Date post: | 13-Sep-2015 |
Category: |
Documents |
Upload: | justin-carder |
View: | 1,286 times |
Download: | 3 times |
SEATTLE FIRE STATION 22
CITY OF SEATTLEProject Manager, FAS-CDCM: David JacksonFAS-CDCM: David KunselmanSFD Liason: Charles CordovaPublic Art Liason: Kelly Pajek
DESIGN TEAMArchitect: Weinstein A+UStructural Engineer: Swensen Say FagetMechanical Engineer: The Greenbusch GroupLandscape Architect: Murase AssociatesCivil Engineer: LPD EngineeringElectrical Engineer: SparlingLighting Design: Blanca LightingAlerting & Signalization: Tetra Tech
Seattle Design Commission Presentation 2 60% Review January 15, 2015
2Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
SITE LOCATION
FS22
UNIVERSITY DISTRICTWALLINGFORD
ROANOKE PARK
EASTLAKE
CAPITOL HILL
LAKE UNION
TO DOWNTOWN
TO MERCER ISLAND& THE EAST SIDE
TO THE U-DISTRICT
MONTLAKE
WESTLAKE
Fire Station 22PRINT DATE:6/17/14 LOCATION:Seattle, WA
First Floor Plan121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
UP
UP
UP
41'-6
"29
'5'
14'-5
"
104'
67'
24'
10'
77'-6" 19'-6"
(E) LONDONPLANE TREE, TBD
STATEPATROL
BUILDING
E ROANOKE STREET
IN
OUTIN
8'-0
"9'
-0"
40'-2"
39'-5"
170'
165'
160'
155'
L S Barrierfree
S S
RO
OF
OV
ER
HA
NG
6' SIDEWALK
TRASHA: 40 sq ft
ENGINE BAYA: 2,607 sq ft
DECONA: 132 sq ft
ENG. STOR.A: 76 sq ft
STATIONA: 315 sq ft
LOBBYA: 157 sq ft
OFFICERA: 346 sq ft
REST.A: 56 sq ft
HOSEA: 64 sq ft
EMSA: 57 sq ft
MAINT.A: 144 sq ft
JANA: 36 sq ft
H. WASHA: 84 sq ft
ELEVA: 60 sq ft
BUNK GEARA: 259 sq ft
REST.A: 61 sq ft
RECV.A: 43 sq ft
DN
10' 14'
ENGINE
(FUTURE) INCIDENTCOMMAND UNIT
PUBLIC PLAZA
N0 8' 16' 32'
901 E. ROANOKE STREET
PORTAGE BAY
INTERLAKEN PARK
GAS WORKS PARK
VOLUNTEER PARK
WASHINGTON PARK
ARBORETUM
3Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
COMMUNITY OPEN HOUSESATURDAY, JANUARY 10, 2015
4Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
WITHOUT SR-520 LID
Fire Station 22PRINT DATE:6/17/14 LOCATION:Seattle, WA
First Floor Plan121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
UP
UP
UP
41'-6
"29
'5'
14'-5
"
104'
67'
24'
10'
77'-6" 19'-6"
(E) LONDONPLANE TREE, TBD
STATEPATROL
BUILDING
E ROANOKE STREET
IN
OUTIN
8'-0
"9'
-0"
40'-2"
39'-5"
170'
165'
160'
155'
L S Barrierfree
S S
RO
OF
OV
ER
HA
NG
6' SIDEWALK
TRASHA: 40 sq ft
ENGINE BAYA: 2,607 sq ft
DECONA: 132 sq ft
ENG. STOR.A: 76 sq ft
STATIONA: 315 sq ft
LOBBYA: 157 sq ft
OFFICERA: 346 sq ft
REST.A: 56 sq ft
HOSEA: 64 sq ft
EMSA: 57 sq ft
MAINT.A: 144 sq ft
JANA: 36 sq ft
H. WASHA: 84 sq ft
ELEVA: 60 sq ft
BUNK GEARA: 259 sq ft
REST.A: 61 sq ft
RECV.A: 43 sq ft
DN
10' 14'
ENGINE
(FUTURE) INCIDENTCOMMAND UNIT
PUBLIC PLAZA
N0 8' 16' 32'
GREEN SPACEDIAGRAM
FS22 SITE
ROANOKE PARK
INTERLAKENPARK
ROGERS PLAY-
GROUND SEATTLE PREP. SCHOOL
BAGLEY VIEWPT.
HARVARD-MILLER/ ROANOKE ANNEX
I-5
SR-520
E. ROANOKE ST.
10TH
AV
E. E
.
DELMAR AVE. E
5Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
WITH SR-520 LID
GREEN SPACEDIAGRAM
ROANOKE PARK
INTERLAKENPARK
ROGERS PLAY-
GROUND
BAGLEY VIEWPT.
