Date post: | 31-Mar-2015 |
Category: |
Documents |
Upload: | alaina-frary |
View: | 214 times |
Download: | 0 times |
Overview of theOverview of thePBN Airspace PBN Airspace
Implementation ProcessesImplementation Processes
Overview of theOverview of thePBN Airspace PBN Airspace
Implementation ProcessesImplementation Processes
11BEIJING, CHINA; 30 JUN-11 JUL 2014
General InformationGeneral InformationGeneral InformationGeneral Information
✈SSID: Public@ICAOBeijingSSID: Public@ICAOBeijing
✈PWD: Welcome2icaoPWD: Welcome2icao
✈SSID: Public@ICAOBeijingSSID: Public@ICAOBeijing
✈PWD: Welcome2icaoPWD: Welcome2icao
22
Schedule OverviewSchedule OverviewSchedule OverviewSchedule Overview
33
Schedule OverviewSchedule OverviewSchedule OverviewSchedule Overview
44
OverviewOverviewOverviewOverview
✈ Learning Objective: Learning Objective: ✈ Understand the Processes involved in the planning, Understand the Processes involved in the planning,
design, validation and implementation of a PBN Airspace design, validation and implementation of a PBN Airspace ConceptConcept
✈ This presentation will discussThis presentation will discuss✈ The activities that lead up to the implementation of a PBN The activities that lead up to the implementation of a PBN
Airspace Concept.Airspace Concept.
✈ Learning Objective: Learning Objective: ✈ Understand the Processes involved in the planning, Understand the Processes involved in the planning,
design, validation and implementation of a PBN Airspace design, validation and implementation of a PBN Airspace ConceptConcept
✈ This presentation will discussThis presentation will discuss✈ The activities that lead up to the implementation of a PBN The activities that lead up to the implementation of a PBN
Airspace Concept.Airspace Concept.
55
ICAO PBN Manual Doc 9613ICAO PBN Manual Doc 9613ICAO PBN Manual Doc 9613ICAO PBN Manual Doc 9613
✈Volume IVolume I✈ Airspace ConceptAirspace Concept
✈ Implementation ProcessesImplementation Processes
✈Volume IIVolume II✈ Navigation SpecificationsNavigation Specifications
✈Volume IVolume I✈ Airspace ConceptAirspace Concept
✈ Implementation ProcessesImplementation Processes
✈Volume IIVolume II✈ Navigation SpecificationsNavigation Specifications
66
ICAO ManualsICAO Manuals
Airspace Design is documented in ICAO Manual
Doc 9992 – Manual on The Use of Performance-Based Navigation (PBN) in Airspace Design
ICAO ManualsICAO Manuals
CCO and CDO are documented in ICAO Manuals
Doc 9931 - Continuous Descent Operations Manual
Doc 9993 – Continuous Climb Operations Manual
PBN Implementation ProcessesPBN Implementation ProcessesPBN Implementation ProcessesPBN Implementation Processes
High-level sequential outline of processes to use High-level sequential outline of processes to use when considering PBN implementationwhen considering PBN implementation
High-level sequential outline of processes to use High-level sequential outline of processes to use when considering PBN implementationwhen considering PBN implementation
99
PBN Implementation ProcessesPBN Implementation ProcessesPBN Implementation ProcessesPBN Implementation Processes
1010
PBN Enables the Airspace ConceptPBN Enables the Airspace ConceptPBN Enables the Airspace ConceptPBN Enables the Airspace Concept
1111
NAVIGATION NAVIGATION APPLICATIONAPPLICATION
NAVAIDNAVAIDINFRASTRUCTUREINFRASTRUCTURE
NAVIGATION NAVIGATION SPECIFICATIONSPECIFICATION
CCOMOM NNAVAV SSURUR ATMATM
PBNPBN
Airspace ConceptAirspace Concept
Navigation Specification by Flight Phase
Navigation Specification by Flight Phase
1212
RNAV 1/2 & RNP 1 SIDsARNP 1 SIDs
RNAV 5/2/1RNP 2
Advanced RNP 2 or 1Enroute Continental
RNAV 1/2 & RNP 1 STARs
ARNP 1 STARsRNP Approach
RNP-AR Approach
OCEANIC / Enroute Remote (nonSUR) RNAV 10, RNP 4, RNP 2, Advanced RNP
2
Airspace ConceptAirspace ConceptAirspace ConceptAirspace Concept
1313
OverviewOverviewOverviewOverview
✈ Learning Objective: Learning Objective: ✈ Understand the Airspace ConceptUnderstand the Airspace Concept
✈ This presentation will discussThis presentation will discuss✈ What is an Airspace ConceptWhat is an Airspace Concept
✈ Why develop an Airspace ConceptWhy develop an Airspace Concept
✈ Who develops an Airspace ConceptWho develops an Airspace Concept
✈ What is needed to develop an Airspace ConceptWhat is needed to develop an Airspace Concept
✈ What happens after the Airspace Concept is developed.What happens after the Airspace Concept is developed.
