OZ MINERALSJP Morgan Melbourne Mining Day
Terry Burgess, Managing Director and CEO
Melbourne16 October 2009
OZMINERALS.COM
2
OZ MINERALS: CURRENT STATUS
Prominent Hill copper-gold
operation
Operation
Headquarters
AUSTRALIA
Cambodia
Exploration
MARKET STATISTICSASX-listed (OZL, S&P/ASX 100).3,121m issued shares.Average turnover; 30m shares/day.Share price; A$1.30Market capitalisation; A$4 billion.
Australia68%
UK12%
Europe2%
Asia5%
N America9%
Other4%
Institutions: 60%. Retail: 40%
SHAREHOLDER BASE
115,000 shareholders
• Prominent Hill ramping-up to name-plate capacity by end of 2009.
• Feasibility study on underground expansion at Prominent Hill underway.
• Exploration accelerated at Prominent Hill and in Cambodia.
• A$1 billion cash at 30 June 2009.
• US$105m convertible note–only debt.
3
COPPER: STRONG OUTLOOK
0
5
10
15
20
25
- 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000
GDP/Capita
kg/c
apita
Sth Korea China
Germany India
Japan China F'cast
COPPER INTENSITY OF USE
> Chinese and Indian demand for copper has a long way to go.
Source: World Bank, CRU
Forecast
COPPER SUPPLY/DEMAND FORECAST – LONG TERM
Source: ICSG; Brook Hunt; Citi
> Supply will be a challenge.
1998
2000
2002
2004
2006
2008
2010
e
2012
e
2014
e
2016
e
2018
e
2020
e
14
18
22
Copp
er (M
t)
Refined production Consumption demand
COPPER PRICE FORECAST – BROKER CONSENSUS
0
50
100
150
200
250
300
2009 2010 2011
USc
/lb
April
June
October
COPPER MINE PRODUCTION LOSSES FROM PLAN
'000
t
Source: Brook Hunt, Macquarie Research, June 2009
4
Location: South Australia, Australia.
Ownership: 100%.
First production: February 2009, completing ramp up.
Production: 2009E
85,000t to 90,000t contained copper, 60,000oz to 70,000oz gold.
C1 costs 2009E: US$0.70 – US$0.75/lb
Plant: 8Mtpa crush, grind, flotation.
Reserves: 72.4Mt @ 1.3% Cu, 0.6g/t Au, 3.2g/t Ag.(0.95Mt Cu, 1.4Moz Au, 7.5Moz Ag)
Resources: 289Mt @ 0.9% Cu, 0.8g/t Au, 2.5g/t Ag, (2.6Mt copper, 7.6Moz gold, 23Moz silver).
Mine: Open pit, mining contractor Thiess
Product: High grade (+50% Cu), high quality, copper concentrate
Estimated mine life:
9 years for Stage 1 open pit. Potential underground or additional open pit capable of supporting mine life and throughput expansion.
PROMINENT HILL – RAMPING UP TO NAME-PLATE CAPACITY
5
PROMINENT HILL SITE
TAILINGS DAM
PIT
ROM PAD
PROCESSING PLANT
VILLAGE
WESTERN COPPER ZONE
AREA
NORTHERN WASTE DUMP
SOUTHERN WASTE DUMP
6
Q3 PRODUCTION
Prominent Hill – Q3 2009SEPT QTR YTD 09
Ore milled 1,734,990t 4,252,385t
Silver 134.4g/t 103.1g/tContained metal in concentrate
Copper 28,316t 59,813t
Gold 21,091oz 45,009ozSilver 220,816oz 360,241oz
Mined Ore
Milled grade
Recovery
Copper concentrate producedConcentrate grade
Total concentrate sold
Waste
CopperGoldSilverCopperGold Silver
CopperGold
Copper
1,569,800t 6,197,617t8,877,954t 27,452,300t
55,156t 91,297t
2.0% 1.9%0.6g/t 0.6g/t4.9g/t 4.4g/t
81% 76%65% 60%80% 60%
51,115t 108,678t
55% 55%12.8g/t 12.9g/t
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
Feb Mar Apr May Jun Jul Aug Sep
Rec
over
y
PROMINENT HILL PLANT COPPER RECOVERY 2009
PROMINENT HILL OPEN PIT SHOWING MINING AREAS
7
CONCENTRATE: HIGH GRADE, COMPETITIVE DELIVERY TIMES
High quality concentrate> Currently highest grade copper concentrate traded on the open
market – 55% copper.
> Ideal for blending with lower grade concentrates.
> Grade will vary depending on ore type – 45% Cu LOM.
> Gold content is high but variable, 19g/tAu LOM.
> Low impurities – controlled by latest technology in fine grinding – IsaMill, Jameson Cell.
Logistics> 48 hours from mine to Port of Darwin.
> 8-10 days sailing to customers.
> Storage at Port of Darwin.
Marketing> 200,000 dmt concentrate per annum.
> Deliveries to China, Europe and India.
> Small domestic tonnages.
> Spot TC’s down significantly in 2009.
> 2009 H2 TC’s mostly at term 2009 contract rates, some deliveries at spot rates
First concentrate loaded into the storage shed.
8
PROMINENT HILL UNDERGROUND FEASIBILITY STUDY
Western Au
UNDERGROUND STUDIES
Western Cu resource
Central lower Cu-Au resource
9
PROMINENT HILL REGIONAL TARGETS
10
CAMBODIA – DRILLING IN PROGRESS
11
OZ MINERALS SUMMARY
> Prominent Hill ramping up successfully.
> Prominent Hill expansion studies recommenced.
> Priority regional underground targets being tested at Prominent Hill.
> Drilling in Cambodia recommenced and good results to date.
> Strong balance sheet.
Now one of the best positioned companies in the sector.
THANK YOU Investor contact:Natalie WorleyHead of Investor and External [email protected]