Lr' SUP'TRCO PC-1 for Pakistan Communication Satellite System (PAKSAT-IR) (Originally submitted in January 2007) (Revised in October 2007 and March 2008) (Amended in the light of pre-CDWP meeting held at Planning Commission on April23, 2008) (April2008) PAKISTAN SPACE & UPPER ATMOSPHERE RESEARCH COMMISSION (SUPARCO)
Transcript
Page 1: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

Lr'

SUP'TRCO

PC-1

for

Pakistan Communication Satellite System(PAKSAT-IR)

(Originally submitted in January 2007)(Revised in October 2007 and March 2008)

(Amended in the light of pre-CDWP meeting held at Planning Commission onApril23, 2008)

(April2008)

PAKISTAN SPACE & UPPER ATMOSPHERE RESEARCH COMMISSION(SUPARCO)

Page 2: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

l. Name of Project: Pakistan communication satellite system (PakSat-lR)

2. Location:

a. Province: Punjab and Sindh

b. District: Lahore and Karachi

c. Location Map: Please see attachments 1, 2 and 3.

3. Authority responsible for:

Code Number for Project :

(To be filled in by Planning Commission)

INFRASTRUCTURE SECTOR

Proiect Dieest

SUPARCO.

SUPARCO.

Medium Term Development Framework (MTDF) [See S'

No. 466 of Annex-III under Transport and Communications

c.

a. Sponsoring:

b. Execution:

Plan Provision

a) The project is included in

No. C2 (PakSat-lR) on Page

Sector.l

The rules, regulations, procedures and policies of SUPARCO shall be followed in

the execution of this project; and Project Director PakSat-lR shall exercise all the

administrative and financial powers delegated to him by Chairman SUPARCO.

Operation & Maintenance: SUPARCO will operate and maintain the

satellite in space and its ground control facilities,

whereas marketing of the satellite capacity will

be undertaken by Paksat Int'l (Pvt.) Ltd, a

subsidiary of SUPARCO

Concerned Federal Ministry: Ministry of Defence/ SPD'd.

Page 3: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

fPC-t Ior PakSst-IR APill 200E

b) The project is proposed to be financed out of PSDP funds. However, serious efforts are

being made to secure a long-term (10-15 years duration) at concessional loan from the

Chinese government as the project is most likely to be awarded to a Chinese company.

5. Plan objectives and its relationship with Sectoral objectives

o Objectives of the sector / sub-sector as indicated in the medium term/five year

Plan

(i) promotion of infrastructure development for increased tele-density and the spread

of telecommunication services in all market segments (voice, data and cellular).

(ii) Increased private investment in the ICT sector, with encouragement of local

manufacturing / service industry.

Objectives of the project

The project has the following strategic and commercial objectives:

a) with the help of a reputed international satellite manufacturer (preferably Chinese)

design, develop / manufacture and launch Pakistan Communication Satellite System

(PakSat-lR) in the shortest possible time, to replace the existing leased

communication satellite Paksat- I ;

b) to establish, maintain and operate necessary satellite ground control facilities for

controlling PakSat-lR from within Pakistan;

c) through Paksat Int'l (Pvt) Ltd, market PakSat-lR transponder capacity, both to

govemment and private sectors' at competitive prices;

d) encourage participation of local (Pakistani) industry in this project to the maximum

possible / feasible extent; and

e) during the implementation of PakSat-lR project, acquire relevant know-how and

technology to the extent possible / feasible, with the ultimate (long-term) goal of

achieving self-reliance in this highly specialized field, starting with the system level

specification, design and AIT (Assembly, Integration and Testing) of both space and

ground segments; and gradually move towards undertaking the same activities for all

subsystems of communication satellite, design, development / manufacturing and AIT

of those subsystems / elements which are either relatively easy to manufacture, make

some commercial sense or have to be undertaken indigenously because of strategic /

security reasons. clearly, all this can not be achieved during the implementation of a

Page 2

Page 4: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

f

6.

single satellite project like PakSat-lR. Realistic ally, it may require a continuous effort

over a long period of time and undertaking of 3-4 satellite projects of this kind.

o Linkage between the proposed project and sectoral objectives

PakSat-1R will help increasing tele-density in remote and rural areas and spreading of

telecommunication services. It will also facilitate promoting GoP's e-Government, e-

Commerce, e-Learning / Tele-education and e-Health / Tele-medicine initiatives.