✈ Learning Objective: Learning Objective: ✈ Understand the Airspace ConceptUnderstand the Airspace Concept
✈ This presentation will discussThis presentation will discuss✈ What is an Airspace ConceptWhat is an Airspace Concept
✈ Why develop an Airspace ConceptWhy develop an Airspace Concept
✈ Who develops an Airspace ConceptWho develops an Airspace Concept
✈ What is needed to develop an Airspace ConceptWhat is needed to develop an Airspace Concept
✈ What happens after the Airspace Concept is developed.What happens after the Airspace Concept is developed.
1414
PBN Concept ReviewPBN Concept Review
15
11
2233
NAVIGATION NAVIGATION APPLICATIONAPPLICATION
NAVAIDNAVAIDINFRASTRUCTUREINFRASTRUCTURE
NAVIGATION NAVIGATION SPECIFICATIONSPECIFICATION
XXRNAVRNAV RNPRNP XX
(Use of NS & NI)(Use of NS & NI)
(Ground- Space-based)(Ground- Space-based)(RNAV System Perf.)(RNAV System Perf.)
XXRNAVRNAV RNPRNP XX
Accuracy value
RNAV and RNPRNAV and RNP
RNP 1RNP 1
1 Nautical Mile 95% of flight time
1 Nautical Mile 95% of flight time
Track Centerline
Alert to Alert to PilotPilot
The Key Extra Ingredient:On-Board Performance Monitoring and Alerting
RNAV 1RNAV 1
RNP is not different from RNAV: it is more than RNAV
PBN Enables Airspace Concepts PBN Enables Airspace Concepts PBN Enables Airspace Concepts PBN Enables Airspace Concepts
1717
NAVIGATION NAVIGATION APPLICATIONAPPLICATION
NAVAIDNAVAIDINFRASTRUCTUREINFRASTRUCTURE
NAVIGATION NAVIGATION SPECIFICATIONSPECIFICATION
CCOMOM NNAVAV SSURUR ATMATM
PBNPBN
Airspace ConceptAirspace Concept
Strategic Goals (Expected Benefits)Strategic Goals (Expected Benefits)
18
Safety? Capacity? Efficiency? Environment? Access?
Airspace Concept
COM NAV SUR ATMNAVIGATION APPLICATION
NAVAIDINFRASTRUCTURE
NAVIGATION SPECIFICATION
PBN
RNAV RNP
✈ A master plan of the intended airspace design and its operationA master plan of the intended airspace design and its operation✈ Describes the intended operations within an airspace Describes the intended operations within an airspace ✈ Developed to satisfy explicit and implicit strategic objectives Developed to satisfy explicit and implicit strategic objectives
(improved safety, increased air traffic capacity, improved (improved safety, increased air traffic capacity, improved efficiency, mitigation of environmental impact)efficiency, mitigation of environmental impact)
✈ A fully developed Airspace Concept:A fully developed Airspace Concept:✈ Describes in detail the airspace organization and its operations Describes in detail the airspace organization and its operations ✈ Addresses all the strategic objectives identified for the projectAddresses all the strategic objectives identified for the project✈ Addresses all CNS/ATM enablers Addresses all CNS/ATM enablers ✈ Identifies all operational and technical assumptionsIdentifies all operational and technical assumptions
✈ A master plan of the intended airspace design and its operationA master plan of the intended airspace design and its operation✈ Describes the intended operations within an airspace Describes the intended operations within an airspace ✈ Developed to satisfy explicit and implicit strategic objectives Developed to satisfy explicit and implicit strategic objectives
(improved safety, increased air traffic capacity, improved (improved safety, increased air traffic capacity, improved efficiency, mitigation of environmental impact)efficiency, mitigation of environmental impact)
✈ A fully developed Airspace Concept:A fully developed Airspace Concept:✈ Describes in detail the airspace organization and its operations Describes in detail the airspace organization and its operations ✈ Addresses all the strategic objectives identified for the projectAddresses all the strategic objectives identified for the project✈ Addresses all CNS/ATM enablers Addresses all CNS/ATM enablers ✈ Identifies all operational and technical assumptionsIdentifies all operational and technical assumptions
1919
What is an Airspace Concept?What is an Airspace Concept?What is an Airspace Concept?What is an Airspace Concept?
Why develop an Airspace Concept?Why develop an Airspace Concept?Why develop an Airspace Concept?Why develop an Airspace Concept?