I-5
SR-520DELMAR AVE. E
SR-520 LID
FS22 SITE
Fire Station 22PRINT DATE:6/17/14 LOCATION:Seattle, WA
First Floor Plan121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
UP
UP
UP
41'-6
"29
'5'
14'-5
"
104'
67'
24'
10'
77'-6" 19'-6"
(E) LONDONPLANE TREE, TBD
STATEPATROL
BUILDING
E ROANOKE STREET
IN
OUTIN
8'-0
"9'
-0"
40'-2"
39'-5"
170'
165'
160'
155'
L S Barrierfree
S S
RO
OF
OV
ER
HA
NG
6' SIDEWALK
TRASHA: 40 sq ft
ENGINE BAYA: 2,607 sq ft
DECONA: 132 sq ft
ENG. STOR.A: 76 sq ft
STATIONA: 315 sq ft
LOBBYA: 157 sq ft
OFFICERA: 346 sq ft
REST.A: 56 sq ft
HOSEA: 64 sq ft
EMSA: 57 sq ft
MAINT.A: 144 sq ft
JANA: 36 sq ft
H. WASHA: 84 sq ft
ELEVA: 60 sq ft
BUNK GEARA: 259 sq ft
REST.A: 61 sq ft
RECV.A: 43 sq ft
DN
10' 14'
ENGINE
(FUTURE) INCIDENTCOMMAND UNIT
PUBLIC PLAZA
N0 8' 16' 32'
HARVARD-MILLER/ ROANOKE ANNEX
10TH
AV
E. E
.
SEATTLE PREP. SCHOOL
E. ROANOKE ST.
6Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
SITE CONTEXT
Looking east at sidewalk along E. Roanoke St.Looking southeast along E. Roanoke St.Looking southwest along E. Roanoke St.Broadway E looking south.
Panoramic view of the site looking southwest from 10th Ave E and E Roanoke St.
7Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
NEIGHBORHOOD CONTEXT
Panoramic view of the site looking northwest from 10th Ave Bridge.
Roanoke Park.Front yard of FS22 looking north toward Roanoke Park.
From corner of E Roanoke & 10th Ave E looking toward Roanoke Park.
Residence, Roanoke Park neighborhood.
8Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
Roanoke Area 33
Area DescriptionThe Roanoke area comprises three subareas: the I-5 Crossing, the 10th and Delmar lid and Bagley Viewpoint, and the Delmar Drive East to Boyer Avenue East pedestrian connection. The area is characterized by both residential and commercial communities, including the nationally designated Roanoke Park Historic District and North Capitol Hill. Set on a high ridge, the area has panoramic views from Bagley Viewpoint to the east of Portage Bay, the University of Washington, Lake Washington and the Cascade Mountains; and from the 10th Avenue East bridge and the I-5 Crossing to the west of the Olympic Mountains, downtown Seattle and Lake Union. Three busy streets converge where the new lid will be located: 10th Avenue East, East Roanoke Street and Delmar Drive East. Steep grades act as both opportunities for exercise and views, while at the same time presenting obstacles to mobility for some users. The area also has two schools: The Option Program at Seward (TOPS) School and Seattle Preparatory High School.
Roanoke Park and Interlaken Park are important components of the Olmsted brothers historic parks and green boulevards plan. The SR 520 project has the opportunity to enhance and reconnect these green spaces with the 10th and Delmar lid and by providing safe and memorable connections to Portage Bay and Lake Union.
Roanoke Area
PortageBay Bridge Montlake Area
West ApproachBridge
N
Roanoke Subareas
10th and Delmar Lid andBagley Viewpoint Subarea
Delmar Drive East to Boyer Avenue Connection Subarea
I-5 Crossing Subarea
Refined baseline design with Design Preferences based on community input (July 2012)
Study area
ROANOkE AREA
BagleyViewpoint
I-5Crossing
Baseline Design
Supporting graphics
Delmar Lid
General-purpose lane (SR 520)General-purpose lane (local)Transit/HOV laneOn- and off-rampsBicycle and pedestrian path
Key
N
FS22
Preliminary design of the SR-520 lid project adjacent to 10th Avenue E:
Emphasizes the sense of threshold between Roanoke Park and North Capitol Hill.
Design not yet finalized. Construction schedule not yet
established.
Image credit: WSDOT Seattle Community Design Process Final Report, July 2012.
SR-520 LID PROJECTROANOKE AREA DESIGN
9Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
Fire Station 22PRINT DATE:6/17/14 LOCATION:Seattle, WA
First Floor Plan121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
UP
UP
UP
41'-6
"29
'5'
14'-5
"
104'
67'
24'
10'
77'-6" 19'-6"
(E) LONDONPLANE TREE, TBD
STATEPATROL
BUILDING
E ROANOKE STREET
IN
OUTIN
8'-0
"9'
-0"
40'-2"
39'-5"
170'
165'
160'
155'
L S Barrierfree
S S
RO
OF
OV
ER
HA
NG
6' SIDEWALK
TRASHA: 40 sq ft
ENGINE BAYA: 2,607 sq ft
DECONA: 132 sq ft
ENG. STOR.A: 76 sq ft
STATIONA: 315 sq ft
LOBBYA: 157 sq ft
OFFICERA: 346 sq ft
REST.A: 56 sq ft
HOSEA: 64 sq ft
EMSA: 57 sq ft
MAINT.A: 144 sq ft
JANA: 36 sq ft
H. WASHA: 84 sq ft
ELEVA: 60 sq ft
BUNK GEARA: 259 sq ft
REST.A: 61 sq ft
RECV.A: 43 sq ft
DN
10' 14'
ENGINE
(FUTURE) INCIDENTCOMMAND UNIT
PUBLIC PLAZA
N0 8' 16' 32'
CONCEPTUAL NEIGHBORHOOD CONTEXT& SITE ACTIVITY DIAGRAM
E. ROANOKE ST.
APPARATUS BAY
10TH
AV
E. E
.
