+ All Categories
Home > Documents > Painting Rate Analysis 15.10.11

Painting Rate Analysis 15.10.11

Date post: 11-Sep-2014
Category:
Upload: suresh-patil
View: 912 times
Download: 13 times
Share this document with a friend
Description:
I have worked for Painting Rate analysis need few inputs & valuable suggestion for improving the same. The suggestion can be forwarded on email id [email protected]
Popular Tags:
18
Basic Material Cost Sl No Element Last update Unit 1 Cement Bags 2 White Cement Bags 3 River Sand Cum 4 Manufactured sand Cum 5 Gravel Cum 6 Murrum / Earth Cum 7 12 mm Aggregate Cum 8 20 mm Aggregate Cum 9 40 mm Aggregate Cum 10 Filter media stone aggregate Cum 11 Soling Cum 12 Quarry Dust Cum 13 Bricks Nos 14 Table mould Bricks Nos 15 Wire cut Bricks Nos 16 Brick bat 25 to 100mm Cum 17 Cinder ballast Cum 18 4" Solid Block Nos 19 6" Solid Block Nos 20 8" Solid Block Nos 21 4" Hallow Block Nos 22 6" Hallow Block Nos 23 8" Hallow Block Nos 24 Size stone 20X20X25cms Nos 25 Size stone dressing [2 line] Nos 26 Bond stones 20X20X45cms Nos 27 Stone slab 10-12cm thk Sqm 28 Granite stone slab fine dressed 40mm thk Sqm 29 Lime Kgs 30 Chicken mesh Sqm 31 Arpitha Mesh Rmt 32 Nails Kgs 33 Reinforcement steel MT 34 Structural steel MT 35 Weld mesh75mm X 25mm of 6g X 10g Sqm 36 AC sheet 6mm thk semi corrugated Sqm 37 AC sheet 6mm thk semi corrugated Sqm 38 Ridges (AC sheet) Pair 39 12mm thk pre laminated board (Novapan) exterior Sqm
Transcript
Page 1: Painting Rate Analysis 15.10.11

Basic Material Cost

Sl No ElementLast update 1-Aug-11

Unit Rate1 Cement Bags 300.002 White Cement Bags 700.003 River Sand Cum 1,236.004 Manufactured sand Cum 900.005 Gravel Cum 300.006 Murrum / Earth Cum 150.007 12 mm Aggregate Cum 918.008 20 mm Aggregate Cum 989.009 40 mm Aggregate Cum 847.00

10 Filter media stone aggregate Cum 500.0011 Soling Cum 500.0012 Quarry Dust Cum 450.0013 Bricks Nos 7.0014 Table mould Bricks Nos 8.0015 Wire cut Bricks Nos 16.0016 Brick bat 25 to 100mm Cum 500.0017 Cinder ballast Cum 300.0018 4" Solid Block Nos 21.0019 6" Solid Block Nos 28.0020 8" Solid Block Nos 39.0021 4" Hallow Block Nos 19.0022 6" Hallow Block Nos 25.0023 8" Hallow Block Nos 32.0024 Size stone 20X20X25cms Nos 8.0025 Size stone dressing [2 line] Nos 12.0026 Bond stones 20X20X45cms Nos 15.0027 Stone slab 10-12cm thk Sqm 250.0028 Granite stone slab fine dressed 40mm thk Sqm 1,000.0029 Lime Kgs 15.0030 Chicken mesh Sqm 30.0031 Arpitha Mesh Rmt 25.0032 Nails Kgs 50.0033 Reinforcement steel MT 42,200.0034 Structural steel MT 50,000.0035 Weld mesh75mm X 25mm of 6g X 10g Sqm 250.0036 AC sheet 6mm thk semi corrugated Sqm 200.0037 AC sheet 6mm thk semi corrugated Sqm 250.0038 Ridges (AC sheet) Pair 250.0039 12mm thk pre laminated board (Novapan) exterior grade Sqm 650.00

