RB - -001 Last Inst. Cal. Date Contact P/A Olympus MX2 PA 32/128 600427 / 100843 Mar-12 Figure 1 - PAUT Scan Plan NA NA K0249 44°-70° 5MHz Type 6+ Page 1 of 11 Date of Inspection Time of Inspection NDE Procedure UT-0001 17:00 08/13/2012 - 08/17-201 Ultrasonic Inspection Report Reference Cable Type, Length Couplant Used Acceptance Criteria Water Client Information Integral PAUT 2nd Cable Type & Length Integral PAUT Surface Temperature Ambient Scan (-) Transfer Value (+) dB Settings Transducer Manufacturer Scope note, the weld profile has been built according to available data from the U1-A form. Actual bevel angle may be different. The scan plan shall be built to employ sectorial PAUT to observe the inner 1/3rd of the weld in order to quantify any signs of ID cracking. To Maple Glen Gas Plant (16-36-036-16W4). A0151944 and A0151945. This is an in-service client information inspection only. We were asked to perform Phased Array inspection of 100% of the welds on the following two Condensate Storage Bullets located at the * See continuation report for further scope and results. Material Type and Thickness SA 612 Method and Reference Documentation Olympus 1.5mm SDH 1.5mm SDH NA NA Method / Type Instrument Used Instrument S.N. A105L16 6+ NA NA Serial No. J4220 Angle 44°-70° Frequency Size 5MHz Olympus A105L16 Report is an interpretation of test results, not a guarantee. The client representative's signature indicates acceptance of results and applicable charges. This form property of Ultratest NDT Services • 5925 91St Edmonton, Alberta T6E 6A7 • www.ultratest.ca Technician Name CGSB Level & Cert. Number Signature UT III 13457 Client Representative Cam Busby Signature Henk Stinis 120817 Client Devon Canada Report Number W.O. Number Equipment ID Condensate Storage Bullets Facility Maple Glen Gas Plant Attention Job Description and Details Surface Condition Painted, Acceptable Cam Busby 20015628 P.O. Number NA Calibration Data Additional Equipment Calibration / Reference Block(s) Serial No. Distance Reading(s) IIW 110411 NA Serial No. Equipment Type Indication Amplitude(s) Reference Reflector(s) Last Cal. Date 1.5mm SDH 08-13-2012 80%
Transcript
Page 1: Page 1 of 11 Ultrasonic Inspection Report · The scan plan shall be built to employ sectorial PAUT to observe the inner 1/3rd of the weld in order to quantify any signs of ID cracking.

RB - -001

Last Inst. Cal. Date

Contact P/AOlympus MX2 PA 32/128600427 / 100843Mar-12

Figure 1 - PAUT Scan Plan

NA NAK0249 44°-70° 5MHz

Type

6+

Page 1 of 11

Date of InspectionTime of InspectionNDE Procedure UT-0001

17:0008/13/2012 - 08/17-201

Ultrasonic Inspection Report

Reference

Cable Type, Length

Couplant UsedAcceptance Criteria

WaterClient Information

Integral PAUT2nd Cable Type & Length Integral PAUT

Surface Temperature Ambient

Scan (-) Transfer Value (+)

dB SettingsTransducerManufacturer

Scope

note, the weld profile has been built according to available data from the U1-A form. Actual bevel angle may be different. The scan plan shall be built to employ sectorial PAUT to observe the inner 1/3rd of the weld in order to quantify any signs of ID cracking. ToMaple Glen Gas Plant (16-36-036-16W4). A0151944 and A0151945. This is an in-service client information inspection only. We were asked to perform Phased Array inspection of 100% of the welds on the following two Condensate Storage Bullets located at the

* See continuation report for further scope and results.

Material Type and Thickness SA 612Method and Reference Documentation

Olympus 1.5mm SDH1.5mm SDH

NANA

Method / TypeInstrument UsedInstrument S.N.

A105L16 6+ NA NASerial No.

J4220Angle

44°-70°Frequency Size

5MHzOlympus A105L16

Report is an interpretation of test results, not a guarantee. The client representative's signature indicates acceptance of results and applicable charges.