PM
NOON
AMFRONT APRON
REAR APRON
URBAN BOSQUE PUBLIC PLAZA
COMMUNITY VIEW ARC
STATION OFFICE
ROANOKE PARK
ZONE OF BAD BEHAVIOR
10Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
SITE PLANSITE PLAN
121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
Fire Station 22PRINT DATE:11/3/14 LOCATION:Seattle, WA
Site Plan
8'-3
"23
'-3 5
/8"
9'-0
"6'
-0"
4'-6
1/2
"40
'-5"
10'-0" 15'-0"
111'-11 5/8"
15'-0" 10'-0"
ORIGIN
170'
165'
160'
N
SCALE: 1/16" = 1'-0"
0 8' 16' 32'
APPARATUS BAY
HOSETOWER
DECK(BELOW)
E ROANOKE STREET
FRONT APRON
PUBLIC PLAZA
PARKING - 5 SPACES
MAIN ENTRY
REAR APRON
IN OUT
BASEMENT + 2-STORY SUPPORT SPACES & LIVING QUARTERS
WSDOT PROPERTY
STATE PATROL
SITE AREA = 14,625 SQ.FT
Fire Station 22PRINT DATE:6/17/14 LOCATION:Seattle, WA
First Floor Plan121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
UP
UP
UP
41'-6
"29
'5'
14'-5
"
104'
67'
24'
10'
77'-6" 19'-6"
(E) LONDONPLANE TREE, TBD
STATEPATROL
BUILDING
E ROANOKE STREET
IN
OUTIN
8'-0
"9'
-0"
40'-2"
39'-5"
170'
165'
160'
155'
L S Barrierfree
S S
RO
OF
OV
ER
HA
NG
6' SIDEWALK
TRASHA: 40 sq ft
ENGINE BAYA: 2,607 sq ft
DECONA: 132 sq ft
ENG. STOR.A: 76 sq ft
STATIONA: 315 sq ft
LOBBYA: 157 sq ft
OFFICERA: 346 sq ft
REST.A: 56 sq ft
HOSEA: 64 sq ft
EMSA: 57 sq ft
MAINT.A: 144 sq ft
JANA: 36 sq ft
H. WASHA: 84 sq ft
ELEVA: 60 sq ft
BUNK GEARA: 259 sq ft
REST.A: 61 sq ft
RECV.A: 43 sq ft
DN
10' 14'
ENGINE
(FUTURE) INCIDENTCOMMAND UNIT
PUBLIC PLAZA
N0 8' 16' 32'
6-0
23
-3 5
/8
9-0
45
-9 1
/2
8-4
112-425-0 25-0
11Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
FIRST FLOOR PLAN
Fire Station 22PRINT DATE:6/17/14 LOCATION:Seattle, WA
First Floor Plan121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
UP
UP
UP
41'-6
"29
'5'
14'-5
"
104'
67'
24'
10'
77'-6" 19'-6"
(E) LONDONPLANE TREE, TBD
STATEPATROL
BUILDING
E ROANOKE STREET
IN
OUTIN
8'-0
"9'
-0"
40'-2"
39'-5"
170'
165'
160'
155'
L S Barrierfree
S S
RO
OF
OV
ER
HA
NG
6' SIDEWALK
TRASHA: 40 sq ft
ENGINE BAYA: 2,607 sq ft
DECONA: 132 sq ft
ENG. STOR.A: 76 sq ft
STATIONA: 315 sq ft
LOBBYA: 157 sq ft
OFFICERA: 346 sq ft
REST.A: 56 sq ft
HOSEA: 64 sq ft
EMSA: 57 sq ft
MAINT.A: 144 sq ft
JANA: 36 sq ft
H. WASHA: 84 sq ft
ELEVA: 60 sq ft
BUNK GEARA: 259 sq ft
REST.A: 61 sq ft
RECV.A: 43 sq ft
DN
10' 14'
ENGINE
(FUTURE) INCIDENTCOMMAND UNIT
PUBLIC PLAZA
N0 8' 16' 32'
LOBBYNIGHTBUNK
BATHOFFICERBUNKMAINT.BUNK GEAR
DECONTRASH/RECYCL.
APPARATUS BAY
ENGINE STOR.