✈ Airspace Concept development provides a structured Airspace Concept development provides a structured and systematic way of determiningand systematic way of determining✈ WhatWhat is to be achieved in an airspace, and is to be achieved in an airspace, and ✈ How it will be achieved How it will be achieved
✈ The development process helps ensureThe development process helps ensure Goals (expected benefits) of planned airspace structure are Goals (expected benefits) of planned airspace structure are
clearly stated;clearly stated; Objectives of the airspace change are met; andObjectives of the airspace change are met; and The means to achieve these goals are appropriate and feasible The means to achieve these goals are appropriate and feasible
within the resources available to the airspace systemwithin the resources available to the airspace system
✈ Airspace Concept development provides a structured Airspace Concept development provides a structured and systematic way of determiningand systematic way of determining✈ WhatWhat is to be achieved in an airspace, and is to be achieved in an airspace, and ✈ How it will be achieved How it will be achieved
✈ The development process helps ensureThe development process helps ensure Goals (expected benefits) of planned airspace structure are Goals (expected benefits) of planned airspace structure are
clearly stated;clearly stated; Objectives of the airspace change are met; andObjectives of the airspace change are met; and The means to achieve these goals are appropriate and feasible The means to achieve these goals are appropriate and feasible
within the resources available to the airspace systemwithin the resources available to the airspace system
2020
What does it look like?What does it look like?What does it look like?What does it look like?
✈ An Airspace Concept An Airspace Concept can be in any can be in any document formatdocument format
✈ Maintain Maintain configuration control!configuration control!
✈ An Airspace Concept An Airspace Concept can be in any can be in any document formatdocument format
✈ Maintain Maintain configuration control!configuration control!
21
What is the most critical point in What is the most critical point in developing an Airspace Concept? developing an Airspace Concept? What is the most critical point in What is the most critical point in
developing an Airspace Concept? developing an Airspace Concept?
Setting the appropriate objectives and scope Setting the appropriate objectives and scope
✈ Enables the project team to remain focused and the budget to Enables the project team to remain focused and the budget to be be managed within the set time managed within the set time
✈ Most projects which fail to meet the intended goal do so Most projects which fail to meet the intended goal do so because of poorly defined scope and objectives.because of poorly defined scope and objectives.
✈ Beware of project creepBeware of project creep!!
Setting the appropriate objectives and scope Setting the appropriate objectives and scope
✈ Enables the project team to remain focused and the budget to Enables the project team to remain focused and the budget to be be managed within the set time managed within the set time
✈ Most projects which fail to meet the intended goal do so Most projects which fail to meet the intended goal do so because of poorly defined scope and objectives.because of poorly defined scope and objectives.
✈ Beware of project creepBeware of project creep!!
2222
Once the Airspace Concept is Once the Airspace Concept is developed, what’s next? developed, what’s next?
Once the Airspace Concept is Once the Airspace Concept is developed, what’s next? developed, what’s next?
✈ Lay out a detailed program plan for the specific Lay out a detailed program plan for the specific implementation(s) in the Airspace Concept implementation(s) in the Airspace Concept
✈ ICAO sample action plans (domain-specific and ICAO sample action plans (domain-specific and comprehensive)comprehensive)
✈ Consider just as a starting point Consider just as a starting point ✈ Adapt as needed to the specific circumstances of a project Adapt as needed to the specific circumstances of a project ✈ Steps not always conducted in strict sequenceSteps not always conducted in strict sequence✈ Certain steps may be conducted on a recurring basis as the Certain steps may be conducted on a recurring basis as the
project progressesproject progresses✈ Steps and the sequence in which they are performed in the Steps and the sequence in which they are performed in the
project should be evaluated by the implementation team on project should be evaluated by the implementation team on the basis of experience and judgmentthe basis of experience and judgment
✈ Lay out a detailed program plan for the specific Lay out a detailed program plan for the specific implementation(s) in the Airspace Concept implementation(s) in the Airspace Concept
✈ ICAO sample action plans (domain-specific and ICAO sample action plans (domain-specific and comprehensive)comprehensive)
✈ Consider just as a starting point Consider just as a starting point ✈ Adapt as needed to the specific circumstances of a project Adapt as needed to the specific circumstances of a project ✈ Steps not always conducted in strict sequenceSteps not always conducted in strict sequence✈ Certain steps may be conducted on a recurring basis as the Certain steps may be conducted on a recurring basis as the
project progressesproject progresses✈ Steps and the sequence in which they are performed in the Steps and the sequence in which they are performed in the
project should be evaluated by the implementation team on project should be evaluated by the implementation team on the basis of experience and judgmentthe basis of experience and judgment
2323
Airspace Concept SummaryAirspace Concept Summary
24
Questions??Questions??
25