Page 2: Painting Rate Analysis 15.10.11

40 Plywood 12mm thk (Commercial) Sqm 400.0041 Plywood 19mm thk (Commercial) Sqm 700.0042 Plywood 25mm thk (Commercial) Sqm 800.0043 Sheet 6mm thk (Commercial) Sqm 300.0044 Plain Particle Board Sqm 450.0045 Cobble stone 60mm thk Sqm 250.0046 Cobble stone 75mm thk Sqm 350.0047 Chequered Cement concrete tiles Sqm 200.0048 Mosaic tiles - Light shade Sqm 350.0049 Vitrified tiles 10mm thk 600X600mm Granolite finish Sqm 600.0050 Grout for vitrtfied tiles Kgs 55.0051 Spacers for vitifried tiles No 1.5052 Ceramics tiles 300 X 300 mm Sqm 300.0053 Ceramics tiles 150 X 150 mm Sqm 250.0054 Colour glazed tiles 150 X 150 mm 10mm thk Each 8.0055 Colour glazed tiles 150 X 150 mm 10mm thk anti skid Each 9.0056 White glazed tiles 150 X 150 mm 6mm thk Each 7.0057 White glazed tiles 150 X 150 mm 10mm thk Each 8.0058 Yelahanka tiles 250 X 250mm Each 5.0059 Mangalore tiles & special tiles for ridge & hips No 15.0060 Cuddapah slab 25-40mm thk Sqm 250.0061 Shahabad slab 25-40mm thk Sqm 300.0062 Tandur blue slab 25-40mm thk Sqm 225.0063 Marble slab 20mm thk Sqm 650.0064 Machine cut Granite stone slab 40mm thk Sqm 400.0065 Machine polished Granite stone slab 20mm thk Sqm 650.0066 Hassan green granite 20mm thk Sqm 1,500.0067 Grey granite 20mm thk Sqm 800.0068 Preploshied Grey granite 20mm thk Sqm 1,000.0069 Preploshied water cut grey granite Sqm 1,000.0070 Ruby red granite 20mm thk Sqm 1,300.0071 Shiva gold granite 20mm thk Sqm 1,600.0072 Black granite 20mm thk Sqm 1,100.0073 Preploshied Black granite 20mm thk Sqm 1,200.0074 Plaster of paris Kgs 25.00

Cement Primer Ltr75 Distemper Primer Ltr 70.0076 Dry Distemper Kgs 70.0077 Aluminium Paint Primer (Red Oxide) Ltr 100.0078 Aluminium Paint Ltr 200.0079 Anticorrosive bitumastic paint Ltr 150.0080 Enamel Primer Ltr 100.0081 Enamel metal paint Ltr 350.00

Page 3: Painting Rate Analysis 15.10.11

82 Plastic emulsion paint Ltr 200.0083 Red Oxide Kgs 90.0084 Varnish Ltr 120.0085 Water proof cement paint Kgs 40.0086 Oil bound distemper Kgs 70.0087 Turpentine oil Ltr 40.0088 Thinner Ltr 150.0089 Anodized M R F Painting Sqm 350.0090 Melamine patty Kgs 200.0091 Synthetic enamel paint Ltr 180.00

Textured Paint LtrAcrylic Exterior Paint LtrEpoxy Paint LtrOil type Wood preservatitive LtrFire Retradant Paint LtrCoal Tar LtrAcid Proof Paint Ltr