EMS BATHBATH JAN
HOSEWASH
HOSETOWER
PUBLIC PLAZA
STATIONOFFICE
Fire Station 22PRINT DATE:6/17/14 LOCATION:Seattle, WA
First Floor Plan121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
UP
UP
UP
41'-6
"29
'5'
14'-5
"
104'
67'
24'
10'
77'-6" 19'-6"
(E) LONDONPLANE TREE, TBD
STATEPATROL
BUILDING
E ROANOKE STREET
IN
OUTIN
8'-0
"9'
-0"
40'-2"
39'-5"
170'
165'
160'
155'
L S Barrierfree
S S
RO
OF
OV
ER
HA
NG
6' SIDEWALK
TRASHA: 40 sq ft
ENGINE BAYA: 2,607 sq ft
DECONA: 132 sq ft
ENG. STOR.A: 76 sq ft
STATIONA: 315 sq ft
LOBBYA: 157 sq ft
OFFICERA: 346 sq ft
REST.A: 56 sq ft
HOSEA: 64 sq ft
EMSA: 57 sq ft
MAINT.A: 144 sq ft
JANA: 36 sq ft
H. WASHA: 84 sq ft
ELEVA: 60 sq ft
BUNK GEARA: 259 sq ft
REST.A: 61 sq ft
RECV.A: 43 sq ft
DN
10' 14'
ENGINE
(FUTURE) INCIDENTCOMMAND UNIT
PUBLIC PLAZA
N0 8' 16' 32'0 4 8
12Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
SECOND FLOOR PLAN
APPARATUS BAY BELOW
PHYS.TRAINING
BUNK
BATH BATH
BUNKBUNKDAYRM
LAUND. HOSETOWER
BEANERY
DECK
Fire Station 22PRINT DATE:6/17/14 LOCATION:Seattle, WA
First Floor Plan121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
UP
UP
UP
41'-6
"29
'5'
14'-5
"
104'
67'
24'
10'
77'-6" 19'-6"
(E) LONDONPLANE TREE, TBD
STATEPATROL
BUILDING
E ROANOKE STREET
IN
OUTIN
8'-0
"9'
-0"
40'-2"
39'-5"
170'
165'
160'
155'
L S Barrierfree
S S
RO
OF
OV
ER
HA
NG
6' SIDEWALK
TRASHA: 40 sq ft
ENGINE BAYA: 2,607 sq ft
DECONA: 132 sq ft
ENG. STOR.A: 76 sq ft
STATIONA: 315 sq ft
LOBBYA: 157 sq ft
OFFICERA: 346 sq ft
REST.A: 56 sq ft
HOSEA: 64 sq ft
EMSA: 57 sq ft
MAINT.A: 144 sq ft
JANA: 36 sq ft
H. WASHA: 84 sq ft
ELEVA: 60 sq ft
BUNK GEARA: 259 sq ft
REST.A: 61 sq ft
RECV.A: 43 sq ft
DN
10' 14'
ENGINE
(FUTURE) INCIDENTCOMMAND UNIT
PUBLIC PLAZA
N0 8' 16' 32'
Fire Station 22PRINT DATE:6/17/14 LOCATION:Seattle, WA
First Floor Plan121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
UP
UP
UP
41'-6
"29
'5'
14'-5
"
104'
67'
24'
10'
77'-6" 19'-6"
(E) LONDONPLANE TREE, TBD
STATEPATROL
BUILDING
E ROANOKE STREET
IN
OUTIN
8'-0
"9'
-0"
40'-2"
39'-5"
170'
165'
160'
155'
L S Barrierfree
S S
RO
OF
OV
ER
HA
NG
6' SIDEWALK
TRASHA: 40 sq ft
ENGINE BAYA: 2,607 sq ft
DECONA: 132 sq ft
ENG. STOR.A: 76 sq ft
STATIONA: 315 sq ft
LOBBYA: 157 sq ft
OFFICERA: 346 sq ft
REST.A: 56 sq ft
HOSEA: 64 sq ft
EMSA: 57 sq ft
MAINT.A: 144 sq ft
JANA: 36 sq ft
H. WASHA: 84 sq ft
ELEVA: 60 sq ft
BUNK GEARA: 259 sq ft
REST.A: 61 sq ft
RECV.A: 43 sq ft
DN
10' 14'
ENGINE
(FUTURE) INCIDENTCOMMAND UNIT
PUBLIC PLAZA
N0 8' 16' 32'0 4 8
13Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
Fire Station 22PRINT DATE:6/17/14 LOCATION:Seattle, WA
First Floor Plan121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
UP
UP
UP
41'-6
"29
'5'
14'-5
"
104'
67'
24'
10'
77'-6" 19'-6"
(E) LONDONPLANE TREE, TBD
STATEPATROL
BUILDING
E ROANOKE STREET
IN
OUTIN
8'-0
"9'
-0"
40'-2"
39'-5"
170'
165'
160'
155'
L S Barrierfree
S S
RO
OF
OV
ER
HA
NG
6' SIDEWALK
