Monief Eid BSc, Lean Six Sigma Black Belt, PROSCI, C A P, ITIL V3 Foundation and Prince2 Certified
National PACS Program Director
The National BIG Picture: Tele-medical Imaging, The Vision for Patient Services (modified based on non-disclosing
information about MOH)
7/1/1436
2
MOH PACS Project Management
Will have PMBOOK methodology for ensuring the project has a structured set of guiding documents to assist the teams in planning Project Charter with Governance Structure Project Defined Scope of Work Project Plan including Timeline, Milestones and Resources Project Assumptions Project Risks and Mitigation Plan Project Communication Plan Project Budget Project Issues lists
PACS Program and Project Management Methodology
7/1/1436
3
MOH PACS Project Management
Initiating
Develop Project Charter
Identify Goals and Objectives
Develop Strategies and Plans
Research Previous Experience
Develop Project Charter
Develop Preliminary Project Scope Statement
Conduct Planning Workshop
Document Project Costs and Benefits
Develop High Level Work Breakdown Structure
Conduct Peer Review
Prepare Preliminary Project Scope Statement
7/1/1436
4
MOH PACS Project Management
Planning Set Up Project Environment
Prepare Facilities
Set Up Project Standards and Procedures
Set Up Project Management Tools
Set Up Project Book
Define Scope
Document Scope Management Plan
Specify Deliverables and Acceptance Criteria
Define Scope
Document Assumptions
Develop Project Schedule
Build Work Breakdown Structure
Develop Resource Plans
Prepare Project Estimates
Define Dependencies and Develop Project Schedule
Document Assumptions
Develop Risk Plans
Document Risk Management Plan
Identify Risks
Analyze Risks
Document Risk Management Plans
Plan for Quality
Document Quality Management Plan
7/1/1436
5
MOH PACS Project Management
Organize Project Resources
Develop Organization Structure
Develop Staffing Plan
Develop Procurement Plans
Determine Procurement Requirements
Define Subcontractor Scope
Identify Potential Subcontractors
Identify Subcontract Type
Document Subcontractor Management Plan
Develop Financial Plan
Prepare Financial Plan
Document Assumptions
Develop Project Support Plans
Document Communications Management Plan
Document Configuration Management Plan
Document Data Management Plan
Develop Project Management Plan
Document Project Management Plan
7/1/1436
6
MOH PACS Project Management
Executing
Acquire Project Team
Obtain Resources
Conduct Team Orientation
Assign Responsibilities
Direct and Manage Project Execution
Manage Data Items
Manage Configuration Items
Manage Process Data
Provide General Office Support
Administer Project Security Processes
Manage Team Performance
Provide Team Training
Recognize Success
Assure Quality
Participate in Walk-throughs and Reviews
Conduct Inspections and Audits
Conduct Project Reviews
7/1/1436
7
MOH PACS Project Management
Facilitate Continuous Improvement
Manage Project Communication
Review Progress
Contracting with Subcontractors
Issue Requisition Documents
Evaluate Responses
Negotiate Subcontractor Contract
7/1/1436
8
MOH PACS Project Management
Monitoring and Controlling
Monitor and Control Project Work
Authorize Work
Manage Action Items
Manage Project Records
Integrated Change Control
Manage Scope
Manage Requirements
Control Decisions
Control Changes
Scope Verification
Manage Project Acceptance
Schedule Control
Track Status
Maintain Project Schedule
Maintain Work Plans
Manage Finances
Monitor Cost/Schedule Variance
Control Costs
Maintain Financial Plan
7/1/1436
9
MOH PACS Project Management
Perform Quality Control
Control Quality
Participate in Testing
Measure Quality Levels
Manage Project Team
Manage Communications
Meet With Team
Monitor Team Morale
Conduct Team Performance Reviews
Produce Performance Reports
Report Weekly Status
Report Monthly Status
Manage Stakeholders
Monitor Satisfaction
Resolve Issues
Risk Monitoring and Control
Manage Risks
Contract Administration
Manage Subcontractor Contract
7/1/1436
10
MOH PACS Project Management
Closing
Close Project
Assess Satisfaction
Summarize Project Results and Lessons Learned
Review and Recognize Team Performance
Close Out the Project Records
Review and Reconcile Financial Performance
Contract Closure
Close Contract
7/1/1436
11
MOH PACS Project Management
• Analyze existing workflows and technology • Define solution and success criteria • Develop standards of work • Define technology standards • Phased planning for enterprise program • Create service level agreements and support protocols • Develop knowledge transfer content • Engage governance committee • Create communication methodologies • Engage clinical and technology champions • Package implementation processes
