PROPOSED 2ND FLOOR EXTENSION (S.P.University)
1
Creative Architects (Anand)
OWNER:- SARDAR VALLABHBHAI PATEL UNIVERSITY AT. VALLABH VIDHYANAGAR DIST: ANAND. TENDER FOR:- PROPOSED SECOND FLOOR EXTENSION FOR COMMUNITY SCIENCE CENTRE AT: VALLABH VIDHYANAGAR. DIST: ANAND. LAST DATE OF DOWNLOADING TENDER: ___01/05/2012________ LAST DATE OF SUBMITTING TENDER: _02/05/2012_ (Afternoon 2:00 o’clock) TENDER OPENING DATE : _02/05/2012_TIME & PLACE: 3:00 p.m Syndicate Hall, S.P.U Main Office. Tenderers are requested to download and submit all 20 pages and 5 drawings without Fail and also requested to sign on each page otherwise tenders will be rejected. NOTE : Those who have downloaded the Tender from URL – www2.spuvvn.edu./estate/index.html are requested to deposit specified tender fee along with all other related documents on or before 2 days of submission of tender date without fail. The tenders without tender fee and required documents shall be rejected. Contact : University Engineer Phone Number 02692 - 226813 Estate Office 02692 – 226816
CREATIVE ARCHITECTS TARU PATEL. B.ARCH. (MSU) F.I. I. A. M.I.C.A.
JATIN VYAS B.ARCH. (MSU) F.I. I.A. M.I.C.A.
AMUL DAIRY ROAD, ANAND – 388 001 9th April March 201
PROPOSED 2ND FLOOR EXTENSION (S.P.University)
2
Creative Architects (Anand)
A P P E N D I X - A 1. NAME OF FIRM : _______________________________________________ _______________________________________________ 2. REGISTRATION: _______________________________________________ (CLASS ETC.) _______________________________________________ _______________________________________________ 3. PARTNERS: _______________________________________________ _______________________________________________ _______________________________________________ NOTE:
THE ENTIRE TENDER DOCUMENT SHOULD BE RETURNED WITH THE FORM AFTER COMPLYING WITH
THE FOLLOWING.
1.) THE TENDERER SHOULD SIGN INTIAL EACH PAGE AND ALL CORRECTIONS.
2.) THE TENDERER SHOULD GIVE HIS FULL SIGNATURE AT ALL PLACES MARKED THE “SIGNATURE OF
CONTACTOR.”
DATE: 20 / 03 / 2012 CONTRACTOR
PROPOSED 2ND FLOOR EXTENSION (S.P.University)
3
Creative Architects (Anand)
Sr. No Description Page No.
1 Tender Notice 04
2 General Specification & Conditions 05-08
3 Specification of Materials 09-10
4 Detail Specification 11-20
5 Drawings Attached
File
PROPOSED 2ND FLOOR EXTENSION (S.P.University)
4
Creative Architects (Anand)
TENDER NOTICE
SLEALED ITEM RATE TENDERS ARE INVITED FROM, FEW SELECTED CONTRUCTION COMPANIES BEARING GOVERNMENT REGISTRATION HAVING SOUND TECHNICAL &
FINANCIAL CAPABILITIES POSSESSING REQUIRED EQUIPMENTS WITH WIDE EXPERIENCE (B+) AND REPUTATION IN
THE FIELD FOR FOLLOWING WORK:
1 NAME OF THE PROJECT PROPOSED SECOND FLOOR EXTENSION FOR COMMUNITY SCIENCE CENTER
2 ESTIMATED COST RS.23,13,277/-
4 TIME LIMIT 150 DAYS FROM THE DATE OF WORK ORDER 5 EARNEST MONEY RS 23000.00 TO BE REFUNDED AFTER SECURITY DEPOSIT AND WITHIN 30
DAYS OF COMMENCEMENT OF WORK ON SITE TO BE PAID BY CROSS DEMAND DRAFT FROM ANY NATIONALIZE BANK ONLY, IN FOVOUR OF REISTRAR SARDAR PATEL UNIVERSITY,PAYBLE AT V.V.NAGAR-388120(NO INTEREST WILL BE PAID)
6 SECURITY DEPOSIT 2.5 % OF THE CONTRACT VALUE TO BE REFUNDED AFTEER 12 MONTHS OF VIRTUAL COMPLETION CERTIFICATE DATE (NO INTEREST SHALL BE PAID)
7 RETENTION MONEY 2.5 % OF THE BILL AMOUNT TO BE REFUNDED AFTER VIRTUAL COMPLETION CERTIFICATE (NO INTEREST SHALL BE PAID)
8 INTERIM CERTIFICATE VALUE MINIMUM RS.5.0 LACS 9 DEFECT LIABILITY PERIOD 12 MONTHS FROM THE DATE OF COMPLETION CERTIFICATE
10 PERIOD FOR HONORING CERTIFICATE
WITHIN 30 DAYS
11 WATER CHARGES 0.5 % OF BILL AMOUNT
12 ELECTRICITY CHARGES 0.5% OF BILL AMOUNT
13 STRUCTUREAL CONSULTANT FEES 1% OF STRUCTURAL COST
14 INCOME TAX DEDUCTION AS PER GOVERNMENT RULES
15 TENDER FEE RS.900/-IN CASH (NON REFUNDABLE)
16 VALIDITY PERIOD TENDER VALID FOR 90 DAYS FROM THE DATE OF BID OPENING
17
TESTING OF MATERIALS
NECESSARY TESTING OF STEEL, CEMENT, BRICK SAND, COURSE AGGREGATE ETC.AS PER IS NORMS REQUIRED & DIRECTED BY EIC.THE CHARGES SHALL BE BORNE BY THE TENDERER.
18
DATE OF COMMENCEMENT WITHIN 10 DAYS FROM THE DATE OF WORK ORDER.
19 PASSING OF THE RUNNING BILLS BY THE ARCHITECTS
PAYMENT UP TO 70 % OF THE INTERIM BILL VALUE AFTER CERTIFICATION/JOINT VERIFICATION BY CONTRACTOR WITH ENGINEER-IN-CHARGE,AND BALANCE 30 % AFTER CERTIFICATE FROM ARCHITECTS
20 21
PERIOD OF FINAL MEASURMENT LIQUIDATED AND ASCERTAINED DAMAGES
ONE MONTH AFTER VIRTUAL COMPLETION 3% ON CONTRACT SUM FOR DELAY PER WEEK, NOT TO EXCEED TEN PERCENT OF THE CONTRACT SUM.
SARDAR PATEL UNIVERSITY RESRVES ALL RIGHTS TO REJECT ANY OR ALL THE TENDERS
WITHOUT ASSIGNING ANY REASON THEREOF.