Moreover, PakSatlR will offer a reliable and quick-to-establish means of

communication over a large geographic area, stretching much beyond our national

borders and deep into the Indian Ocean, where other terrestrial means of

communication may not be feasible. These aspects of PakSat-1R are obviously quite

attractive for strategic / emergency communication needs, e.g. in disasters like

earthquakes and floods, and geopolitical conflicts wherein other means of

communication are no longer available.

Description, justification and technical parameters and technology transfer aspects

o Background

Being fully cognisant of the potential of satellite communications in the context of

socio-economic uplift of a country and its securify, SUPARCO, on behalf of the

Government of Pakistan, filed an application, in 1984, with the ITU for the allocation

of two slots (38'EL and 4l'EL) in the Geo-Synchronous Orbit (GSO) for the eventual

placement of country's domestic communication satellite system (Paksat). A

feasibility study of the project was conducted jointly by SUPARCO and M/s. Hughes

Communication Intemational, USA in 1985. However, due to various reasons, the

project remained shelved till late 1990s.

After the expiry of the first set of filings in 1994, a new application for the allocation

of five slots (at 38oEL, 4l"EL,30oEL, 88"EL and l0loEL) was filed by M/s Alcatel

(France) on behalf of the Ministry of Communications, GoP which at that time was

responsible for getting the project implemented. In June 1998, M/s Alcatel was

awarded a license by Pakistan Telecommunication Authority (PTA) for the

implementation of Paksat on self-financing basis. However, in late 2000, due to M/s

Alcatel's dismal progress on the project, PTA declined Alcatel's request for grant of

Page 3

Page 5: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

Pc-t lor Pshsar-l& APril 200E

{

extension in the license and subsequently, the supplier conveyed its inability to

proceed with the project.

Keeping in view the fact that out of the 5 slots Pakistan had filed for, only 38oEL

offered a real possibility of implementing Paksat-l and being faced with the risk ofloosing Pakistan's priority (over other applicants for this slot) in case it failed to

occupy the slot with a working satellite before Paksat-l's due diligence date of

19 April 2003, the then Minister for Science and Technology made a presentation to

the Cabinet on the stafus of the project and the issues involved in taking the process

further for the protection of 38'EL slot. The Cabinet authorised the Minister to take

appropriate steps/decisions for safeguarding national interests in the light of the

discussion held during the meeting. The Minister constituted a High Powered

Committee (HPC) on Paksat, which comprised chief executives and I or

representatives of the relevant organizations, to investigate the problem and determine

the most appropriate solution after exploring the options available.

Adjudging the remaining time insufficient for the design, development /

manufacturing and launch of a new satellite tailored to our national needs, the HPC

proposed to resolve the problem in two phases. In Phase-I, a suitable in-orbit working

satellite was to be procured and relocated at 38oEL (as a'gap-filler') before 19 April

2003 with the prime objective of protecting the slot; and in Phase-II, a new satellite

system was to be designed according to our national needs and launched at 38"8L

before the expiry of the gap-filler. The proposal along with recommended solutions /

strategies was presented to the President (also Chief Executive of Pakistan at that

time) on 3l May 2002 who very kindly approved it. It was decided, however, that the

institutional responsibility for the implementation of Phase-I would rest with the

National Telecommunication Corporation (NTC) and that of Phase-II with

SUPARCO.

A contract with M/s. Intelsat / PanAmSat (then Hughes Global Services) of USA was

signed for the lease and relocation at 38oEL of their HGS-3 satellite for a period of 05

years and US$ 4,1 Million paid to the supplier as the service establishment fee,

followed by US$ 2.00 Million per year for leasing the entire satellite and US$ 2'65

Million per year as its operating fee. The satellite was successfully relocated at 38oEL

Page 4

Page 6: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

PC-I lor PahSar-IRtand since 20 December 2002, it has been operating successfully as Paksat-1. It has 34

transponders (30 in C-band and 4 in Ku-band) and is being controlled from Perth,

Australia, with the help of two Tracking, Telemetry and Command (TT&C) stations,

one in Belgium and the other in the U.K. The communication payload of the satellite

is being monitored and operated jointly by Intelsat / PanAmSat and SUPARCO. The

lease of PakSat-l has lately been extended for another three (03) years (till December

2010) for an annual fee of 3.02 Million USD.

