Sensor; 2

EDF; 4

Cables, 4SPS compensator BEQ1; 8; 5+2+1

Animals; 1

AUG user; 1Others; 1

ATC/ABOC days 21, 22 and 23 January 2008

Page 4: Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.

CERNwide problems• 3 perturbations

from EDF in May

Rem: For the stop no alarms and wrong state of the LEIR cooling station → new supervision

5-5-2007 Perturb. 400kV 11-05-2007 Perturb. 400kV 28-05-2007 Perturb. 400kV0

1

2

3

4

5

6

7

ATC/ABOC days 21, 22 and 23 January 2008

Page 5: Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.

Linac 2 – Leir - Booster24 June: Booster faulty temperature sensor in the motor

- Temperature probe not used anymore- Other kind of protection

20 July : Linac 2 pump stopped without any fault - Replacement of the circuit breaker- Mechanical expertise still to be done

23 July : LEIR cooling stopped because of bearing - Motor was replaced by a spare motor (+4h30) - Original motor was repaired and put back in place

For Linac 2 : Black dust on the source. Filter installed. Maintenance work will be done during this shutdown.

24-06-2007 Pump Booster 20-07-2007 Pump Linac2 23-07-2007 Pump Leir0

1

2

3

4

5

6

7

8

Linac - Leir - Booster

ATC/ABOC days 21, 22 and 23 January 2008

Page 6: Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.

PS

16-09-2007 Flash transfo point6

25-10-2007 PS -354 intervention

27-10-2007 PS smoke detection

07-11-2007 PS power cut

0

1

2

3

4

5

6

7

8

PS

ATC/ABOC days 21, 22 and 23 January 2008

• 16 September : Flash on the 66kV in LHC point 6 caused by a weasel. PS affected by the perturbation.

• 25 October : Planned power cut for the CMS control room (bldg 354). Written authorization given by the user.

• 27 October : Problem with a blocked pipe in the smoke detection system. Cleaned and restarted.

• 7 November : Low oil level on the transformer and cold temperature outside.

- Wrong alarm level priority prevented earlier intervention of standby - Round for checking oil level every winter

Page 7: Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.

IsoldeThe increase of the radioactive gas release :

– Check every device and characteristics of the ventilation system (flow, temperature, damper, filter, etc...)

– Tests to understand the problem (variation of the supply and return air flow, increase of the under pressure, etc... )

– In December 2007: air flow measurement in BEAM mode– Modelisation of the tunnel and simulation for the existing situation

and for several solutions

ATC/ABOC days 21, 22 and 23 January 2008

Page 8: Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.

1300 m3/h

400 m3/h

620 m3/h

65 m3/hWith “marker”

1500 m3/h Total inflow :4500 m3/h

Air Temperature :20 °C

Magnets Temperature :35 °C

Outlet

10 m3/hWith “marker”

540 m3/h

700

600

Isolde

ATC/ABOC days 21, 22 and 23 January 2008

Page 9: Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.

AD21 July : Stopped more than 2 days following the mechanical breakdown of the

fan for the controlled leak of the target.No spare fan at CERN → 6h to get a new one.

August : No stop but very severe breakdown in the cooling tower→ the rest of the run done without any backup

ATC/ABOC days 21, 22 and 23 January 2008

Page 10: Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.

CTF3

• CTF3 : 1h shortcut on electrical connection of the motor of the pump.– Cable to be changed on both pumps

Rem : Filters blocked on the user equipment (MKS), still under investigation.

ATC/ABOC days 21, 22 and 23 January 2008

Page 11: Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.

SPS

08.05.2007 PLC BA6

27-05-2007 Cable B

E-BA4

01-06-2007 Leak

BB3

06.06.2007 Leak

BB3

07.06.2007 Cooling B

A3

10-06-2007 Storm

SPS c

ompensat

or

13-06-2007 SPS C

ompensat

or

14-06-2007 SPS C

ompensat

or

16-06-2007 SPS C

ompensat

or

17-06-2007 SPS C

ompensat

or

18-06-2007 SPS C

ompensat

or

02-07-2007 Cable B

A7

03-07-2007 SPS C

ompensat

or

08-08-2007 SPS C

ompensat

or

19-08-2007 SPS C

ompensat

or

15-10-2007 Cable B

A2

06-11-2007 Cable B

A

09-11-2007 BA3 - lea

k0

5

10

15

20

25

30

35

40

SPS• 18 events for SPS• 8 May in BA6 cooling: PLC CPU

out of order. Spare parts available but problem with memory card.

• 27 May : failure on the connection of the new cable between BE and BA4

• 1 and 6 June and 9 November : leaks on the user side of the “Power Supply“ circuit in BA3.

• 7 June : human error from a contractor

• 10 June : Lightning cause a compensator BEQ1 stop

ATC/ABOC days 21, 22 and 23 January 2008

Page 12: Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.

SPS• 13, 14, 16,17 18 June stops for SPS compensator 1

Problem of temperature in the reactor– High outside temperature – No pulse – EDF voltage high (412kV)

• Solutions– Cleaning of the heat exchanger– Procedure (increased supervision)– New compensator for 2008, compensator 1 will be used as back-up n+1

ATC/ABOC days 21, 22 and 23 January 2008

Page 13: Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.

SPS• 2 July : cable fault on the SPS pulsed loop between BA6 and 7.

– Loop opened for the rest of the run. Repair was not successful – New cables to be installed expected before SPS startup

• 3 July : connection broken on the filter H17 compensator 1• 8 and 19 August : compensator 1 stopped because of unbalanced

current in the by-pass resistances• 15 October and 9 November : Faults on cable between BE and BA1

(SMB1)– First repair on the T– Second on the phase R – Reparation expected end of March 2008

ATC/ABOC days 21, 22 and 23 January 2008

Page 14: Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.

North Area• 3 November : leak on a magnet

stopped the cooling for TDC2 and TCC2

• 17 August and 7 September : problem on the flow switch which protects the pump

- threshold was changed- flow switch by-passed

(risky)03.11.2007 Le

ak TD

C2

17.08.2007 T10 co

oling s

top

07.09.2007 T10 co

oling s

top02468

North area

ATC/ABOC days 21, 22 and 23 January 2008

Page 15: Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.

CNGS• 12 September : AUG hit by a user by mistake • From the 9 to the 20 October : problem with the control of the ventilation

system.– 9/10 : 2 units stopped in TSG4 and no information on 2 other units →

1st modification : autoreset system– 12/10: 1 unit stopped and no information on 2 other units → 2nd

modification : Most important points connected by wire– 20/10: Problem appeared on units in TCV4. Not able to switch the

system into access mode → CNGS stopped for 2007 →new project

ATC/ABOC days 21, 22 and 23 January 2008

Page 16: Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.

ConclusionSPS compensators :

in 2007 no backup compensator in 2008 SVC2 and SVC3 in service, BEQ1 backup only n+1

SPS Cables : consolidation is ongoing → improvement in the future

Isolde : solution implemented during this shutdown should reduce radioactive

gas release

CNGS : new installation adequate to the environment

ATC/ABOC days 21, 22 and 23 January 2008