AUTHORIZED SIGNATORY UNIVERSITY ENGINEER
PROPOSED 2ND FLOOR EXTENSION (S.P.University)
5
Creative Architects (Anand)
G E N E R A L
1. THE TIME IS THE ESSENCE OF CONTRACT.
2. FOR EXTRA ITEM THE RATE SHALL BE FIXED ON THE BASE OF CURENT MARKET RATES FOR
MATERIAL ACTUAL LABOUR AND 12 % PROFIT & 3% OVERHEAD CHARGES MATERIAL RATES
MUST BE SUPPORTED WITH PURCHASE BILLS.
3. THE ENTIRE WORK WILL BE CARRIED OUT AND COMPLETE USING APPROPRIATE QUALITY OF
MATERIALS, BEST WORKMANSHIP IN SPECIFIED TIME AND WITH RED AND DILIGENCE, AS
PER RELEVANT I.S. SPECIFICATION, INSTRUCTIONS, AND DISCUSSION OF CONSULTING
ENGINEER/ARCHITECT AND THE EMPLOYER.
4. ELECTRICITY REQUIRED FOR WORK SHALL BE OBTAINED ARRANGED AND PAID BY THE
CONTRACTOR.
5. ALL CO-OPERATIONS WILL BE GIVEN BY THE CONSULTING ARCHITECT AND THE EMPLOYER.
SIMILAR CO-OPERATION TO CARRY OUT AND COMPLETE THE WORK IS REQUIRED FROM THE
CONTRACTOR AND HIS STAFF.
6. THE TERMS & CONDITIONS WOULD BE AS PER THE CONDITIONS OF CONTACT, AND
STANDARD SPECIFICATIONS OF P.W.D. KHEDA. DETAIL SPECIFICATION WILL BE AVAILABLE
FOR STUDY FROM CREATIVE ARCHITECTS’ OFFICE.
7. FORMWORK FOR COLUMNS i.e. CIRCULAR OR RECTANGULAR OR SQUARE SHOULD BE NEW
SO AS TO GET FINE FINISH.
PROPOSED 2ND FLOOR EXTENSION (S.P.University)
6
Creative Architects (Anand)
NOTES ALL WORKS SHALL CONFIRM TO GENERAL TECHNICAL SPECIFICATION FOR BUILDING WORK REGARDING SCHEDULE OF RATES FOR ROADS, BUILDING AND BRIDGES ITEM FOR THE YEAR 2002-03 OF GUJARAT STATES, BASED ON ANAND (R. & B.) DIVISION, ANAND. QUANTITIES FURNISHED ARE APPROXIMATE AND CAN INCREASE OR DECREASE DURING ACTUAL EXECUTION OF WORK. TENDERER SHALL QUOTE FIRM UNIT RATES. NO CLAIM IN RESPECT OF ACTUAL QUANTITIES VARYING OR DELETED FROM FURNISHED HEREIN SHALL BE ENTERTAINED. RATES AND PRICES SHALL BE WRITTEN IN BLUE/BLACK INK AND SHALL BE ENTERED BOTH IN FIGURE & IN WORDS. RATES QUOTED SHALL BE FIRM FOR ENTIRE DURATION OF THE WORKS PROGRESSIVE PAGE TOTAL AND THE FINAL TOTAL AMOUNT SHALL BE FURNISHED. TENDERS SHALL AS FAR AS POSSIBLE QUOTE FOR THE ENTIRE WORK. ON AWARD OF THE WORK – BUILDING – WISE BREAKUP OF QUANTITIES SHALL BE WORKED OUT AND R.A. BILLS WILL BE PREPARED ITEM WISE. ANY DISCOUNT/REBATE OFFERED BY THE TENDERER WILL BE APPLICABLE ON ENTIRE VALUE OF THE WORK INCLUDING THAT OF EXTRA ITEMS IF ANY. ALL THE PAYMENTS TO PARTY ON ACCOUNT OF RUNNING ACCOUNTS BILL SHALL BE TRATED AS ADVANCE PAYMENT ONLY SUBJECT TO SETTLEMENT IN THE FINAL BILL OF THE PROJECT. CONTRACTORS SHOULD ALSO GIVE US THE INFORMATION OF WORK CARRIED OUT BY THEM IN LAST THREE YEARS. TENDERERS SHOULD GIVE INFORMATION REGARDING TECHNICALLY QUALIFIED FULL TIME STAFF EMPLOYED BY THEM FOR THEIR WORKS AND ALSO FOR THIS PROJECTS & IF TENDERS ARE TECHNICALLY QUALIFIED, SHOULD ATTACH CERTIFICATES FOR INFROMATION. Registrar SARDAR PATEL UNIVERSITY, VALLABH VIDHYANAGAR RESERVES THE RIGHTS TO ACCEPT OR REJECT ANY OR ALL TENDERS WITHOUT ANY REASON. IT IS NOT NECESSARY TO ACCEPT THE LOWEST QUOTATION. DECISION OF Registrar SARDAR PATEL UNIVERSITY, VALLABH VIDHYANAGAR WILL BE BINDING TO ALL THE TENDERS. * CONTACTOR SHALL FILL THE RATE WHEN THE QUANTITY IS NOT GIVEN IN THE TENDER AND ALSO SUBMIT THE RATE ANALYSIS OF SUCH ITEMS. AUTHORITIES. RESERVES RIGHT TO GIVE THIS WORK TO ELIGIBLE CONTRACTOR.
PROPOSED 2ND FLOOR EXTENSION (S.P.University)
7
Creative Architects (Anand)
OWNER: - Registrar SARDAR PATEL UNIVERSITY, VALLABH VIDHYANAGAR NOTE :
THE CONTRACTOR SHALL PAY THE CHARGES TO OBTAIN ELECTRICITY FROM THE G.E.B.
AUTHORITIES AND ARRANGE FOR THE NECESSARY WIRING & POLES ETC. ON HIS OWN. HE SHALL
ARRANGE FOR THE SEPARATE METER AND PAY THE BILLS WHICH WILL NOT BE INCLUDED IN THE
TENDER OR CIVIL WORKS.
------------------------------------------------------------------------------------------------------------
MATERIALS LIKE BRICKS, SAND ETC. WILL BE PROCURED BY CONTRACTOR HIMSELF.
CEMENT : AMBUJA, Altratec, Sanghi, Binani SHALL BE UTTLIZED)
STEEL: I.S.I. STEEL LIKE TATA, Kamdhenu, Nilkanth, ASR Thermax etc SHALL BE UTILIZED.