As regards Paksat Phase-II, hereinafter refened to as PakSat-lR, its Feasibility and

System Definition Study (FSDS), embodying 12 different work packages (see

Attachment-4) covering all aspects of the project, was undertaken in 2004-2005 by

SUPARCO, with the help of a reputed foreign consulting firm, IWs Detecon of

Germany.

Based on the results of an extensive market research (both within and outside

Pakistan) undertaken during PakSat-lR FSDS and analysis of the frequency

coordination and regulatory constraints confronted by Paksat-l/lR, top-level system

design concept of the required PakSat-lR had been completed and its functional

specifications finalized. It was envisaged that PakSat-lR would be a hybrid satellite

(carrying both commercial and government communication payloads), having a total

of 28 transponders: 14 in Ku-band, l0 in C-band, 02 in X-band and 02 in Ka-band,

with footprints covering Pakistan, India, Afghanistan, Iran, Arabian Peninsula, Iraq,

Eastem Syria, Eastern Turkey, Southern Russia and Central Asian States, Sri Lanka,

Bangladesh, Southem China, North Eastern Africa, Eastem Europe, Arabian Sea,

Persian Gulf and parts of Indian Ocean. However, due to budgetary constraints, the

FSDS proposed / recommended satellite configuration had to be revised with the aim

to bring it to its bare minimum level that could satisff most, if not all, of the

requirements of prospective users of the satellite.

Consequent upon Government of Pakistan's decision in April 2007, to establish and

strengthen a long-term strategic relationship with the Peoples Republic of China in the

field of Space Science and Technology, two MoUs were signed between SUPARCO

and China Great Wall Industry Corporation (CGWIC) and China National Space

Agency (CNSA). Following this strategic decision, it was decided to procure both

Poge 5

Page 7: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

PC-l lor Psk$o/'-l R

{

PakSat-lR and RSSS satellite systems from CGWIC with the following main

objectives:

(i) To establish a long-term strategic relationship with China in the highly

specialized and restricted field of Space Technology, as in some other similar

fields/areas;

(ii) To acquire know-how and technology relating to satellite design and

developmenVmanufacturing to the maximum possible/feasible extent, with an

ultimate aim of achieving self-reliance (through indigenization) in this

field/area; and

(iiD To seek Chinese help in the design and development of satellite related

infrastrucfure and facilities

Proposed Design Features

Keeping in view the current state of Chinese space / satellite technology vis-d-vis

PakSat-lR mission objectives / requirements and to improve economic viability of the

project, the originally conceived broad design parameters of PakSat-lR satellite

system have been reviewed and the same are outlined in Attachment-S'

The satellite will have upto 30 transponders, upto 12 in C and upto 18 in Ku-band,

each of 36 MHz bandwidth. The C-band footprints cover Pakistan, India,

Afghanistan, Iran, Nepal, Bhutan, Bangladesh, Mayanmar, Sri Lanka, Tajikistan,

Kyrgyzstan, Qatar, UAE, Oman, Yemen, Saudi Arabia, Kuwait, Iraq, China,

Turkmenistan, Somalia and France with EIRP ranging from 28dBW to 39dBW and

G/T from -lzdBlK to +ldB/K. Whereas the Ku-band footprints cover Pakistan

Afghanistan, Iran, UAE, Qatar, Oman, Kuwait, Tajikistan, Kyrgyzstan, Turkmenistan,

Uzbekistan, Azerbaijan, Kazakhstan, Iraq, Saudi Arabia and parts of: India, Nepal,

China, Yemen and Iraq with EIRP ranging from 42dBW to 53dBW and G/T from

-4dB/K to +6dB/K. The satellite will have a designed service life of 15 years and will

support all Fixed Satellite Service (FSS) applications, including voice / data

communications and digital TV / video distribution and broadcasting.

The satellite bus / patform will keep / have a provision for the incorporation of four

(04) pieces of SUPARCO-developed / manufactured pieces of equipment, for their

Page 8: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

PC-I for Pskss,-l R

a

o

design and technology validation, as an auxiliary payload. These pieces of equipment

will be referred to as Customer Furnished Instruments (CFIs).