This form property of Ultratest NDT Services • 5925 91St Edmonton, Alberta T6E 6A7 • www.ultratest.ca

Technician NameCGSB Level & Cert. Number

Signature

UT III 13457 Client Representative Cam Busby

Signature

Henk Stinis

120817Client Devon Canada Report NumberW.O. Number

Equipment ID Condensate Storage Bullets

Facility Maple Glen Gas PlantAttention

Job Description and DetailsSurface Condition Painted, Acceptable

Cam Busby20015628

P.O. Number NA

Calibration Data Additional EquipmentCalibration /

Reference Block(s) Serial No. Distance Reading(s)

IIW 110411 NA

Serial No.Equipment TypeIndication Amplitude(s)

Reference Reflector(s)

Last Cal. Date

1.5mm SDH08-13-2012 80%

Page 2: Page 1 of 11 Ultrasonic Inspection Report · The scan plan shall be built to employ sectorial PAUT to observe the inner 1/3rd of the weld in order to quantify any signs of ID cracking.

RB - -001

Henk StinisTechnician Name

Page 2 of 11

Date of InspectionTime of InspectionNDE Procedure UT-0001

17:0008/13/2012 - 08/17-2012

Ultrasonic Inspection Report

120817

Attention

Scope - Continued

Cam Busby20015628

P.O. Number

Report is an interpretation of test results, not a guarantee. The client representative's signature indicates acceptance of results and applicable charges.

This form property of Ultratest NDT Services • 5925 91St Edmonton, Alberta T6E 6A7 • www.ultratest.ca

CGSB Level & Cert. Number

Signature

UT III 13457 Client Representative Cam Busby

Signature

NA

Client Devon Canada Report NumberW.O. NumberFacility Maple Glen Gas Plant

When discontinuities are encountered that may be indicative of ID connected cracking, they shall be imaged with TOFD to determineextent and only whether the indication is crack like or not. Due to the original joint efficiency requirements, this inspection shall not be utilizedto determine acceptability of the weld in accordance to code of construction. The Bullet on the North side of the plant is called tank north, the Bullet on the South side is called tank south. The ‘direction of flow’ of thetanks is assumed to be from west to east, naming the outer most circular weld on the west side number 1. All circular welds are scanned in

interpreted as crack like. As a cautionary note the other 17 indications may pose a risk to develop into cracks in the future. A monitoringprotocol may be wise until such time that a visual internal can be completed. Refer to Figures A and B for crack like indication detail.

four sections, 12 to 3 o-clock, 3 to 6 o-clock, 9 to 6 o-clock and 12 to 9 o-clock. The longitudinal welds on the heads are scanned clockwise, naming the 12 o-clock position ‘zero’.

Summary Report 146 data sets were captured, giving 100% coverage of all welds for each vessel. 19 relevant indications were detected, 2 of which are

Detail Report - PAUT Data sets and description.

Page 3: Page 1 of 11 Ultrasonic Inspection Report · The scan plan shall be built to employ sectorial PAUT to observe the inner 1/3rd of the weld in order to quantify any signs of ID cracking.

RB - -001

P.O. Number NA

Client Devon Canada Report NumberW.O. NumberFacility Maple Glen Gas Plant

Report is an interpretation of test results, not a guarantee. The client representative's signature indicates acceptance of results and applicable charges.

This form property of Ultratest NDT Services • 5925 91St Edmonton, Alberta T6E 6A7 • www.ultratest.ca

CGSB Level & Cert. Number

Signature

UT III 13457 Client Representative Cam Busby

Signature

Henk StinisTechnician Name

Page 3 of 4

Date of InspectionTime of InspectionNDE Procedure UT-0001

17:0008/13/2012 - 08/17-2012

Ultrasonic Inspection Report

120817

Attention

Detail Report - PAUT Data sets and description - Continued.

Cam Busby20015628

Page 4: Page 1 of 11 Ultrasonic Inspection Report · The scan plan shall be built to employ sectorial PAUT to observe the inner 1/3rd of the weld in order to quantify any signs of ID cracking.