PROPOSED 2ND FLOOR EXTENSION (S.P.University)
8
Creative Architects (Anand)
(DECLARATIONS BY THE CONTRACTOR)
1. WE AGREE THAT THE OWNER * IS NOT BOUND TO ACCEPT THE LOWEST AND/OR: QUOTATIONS
AND THAT WE : SHALL NOT DEMAND ANY REASON FOR THE SAME FROM THE OWNER. * 2. WE AGREE THAT THE OWNER * CAN DEDUCT INCOME TAX AT SOURCE, FROM OUR FINAL BILLS
IF OUR QUOTATIONS ARE APPROVED BY THE OWNER. 3. WE AGREE THAT THE ABOVE QUOTATIONS ARE ITEM-RATE QUOTATIONS AND THE QUANTITIES
GIVEN ABOVE ARE APPROXIMATE AND THAT THE : - OWNER * CAN ADD/OR DELETE ITEMS OF WORKS AS ABOVE WOULD BE AS PER THE JOINT MEASUREMENTS WITH : THE OWNER. *
4. WE CERTIFY THAT WE HAVE INSPECTED THE SITE AND HAVE CAREFULLY STUDIES THE
SPECIFICATION AND OTHER DETAILS SUPPLIED BY THE OWNER * PRIOR TO THE FILLING UP OF THIS QUOTATION FORM.
5. WE AGREE THAT WE SHALL NOT DEMAND ANY COST ESCALATION IN OUR ABOVE QUOTED
RATES FROM THE OWNER *, EVEN IF THE COST OF RAW MATERIALS, LABOUR, TAXES, EXCISE DUTIES ETC. GO UP i . e. THE RATES QUOTED BY US IN THE ABOVE QUOTATION FORM ARE FULLY BINDING ON US.
6. ANY DEFECTS IN MATERIALS AND OR WORKMANSHIP ETC., POINTED TO US BY THE OWNER *
WITHIN 12 MONTHS OF THE COMPLETION OF THE ABOVE JOB WILL BE RECTIFIED BY US IMMEDIATELY FREE OF COST i. e. WE SHALL NOT CHARGE ANYTHING EXTRA TO THE OWNER.
Contractor’s Sign & Stamp University Engineer
PROPOSED 2ND FLOOR EXTENSION (S.P.University)
9
Creative Architects (Anand)
SCHEDULE OF APPROVED MAKES OF MATERIALS FOR CIVIL WORKS
1. Anodized Aluminium Hardware Eve rite, Sigma, Diamond
Fittings.
2. Water proofing Compound CICO / ACCCO Proof
3. Distemper Asian Paints only.
4. Waterproofing Cement Paints Asian Paints, Snowcem India Ltd.
5. Synthetic Enamel Paints Asian Paints only.
6. Commercial particleboard Teak Ply, Bombay Burman Treading Corp. Indian
Commercial
7. Ply Plywood Manufacturing Co. Ltd.
Mysore Ply. Minar, National in terms of
ISI Bayers Guide 1981.
8. Prelaminated Ply Board Bhutan Ply, Novapan, ECO Board,
NOVO Teak, Easyloan
9. Glass Sheet Hindustan Plinkiston Glass work Ltd.
Triveni Sheets Glass, Atul Glass, Indo
Ashay Glass, Modi Glass.
10. NOT APPLICABLE.
11. Termite Treatment Pest Control of India Ltd.
12. Floor Spring for Aluminium Doors ECIE, Everite, Prabhat
13. Glazed Tiles (First Quality) Jhonson(i) Ltd., Somany, Pilkington,
Orient, CERA, ASIAN
14. Ceramic Tiles (First Quality) Spartek, Regency, Bell, NITCO, Kajaria,
ASIAN
15. C.P. Hardware Fitting ECIE
16. O.P. Cement Ambuja, Ultratech, J.P., Sanghi Cement.
17. White Cement J. K. White / Birla White
18. Reinforcement Bar Kamdhenu, Tata, A.S.R., Elecrotherm
National, Sanghi, Nilkanth, Tharmex
19.PVC Pipes & Fitting Supreme / Prince
b) PVC Fitting & Fixtures Prayang, Polymers
20. Brick Coba Water Proofing Indian Water Proofing Co., Water Proofing
PROPOSED 2ND FLOOR EXTENSION (S.P.University)
10
Creative Architects (Anand)
21. Locks Godrej, Harrison
22. MDF Nu-Wood, Dura Tuff
23. Aluminium sliding openable Shutter window fixing Jindal
SCHEDULE OF APPROVED MAKES OF MATERIALS FOR SANITARY WORKS
1. C. P. BRASS FITTINGS GEM, ESSCO, JAGUAR, PRINCE 2. CI PIPES & FITTINGS FOR SOIL, NECO-NAGPUR ENGG. CO. LTD. WASTE & VENT PIPES CI MANHOLE NAGPUR BIC COVER & ROAD GRATING 3. FLUSH COCK (HEAVY) PRINCE 4. LOOKING MIRROR 5mm THICK GOLD FISH, ATUL, MODI GLASS 5. GLAZED STONE WARE PIPE PERFECT POTTERIES BHARATPUR, BURN POTTERIES JABALPUR, ISHWAR PIPES, VIJAYPUR, SONIA BRAND. 6. PVC WATER TANK SINTEX. 7. PVC PIPES & FITTINGS SUPREME, PRINCE. 8. G. I. PIPE ASIAN, JINDAL. 9. G. I. PIPE FITTINGS “ISI” FITTING. 10. VALVES (CI) KIRLOSKAR, FOURESS. 11. GUN METAL VALVES LEADER BRAND BY LEADER ENGG. WORKS, JULLUNDHAR. 12. STAINLES STEEL KITCHEN SINK NIRALI, COBRA, AMBICA. 13. SANITARY FIXTURES HINDUSTAN SANITARY, CERA. 14. CPVC PIPE ASTRAL, SUPREME, ASHIWARD. 15. CPVC FITTING ASTRAL, ASHIWARD.
PROPOSED 2ND FLOOR EXTENSION (S.P.University)
11
Creative Architects (Anand)
PROJECT OWNER : SARDAR PATEL UNIVERSITY
PROJECT: EXTENSION OF SECOND FLOOR OF EXISTING
COMMUNITY SCIENCE CENTRE @ V.V.NAGAR
APPROXIMATE BUILT UP AREA: 285.00 SMT
DESCRIPTION OF ITEMS
AMOUNT RS.
ITEM NO:-1. EARTH WORK
RS.
ITEM NO:-2. CONCERTE WORK
RS.
ITEM NO:- 3. MASONARY WORK
RS.
ITEM NO:- 4. TEAK WOOD DOORS, ALUMINIUM
WINDOWS AND VENTILATORS WITH M.S. GRILL WORK
RS.
ITEM NO:- 5 FINISHING WORK (PLASTERING &
PAINTING)
RS.
ITEM NO:- 6. FLOORING WORK
RS.
ITEM NO:-7 . PLUMBING AND SANITATION WORK
RS.
8 : DEMOLITION & DISMANTLING
RS.
GRAND TOTAL
RS.
REBATE IF ANY %
RS.
NET AMOUNT
RS.
SAY ………………………………………………………………………………………………………..
ONLY
CONTRACTOR'S SIGN & STAMP UNIVERSITY ENGINEER
PROPOSED 2ND FLOOR EXTENSION (S.P.University)
12
Creative Architects (Anand)
SR.