For enhanced security of the satellite, not only that its telemetry and command data

links will be encrypted and authenticated, but also, two fully redundant PakSat

Ground Control Stations (PGCS) will be established, one in Lahore and one in

Karachi. Some other important features / aspects of this project are described below.

Know-How and Technology Transfer (KHTT)

To acquire know-how and technology relating to the design, development,

manufacturing, testing, launch, operations and control of communication satellites to

the maximum possible / feasible extent, a comprehensive KHTT plan has been

chalked out in consultation with Telesat Canada (SUPARCO's consultant) and some

elements of it after due deliberation with China Academy of Space Technology

(CAST) and china Great wall Industry corporation (cGwIC) have been

incorporated in this project. The same are described below:

i) Specialized training of SUPARCO scientists and engineers prior to their

deployment at the satellite supplier's premises for the KHTT;

ii) KHTT relating to various aspects of PakSat-lR space segment (satellite)

through active participation of SUPARCO scientists and engineers in the design,

development/ manufacturing and testing related activities at the supplier's

premises;

iii) KHTT relating to various aspects of PakSat-lR ground control segment through

active participation of SUPARCO scientists and engineers in the design'

developmenV manufacturing and testing related activities at the supplier's

premises;

iv) KHTT relating to payload AIT through active participation of SUPARCO

scientists and engineers in PakSat-lR Flight Model communication Module

AIT at SUPARCO's Satellite Research and Development Centre (SRDC)

Lahore;

Even though SUPARCO desires maximum KHTT during the course of PakSat-lR

satellite system procurement from the supplier, restrictions/ limitations on the supplier

side and the very high prices quoted by the supplier have limited the scope of KHTT

Poge 7

Page 9: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

PC-l lor PohStt-l R

{

incorporated in the Paksat-lR space segment contract negotiated with the Chinese

(CGWIC). Nevertheless, to derive maximum benefit from the oppoffunity,

SUPARCO intends to deploy (for different durations) 9l trained scientists and

engineers (also referred to as interns) at the satellite supplier's premises during the

execution of PakSat-lR space segment contract. Of these, l0 will be used formonitoring the manufacturing of the satellite (product assurance), 20 for satellite

control and operations training and 6l for KHTT.

Keeping in view that PakSat-lR space segment will comprise two major parts or

modules, namely platform and payload, the KHTT work package incorporated in the

contract with the Chinese has two parts, namely Platform KHTT and Payload KHTT,

each to be implemented in three phases, as outlined below.

D Platform KHTT

Phase 1: System/Subsystem Level Design

This phase will have two parts. Part I will entail theoretical training on the system and

subsystem level design of latest Chinese communication satellite platform, namely

DFH-4. Whereas Part 2 will focus on system and subsystem design of a virtual

communication satellite called X-Sat. During this phase SUPARCO interns will also

participate in all PakSat-lR Design Review Meetings.

Phase 2: Satellite Hardware Design

This phase will also have two parts. Part I will encompass training on spacecraft

hardware and software design principles, and unit level design through projects' Patt2

will entail design of three subsystems, namely Telemetry, Command and Ranging

(TCR), On-Board computer (oBC) and Platform Distribution unit (PLDU)' Also, 20

seminars (normally half a day long) on special topics relating to spacecraft

engineering will be delivered by the Chinese (CAST) experts'

Page 8

Page 10: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

Pc'I for P*slt-IR APril2ooE

tPhase 3: System/Subsystems AIT Certification and Hands-on Active

Participation on PakSat-lR AIT

Phase 3 will be divided into two parts. Part I will focus on practical training on all

aspects of spacecraft AIT (except environment tests), through lectures and hands-on

training using Engineering Model (EM) PakSat-lR spacecraft and certification of

SUPARCO interns for independently undertaking certain Flight Model (FM)

spacecraft AIT activities. Part 2 will start after certification of SUPARCO interns by

CAST. In this part the interns will actively participate in FM PakSat-lR AIT.