TRASHA: 40 sq ft
ENGINE BAYA: 2,607 sq ft
DECONA: 132 sq ft
ENG. STOR.A: 76 sq ft
STATIONA: 315 sq ft
LOBBYA: 157 sq ft
OFFICERA: 346 sq ft
REST.A: 56 sq ft
HOSEA: 64 sq ft
EMSA: 57 sq ft
MAINT.A: 144 sq ft
JANA: 36 sq ft
H. WASHA: 84 sq ft
ELEVA: 60 sq ft
BUNK GEARA: 259 sq ft
REST.A: 61 sq ft
RECV.A: 43 sq ft
DN
10' 14'
ENGINE
(FUTURE) INCIDENTCOMMAND UNIT
PUBLIC PLAZA
N0 8' 16' 32'0 4 8
PV PANELS
GREEN ROOF
MECHANICAL HOSETOWER
ROOF PLAN
Fire Station 22PRINT DATE:6/17/14 LOCATION:Seattle, WA
First Floor Plan121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
UP
UP
UP
41'-6
"29
'5'
14'-5
"
104'
67'
24'
10'
77'-6" 19'-6"
(E) LONDONPLANE TREE, TBD
STATEPATROL
BUILDING
E ROANOKE STREET
IN
OUTIN
8'-0
"9'
-0"
40'-2"
39'-5"
170'
165'
160'
155'
L S Barrierfree
S S
RO
OF
OV
ER
HA
NG
6' SIDEWALK
TRASHA: 40 sq ft
ENGINE BAYA: 2,607 sq ft
DECONA: 132 sq ft
ENG. STOR.A: 76 sq ft
STATIONA: 315 sq ft
LOBBYA: 157 sq ft
OFFICERA: 346 sq ft
REST.A: 56 sq ft
HOSEA: 64 sq ft
EMSA: 57 sq ft
MAINT.A: 144 sq ft
JANA: 36 sq ft
H. WASHA: 84 sq ft
ELEVA: 60 sq ft
BUNK GEARA: 259 sq ft
REST.A: 61 sq ft
RECV.A: 43 sq ft
DN
10' 14'
ENGINE
(FUTURE) INCIDENTCOMMAND UNIT
PUBLIC PLAZA
N0 8' 16' 32'
14Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
SUSTAINABILITY DIAGRAMGOAL: LEED PLATINUMMINIMUM: LEED GOLD
Fire Station 22PRINT DATE:6/17/14 LOCATION:Seattle, WA
First Floor Plan121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
UP
UP
UP
41'-6
"29
'5'
14'-5
"
104'
67'
24'
10'
77'-6" 19'-6"
(E) LONDONPLANE TREE, TBD
STATEPATROL
BUILDING
E ROANOKE STREET
IN
OUTIN
8'-0
"9'
-0"
40'-2"
39'-5"
170'
165'
160'
155'
L S Barrierfree
S S
RO
OF
OV
ER
HA
NG
6' SIDEWALK
TRASHA: 40 sq ft
ENGINE BAYA: 2,607 sq ft
DECONA: 132 sq ft
ENG. STOR.A: 76 sq ft
STATIONA: 315 sq ft
LOBBYA: 157 sq ft
OFFICERA: 346 sq ft
REST.A: 56 sq ft
HOSEA: 64 sq ft
EMSA: 57 sq ft
MAINT.A: 144 sq ft
JANA: 36 sq ft
H. WASHA: 84 sq ft
ELEVA: 60 sq ft
BUNK GEARA: 259 sq ft
REST.A: 61 sq ft
RECV.A: 43 sq ft
DN
10' 14'
ENGINE
(FUTURE) INCIDENTCOMMAND UNIT
PUBLIC PLAZA
N0 8' 16' 32'
VEGETATED ROOF
HOSE TOWER
PV PANELS65% OF THE ELECTRICAL REQUIREMENTS
UNDERGROUND CISTERNRAINWATER HARVESTING WILL PROVIDE 100% OF THE NON-POTABLE WATER NEEDS
PERMEABLE PAVING
PERMEABLE PAVERS
STORMWATER BIO-RETENTION
CONCRETE FRONT APRON
CONCRETE REAR APRON
E. ROANOKE STREET
GEOTHERMAL HEAT WELL (12)PRIMARY HEAT FOR HEATING & COOLING OF DOMESTIC HOT WATER
15Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
NORTH ELEVATIONROANOKE STREET
Fire Station 22PRINT DATE:6/17/14 LOCATION:Seattle, WA
First Floor Plan121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
UP
UP
UP
41'-6
"29
'5'
14'-5
"
104'
67'
24'
10'
77'-6" 19'-6"
(E) LONDONPLANE TREE, TBD
STATEPATROL
BUILDING
E ROANOKE STREET
IN
OUTIN
8'-0
"9'
-0"
40'-2"
39'-5"
170'
165'
160'
155'
L S Barrierfree
S S
RO
OF
OV
ER
HA
NG
6' SIDEWALK
TRASHA: 40 sq ft
ENGINE BAYA: 2,607 sq ft