NO DESCRIPTION QUANTITY UNIT RATE AMOUNT
ITEM NO:-1. EARTH WORK ( THE RATES SHALL BE APPLICABLE FOR ALL FLOORS)
1.01 EXCAVATION FOR FOUNDATION IN ALL TYPES SOIL FOR
WALLS, COLUMNS, PLINTH BEAMS, BASEMENT, RAFT
DUCTS, PIPE TRENCHES, ETC. INCLUDING SOARING,
STRUTTING, BAILING OUT SURFACE WATER PUMPING OFF
IF REQUIRED, REMOVING AND STACKING ADDITIONAL
EXCAVATED EARTH UPTO 1.5 MT DEPTH
10.00 CMT RS.
1.02 -DO- AS ITEM NO.1.01 IN YELLOW SOIL OR DENSE OR
HARD SOIL BEYOND 1.50 M. BUT NOT EXCEEDING 3.00
MT (AS PER STRUCTURAL DEATIL) BELOW THE GROUND
LEVEL.
4.00 CMT RS.
1.06 EARTH FILLING IN FOUNDATION PIT, SIDE TERNCHES,
PLINTH, SITE DEVELOPMENT ETC WITH SELECTED
EXCAVATED EARTH IN LAYERS 15CMS TO 20CMS.
INCLUDING WATERING TO OPTIMUM MOISTURE
CONTENT, RAMMING AND COMPACTING USING
MECHANICAL VIBRO -ROLLER COMPLETE AS DIRECTED
1.06.1 -DO- AS ITEM NO.1.06 BUT WITH AVAILABLE SELECTED
EARTH FROM SITE. NIL NIL NIL NIL
1.06.2 -DO- AS ITEM NO.1.06 BUT WITH SELECTED YELLOW SOIL
BROUGHT FROM OUT SIDE INCLUDING FREIGHT
TRANSPORTATION, LOADING UNLOADING, TAXES,
ROYALTY, SCREENING ETC. (MESUREMENT AFTER
COMPLETE CONSOLIDATION WILL BE CONSIDERED FOR
PAYMENT)
12.00 CMT RS.
1.08 PROVIDING & SPREADING ANTITERMITE CHEMICAL
TREATMENT FOR FOOTINGS & FLOORINGS WITH
PRESSURE PUMPS, FOR SPREADING OPERATIONS TO
FACILITATE PROPER PENETRATION OF CHEMICALS INTO
THE EARTH WITH THE HELP OF CHEMICALS
CONCENTRATIONS & DOSAGES THROUGH REPUTED
1.00 SMT RS.
TOTAL OF EARTH WORK
RS.
ITEM NO:-2. CONCERTE WORK
A) FOR ALL CONCRETE ITEMS THE PROPORTION OF (1:2:4)/1:4:8) ETC., SPECIFIED IN THE RESPECTIVE
ITEMS SHALL BE BY VOLUME. FOR ALL R.C.C. WORKS MACHINE CRUSHED COARSE AGGREGATE
SHALL BE OF 20 mm. AND DOWN GAUGE SITE HARD WELL GRADED STONE AGGREGATE UNLESS
OTHERW
B) SHUTTERING SHALL BE WATER TIGHT, WHEREVER DIRECTED PLYWOOD LINED TIMBER SHUTTERING
SHALL BE USED AT NO EXTRA COST.
C) THE RATES SHALL BE INCLUSIVE DEWATERING, CENTERING, AND FORM WORK, FOR ANY SIZE AND
SHAPE, SCAFFOLDING, MACHINE MIXING, HOISTING MANUALLY OR BY MEANS OF MACNINISED
EQUIPMENT, CONSOLIDATING BY RODDING, TEMPING, VIBRATING, CURING, STRIPPING THE
SHUTTERING A
D) THE RATES QUOTED SHALL INCLUDE FORMING CONSTRUCTION JOINTS, DUMMY CONSTRUCTION
JOINTS AS DIRECTED BY THE ARCHITECTS.
E) STEEL FOR REINFORCEMENTS SHALL BE PAID SEPERATELY UNLESS OTHERWISE SPECIFIED.
F) NO FINISHING ITEM SHALL BE CONSIDERED IN QUOTING THE RATES UNLESS OTHERWISE SPECIFIED.
G) RATES SHALL HOLD GOOD FOR ALL FLOORS/ LEVELS/ DOUBLE HEIGHT.
PROPOSED 2ND FLOOR EXTENSION (S.P.University)
13
Creative Architects (Anand)
H)
THE RATES SHALL INCLUDE PROVIDING, FABRICATING IF NEEDED , WELDING THE LAPPING OF
REINFORCEMENT BAR WHERE REQUIRED AND LAYING POSITION STEEL REINGORCEMENT FOR
R.C.C. STRUCTURES.
THE RATES SHALL BE APPLICABLE FOR ALL FLOORS.
SR.NO DESCRIPTION QUANTITY UNIT RATE AMOUNT
2.01 PROVIDING AND LAYING MACHINE MIXED B.B.C.C.
VOLUMETRIC PROPORTION 1:4:8 WITH 50 MM DOWN
SIZE BRICKBATS OF SPECIFIED THICKNESS, MIX &
GRADATION OF THE AGGREGATES EXCLUDING THE
DISMANTLED DEBRIS INCLUDING CENTERING &
SPREADING, RAMMING, CONSOLIDATING AS
2.01(A) -DO- AS PER ITEM NO. 2.01 FOR FOUNDATION AND
GROUND FLOOR NIL CMT RS.
2.03 PROVIDING AND LAYING MACHINE MIXED PLAIN
CEMENT CONCRETE IN VOLUMETRIC PROPORTION 1 : 4
: 8 WITH 37 MM AND DOWN STONE AGGREGATES OF
SPECIFIED THICKNESS, MIX AND GRADATION INCL. CENTERING, SHUTTERING IF REQUIRED, LAYING,
SPREADING, RAMMING CONSOLIDATIN
2.03(A) -DO- AS PER ITEM NO. 2.03 FOR ALL FLOORS 2.00 CMT RS.
2.06 PROVIDING AND LAYING IN POSITION MACHINE MIXED
& MACHINE VIBRATED CEMENT CONCRETE OF M20
GRADE(DESIGN OF CONCRETE MIX WILL BE DONE BY
CONTRACTOR) WITH MINIMUM 350 KG OF CEMENT
CONSUMPTION PER CUBIC METRE OF CONCRETE (BY
WEIGHT BATCHING/BY VOLUME BATCHING)
2.06
(B)
-DO- AS PER ITEM NO. 2.06 FOR COPING , BEAM
,COLUMN, SLAB, PARDI, ETC.ETC FOR ALL R.C.C.
WORK FOR ALL HEIGHTS
68.00 CMT RS.
ADDITIONAL CHARGES OVER AND ABOVE ITEM NO
2.06 (B) FOR - DOUBLE HEIGHT/ TRIPLE HEIGHT
SHUTTERING FOR R.C.C. WORK IF NEEDED
10.00 SMT RS.
2.07 PROVIDING AND ADDING CEMENT BEG FOR SPECIFIC
GRADE OF CONCRETE RATHER THEN M20. 25.00 BAG RS.