92 Road Marking paint Ltr 275.0093 Bitumen Grade 80/100 MT 37,620.0094 Bitumen Grade 60/70 MT 38,600.00

Page 4: Painting Rate Analysis 15.10.11

Latest rate can be obtained from www.anytimeproperty.com

RMC Lowest quoted rateGrade of concrete Unit Rate/Cum

35 M10 Cum 3,200.00 M15 Cum 3,350.00 M20 Cum 3,450.00 M25 Cum 3,650.00

26 M30 Cum 3,850.00 28 M35 Cum 4,100.00 24 M40 Cum 4,300.00

M45 Cum 4,500.00

Shuttering Sqm 325

APCOAPCOAPCOAPCOAPCOAPCO

Page 5: Painting Rate Analysis 15.10.11
Page 6: Painting Rate Analysis 15.10.11

Labour wages

Sl no ItemLast Update 1-Aug-11

Unit Rate1 Foreman/Supervisor Nos 1,000.00 2 Mason [1st Class] Nos 550.00 3 Mason [2nd Class] Nos 450.00 4 Male cooli Nos 300.00 5 Female cooli Nos 250.00 6 Bhisti Nos 250.00 7 Bar bender Nos 450.00 8 Helper Nos 300.00 9 Carpenter Nos 450.00

10 Helper Nos 300.00 11 Gas / Electric welder Nos 500.00 12 Plumber Nos 500.00 13 Stone cutter Nos 500.00 14 Painter Nos 450.00

Page 7: Painting Rate Analysis 15.10.11

Rate Analysis for Painting 1 SQM

Materials (A )

Item

Unit

Lim

e K

g

New Work

Whitewash with lime (2 - 3 coats) Sqm 0.30

Sqm 0.30

Dry Distemper incl priming (2 - 3 coats) Sqm 0.01 0.15

Sqm 0.07 0.15

Sqm 0.15

Cement Primer 01 coat Sqm 0.07

Water proof cement paints (2 - 3 coats) Sqm 0.38

Sqm 0.22

Sqm 0.22

Aluminium Primer Sqm 0.075

Sqm 0.054

Second Coat Sqm 0.036

Sqm 0.075

Sqm 0.084

Sqm

Fire retradant paint 2coats Sqm

Coal Tarring 2coats Sqm

Plastic Emulsion Paint (2 - 3 coats) Sqm

Synthetic Enamel Paint (2 - 3 coats) Sqm

Aluminium Enamel Paint (2 - 3 coats) Sqm

Acid Proof Paint (2 - 3 coats) Sqm

Sqm

Cem

ent

Pri

mer

(Kg)

Alu

min

ium

Pri

mer

(Ltr

s)

Red o

xid

e

pri

mer

(Ltr

s)

Dry

Dis

tem

per

(Kg)

Oil

Bound

Dis

tem

per

(Kg)

Wate

r Pro

of

Cem

ent

pain

t (K

g)

Colour wash with base coat of white wash with lime (2 - 3 coats)

Oil bound washable distemper incl cement primer (2 - 3 coats)

1st Quality Acrylic washable distemper (2 - 3 coats)

Texture exterior paint over water proof cement paint (2 - 3 coats)

Acrylic exterior paint over water proof cement paint (2 - 3 coats)

Red Oxide Zinc Chromate primer over steel works

Epoxy Coat incl Primer on steel work (2 - 3 coats)

Epoxy Coat incl Primer on Concrete work (2 - 3 coats)

Oil Type Wood Preservative (2 - 3 coats)

Black anti-corrosive bitumastic paint (2 - 3 coats)

Page 8: Painting Rate Analysis 15.10.11

Materials (A )

Coal Tar

(Ltr

s)

0.33

0.17

0.13

0.12

0.10

0.57

0.28 0.05

0.12

0.12

0.08

0.12

Textu

red P

ain

t (L

trs)

Acr

ylic

Exte

rior

Pain

t (L

trs)

Epoxy P

ain

t (L

trs)

Oil

type w

ood

pre

serv

ata

tive

(Ltr

s)

Fir

e R

etr

adant

Pain

t (L

trs)

Kero

sene O

il (L

trs)

Pla

stic

Em

uls

ion P

ain

t (L

trs)

Synth

eti

c Enam

el Pain

t (L

trs)

Alu

min

ium

Enam

el Pain

t (L

trs)

Aci

d P

roof

Pain

t (L

trs)

Page 9: Painting Rate Analysis 15.10.11

Materials (A ) Labour cost (B) Tools & Tackles (C )