DECONA: 132 sq ft
ENG. STOR.A: 76 sq ft
STATIONA: 315 sq ft
LOBBYA: 157 sq ft
OFFICERA: 346 sq ft
REST.A: 56 sq ft
HOSEA: 64 sq ft
EMSA: 57 sq ft
MAINT.A: 144 sq ft
JANA: 36 sq ft
H. WASHA: 84 sq ft
ELEVA: 60 sq ft
BUNK GEARA: 259 sq ft
REST.A: 61 sq ft
RECV.A: 43 sq ft
DN
10' 14'
ENGINE
(FUTURE) INCIDENTCOMMAND UNIT
PUBLIC PLAZA
N0 8' 16' 32'0 4 8
16Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
EAST ELEVATION10TH AVENUE
Fire Station 22PRINT DATE:6/17/14 LOCATION:Seattle, WA
First Floor Plan121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
UP
UP
UP
41'-6
"29
'5'
14'-5
"
104'
67'
24'
10'
77'-6" 19'-6"
(E) LONDONPLANE TREE, TBD
STATEPATROL
BUILDING
E ROANOKE STREET
IN
OUTIN
8'-0
"9'
-0"
40'-2"
39'-5"
170'
165'
160'
155'
L S Barrierfree
S S
RO
OF
OV
ER
HA
NG
6' SIDEWALK
TRASHA: 40 sq ft
ENGINE BAYA: 2,607 sq ft
DECONA: 132 sq ft
ENG. STOR.A: 76 sq ft
STATIONA: 315 sq ft
LOBBYA: 157 sq ft
OFFICERA: 346 sq ft
REST.A: 56 sq ft
HOSEA: 64 sq ft
EMSA: 57 sq ft
MAINT.A: 144 sq ft
JANA: 36 sq ft
H. WASHA: 84 sq ft
ELEVA: 60 sq ft
BUNK GEARA: 259 sq ft
REST.A: 61 sq ft
RECV.A: 43 sq ft
DN
10' 14'
ENGINE
(FUTURE) INCIDENTCOMMAND UNIT
PUBLIC PLAZA
N0 8' 16' 32'0 4 8
17Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
WEST ELEVATIONFire Station 22PRINT DATE:6/17/14 LOCATION:Seattle, WA
First Floor Plan121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
UP
UP
UP
41'-6
"29
'5'
14'-5
"
104'
67'
24'
10'
77'-6" 19'-6"
(E) LONDONPLANE TREE, TBD
STATEPATROL
BUILDING
E ROANOKE STREET
IN
OUTIN
8'-0
"9'
-0"
40'-2"
39'-5"
170'
165'
160'
155'
L S Barrierfree
S S
RO
OF
OV
ER
HA
NG
6' SIDEWALK
TRASHA: 40 sq ft
ENGINE BAYA: 2,607 sq ft
DECONA: 132 sq ft
ENG. STOR.A: 76 sq ft
STATIONA: 315 sq ft
LOBBYA: 157 sq ft
OFFICERA: 346 sq ft
REST.A: 56 sq ft
HOSEA: 64 sq ft
EMSA: 57 sq ft
MAINT.A: 144 sq ft
JANA: 36 sq ft
H. WASHA: 84 sq ft
ELEVA: 60 sq ft
BUNK GEARA: 259 sq ft
REST.A: 61 sq ft
RECV.A: 43 sq ft
DN
10' 14'
ENGINE
(FUTURE) INCIDENTCOMMAND UNIT
PUBLIC PLAZA
N0 8' 16' 32'0 4 8
18Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
FENESTRATION REQUIREMENTSFIRST FLOOR PLAN
Fire Station 22PRINT DATE:6/17/14 LOCATION:Seattle, WA
First Floor Plan121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
UP
UP
UP
41'-6
"29
'5'
14'-5
"
104'
67'
24'
10'
77'-6" 19'-6"
(E) LONDONPLANE TREE, TBD
STATEPATROL
BUILDING
E ROANOKE STREET
IN
OUTIN
8'-0
"9'
-0"
40'-2"
39'-5"
170'
165'
160'
155'
L S Barrierfree
S S
RO
OF
OV
ER
HA
NG
6' SIDEWALK
TRASHA: 40 sq ft
ENGINE BAYA: 2,607 sq ft
DECONA: 132 sq ft
ENG. STOR.A: 76 sq ft
STATIONA: 315 sq ft
LOBBYA: 157 sq ft
OFFICERA: 346 sq ft
REST.A: 56 sq ft
HOSEA: 64 sq ft
EMSA: 57 sq ft
MAINT.A: 144 sq ft
JANA: 36 sq ft
H. WASHA: 84 sq ft
ELEVA: 60 sq ft
BUNK GEARA: 259 sq ft
REST.A: 61 sq ft
RECV.A: 43 sq ft
DN
10' 14'
ENGINE
(FUTURE) INCIDENTCOMMAND UNIT
PUBLIC PLAZA
N0 8' 16' 32'
MAINT.BUNK GEAR
DECONTRASH
APPARATUS BAY
ENGINE STOR.