2.14 SUPPLYING AND MIXING OF WATER PROOFING
COMPOUND OF APPROVED MAKE. FOR R.C.C. NEW
/OLD JOINTS
52.00 LITRE RS.
2.15 PROVIDING, FABRICATING IF NEEDED , WELDING THE
LAPPING OF REINFORCEMENT BAR WHERE REQUIRED
AND LAYING POSITION STEEL REINGORCEMENT T.M.T
OR H.Y.S.D. BAR FOR R.C.C. STRUCTURES AS PER
DESIGN INCLUDING BASIC COST OF THE STEEL/OR
STORE AT THE SITE & CUTTINGS ,WESTAGES AND
INCIDENTAL CHARGES FOR HANDELLING ETC
COMPLETE. FOR ALL FLOOR HEIGHTS
2.15
(A)
-DO- AS PER ITEM NO. 2.15 FOR MILD STEEL & TMT BARS
FOR BASEMENT & GROUND FLOOR. 8.00 TON RS.
TOTAL FOR CONCRETE WORK
RS.
PROPOSED 2ND FLOOR EXTENSION (S.P.University)
14
Creative Architects (Anand)
ITEM NO:- 3. MASONARY WORK
1.00 1] FLOOR HEIGHT OF THE RESPECTIVE FLOOR CAN BE CONSIDERED MINIMUM 3.60M.
2.00 2] FLOOR HEIGHT OF LESS THAN 3.60M I.E. MEZZANINE FLOOR ETC., THE PAYMENT SHALL BE
CONSIDERED FOR RESPECTIVE FLOOR
3.00 3] THE BRICK MASONARY WORK ABOVE TERRACE LEVEL WILL BE CONSIDERED IN TOP FLOOR.
4.00 4] MINIMUM CRUSHING STRENGTH OF BRICK SHALL BE 35 KG/SQ CM
5] THE RATES SHALL BE APPLICABLE FOR ALL FLOORS.
SR.NO DESCRIPTION QUANTITY UNIT RA
TE AMOUNT
3.01 &
3.02
PROVIDING AND LAYING BRICK MASONARY IN C.M .
1:6 ( 1 CEMENT AND 6 COARSE SAND) KEEPING ITS FROG
ON TOP INCLUDING SCAFFOLDING,RACKING OUT THE
JOINTS, CURING ETC. COMP. AS DIRECTED
3.02(B) -DO- AS PER ITEM NO. 3.02 BUT FOR SUPER STRUCTURE 60.00 CMT RS.
3.01(A) PROVIDING AND CONSTRUCTING EXPOSED B.B
MASONARY WORK FOR WALLS,ORNAMENTAL
CORNICES/ARCHES IN SUPERSTRUCTURE IN C.M. 1:4(1
CMENT AND 4 COARSE SAND) OR THE BRICK ON EDGE
WALL INCLUDING SCAFFOLDING,RACKING OUT THE
JOINTS OF 8MM DEEP AND 10MM HT. MORTER JOINTS
EVENLY KEEPING ALL BRICK CORNER UNBREALED WITH
PERFECT LINE & LEVELLLING ETC COMPLETE (BRICKS SHALL
BE OF EVENLY SIZED ON EMERY MACHINE AS DIRECTED
UPTO SATISFACTION OF ARCHITECT OR INCHARGE .
INCLUDING PROVIDING EXPOSED BRICK TRANSPERENT
WEATHER COAT PAINTS TO ENSURE WATER PROOF
SURFACES OF BRICKS.
108.00 SMT RS.
3.03 PROVIDING AND CONSTRUCTING 115MM B.B.
MASONARY PARTITION FOR SUPERSTRUCTURE IN C.M. 1:4 (
1 CEMENT AND 4 COARSE SAND ) OR THE BRICK ON
EDGE PARTITION INCLUDING SCAFFOLDING, RACKING
OUT THE JOINTS REINFORCEMENT OF 2NOS. 6MM DIA.
BARS AT EVERY FOUR LAYERS OF MASONARY WORK.
3.03(A) -DO- AS PER ITEM NO. 3.03 BUT FOR ALL FLOOR
HEIGHTS. 27.50 SMT RS.
TOTAL OF MASONARY WORK
RS.
ITEM NO:- 4. T.W. DOORS, ALUMINIUM WINDOWS/VENTILATORS / M.S. GRILL WORK
NOTE : A ALL WOOD SHALL BE OF GOOD QUALITY BULSAR CUT OR GHANA CUT TEAK WOOD
B. THE RATE SHALL INCLUDE PAINTING ALL WOOD WORK ONE COAT OF WOOD PRIMER AND
TWO COATS OF APPROVED OIL PAINT OF SUGGESTED SHED AND OF ASIAN MAKE.
C. THE RATE FOR WINDOWS AND VENTILATIONS SHALL BE WITH PROCUREMENT OF ALL MATERIALS,
CUTTING, ANODIZING, ASSEMBLING, ERECTION ON SITE, GLASS, EPDM GASKETS, CLEANIING, ETC.
COMPLETE.
PROPOSED 2ND FLOOR EXTENSION (S.P.University)
15
Creative Architects (Anand)
D. THE RATE SHALL BE COMMON FOR ALL FLOORS OF THE BOILDING; NO RAISE IN THE PRICE FOR
WORKING ON ANY HEIGHT SHALL BE GIVEN.
E. THE RATE SHALL INCLUDE ALL NECESSARY FIXING SUCH AS HINGES,HANDELS, LOCKS ,STOPPERS
ETC..ETC AS SUGGESTED.AND HARDWARE OF : HEAVY DUTY, GOOD QUALIT AS PER DETAIL
F. COMPANY: ALUMINUM SECTIONS: BANCO ALUMINUM.
GLASS: SAINT GOBAIN FLOAT GLASS / KASUMBI GLASS. FOR WINDOWS AND VENTILAIONS
G.THE RATE SHALL BE COMMON FOR ALL FLOOR.
H. ALL MILD STEEL WORK SHALL BE FROM HEAVY DUTY HOLLOW PIPES, M.S. BARS AS PER DESIGN ,
NEATLY FINISHED WELDED JOINTS.
I THE RATE SHALL BE FOR FEBRICATION WORK SHALL INCLUDE WITH PROCUREMENT OF ALL
MATERIALS, CUTTING, WELDING ,FIXING ON SITE FINISHED SURFECE IN PLASTER , PAINTING ONE
COAT OF RED OXIDE AND TWO COATS OF APPROVED OIL PAINT OF SUGGESTED SHED AND OF
ASIAN MAKE, INCLUDING MAKING SURFACE GOOD .