SUPARCO interns will be expected to actively assist during spacecraft level AIT

including environmental testing alongside CAST AIT team.

ii) Pavload KHTT

Phase 1: System/Subsystem Level Design:

It will have two parts. Part I will entail classroom lectures aimed at providing in-

depth knowledge about repeater and antenna subsystems. Whereas in Part 2, the

interns will design a payload based on the Virtual Design Platform developed by

CAST, as a part of X-Sat.

Phase 2: Satellite Hardware Design

This Phase will also have two parts. Part I will be similar to Part I of Platform KHTT

Phase 2. Whereas in Part 2, the interns will design the following units:

l)2)

3)

4)

Switch Controller

Ku-band Receive Antenna

Ku-band Wide-band InPut Filter

Ku-band Wide-band OutPut Filter

Page 11: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

tPhase 3: Ftight Model Communication Module (FM CM) AIT KHTT

The PakSat-lR payload AIT will be divided into two steps. In Step l, pakSat-lR FM

CM AIT will be conducted in Lahore. In this, all passive units and as many active

units as possible will be assembled and integrated in Lahore. After completing all

PakSat-lR passive FM CM assembly and integration, the FM CM will return back to

Beijing where, in Step 2, remaining active units, if any, will be integrated and payload

subsystem level tests performed.

Justification

Fortunately geostationary communication satellites offer a transmission medium that

is virtually insensitive to distance. A communication satellite system can offer the

most reliable communication overlay and is rightly considered as a complement to

terrestrial networks of microwave, optical fiber and cable links. Inherent advantages

offered by a communication satellite, through its multi-point to point and point to

multi-point capabilities, afford maximum flexibility to a network that best suits the

needs of a developing country like Pakistan. It provides the fastest mechanism for

linking distant points as the satellite acts as a repeater in the sky overlooking almost

one third of the Earth surface, On the other hand, satellite transmissions are generally

impervious to weather and climatic conditions, and are not susceptible to sabotage,

which is the case with optical fiber based networks.

Realising the strategic importance of geostationary communication satellites, the

Government of Pakistan decided to have a long-term presence in the GSO and, as an

interim measure, leased and relocated Paksat-l at 38oE in the GSO for 05 years (till

December 2007), involving an initial one-time fee of US$ 4.1 million and an annual

fee of US$ 4.65 million. The lease has lately been extended for three (03) years, till

December 2010 for an annual fee of US$ 3.02 Million. Clearly, substantial

expenditure incurred so far on Paksat-l only makes sense if Paksat-lR is

implemented in time. And to ensure this, execution of the project has to commence as

soon as possible.

Page l0

Page 12: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

to Project Development / Implementation Plan

Due to the specialized nature of PakSat-lR project, it was decided to implement itwith the help of a reputed intemational satellite consulting company. Accordingly,

M/s Telesat Canada were hired, after completing the required tendering process, to

provide technical and procurement contract execution monitoring services to

SUPARCO. To ensure the quality of goods and services under procurement, a team

of l0 SUPARCO officials and 2-3 Telesat experts will be deployed at the supplier

premises throughout the design and development phase.

As shown in Attachment-7, the project spans over five phases, covering a total period

of about sixty (60) months, including twenty four (24) months prior to the signing of

the space segment procurement contract, but excluding Phase-5 (operations) spanning

over 15 years. In order to avoid delay and to ensure replacement of the existing

Paksat- I before expiry of its life in March / April 201 I , implementation / execution of

those elements of the project which were / are on the critical path (see Attachment-7)

was initiated immediately after the in-principle approval of the project, using funds

borrowed from SPD with the understanding that the expenditure incurred will be

adjusted against this PC-l (after its approval) through bridge financing and the

amounts borrowed returned to SPD.

Phase-I of the project, entailing mostly general type activities such as IT infrastrucfure

development, consultancy, frequency coordination and informal interaction with

prospective satellite suppliers, started on 03 May 2006 and is envisaged to complete

on 07 May 201l.

Whereas Phase-2, focused on the realisation of the Space Segment (i'e. spacecraft),

started on 30 January 2A07 and is expected to complete by 02 March 201l, i.e' after

successful launch and in-orbit acceptance of Paksaf lR satellite.

phase-3 of the project, entailing various activities pertaining to the realisation of the

Ground control Segment, commenced on 0l January 2007 and is envisaged to

complete by 07 May 20ll,i.e. about 03 months after in-orbit acceptance of PakSat-

lR satellite. Whereas Phase-4, focused on KHTT related activities, will start two (02)

Page ll

Page 13: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

tmonths after Effective Date of Contract (EDc) of space segment and end on 3l

January 201 l.