RB - -001

Figure A - Indication number 10

P.O. Number NA

Client Devon Canada Report NumberW.O. NumberFacility Maple Glen Gas Plant

Report is an interpretation of test results, not a guarantee. The client representative's signature indicates acceptance of results and applicable charges.

This form property of Ultratest NDT Services • 5925 91St Edmonton, Alberta T6E 6A7 • www.ultratest.ca

CGSB Level & Cert. Number

Signature

UT III 13457 Client Representative Cam Busby

Signature

Henk StinisTechnician Name

Page 4 of 11

Date of InspectionTime of InspectionNDE Procedure UT-0001

17:0008/13/2012 - 08/17-2012

Ultrasonic Inspection Report

120817

Attention

Detail Report - Discontinuity Identification

Cam Busby20015628

Page 5: Page 1 of 11 Ultrasonic Inspection Report · The scan plan shall be built to employ sectorial PAUT to observe the inner 1/3rd of the weld in order to quantify any signs of ID cracking.

RB - -001

the next internal inspection by visual or magnetic particle methods.

Images of Relevant Indications The following pages contain the images of both the PAUT and TOFD for the 19 relevant indications detected during the inspection.

Comments on Figures A and B (Indications 10 and 12) Indication 10 measures Length: 46mm (1129 to 1175) Height: 3mm (17 to 20). Indication 12 measures Length: 103mm (100 to 203) Height: 1.5mm (18.5 to 20). While these indications certainly appear to be ID connected, without full knowledge of the weld bevel and internal weld profile (caps ground flush?) these has to be some caution in analysis. These indications may turn out to be undercut or small

Figure B - Indication number 12

P.O. Number NA

Client Devon Canada Report NumberW.O. NumberFacility Maple Glen Gas Plant

Report is an interpretation of test results, not a guarantee. The client representative's signature indicates acceptance of results and applicable charges.

This form property of Ultratest NDT Services • 5925 91St Edmonton, Alberta T6E 6A7 • www.ultratest.ca

CGSB Level & Cert. Number

Signature

UT III 13457 Client Representative Cam Busby

Signature

Henk StinisTechnician Name

areas of cold lap. Future monitoring to look for signs of growth would be prudent, however these indications may be easily classified with

Page 5 of 11

Date of InspectionTime of InspectionNDE Procedure UT-0001

17:0008/13/2012 - 08/17-2012

Ultrasonic Inspection Report

120817

Attention

Detail Report - Discontinuity Identification

Cam Busby20015628

Page 6: Page 1 of 11 Ultrasonic Inspection Report · The scan plan shall be built to employ sectorial PAUT to observe the inner 1/3rd of the weld in order to quantify any signs of ID cracking.

RB - -001

P.O. Number NA

Client Devon Canada Report NumberW.O. NumberFacility Maple Glen Gas Plant

Report is an interpretation of test results, not a guarantee. The client representative's signature indicates acceptance of results and applicable charges.

This form property of Ultratest NDT Services • 5925 91St Edmonton, Alberta T6E 6A7 • www.ultratest.ca

CGSB Level & Cert. Number

Signature

UT III 13457 Client Representative Cam Busby

Signature

Henk StinisTechnician Name

Page 6 of 11

Date of InspectionTime of InspectionNDE Procedure UT-0001

17:0008/13/2012 - 08/17-2012

Ultrasonic Inspection Report

120817

Attention

Images of Relavant Indications - Continued

Cam Busby20015628

Page 7: Page 1 of 11 Ultrasonic Inspection Report · The scan plan shall be built to employ sectorial PAUT to observe the inner 1/3rd of the weld in order to quantify any signs of ID cracking.

RB - -001

P.O. Number NA

Client Devon Canada Report NumberW.O. NumberFacility Maple Glen Gas Plant

Report is an interpretation of test results, not a guarantee. The client representative's signature indicates acceptance of results and applicable charges.