J. THE RATES SHALL BE APPLICABLE FOR ALL FLOORS.
SR.NO DESCRIPTION QUANTITY UNIT RATE AMOUNT
4.10(A) PROVIDNG AND FIXING 35 MM THICK SHUTTER WITH 125MM WIDE VERTICAL STYLE ,150MM x35MM TH
HORIZONTAL STYLE IN 3 NOS. WITH AVERAGE 100MM x
25MM THICK WOOD PANELLINGS FOR DOORS,
INCLUDING INDIAN TEAK WOOD FRAMES 12CM X 7CM
SIZE INCLUDING STAINLESS STEEL FIXTURES AND
FASTENING INCLUDING PRIMER COAT OF APPROVED
QUALITY AND TWO COATS OF OIL PAINTING ETC.
COMPLETE
6.50 SMT RS.
4.10
(B)
PROVIDNG AND FIXING 35 MM THICK SHUTTER WITH
125MM WIDE VERTICAL STYLE ,150MM x35MM TH
HORIZONTAL STYLE IN 3 NOS. WITH 12MM THICK WATER
PROOF PLY- PANELLINGS IN TWO PARTS FOR DOORS,
INCLUDING INDIAN TEAK WOOD FRAMES 12CM X 7CM
SIZE INCLUDING STAINLESS STEEL FIXTURES AND
FASTENING INCLUDING PRIMER COAT OF APPROVED
QUALITY AND TWO COATS OF OIL PAINTING ETC.
COMPLETE
4.60 SMT RS.
4.20 ROVIDING AND FIXING ALUMINUM ANNODISED
WINDOWS FRAME OF TWO SLIDING RAILS AND
APPROVED SHEDSLIDING WINDOW , INCLUDING
FIXING ON SITE MAKING NECCERARY CHISELLING OF
WALL IF NEEDED, PROVIDING E.P.D.M. RUBBER GASKET
FOR FIXING OF GLASS,PROVIDING SILICATED WOOL
STRIPS TO ENSURE DUST PROOFING , ETC. INCLUDING 4
TO 5 MM PLAIN FLOAT GLASS AS PER REQUIREMENTS
INCLUDING PROVIDING & FIXING ALUMINIUM
ANNODISED GROOVED HANDLE, LOCK STOPPER,
ALUMINIUM WINDOW FRAME AND SLIDING SHUTTERS
FRAME SECTIONS SHALL BE FROM IS APPROVRD MAKE
AND OF HEAVY DUTY SECTIONS . ETC ALL COMPLETE
FIXED GLASS LOUVERS
23.28 SMT RS.
4.30 DO AS SPECIFIED IN ITEM NO 4.2 BUT FOR ALUMINIUM
COLOURED ANNODISED OPENABLE LOUVERS
VENTIATIONS.
4.50 SMT RS.
PROVIDING, FEBRICATING WELDING AND ERECTING
STEEL WORK FOR SAFETY GRILLS ,RAILINGS, STAIR
RAILINGS ETC ETC , IN BUILT UP SECTIONS FRAMED
WORK INCLUDING CUTTING HOISTING, FIXING IN
600.00 KG RS.
PROPOSED 2ND FLOOR EXTENSION (S.P.University)
16
Creative Architects (Anand)
POSITION AND APPLYING A PRIMIE COAT OF RED LEAD
PAINT: IN M.S. HOLLOW SECTIONSM.S. FLATS,BARS ETC
RHS OR SHS, ANGLES, TEES, FLATS
TOTAL OF TEAK WOOD WORK RS.
ITEM NO:- 5 FINISHING WORK (PLASTERING & PAINTING)
THE RATES FOR PLASTERING SHALL INCLUDE USE OF ALL SCAFFOLDING, PREPARATION OF
SURFACE, RAKING OUT JOINTS CORNERS OR CHAMFERING, FORMING OF DRIP COURSE ETC.,
20mm X 10mm. AND GROOVES AS DIRECTED DURING AND WORKING AT ANY FLOOR.
THE RATES FOR PLASTERING SHALL ALSO INCLUDE USE OF APPROVED MAKE MORTAR PLASTICISER.
PLASTER ON R.C.C. ITEMS IN BRICK WALL SHALL BE MEASURED IN ITEM NO. G-1.
THE RATES SHALL BE APPLICABLE FOR ALL FLOORS.
SR.NO DESCRIPTION QUANTITY UNIT RATE AMOUNT
5.10 PROVIDIND AND APPLYING SMOOTH CEMENT PLASTER
IN CEMENT MORTAR 1:4 (1 CEMENT 2 FINE SAND AND 2
COARASE SAND) TO THE WALLS, BEAMS,
CEILINGS,STAIRS,COLUMNS,PARDI,BENDS,MOULDS,FOR
MING MAKING VATA FOR PARAPET
GROOVES,BENDS,VERTICAL HORIZONTAL,OR OBLIQUE
GROOVES INCLUDING SCAFFOLDING CURING &
FINISHING,SMOOTH WITH CEMENT SLURRY ETC.
COMPLETE DIRECTED BY SITE ENGINEER.
5.10
(A )
DO - AS ITEM NO.5.1 BUT FOR ALL SURFACES OF ALL
FLOORS 704.00 SMT RS.
DO - AS ITEM NO.5.1 BUT FOR ALL SURFACES OF ALL
FLOORS FOR OUTSIDE SMOOTH PLASTER 112.00 SMT RS.
5.10 (B)
PROVIDING AND APPLYING 20 MM. TH.BUTKI PLASTER IN TWO COATS AT ALL HEIGHTS.1) 1:4, 2)12 MM. TH.
BACKING COAT OF CEMENT MORTAR (1:3)AND
8MM.TH.FINISHING COAT OF C.M. (1:1)ROUGH FINISH
ALLINCLUDING MAKING GROOVES OR PATTAINFIRST
COAT AS PER INSTRUCTION OF ARCHITECT OR
INSTRUCTOR. ETC.COMPLETE AS DIRECTED.
70.00 SMT RS.
5.20 PROVIDING & APPLYING WHITE WASHING WITH BRUSH
INCLUDING LIME ON NEW PLASTERED SURFACE IN THREE
OR MORE COATS INCLUDING COST OF FEVICOL DDL
ETC. TO GIVE EVEN SHADE INCLUDING THOROUGHLY
BROOMING, SAND PAPERING. THE SURFACE TO
REMOVE ALL DIRT, DUST, MORTOR ETC COMPLETE AS
DIRECTED
278.00 SMT RS.
5.30
(A)
PROVIDING & APPLYING PLASTIC EMULSION PAINTING
ICLUDING APPLYING SYNTHETIC PUTTY TO MAKE
SURFACE SMOOTH ,RUBBING FINISHING THE SAME
SMOOTH INCLUDING APPLYING ONE COAT OF PRIMER
AND TWO COATS OR MORE COATS OF PLASTIC PAINT
TO GIVE AS EVEN SHADE INCLUDING THOROUGHLY
BROOMING.THE SURFACE TO REMOVE ALL DIRT,DUST,
MORTAR DROPS AND OTHER FOR
426.00 SMT RS.
PROPOSED 2ND FLOOR EXTENSION (S.P.University)
17
Creative Architects (Anand)
5.30(B) PROVIDING & APPLYING APEX PAINT FOR EXTERIOR
BUTKI PLASTERED SURFACES APPLYING ONE COAT OF
PRIMER AND TWO COATS OR MORE COATS OF PAPEX
PAINTS TO GIVE AS EVEN SHADE INCLUDING
THOROUGHLY BROOMING.THE SURFACE TO REMOVE
ALL DIRT,DUST, COLOUR DROPS AND OTHER FROM
FLOORS/ WALLS ETC. COMPLETE FINISHED.