Finally, Phase-5 of the project, pertaining to in-orbit operations of the satellite, is

envisaged to commence on 03 March 20ll and complete on 02 March2026, i.e. after

completing l5 years of service life. Details of numerous tasks/sub-tasks/activities are

indicated in the Gantt Chart given in Attachment-7.

Keeping in view that space segment (satellite) manufacturers are generally not in a

position to offer cost-competitive solutions for the ground segment / satellite ground

control station(s), it has been decided to issue separate RFPs for the space and ground

segments.

Civil works

As indicated in attachments 8B-l and 8B-II, civil infrastructure requirements include

PGCS Karachi and PGCS Lahore alongwith their Allied Facilities with a total covered

area of 1,00,000 sq.ft, i.e. 50,000 sq.ft. for each site. Preliminary / provisional layout

plans for the buildings required are shown in attachments 8B-I-a to 8B-I-f.

Equipment and machinery

As per details given in attachments 8, 8A, 88, 8C-I and 8C-II .

Other physical facilities

None (except those mentioned above)

Governance issues

None

Mention alternate means of providing the same facilities

Geostationary communication satellite systems are a preferred means of

communication where large distances between the transmit and receive locations are

involved or where alternate means are either not available or unfeasible, e.g,, in the

air, at the sea, in deserts and in hilly or remote areas. Also, these systems offer very

reliable and quick to establish emergency or backup means of communications.

Moreover, there are certain type of services, such as video / TV distribution or

broadcasting through cable-heads or Direct-to-Home (DTH) seryices, which are more

suited to communication satellites. Hence, the available alternative means of

Page 12

Page 14: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

communications are

users.

7. Capital cost estimates

a. Local:b. F.E.C:

Note-4:-

unlikely to meet the requirements of prospective pakSat_tR

Million US$23.696

255.575

279.21t

Million PKRt,492.962

t6,t01.210

Total: 17,594.072

Note-l:- It is envisaged that upto eighty five percent (85%) of the contract value will be metthrough long-term concessional loan from the Chinese Government and theremaining amount will be ananged by GoP through grant / equity from pSDpbudget.

Note-2:- To cope with the dynamics of this highly specialized project, non-lapsable fundswill be required.

Assuming Chinese govt concessional loan (@ 5oZ interest rate) upto 85% of thecontract value (US$ 222.260 million) will be available in the next financial year,.Rs.1090 million (including FE of Rs. 894 million) would be required before 30th ofJune 2008. The figure of Rs. 1090 million stems from adding the already spentamount of Rs. 24.038 million during FY 2006-07 to Rs. 1065.138 millionearmarked for FY 2007-08.

Rs,704 million (Ell.l78 million US$) out of the total amount of Rs. 1065.138

million requested for FY 2007-08 will be used to make the advance payment toCGWIC after signing of the contract in May 2008. The balance amount will be used

to meet other related expenses, both already incurred (as bridge financing) and to be

incurred till 30th of June 2008.

Date of estimation of Project cost

April,2008 (Revised)

Basis of determining the capital cost

The cost estimates are based on:

o Prices given in cGWIC's Best And Final offer (BAFO) submitted to

SUPARCO at the end of contract negotiations meeting held on 27 Marchto 04

April2008 in Beijing China.

o Telesat Canada's price estimates for PakSat-lR Ground Control Segment

equipment.

o Informal interaction with the satellite industry'

o Most recent civil works contracts awarded by SUPARCO'

o Civil works oonsultant's estimates.

o Paksat int'l's estimates'

Page 13

,/(@ IUS$:63 PKR)

Page 15: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

{PCJ Ior Psksat-lt APril 2008

Since there are several factors (e.g. number of payloads or frequency bands, number

of beams, number of transponders, output power of each transponder, configuration of

the satellite ground control segment, configuration of the telemetry / telecommand

subsystem, etc, etc.) that determine the cost of a satellite project and a given satellite

project may be quite different from other satellite projects, comparative cost analysis

of different satellite projects may not be very helpful. Moreover, the actual cost of a

complete project is usually not disclosed. Hence, the cost related data available on the

Internet ought to be used guardedly.