This form property of Ultratest NDT Services • 5925 91St Edmonton, Alberta T6E 6A7 • www.ultratest.ca

CGSB Level & Cert. Number

Signature

UT III 13457 Client Representative Cam Busby

Signature

Henk StinisTechnician Name

Page 7 of 11

Date of InspectionTime of InspectionNDE Procedure UT-0001

17:0008/13/2012 - 08/17-2012

Ultrasonic Inspection Report

120817

Attention

Images of Relavant Indications - Continued

Cam Busby20015628

Page 8: Page 1 of 11 Ultrasonic Inspection Report · The scan plan shall be built to employ sectorial PAUT to observe the inner 1/3rd of the weld in order to quantify any signs of ID cracking.

RB - -001

P.O. Number NA

Client Devon Canada Report NumberW.O. NumberFacility Maple Glen Gas Plant

Report is an interpretation of test results, not a guarantee. The client representative's signature indicates acceptance of results and applicable charges.

This form property of Ultratest NDT Services • 5925 91St Edmonton, Alberta T6E 6A7 • www.ultratest.ca

CGSB Level & Cert. Number

Signature

UT III 13457 Client Representative Cam Busby

Signature

Henk StinisTechnician Name

Page 8 of 11

Date of InspectionTime of InspectionNDE Procedure UT-0001

17:0008/13/2012 - 08/17-2012

Ultrasonic Inspection Report

120817

Attention

Images of Relavant Indications - Continued

Cam Busby20015628

Page 9: Page 1 of 11 Ultrasonic Inspection Report · The scan plan shall be built to employ sectorial PAUT to observe the inner 1/3rd of the weld in order to quantify any signs of ID cracking.

RB - -001

P.O. Number NA

Client Devon Canada Report NumberW.O. NumberFacility Maple Glen Gas Plant

Report is an interpretation of test results, not a guarantee. The client representative's signature indicates acceptance of results and applicable charges.

This form property of Ultratest NDT Services • 5925 91St Edmonton, Alberta T6E 6A7 • www.ultratest.ca

CGSB Level & Cert. Number

Signature

UT III 13457 Client Representative Cam Busby

Signature

Henk StinisTechnician Name

Page 9 of 11

Date of InspectionTime of InspectionNDE Procedure UT-0001

17:0008/13/2012 - 08/17-2012

Ultrasonic Inspection Report

120817

Attention

Images of Relavant Indications - Continued

Cam Busby20015628

Page 10: Page 1 of 11 Ultrasonic Inspection Report · The scan plan shall be built to employ sectorial PAUT to observe the inner 1/3rd of the weld in order to quantify any signs of ID cracking.

RB - -001

P.O. Number NA

Client Devon Canada Report NumberW.O. NumberFacility Maple Glen Gas Plant

Report is an interpretation of test results, not a guarantee. The client representative's signature indicates acceptance of results and applicable charges.

This form property of Ultratest NDT Services • 5925 91St Edmonton, Alberta T6E 6A7 • www.ultratest.ca

CGSB Level & Cert. Number

Signature

UT III 13457 Client Representative Cam Busby

Signature

Henk StinisTechnician Name

Page 10 of 11

Date of InspectionTime of InspectionNDE Procedure UT-0001

17:0008/13/2012 - 08/17-2012

Ultrasonic Inspection Report

120817

Attention

Images of Relavant Indications - Continued

Cam Busby20015628

Page 11: Page 1 of 11 Ultrasonic Inspection Report · The scan plan shall be built to employ sectorial PAUT to observe the inner 1/3rd of the weld in order to quantify any signs of ID cracking.

RB - -001

Henk StinisTechnician Name

Page 11 of 11

Date of InspectionTime of InspectionNDE Procedure UT-0001

17:0008/13/2012 - 08/17-2012

Ultrasonic Inspection Report

120817

Attention

Images of Relavant Indications - Continued

Cam Busby20015628

Report is an interpretation of test results, not a guarantee. The client representative's signature indicates acceptance of results and applicable charges.

This form property of Ultratest NDT Services • 5925 91St Edmonton, Alberta T6E 6A7 • www.ultratest.ca

CGSB Level & Cert. Number

Signature

UT III 13457 Client Representative Cam Busby

Signature

P.O. Number NA

Client Devon Canada Report NumberW.O. NumberFacility Maple Glen Gas Plant


Recommended