+ All Categories
Home > Documents > page 01 02 · KENZA INDUSTRY AND SERVICES SONATRACH ( Algeria) 2018 Project: Client: Owner: Year:...

page 01 02 · KENZA INDUSTRY AND SERVICES SONATRACH ( Algeria) 2018 Project: Client: Owner: Year:...

Date post: 07-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
17
EN 1090-1 Engineering, Manufacturing, Industrial Construction & Maintenance References SOCOMENIN www.socomenin.com.tn Oil & Gas Petrochemical References
Transcript
Page 1: page 01 02 · KENZA INDUSTRY AND SERVICES SONATRACH ( Algeria) 2018 Project: Client: Owner: Year: Design , Supply , Prefabrication , Delivery and Construction of 03 storage tanks

EN 1090-1

Engineering, Manufacturing, Industrial Construction & Maintenance ReferencesSOCOMENIN

www.socomenin.com.tn

Oil & GasPetrochemical

References

Page 2: page 01 02 · KENZA INDUSTRY AND SERVICES SONATRACH ( Algeria) 2018 Project: Client: Owner: Year: Design , Supply , Prefabrication , Delivery and Construction of 03 storage tanks

0201

Industrial Construction & Maintenance Division:Manufacturing Division:

SOCOMENIN is specialized in Manufacturing of the following products:

- Pressure vessels: Skid Separators, Columns, Bullets ,Strippers, KO Drums,Scrubbers. Storage tanks : Conical - Open top and Dome roof - Offshore Equipments & Modules: Conductor- Supported Platforms, Subsea struc- tures- Steel Structures and Pipe Racks- Heat Exhangers- Stacks & Flares

SOCOMENIN is the leader of steel equipment manufacturing companies in NorthAfrica. SOCOMENIN involved in the Construction & Maintenance of various projects

Water Industry

Oil & Gas and Petrochemical

Power Generation & Renewable and Other Industries

Chemical & Mineral Industries

Food Industry

Iron & Steel Industries

Page 3: page 01 02 · KENZA INDUSTRY AND SERVICES SONATRACH ( Algeria) 2018 Project: Client: Owner: Year: Design , Supply , Prefabrication , Delivery and Construction of 03 storage tanks

0403

Design , Supply and Fabrication of Z5105 stabilization package for the ASHTART REVAMPING PROJECT.SEREPTETAP & PERENCO (Tunisia)2010

Project:

Client:Owner:

Year:

Design , Supply , Fabrication and Delivery of 09 storage Bullets (Propane , Pentane & Butane ): Ø : 4.5m, L : 33 m, C : 500 m3, Weight : 04*120 Tons / 05* 160 Tons, for the Nawara Develop-ment Project – GTP in GabesTDEETAP & OMV (Tunisia)2015/2016

Project:

Client:Owner:

Year:

Design , Supply , Fabrication and Delivery of 24 pressure vessels according to ASME code & ARH for Touat gas project.TECNICAS REUNIDASSONATRACH (Algeria)2015

Project:

Client:Owner:

Year:

Page 4: page 01 02 · KENZA INDUSTRY AND SERVICES SONATRACH ( Algeria) 2018 Project: Client: Owner: Year: Design , Supply , Prefabrication , Delivery and Construction of 03 storage tanks

0605

Design , Supply , Fabrication and Delivery of 10 presure vessels for the Nawara Development Project – GTP in GabesABBETAP& OMV ( Tunisia)2016

Project:

Client:Owner:

Year:

Design , Supply and Fabrication of Three phases Horizontal Separator & Steel Structure – Liawenda project – PERENCOMG GroupPerenco (Congo)2013

Project:

Client:Owner:

Year:

Design , Supply and Fabrication of 6 skid mounted separators and one degassing boot.PEERLESS EUROPEGulf Arabian Company (Libya)2008/2009

Project:

Client:Owner:

Year:

Design , Supply and Fabrication of 51 chemical tanks for new injection skids.Waha Oil Company (Libya)2018

Project:

Owner:Year:

Page 5: page 01 02 · KENZA INDUSTRY AND SERVICES SONATRACH ( Algeria) 2018 Project: Client: Owner: Year: Design , Supply , Prefabrication , Delivery and Construction of 03 storage tanks

0807

KO Drum , Closed Drain Vessel and Cryogenic Flare KO Drum for the Nawara Development Project – GTP in Gabes TDEETAP& OMV (Tunisia)2015

Project:

Client:Owner:

Year:

Design , Supply , Fabrication and Delivery of Hot oil surge Drum according ASME code ( Ø 4.6 – L 20 m ) for HASDRUBAL project.WORLEY PARSONSBRITISH GAS (Tunisia)2008

Project:

Client:Owner:

Year:

Design , Supply and Fabrication of 18 Pressure Vessels accor-ding to ASME stamp (with 02 Pressure Vessels Ø: 2600 L: 8200 TH: 38mm with Heat treatment ) for HASDRUBAL gas treatment projectPETROFAC BRITISH 2007/2008

Project:

Client:Owner:

Year:GAS (Tunisia)

