Ellll- RAILWAY Via E-filing March 23, 2015 Cynthia Brown Chief, Section of Administration Surface Transpo1tation Board Office of Proceedings 395 E Street, SW Washington, DC 20423 Courtney Biery Estes Senior General Attorney BNSF Railway Company P. 0. Box 961039 Fort Worth, TX 76161 2500 Lou Menk Drive Fort Worth, TX 76131 Telephone: 817-352-2351 Fax: 817-352-0211 Email: [email protected] Re: Finance Docket No. 35895, BNSF Railway Company - Lease Exemption - Union Pacific Railroad Company Finance Docket No. 35896, Union Pacific Railroad Company - Lease Exemption - BNSF Railway Company Dear Ms. Brown: On March I 0th, BNSF Railway Company ("BNSF") and Union Pacific Ra ilroad Company ("U P") filed Petitions for Exemption seeking exemptions to lease each other certain track (the "Jo int Trackage") for track a nd signal maintenance. Currently, the railroads' maintenance obli gat ions on the Joint Trackage are disjointed with no geographic consistency. The new lease agreement will realign and consolidate maintenance obligations so that each railroad will be responsible for maintaining a contiguous line of track and maintenan ce can be performed with fewer outages and less impact on shippers. The railroads have req ue sted ex pedited treatment of the petitions so that the necessary maintenance can begin as soon possible. With expedited co nsideration, BNSF ca n plan for and deploy maintenan ce this summer. BNSF has ordered mater ials and is ready to make the necessa1y repairs and to beg in long-term capital improvement projects. Expedited consideration by the Board will ensure that we can begin work on the line as soon as soon as possible so that the maintenance work can be completed during the 20 15 construction seaso n. BNSF urges the Board to issue a decision exempting the proposed leases from the prior approval requirement as soon as possible. BNSF fmther requests the Boa rd vacate the requirements of 49 CFR l 12 I .4(e) and order that the decision be effective immediately upon issuance or as soon thereafter as possible. Sincerely, Co urtney B. Estes 238020 238021 ENTERED Office of Proceedings March 23, 2015 Part of Public Record
Transcript
Page 1: P. 0. Box RAILWAY · P. 0. Box 961039 Fort Worth, TX 76161 2500 Lou Menk Drive Fort Worth, TX 76131 Telephone: 817-352-2351 Fax: 817-352-0211 Email: Courtney.Estes@bnsf.com Re: Finance

Ellll-RAILWAY

Via E-filing

March 23, 2015

Cynthia Brown Chief, Section of Administration Surface Transpo1tation Board Office of Proceedings 395 E Street, SW Washington, DC 20423

Courtney Biery Estes Senior General Attorney

BNSF Railway Company P. 0. Box 961039 Fort Worth, TX 76161

2500 Lou Menk Drive Fort Worth, TX 76131

Telephone: 817-352-2351 Fax: 817-352-0211 Email: [email protected]

Re: Finance Docket No. 35895, BNSF Railway Company - Lease Exemption - Union Pacific Railroad Company Finance Docket No. 35896, Union Pacific Railroad Company - Lease Exemption -BNSF Railway Company

Dea r Ms. Brown:

On March I 0th, BNSF Railway Company ("BNS F") and Union Pacific Railroad Company ("UP") filed Petitions for Exemption seeking exemptions to lease each other certain track (the "Jo int Trackage") for track and s ignal maintenance. Currently, the railroads' maintenance obligations on the Joint Trackage are disjointed with no geographic consistency. The new lease agreement will realign and consolidate maintenance obligations so that each railroad will be responsible for maintaining a contiguous line of track and maintenance can be performed with fewe r outages and less impact on shippers.

The rail roads have requested expedited treatment of the petitions so that the necessary maintenance can begin as soon possible. With expedited consideration, BNSF can plan for and deploy maintenance this summer. BNSF has ordered materials and is ready to make the necessa1y repairs and to begin long-term capita l improvement projects. Expedited consideration by the Board will ensure that we can begin work on the line as soon as soon as possible so that the maintenance work can be completed during the 20 15 construction season.

BNSF urges the Board to issue a decision exempting the proposed leases from the prior approval requirement as soon as possible. BNSF fmther requests the Board vacate the requirements of 49 CFR l 12 I .4(e) and order that the decision be effective immediately upon issuance or as soon thereafter as possible.

Sincerely,

Courtney B. Estes

238020 238021 ENTERED Office of Proceedings March 23, 2015 Part of Public Record