Implementation Milestones
7/1/1436
12
Pilot Implementation Plan
MOH PACS Project Management
7/1/1436
13
Thank You ………. Q & A
7/1/1436
14
MOH PACS Training
Definition of Training and the Training Process
• Training is a process through which specific conditions are put in place to facilitate learning - usually focused on the practical knowledge of how to use a new tool, procedure, or process
• Conditions that support successful training for clinicians include: – The learning environment – The learners themselves (their needs, expectations, learning styles,
etc.) – The training objectives, content and teaching methods (approach) and
style – The trainers
• Training is a five step process that includes: 1. A needs analysis 2. Objectives and determination of content 3. Selection of teaching methods 4. Training delivery 5. Evaluation
7/1/1436
15
MOH PACS Training
Currently there is 80 Hospitals with more than 100 System administrators. And there will be more than 300 hospitals in the coming 5 years. For training program, We planned the trainings in different aspects: - International Certifications
- Targeting 100 sys. admin in 2014. - CPAS (May) - CPSA, CPIA (June) - CPAS,CPSA and CPIA “Group 2” (Sep-Nov)
- Training and Upgrading the current and future solutions
- Arabization workshop (done) - Diagnostics Monitors QA/QC - Cardiac Workshop - Monitors components - New versions features and options
- Soft Skills trainings
7/1/1436
16
PACS Training and Strategy Approach International Certificates
3 - 4 Days course in Class locally in Saudi Arabia at MOH e-health Lab: Online exams PARCA PACS Administrators Registry and Certification Association
CPAS Certified PACS Associate “clinical exam and technical exam” 25 in ME “7 from MOH-Saudi”, 880 Worldwide CPIA Certified PACS Interface Analyst 3 in ME, 101 Worldwide CPSA Certified PACS System Analyst 2 in ME, 125 Worldwide CPEMS Certified Professional EMR Specialist 1 Worldwide CHEA Certified Healthcare Enterprise Architect 1 worldwide
USA: On-Site Exam
CIIP Certified Imaging Informatics Professional 1 ME, 1024 worldwide
MOH PACS Training
7/1/1436
17
MOH PACS Training
From the 53 middle east certificates, more than 45 of them from Ministry of health
7/1/1436
18
MOH PACS Training
Zone 1 Zone 2 Zone 3 MOH
Training Academy Centre
PACS
users
PACS
users
PACS
users
Knowledge, skills & Materials
Knowledge Transferred
Technical Skills,
Soft Skills,
Change Management Skills,
Training Skills,
Communication Skills,
Deployment Skills,
PM Skills,
7/1/1436
19
MOH PACS Training Kolb's
learning styles
Reflective Observation
Watching
Concrete Experience
Feeling
Active Experimentation
Doing
Abstract Conceptualisation
Thinking
Processing Continuum
how we do things
Pe
rce
pti
on
Co
nti
nu
um
how
we
thin
k ab
out
thin
gs
Assimilating (think and watch)
AC/RO
Diverging (feel and watch)
CE/RO
Converging (think and do)
AC/AE
Accommodating (feel and do)
CE/AE
Fig.1 © concept David Kolb, adaptation and design Alan Chapman 2005-06, based on Kolb's learning styles, 1984
www.businessballs.com.
7/1/1436
20
MOH PACS Training
Admin. clerk
Page 1
The connection between process and competencies
Ccomplains
about chess
pain
View historical
health information
iEHR
Is patient
registered
Assess
phisical
patient
condition
Provides required
information
Counsel
patient on
quitting
smoking
Admits
patient to
the clinic
Takes inhaled
medication, stop
smoking
Enters key
informations
(name, birth, adress)
ADT
Heavy smoking,
bacterial resistance
to antibioticDoctors
Hospital
Patient
Patient Admin, clerk HospitalDoctor
1
2
3
45
76
8 9 10
11
1
3
13
2
4
5
11
12
8
9
10
Specifying
symptoms
Communicates
information
Comply to
treatment
Data entry
Registering
patients
Admitting patients
X-Rays recorded
in DI repository
Rx filled and
recorded in DIS
repository
Use iEHR viewer
to get health info
To counsel
patients
Exam Requests,
and e-RX
Family clinic: COPD, diagnosis and treatment
Com
pete
ncie
s
Register patient
Prescribes new
X-Rays, new
antibiotics
Hypothetical
diagnosis:
COPD
X-Rays performed,
film and written
report recorded
Rx filled
Yes
No
12
13
An example demonstrating the connection between clinical processes and required competencies that support a needs analysis
7/1/1436
21
MOH PACS Training
Phase 1 “Define”
- Detailed workflow design - Clinical usage scenarios (will drive system Configuration) - Integration and
deployment - Change Management - Leadership Development - Workforce Assessment - Learning Needs Analysis - Communication Plan -
Phase 2 “Deliver”
Phase 3 “Sustain”
7/1/1436
22
Thank You ………. Q & A