Design , Supply and Fabrication of 15 pressure vessels 42m3 and 03 pressure vessel 30m3 for RTO project.MB FLUIDSONATRACH (Algeria)2015

Project:

Client:Owner:

Year:

Page 6: page 01 02 · KENZA INDUSTRY AND SERVICES SONATRACH ( Algeria) 2018 Project: Client: Owner: Year: Design , Supply , Prefabrication , Delivery and Construction of 03 storage tanks

1009

Supply , Prefabrication and construction of a complete unit of gas oil separator (G. O. S. P.) At SIDI EL-KILANI / SOUASSI- ETAPKUFPEC (Tunisia)1994

Project:

Owner:Year:

Design , Supply and Fabrication of equipments ( columns,

type gas dehydration unit at El Borma BILFINGER EMS GMBH SITEP (Tunisia)2012

Project:

Client:Owner:

Year:

Design , Supply and Fabrication of 01 HP KO Drum & 01 LP KO Drum for Nawara Project- OMV / ETAPFIVESETAP& OMV ( Tunisia)2016

Project:

Client:Owner:

Year:

Engineering, Procurement, Construction, and Installation Guebiba station Process & Flaring improvement ( Flare H 27 m , LP Flare Knock-Out Drum , Instrument Air Buffer Drum, Second Stage Separator ,HP Flare Knock-Out Drum )THYNA PETROLEUM SERVICESETAP (Tunisia)2013/2014

Project:

Client:Owner:

Year:

Page 7: page 01 02 · KENZA INDUSTRY AND SERVICES SONATRACH ( Algeria) 2018 Project: Client: Owner: Year: Design , Supply , Prefabrication , Delivery and Construction of 03 storage tanks

1211

Supply and Fabrication of HP, LP, & Cryogenic Tandem Flare System ( H : 65m ) for the Nawara Development Project – GTP in GabesAEREONOMV / ETAP (Tunisia)2015

Project:

Client:Owner:

Year:

Design and Fabrication of two columns, C101:Stripper gasolineC201:Oil regeneration SOTULUB (Tunisia)2001

Project:

Owner:Year:

Supply , Prefabrication and construction of a complete unit of gas oil separator (G. O. S. P.) 15 000 B/ Day At EL-MABRUK and erection of 5 oil storage tank (5000 BBLS) GEO SERVICESTOTAL (Libya)1995

Project:

Client:Owner:

Year:

d

Page 8: page 01 02 · KENZA INDUSTRY AND SERVICES SONATRACH ( Algeria) 2018 Project: Client: Owner: Year: Design , Supply , Prefabrication , Delivery and Construction of 03 storage tanks

1413

Design , Fabrication & Construction of 07 shop fabricated Storage Tanks ( API 12F )MSBI (Streicher & Bouchamaoui)ETAP & OMV (Tunisia)2017/2018

Project:

Client:Owner:

Year:

Mechanical equipment Erection works ( 150 equipment )in CPF Nawara Gas Project MSBI (Streicher & Bouchamaoui)ETAP & OMV (Tunisia)2017/2018

Project:

Client:Owner:

Year:

Prefabrication and Site Erection works of 17 Skids & Piping ( 93 000 ID and 8000 spools in : CS , SS , Duplex & Super Duplex )MSBI (Streicher & Bouchamaoui)ETAP & OMV (Tunisia)2017/2018

Project:

Client:Owner:

Year:

Page 9: page 01 02 · KENZA INDUSTRY AND SERVICES SONATRACH ( Algeria) 2018 Project: Client: Owner: Year: Design , Supply , Prefabrication , Delivery and Construction of 03 storage tanks

1615

Design , Supply & Fabrication of 01 Pig Launcher Skid and 01 Pig Receiver Skid .SITEPETAP & ENI (Tunisia)2013

Project:

Client:Owner:

Year:

Supply of Pig Traps (10 Pig Launcher & Pig Receiver from 4'' to 28'') for the Nawara Development Project MSBI (Streicher & Bouchamaoui)ETAP & OMV (Tunisia)2016/2017

Project:

Client:Owner:

Year:

Supply, Prefabrication and delivery of tubular pipe racks steel structure for the jetty of AGIP gas project. 72 bent (L: 36m; w: 6m; h: 4.5m).Total length: 2500m; total weight: 2500 tons.BESIXENI GAS (Libya)2003

Project:

Client:Owner:

Year:

Page 10: page 01 02 · KENZA INDUSTRY AND SERVICES SONATRACH ( Algeria) 2018 Project: Client: Owner: Year: Design , Supply , Prefabrication , Delivery and Construction of 03 storage tanks

1817

Engineering , Procurement and Construction of 2 oil storage Tanks (60 000 m3) on turn-key basis including manifold and interconnecting piping at Skhira terminal. TANKMEDETAP & SNDP (Tunisia)2008/2011

Project:

Client:Owner:

Year:

Prefabrication of piping for Miscar Plateform and Hannabal gas plantBG ETAP (Tunisia)2012

Project:

Client:Owner:

Year:

Prefabrication of piping works ( 42 000 ID) including NDT , Painting , Preservation & Packing for the new inlet gas

BONATTIMELLITAH OIL &GAS (Libya)2018

Project:

Client:Owner:

Year:

Page 11: page 01 02 · KENZA INDUSTRY AND SERVICES SONATRACH ( Algeria) 2018 Project: Client: Owner: Year: Design , Supply , Prefabrication , Delivery and Construction of 03 storage tanks

2019

Engineering , Supply , Prefabrication and Delivery of 05 Storage Tanks ( 2* 3500 m3 Ohanet , 01*2100 m3 Acheb and 02*250 m3 Edeyen ) at the Ohanet region.KENZA INDUSTRY AND SERVICES SONATRACH ( Algeria)2018

Project:

Client:

Owner:Year:

Design , Supply , Prefabrication , Delivery and Construction of 03 storage tanks ( 2* 10 000m3 & 1*1000 m3 ) for ALRAR ProjectPETROFAC & BONATTISONATRACH (Algeria)2014/2015

Project:

Client:Owner:

Year:

Demolition using water-jet & cold cutting tools of existing and reconstruction of new 500,000 USBBL Crude Oil Floating Roof Storage Tank (Diam: 80m, H:17m)HAROUGE OIL OPERATIONS (Libya) 2012

Project:

Owner:Year:

Page 12: page 01 02 · KENZA INDUSTRY AND SERVICES SONATRACH ( Algeria) 2018 Project: Client: Owner: Year: Design , Supply , Prefabrication , Delivery and Construction of 03 storage tanks

2221

Batch II : - Design , Supply , Prefabrication and Delivery of Vertical Tanks ( 1* 2000m3 )With Fixed Roof Floating Suction Supplying For The Conversion Of Floating Roof Tank To Fixed Roof Tank Floating Suction (1*3 000m3 & 1*1000m3 ) - EL Khroub project -NAFTALBatch III : Design , Supply , Prefabrication and Delivery of Vertical Fixed Roof Tanks an Internal Floating Screen( 03* 10 000m3 & 1 * 1000m3 ) - EL Khroub project ENGTP NAFTAL (Algeria)2013/2014

Project:

Client:Owner:

Year:

Engineering , Procurement and Construction of 4 oil storage tank (80.000m3) including manifold and interconnecting piping TANKMEDETAP & SNDP (Tunisia)2011

Project:

Client:Owner:

Year:

1) Design, Supply of materials, cleaning, inspection and mainte-

tanks at asphalt plant Benghazi.2) Supply materials and Maintenance of 09 Floating Roof

(1) 2008/2009 - (2) 2012/2014

Projects:

Owner:Year:

Provision of construction services for Pre-commissioning/Assistance to commissioning for the Nawara Development Project - GTP in Gabes.ABB OMV/ETAP (Tunisia)2018

Project:

Client:Owner:

Year:

Page 13: page 01 02 · KENZA INDUSTRY AND SERVICES SONATRACH ( Algeria) 2018 Project: Client: Owner: Year: Design , Supply , Prefabrication , Delivery and Construction of 03 storage tanks

2423

Revamping of the marine jetty and 28th march terminal station in TOBRUK.

maintenance works :-Overhauling of loading arms, diesel engines, pumps, valves…-Replacement of tanks, cooling system.

Electrical and instrument works: lighting, control rooms, trans-formers, electric motors, generators.

Sandblasting and painting works (50 000 m²).BREGA PETROLEUM MARKETING CO. (Libya) 1995/1996

Project:

Owner:Year:

Revamping of the ASHTART offshore platform Piping Prefabrica-tion and installation on site (ASHTART offshore platform )ROSETTI MARINO SEREPT ( Tunisia)2011

Project:

Client:Owner:

Year:

Supply , Fabrication and E&I installation of an offshore subsea and topside structure elements of a conductor supported platform (CSP) - Dimensions: H 18 m, L 14 m, W 12 m / Weight: 200T with Equipments- SAPETROAQUATERRA SAPETRO (Benin)2013/2014

Project:

Client:Owner:

Year:

Page 14: page 01 02 · KENZA INDUSTRY AND SERVICES SONATRACH ( Algeria) 2018 Project: Client: Owner: Year: Design , Supply , Prefabrication , Delivery and Construction of 03 storage tanks
Page 15: page 01 02 · KENZA INDUSTRY AND SERVICES SONATRACH ( Algeria) 2018 Project: Client: Owner: Year: Design , Supply , Prefabrication , Delivery and Construction of 03 storage tanks

Other References

27 28

Page 16: page 01 02 · KENZA INDUSTRY AND SERVICES SONATRACH ( Algeria) 2018 Project: Client: Owner: Year: Design , Supply , Prefabrication , Delivery and Construction of 03 storage tanks

Other References:

29 30

Other References

29 30

Page 17: page 01 02 · KENZA INDUSTRY AND SERVICES SONATRACH ( Algeria) 2018 Project: Client: Owner: Year: Design , Supply , Prefabrication , Delivery and Construction of 03 storage tanks

Recommended