Page 1 May 08 Energy – Fossil Power Generation 700°C Steam Turbine for highest efficiency Energy – Fossil Power Generation 700°C Steam Turbine – Challenges Coal fired steam power plants are still main contributors to fossil power production Additional power demand and replacement of aging power plants require new installations Fuel prices, CO 2 tax and carbon capture negatively impact cost of electricity and power plant efficiencies Customers demand high cycle efficiencies to compensate for these effects Source Siemens PG GS Worldwide electricity generation Other Renewables PWh 2006 2030 19 34 2.5 % p.a. Fossil Fuels 64% 6% 16% 15% 21% 40% Natural Gas 22% Hydro 15% Nuclear 13% Oil 3% Coal 39% 2% 8%
Transcript

Page 1 May 08 Energy – Fossil Power Generation700°C Steam Turbine for highest efficiency

Energy – Fossil Power Generation 700°C Steam Turbine – Challenges

Coal fired steam power plants are still main contributors to fossil power production

Additional power demand and replacement of aging power plants require new installations

Fuel prices, CO2 tax and carbon capture negatively impact cost of electricity and power plant efficiencies

Customers demand high cycle efficiencies to compensate for these effects

Source Siemens PG GS

Worldwide electricity generation

OtherRenewablesPWh

2006 2030

19

34

2.5 % p.a.

Fossil Fuels64%

6%

16%

15%

21%

40%

NaturalGas22%

Hydro15%

Nuclear13%

Oil 3%

Coal39%

2%

8%

Page 2 May 08 Energy – Fossil Power Generation700°C Steam Turbine for highest efficiency

Energy – Fossil Power Generation700°C Steam Turbine – Innovative Step

Increase steam power plant efficiencies by rising main steam parameters

Increase temperature (+100°C) Increase pressure (+100 bar)

For maximized gain raise pressure and temperature at the same time

Temperature

Pre

ssur

e

Gas Turbines25 bar / 1400°C

700°C Steam Turbine350 bar / 700°C

ConventionalSteam Turbines250 bar / 600°C

increase

To raise plant efficiency raise Carnot efficiency

To raise Carnot efficiency raise temperature!

hot

coldC T

T1

Carnot Efficiency

Page 3 May 08 Energy – Fossil Power Generation700°C Steam Turbine for highest efficiency

Energy – Fossil Power Generation700°C Steam Turbine – Implementation

Increased material strength at higher temperatures needed: conflicting demands

Measure: use of Nickel alloys in major turbine components

First application of expensive Nickel alloys for thick-walled and heavy parts > 10 tons

New technologies, cooling and design concepts, production

processes

Nickel Alloy Forging

Nickel Alloy Casting

Page 4 May 08 Energy – Fossil Power Generation700°C Steam Turbine for highest efficiency

Energy – Fossil Power Generation700°C Steam Turbine – Innovation

Major Research Work on Thermal Turbine Design Mechanics, especially long term

behaviour Materials (alloy properties) Manufacturing (casting and

machining)

Yields Technological leap in steam

turbine design Entire new generation of steam

turbines

cold

hot

Page 5 May 08 Energy – Fossil Power Generation700°C Steam Turbine for highest efficiency

Energy – Fossil Power Generation700°C Steam Turbine – Customer Value

Increased customer value due to

Increased power plant efficiency

Approximately 7% less fuel consumption and CO2 emission

Means to compensate for efficiency deficit due to carbon capture

No cut backs on reliability and operational flexibility

Goal: > 50% net efficiency

State of the art: 46% net efficiency

approx. 7% less fuel

and CO2

Page 6 May 08 Energy – Fossil Power Generation700°C Steam Turbine for highest efficiency

Siemens currently in leadingposition for 700°C steam turbine technology

Target: Development of 700°C full-scale pilot plant together with e.on by 2014

Of special interest with increasing emission tax

Planned scale-up to large plant size >800MW when operation experience is available

Potential to replace a part ofcurrent high-end steam power plant market

Market entry expected after 2015

Market success

Energy – Fossil Power Generation700°C Steam Turbine – Market success

Market potential

only ST > 115 MW (F-Market)

GW

0

20

40

60

80

100

2000 2002 2004 2006 2008 2010 2012 2014 2016

Market potential for 700°C ST

STPP Super Critical

STPP Sub Critical

ST in CCPP

ST in NPP

Source PMD2

Page 7 May 08 Energy – Fossil Power Generation700°C Steam Turbine for highest efficiency

Energy – Fossil Power Generation700°C Steam Turbine – Innovation Process

Based on long term development Participation in European

research programs Utilization of common

“Mülheim inventor days”with gas turbine, generator and steam turbine engineering

Conduct internal concept workshops

Simultaneous multi-field research in engineering, materials and manufacturing

Source E.ON

Page 8 May 08 Energy – Fossil Power Generation700°C Steam Turbine for highest efficiency

Energy – Fossil Power Generation700°C Steam Turbine – Lessons learnt

Improvements in performance, costs and operational flexibility

of conventional turbines

Cus

tom

er B

enef

it 1

)

Evolutionary approach

Technology demonstrator

approach

Technology download

700°C ST

600°C S

T

1) Net Present Value, Performance, Flexibility, …

Time

Technology Downloads

Contact: Dr. Ernst-Wilhelm Pfitzinger, [email protected]


Recommended