EMS BATHBATH JAN
HOSEWASH
HOSETOWER
NIGHTBUNK
BATHOFFICERBUNKLOBBY
PUBLIC PLAZA
STATIONOFFICE
19Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
SECOND FLOOR PLAN
Fire Station 22PRINT DATE:6/17/14 LOCATION:Seattle, WA
First Floor Plan121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
UP
UP
UP
41'-6
"29
'5'
14'-5
"
104'
67'
24'
10'
77'-6" 19'-6"
(E) LONDONPLANE TREE, TBD
STATEPATROL
BUILDING
E ROANOKE STREET
IN
OUTIN
8'-0
"9'
-0"
40'-2"
39'-5"
170'
165'
160'
155'
L S Barrierfree
S S
RO
OF
OV
ER
HA
NG
6' SIDEWALK
TRASHA: 40 sq ft
ENGINE BAYA: 2,607 sq ft
DECONA: 132 sq ft
ENG. STOR.A: 76 sq ft
STATIONA: 315 sq ft
LOBBYA: 157 sq ft
OFFICERA: 346 sq ft
REST.A: 56 sq ft
HOSEA: 64 sq ft
EMSA: 57 sq ft
MAINT.A: 144 sq ft
JANA: 36 sq ft
H. WASHA: 84 sq ft
ELEVA: 60 sq ft
BUNK GEARA: 259 sq ft
REST.A: 61 sq ft
RECV.A: 43 sq ft
DN
10' 14'
ENGINE
(FUTURE) INCIDENTCOMMAND UNIT
PUBLIC PLAZA
N0 8' 16' 32'
Fire Station 22PRINT DATE:6/17/14 LOCATION:Seattle, WA
First Floor Plan121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
UP
UP
UP
41'-6
"29
'5'
14'-5
"
104'
67'
24'
10'
77'-6" 19'-6"
(E) LONDONPLANE TREE, TBD
STATEPATROL
BUILDING
E ROANOKE STREET
IN
OUTIN
8'-0
"9'
-0"
40'-2"
39'-5"
170'
165'
160'
155'
L S Barrierfree
S S
RO
OF
OV
ER
HA
NG
6' SIDEWALK
TRASHA: 40 sq ft
ENGINE BAYA: 2,607 sq ft
DECONA: 132 sq ft
ENG. STOR.A: 76 sq ft
STATIONA: 315 sq ft
LOBBYA: 157 sq ft
OFFICERA: 346 sq ft
REST.A: 56 sq ft
HOSEA: 64 sq ft
EMSA: 57 sq ft
MAINT.A: 144 sq ft
JANA: 36 sq ft
H. WASHA: 84 sq ft
ELEVA: 60 sq ft
BUNK GEARA: 259 sq ft
REST.A: 61 sq ft
RECV.A: 43 sq ft
DN
10' 14'
ENGINE
(FUTURE) INCIDENTCOMMAND UNIT
PUBLIC PLAZA
N0 8' 16' 32'
APPARATUS BAY BELOW
PHYS.TRAINING
BUNK
BATH BATH
BUNKBUNKDAYRM
LAUND. HOSETOWER
BEANERY
DECK
FENESTRATION REQUIREMENTS
20Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
SECOND FLOOR PLAN
Fire Station 22PRINT DATE:6/17/14 LOCATION:Seattle, WA
First Floor Plan121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
UP
UP
UP
41'-6
"29
'5'
14'-5
"
104'
67'
24'
10'
77'-6" 19'-6"
(E) LONDONPLANE TREE, TBD
STATEPATROL
BUILDING
E ROANOKE STREET
IN
OUTIN
8'-0
"9'
-0"
40'-2"
39'-5"
170'
165'
160'
155'
L S Barrierfree
S S
RO
OF
OV
ER
HA
NG
6' SIDEWALK
TRASHA: 40 sq ft
ENGINE BAYA: 2,607 sq ft
DECONA: 132 sq ft
ENG. STOR.A: 76 sq ft
STATIONA: 315 sq ft
LOBBYA: 157 sq ft
OFFICERA: 346 sq ft
REST.A: 56 sq ft
HOSEA: 64 sq ft
EMSA: 57 sq ft
MAINT.A: 144 sq ft
JANA: 36 sq ft
H. WASHA: 84 sq ft
ELEVA: 60 sq ft
BUNK GEARA: 259 sq ft
REST.A: 61 sq ft
RECV.A: 43 sq ft
DN
10' 14'
ENGINE
(FUTURE) INCIDENTCOMMAND UNIT
PUBLIC PLAZA
N0 8' 16' 32'
Fire Station 22PRINT DATE:6/17/14 LOCATION:Seattle, WA
First Floor Plan121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
UP
UP
UP
41'-6
"29
'5'
14'-5
"
104'
67'
24'
10'
77'-6" 19'-6"
(E) LONDONPLANE TREE, TBD
STATEPATROL
BUILDING
E ROANOKE STREET
IN
OUTIN
8'-0
"9'
-0"
40'-2"
39'-5"
170'
165'
160'
155'
L S Barrierfree
S S
RO
OF
OV
ER
HA
NG
6' SIDEWALK
TRASHA: 40 sq ft
ENGINE BAYA: 2,607 sq ft
DECONA: 132 sq ft
ENG. STOR.A: 76 sq ft
STATIONA: 315 sq ft
LOBBYA: 157 sq ft
OFFICERA: 346 sq ft
REST.A: 56 sq ft
HOSEA: 64 sq ft
EMSA: 57 sq ft
MAINT.A: 144 sq ft
JANA: 36 sq ft
H. WASHA: 84 sq ft
ELEVA: 60 sq ft
BUNK GEARA: 259 sq ft
REST.A: 61 sq ft
RECV.A: 43 sq ft
DN
10' 14'
ENGINE
(FUTURE) INCIDENTCOMMAND UNIT
PUBLIC PLAZA
N0 8' 16' 32'
APPARATUS BAY BELOW
PHYS.TRAINING
BATH BATH
DAYRM
LAUND. HOSETOWER
BEANERY
DECK
BUNK ROOMS MUST BE AT NORTH WALL
STAIR MUST BE ADJACENT TO APPARATUS BAY
GENERAL FLOW OF MOVEMENT TOWARDS APPARATUS BAY
BUNKBUNKBUNK
FLOOR PLAN REQUIREMENTS
21Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
bunk bunk
ocernight bunk
station oce
bunk
bunk
FS6 SOUTH (ALLEY) ELEVATION
FS22 NORTH ELEVATION
FENESTRATION REQUIREMENTS
22Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
NORTH FACADE STUDYPROGRAM BASELINE
23Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
NORTH FACADE STUDYAS DESIGNED
24Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
NORTH FACADE STUDYWIDENED BEANERY MODULE
25Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
NORTH FACADE STUDYWIDENED BEANERY MODULEW/ CONTRASTING CLADDING
26Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
NORTH FACADE STUDYWIDER MODULES
27Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
22
trees synchronized with monoliths
calm progression draws the eye towards the station office
A B B B B B B B B
NORTH FACADE STUDYAS DESIGNED
28Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
create one wide crenellation at Beanery
A B B B B B C B
22
NORTH FACADE STUDYOPTION 1A
29Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
create one wide crenellation at Beanery with shallow indents
A B B B B B B
22b b
NORTH FACADE STUDYOPTION 1B
30Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
22
create one wide crenellation at Beanery and egress stair
A B B B B B C
NORTH FACADE STUDYOPTION 2A
31Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
22A B B B B B Bb b
create one wide crenellation at Beanery and egress stair with shallow indents
NORTH FACADE STUDYOPTION 2B
32Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
VIEW LOOKING EASTFROM E ROANOKE ST
33Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
VIEW LOOKING SOUTHEASTFROM E ROANOKE ST
34Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
VIEW LOOKING SOUTHFROM BROADWAY E
35Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
VIEW LOOKING SOUTHWEST FROM ROANOKE AND 10TH AVE
36Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
VIEW FROM 10TH AVE BRIDGE
37Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
NIGHT RENDER
38Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
DEVELOPMENT WAIVERS REQUESTED
22 SIGNAGE
FRONT YARD SETBACKREQUIRED: 20-0 min.PROPOSED: 6-0
LOT COVERAGEREQUIRED: 35% max.PROPOSED: 51.5%
HEIGHT OF HOSE TOWER AND FLAG POLEREQUIRED: 30-0 height limit (above average grade level) for any structure not in a required yard.
PROPOSED:46-5 parapet at hose tower48-0 flag pole29-4 portion of building located in required front yard setback
30-0 HEIGHT LIMIT
39Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
Braid of life (working title)For Fire Station 22, the braid is used to suggest the interwoven relationship and the multiple roles firefighters hold within the community.
The intent is for a triaxial braid of recycled firehoses to clad the hose tower. Using reclaimed fire hose, thousands of feet will be used to create a panel of braids which will be attached to the tower with metal attachments or frames.
A multilayer vinyl impregnated synthetic fabric reinforced jacket layer over the rubber hose is quite common and will likely work great for the purposes of this artwork.
There is the potential for a community event where the hoses may be braided by the public and firefighters as a safe and fun way for the community to get involved with the new fire station and feel a long term relationship to it. Examples of materials
PUBLIC ART PROPOSALARTIST: OLIVER HESS
40Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
CONCEPTUAL ART INSTALLATIONARTIST: OLIVER HESS
41Design Commission Meeting 2: 60% Review | Seattle Fire Station 22 |
Flowering Dogwood
Rockrose
LilyturfJapanese Anemone
Goatsbeard
Redtwig Dogwood
Aspen
Pachysandra
Sedum Greenroof
LANDSCAPE DESIGN
Fire Station 22PRINT DATE:6/17/14 LOCATION:Seattle, WA
First Floor Plan121 Stewart Street, Suite 200Seattle, Washington 98101
Telephone 206 443-8606Facsimile 206 443-1218
UP
UP
UP
41'-6
"29
'5'
14'-5
"
104'
67'
24'
10'
77'-6" 19'-6"
(E) LONDONPLANE TREE, TBD
STATEPATROL
BUILDING
E ROANOKE STREET
IN
OUTIN
8'-0
"9'
-0"
40'-2"
39'-5"
170'
165'
160'
155'
L S Barrierfree
S S
RO
OF
OV
ER
HA
NG
6' SIDEWALK
TRASHA: 40 sq ft
ENGINE BAYA: 2,607 sq ft
DECONA: 132 sq ft
ENG. STOR.A: 76 sq ft
STATIONA: 315 sq ft
LOBBYA: 157 sq ft
OFFICERA: 346 sq ft
REST.A: 56 sq ft
HOSEA: 64 sq ft
EMSA: 57 sq ft
MAINT.A: 144 sq ft
JANA: 36 sq ft
H. WASHA: 84 sq ft
ELEVA: 60 sq ft
BUNK GEARA: 259 sq ft
REST.A: 61 sq ft
RECV.A: 43 sq ft
DN
10' 14'
ENGINE
(FUTURE) INCIDENTCOMMAND UNIT
PUBLIC PLAZA
N0 8' 16' 32'