Pain

ter

Cost

Male

cooli

Cost

Bhis

ti

Cost

Sca

ffold

ing

0.02 9.00 0.01 3.00 - 12.00 0.25 81.25

0.03 13.50 0.01 3.00 - 16.50 0.25 81.25

0.08 36.00 0.04 12.00 - 48.00 0.25 81.25

0.10 45.00 0.05 15.00 - 60.00 0.25 81.25

0.04 18.00 0.05 13.80 - 31.80 0.25 81.25

0.04 18.00 0.02 6.00 - 24.00 0.25 81.25

0.05 20.70 0.02 6.90 0.01 2.50 30.10 0.25 81.25

0.06 27.00 0.03 9.00 0.01 1.25 37.25 0.25 81.25

0.01 2.70 0.03 9.00 0.01 1.25 12.95 0.25 81.25

0.03 11.25 0.03 7.50 - 18.75 0.25 81.25

0.02 10.80 0.02 7.20 - 18.00 0.25 81.25

0.01 5.40 0.01 3.60 - 9.00 0.25 81.25

0.08 35.55 0.08 23.70 - 59.25 0.25 81.25

0.08 35.55 0.08 23.70 - 59.25 0.25 81.25

0.02 6.75 0.02 4.50 - 11.25 0.25 81.25

0.05 24.30 0.05 16.20 - 40.50 0.25 81.25

- 0.04 12.90 - 12.90 0.25 81.25

0.05 24.30 0.05 16.20 - 40.50 0.25 81.25

0.05 24.30 0.05 16.20 - 40.50 0.25 81.25

0.05 24.30 0.05 16.20 - 40.50 0.25 81.25

0.05 24.30 0.05 16.20 - 40.50 0.25 81.25

0.10 0.05 24.30 0.05 16.20 - 40.50 0.25 81.25

Anti

Corr

osi

ve

Bit

um

ast

ic (

Ltrs

)

Tota

l M

ate

rial

Cost

Tota

l Lab

ou

r C

ost

Cost

of

Sca

ffold

ing

Page 10: Painting Rate Analysis 15.10.11

Tools & Tackles (C ) D E F

Tota

l A

+B

+C

WC

T @

4%

On D

Gra

nd

Tota

l

1.87 0.93 96.05 3.84 19.98 119.90 9.00

1.96 0.98 100.68 4.03 20.94 125.70 10.00

2.59 1.29 133.13 5.33 27.69 166.10 13.00

2.83 1.41 145.49 5.82 30.26 181.60 14.00

2.26 1.13 116.44 4.66 24.22 145.30 11.00

2.11 1.05 108.41 4.34 22.55 135.30 11.00

2.23 1.11 114.69 4.59 23.86 143.10 11.00

2.37 1.19 122.06 4.88 25.39 152.30 12.00

1.88 0.94 97.03 3.88 20.18 121.10 10.00

2.00 1.00 103.00 4.12 21.42 128.50 10.00

1.99 0.99 102.23 4.09 21.26 127.60 10.00

1.81 0.90 92.96 3.72 19.34 116.00 9.00

2.81 1.41 144.72 5.79 30.10 180.60 14.00

2.81 1.41 144.72 5.79 30.10 180.60 14.00

1.85 0.93 95.27 3.81 19.82 118.90 9.00

2.44 1.22 125.40 5.02 26.08 156.50 12.00

1.88 0.94 96.97 3.88 20.17 121.00 10.00

2.44 1.22 125.40 5.02 26.08 156.50 12.00

2.44 1.22 125.40 5.02 26.08 156.50 12.00

2.44 1.22 125.40 5.02 26.08 156.50 12.00

2.44 1.22 125.40 5.02 26.08 156.50 12.00

2.44 1.22 125.40 5.02 26.08 156.50 12.00

2%

Sundri

es,

bru

shes,

putt

y

etc

Wate

r C

harg

es

@ 1

%

Over

head

s &

Pro

fits

@ 2

0%

on D

& E

Rate

in

Sft

excl W

CT,

OH

&

Pro

fit


Recommended