70.00 SMT RS.
5.40 PROVIDING AND FIXING 300 MM WIDE & 24 GUAGE
CHICKEN WIRE NET ON THE JUNCTION OF BRICK WALL
AND R.C.C. MEMBERS INCLUDING SCREWING, GI
WASHER OF 26MM DIA AT EVERY 468MM ON BOTH SIDE
OF MESH AT ALTERNATE AS PER INSTRUCTION.
50.00 RMT RS.
TOTAL OF PLASTER & COLOUR WORK
RS.
ITEM NO:- 6. FLOORING WORK
A. THE RATE FOR SHALL INCLUDE USE AND WASTE OF ALL TEMPRARY FILLETS, SIDE FORMS,
TEMPLATES MOULDS, ETC., PREPARATION OF BASE AND SUB GRADEN BY TRIMMING, APPLYING
NEAT CEMENT SLURRY, MAKING ALL CONSTRUCTIONS AND EXPANSION JOINTS, MAKING V-
GROOVES, ROUNDING
B. BASIC RATE OF TILES MEANS FACTORY RATE PLUS ALL TAXES & TRANSPORTATION TO SITE.
C. CONTRACTOR SHALL GET APPROVAL FOR ALL LEVELS BY PLACING LEVEL STONE AT EVERY
OPENING AND CENTER OF ROOMS/AREAS AND SHALL BE APPROVED BY ENGINEER-IN-
CHARGE.BEFORE LAYING THE FINAL FLOOR OR PLASTER.
D. CONTRACTOR SHALL MAINTAIN ALL NECESSARY SLOP IN TOILET / PANTRY / TERRACE OR ANY
SPECIFIED AREA IN DRAWING.
E. COMPANY: FOR VITRIFIED TILES (FOR FLOORING/WALL CLADDING): SIDDARTH,OREVA, EURO
FOR CERAMIC/GLAZED TILES: SOMANI, KAJARIA, NITCO,SIDDARTH,ISI MAKE
ALL TILES (VITRIFIDE, CERAMIC, GLAZED ) FIRST QUALITY ONLY
IN TERRACE WITH KEEPING GRADIENT TOWARDS RAIN WATER SPOUT FOR EASY FLOW OF RAIN
WATER,
F. THE RATES SHALL BE APPLICABLE FOR ALL FLOORS.
SR.NO DESCRIPTION QUANTITY UNIT RATE AMOUNT
6.10 PROVIDING & FIXING 30MM TO 37MM GREEN POLISHED
KOTA STONE OF ONE SIDE PRE-POLISHED OF UNIFORM
TINT FOR FLOORING & OF SIZE 600MM X 600MM OR
450MM X 600M ON 50MM TK CEMENT MORTAR 1:6 IN
PROPER SLOPE INCLUDING DRESSING THE STONES,
RUBBING THE EDGE ON MS GRIN
6.1A DO - AS ITEM NO. 6.05 BUT FOR ALL FLOORS UP TO
SECOND FLOOR 41.00 SMT RS.
6.20 PROVIDING & FIXING GREEN KOTA STONE SKIRTING &
DADO FOR AVE.19 MM. TH. MACHINE CUT DOUBLE
POLISHED ETC COMP.
3.00 SMT RS.
6.09 PROVIDING & FIXING FOR AVE.35 MM. TH. MACHINE CUT
DOUBLE POLISHED KOTA STONE FOR PARTITIONS/DIVIDERS,
SHELVES ETC. EVEN THICKNESS FACIA & CHAMFERING
ETC. (ANY LENGTH - RATE SHALL BE COMMON FOR ALL
FLOORS)
5.00 SMT RS.
PROPOSED 2ND FLOOR EXTENSION (S.P.University)
18
Creative Architects (Anand)
8*14.29
P:44
PROVIDING AND LAYING WHITE GLAZED TILES ANY SIZE 6
MM THICK IN FLOORING, DADO, RISER OF STEPS AND
LANDING LAID ON A BED OF 12 MM THICK CEMENT
MORTAR 1 : 3 (1 CEMENT : 3 COARSE SAND) FINISHED
WITH FLUSH POINTING IN WHITE CEMENT.
49.00 SQ.
M RS.
6.18 PROVIDING & LAYING 1ST QUALITY MAT FINISH CERAMIC
TILES ANY COLOR ANY SIZE FOR FLOORS, SKIRTING &
WALL DADO WITH NECESSARY CEMENT SAND BASE
PLASTER / DADO INCLUDING CURING CLEANING ,
MAINTAINING (UP TO COMPLETION OF WORK.) IT SHALL
BE CONF
13.00 SMT RS.
6.19 PROVIDING & LAYING 1ST QUALITY MAT FINISH VITRIFIED
TILES ANY COLOR ,ANY SIZE FOR FLOORS, SKIRTING &
WALL DADO WITH NECESSARY CEMENT SAND BASE
PLASTER / DADO INCLUDING CURING CLEANING ,
MAINTAINING UP TO COMPLETION OF WORK
152.00 SMT RS.
6.25 PROVIDING AND LAYING TYPICAL INDIAN WATER
PROOFING ON TERRACE (I.E. PLACING BRICKS ON EDGE
WITH MORTAR ALL AROUND FOR WHOLE TERRACE
AREA.)INCLUDING CLEANING THE SURFACE OF SLAB WITH
WATER AND THAN APPLYING MINIMUM 20MM THICK
CEMENT MORTAR IN PROPER SLOP & ON THIS LAYING OF
BRICK ON EDGE (NOT LESS THEN HALF BRICK IN SIZE ) BED
IN 1:3 (1 CEMENT : 3 BRICK BATS), AVERAGE 115 MM. TH.
LAYING IN PROPER SLOPE TO DRAIN THE RAIN WATER PIPE,
FILLING THE JOINTS WITH THE SAME, FINISHING THE
SURFACE IN SMOOTH INCLUDING CEMENT VATA(10 CM x
10 CM) QUATER ROUND INCLUDING NEAT CEMENT
FINISHING WATERING ETC. COMPLETE GIVING 10 YEARS
GAURANTEE ON Rs. 20/- STAMP PAPER FOR THE WORK
DONE.
263.00 SMT RS.
TOTAL OF FLOORING WORK
RS.
ITEM NO:-7 . PLUMBING AND SANITATION WORK
(NOTE: THE RATES SHALL BE APPLICABLE FOR ALL FLOORS.)
SR.NO DESCRIPTION QUANTITY UNIT RATE AMOUNT
PROVIDING AND FIXING ON WALL FACE P.V.C. RAIN
WATER PIPE OF SPECIFIED DIA. ( 6 KG. / SCM
PRESSURE) WITH I.S.I. MARK INCLUDING NECESSARY
FITTINGS LIKE BEND, SHOE BEND ETC. WITH 16 TO 18
GAUGE G. I.CLAMPS AT EVERY 1.8 MT. INCLUDING
FILLING TH
8.00 -DO- AS PER ITEM NO. 8.1 FOR 100MM DIA. 31.00 RMT RS.
8.20 PROVIDING AND FIXING TO WALL CEILING AND FLOOR
UPVC TUBES (MEDIUM GRADE) OF THE FOLLWING
NOMINAL BORE TUBE FITTING AND CLAMPS INCLUDING
MAKING NECESSARY EXCAVATION AND MAKING GOOD
THE WALL, CEILING AND FLOOR.
8.2A (A) 15 MM 25.00 RMT RS.
8.2B (C) 25 MM 20.00 RMT RS.
8.2C (F) 50 MM 7.00 RMT RS.
8.30 PROVIDING AND FIXING CAST IRON SPIGOT AND SOCKET
SOIL WASTE AND VENTILATING PIPES OF THE FOLLOWING
NOMINAL SIZE.
PROPOSED 2ND FLOOR EXTENSION (S.P.University)
19
Creative Architects (Anand)
8.3A (I) 75 MM. DIA. 324 RMT NOTED BUT REDUCED 10.00 RMT RS.
8.3B (C) 100 MM DIA 8.00 RMT RS.
8.40 PROVIDING AND FIXING SCREWDOWN P.V.C. PIPES OF
PRINCE OR EQ. MAKE SOIL WASTE AND VENTILATING
PIPES OF THE FOLLOWING NOMINAL SIZE.
8.4A (I) 75 MM. DIA. 4.00 RMT RS.
8.4B (C) 100 MM DIA 1.00 RMT RS.
8.50 PROVIDING AND FIXING IN POSITION COWEL VENT TO
PIPES.
8.5A (I) 75 MM. DIA. 1.00 NO RS.
8.5B (II) 100 MM. DIA. 1.00 NO RS.
8.60 PROVIDING AND FIXING CAST IRON (SPUN) NAHNI TRAP
OF THE FOLLOWING NOMINAL DIAMTER OF SELF
CLEANING DESIGN WITH C.I SCREWED DOWN OR HINGED
GRATING INCLUDING COST OF CUTTING AND MAKING
GOOD THE WALLS AND FLOORS 100 MM. INLET AND 50
MM. OUTLET
4.00 NO RS.
8.80 PROVIDING AND FIXING WASH DOWN WATER CLOSET
EUROPEAN TYPE W.C. PAN WITH INTEGRAL “P” OR “S”
TRAP INCLUDING JOINTING THE TRAP WITH SOIL PIPE IN
CEMENT MORTAR 1 : 1 (1 CEMENT : 1 FIND SAND) (SEAT
AND COVER TO BE MEASURED AND PAID FOR
SEPARATELY) (A) VITREOU
1.00 NO RS.
8.90 PROVIDING AND FIXING WASHBASIN WITH C.I. BRACKETS
PAINTED WHITE INCLUDING PROVIDING AND FIXING S.S. BOTTLE TRAP, S.S. CONNECTING PIPES ,WEASTE
COUPLING ETC AND MAKING GOOD T (A) VITREOUS
CHINA : (II) FLAT BACK WASHBASIN 550 MM X 400 MM SIZE
(I) IN WH
2.00 NO RS.
8.10 PROVIDING AND FIXING KITCHEN SINK WITH C.I. OR M.S.
BRACKETS, PAINTED WHITE INCLUDING CUTTING HOLES IN
WALLS AND MAKING GOOD THE SAME BUT EXCLUDING
FITTING (C) SS NIRALI MAKE SINK (I) 600 MM X 450MM X
150 MM SIZE
1.00 NO RS.
8.11 PROVIDING AND FIXING SCREW DOWN BIB TAPS OF
FOLLWING SIZE (B) BRASS CHROMIUM PLATED SCREW
DOWN BIB TAP.
8.11A (I) 15 MM DIA 6.00 NO RS.
8.11B PROVIDING AND FIXING SCREW DOWN STOP TAP (A) 25
MM. DIA. 1.00 NO RS.
8.12 PROVIDING AND FIXING GUN METAL CHECK OR NON
RETURN FULLWAY WHEEL VALVE (C) 25 MM. DIA. 1.00 NO RS.
PROVIDING AND FIXING CHROMIUM PLATED BRASS HALF
TURN FLUSH COCK OF APPROVED QUALITY INCLUDING
FIXING IN PIPE LINE ETC. COMPLETE
8.13 (II) 25 MM DIA 1.00 NO RS.
PROVIDING AND FIXING BALL COCK OF APPROVED
QUALITY AS DIRECTED. (A) COPPER METAL
8.14 (II) 50 MM. DIA. 1.00 NO RS.
8.15 PROVIDING AND FIXING C.I. MANHOLE COVER 0.60M X
0.45M. SIZE HAVING WEIGHT NOT LESS THAN 35 KGS.
1.00 NO RS.
PROPOSED 2ND FLOOR EXTENSION (S.P.University)
20
Creative Architects (Anand)
8.16 PROVIDING AND FIXING G.I. RAIN WATER SPOUT OF 50
MM DIA AND 30 CM LENGHT. 1.00 NO RS.
8.17 PROVIDING AND LAYING (TWO LEVEL OR SLOPES) AND
JOINTING WITH STIFF MIXTURE OF CEMENT MORTAR IN
PROPORTION 1 : 1 SALT GLAZED STONEWARE PIPES
FOLLOWING NOMINAL INTERNAL DIAMETERS INCLUDING
TESTING OF PIPES AND JOINTS ETC. COMPLETE
8.17A (A) 100 MM DIA 2.00 RMT RS.
TOTAL OF PLUMBING & SANITATION WORK RS.
8 : DEMOLITION & DISMANTLING
1 .DEMOLISHION OF BRICK WORK INCLUDING PLASTER
2 DEMOLISHION OF R.C.C.WORK INCLUDING PLASTER WORK
3 ALL THE DEMOLISHED DEBRIES SHOULD BE DISPOSED BY THE CONTRACTOR OTHER THAN THE S.P.
UNIVERSITY PREMISES / SITES
4 THE RATES SHALL BE APPLICABLE FOR ALL FLOORS.
DEMOLITION OF R.C.C. WORKS. 50.75 SMT RS.
DEMOLITION OF BRICK WORKS.
44.12 SMT RS.
TOTAL OF DEMOLITION & DISMENTLING TOTAL : RS.