The analysis of some relevant data indicates that per transponder per year @TPY)

cost for a 20-24 C and Ku transponders classical satellite system (excluding ground

segment) may vary between 0.396 and 0.667 million US$, with an average value of

0.515 million US$ (see Attachment-l0D), which when compared with PTPY cost of

0.467 million US$ estimated for the 30-transponder PakSat-lR (excluding ground

segment and KHTT etc.) indicates that the estimated PTPY cost for the 30-

transponder PakSat-lR is in line with the prevailing industry trend. Nevertheless, we

ought to keep pressing on the Chinese / CGWIC to further reduce their prices'

However, it is worth mentioning here that PakSat-lR satellite system configuration is

quite different from a classical configuration, specifically in the following two

aspects:

o four (04) CFIs will be integrated into the satellite (provided the respective

PC-1 gets aPProved); and

o encrypted and authenticated command and telemetry data links will be

employed.

o Year-wise estimates of Physical activities by main components

Item Units FY 06-07 FY O?-OE FY OE-09 FY 09-10 FY l0-ll

Space Segment 2% 8% 30% 30% 30%

Ground Control Segment (GCS) 2o/o 5% 40o/o 40% t3%

Know-How Technology Transfer (KHTT) 0% 0% 35% 30% 35%

Consultancy 3% 30% 22% z0% 25%

Communication Module FM AIT at SRDC

Lahore0% 0% 0% t00% 0%

SUPARCO

Table-2: Physical Activities Year-wise Estimates

Page 16: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

PC-| Ior PakSat-lR APril 200E

{

o Phasing of capital cost worked out on the basis of each item of work

See Attachment-8

8. Annual operation and maintenance cost after completion of the project

Million Rs.

BySUPARCO

By PaksatInt'l

Total

a. Local: t26.530 t9.730 t46.260

b. F.E.C:(@ IUS$: Rs. 63)

45.241 0.000 4s.241

Total: l7t.77r 19.730 l91.s0l

Table-3: Annual Operation and Maintenance Cost

For details see Attachment-9.

Note: - As decided by the Prime Minister vide P.M. Sectt's U.O.Note No.52-DM/DS

(lA-ZyZO14 dated24 August 2004 "the income from marketing of PakSat-lR capacity

I services fwill] be deposited in a special account. The annual recurring expenditure on

the operation, maintenance, and marketing of PakSat-lR, as well as funding of future

satellite programmes [will] be made from this account. The government should meet

any shortfalls".

9. Demand and suPPlY analYsis

It is understood that satellite communications and tenestrial communications by virtue of

their different strengths and weaknesses generally do not replace but complement each

other. Satellite communications are not only virtually insensitive to distance and national

boundaries but also can be established relatively much quickly as compared to other

means of communications, which makes them a preferred choice for digital video

broadcasting e.g. Direct-To-Home (DTH), audio broadcasting (e.g. satellite radio),

international communications for landlocked areas, rural / remote communications,

emergency communications, secure / military communications and mobile

communications in the air and sea. Satellite communications are also attractive for

private corporate networks e.g. Very Small Aperture Terminals, (VSATs), Internet

backbone connectivity, Intemet trunking, broadband Internet, TV / video contribution'

TV/video distribution to cable heads, and backup for critical links.

Page 17: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

{PC-t for Paksat-lR April 200E

As per results of the satellite market research and analysis by Paksat Int'l (see

Attachment-10), about 25 of 36 MHz bandwidth equivalent Transponder Units (TPUs)

are currently being used by various users in Pakistan, excluding GoP sensitive users, and

the usage is anticipated to rise to 3l TPUs in 2010 and 35 TPUs in 2012. Ot these, about

16.45 TPUs are currently on Paksat-l (see Attachment-lOA) and the remaining on several

foreign satellites, including Apstar-2R, ST-1, NSS-I & 6, Asiasat-2, 35 & 4, LMI-I,

WSAT-1, SINOSAT-1, PanAmsat-10, Eutelsat and Intelsat.

As regards, total anticipated demand for PakSat-1R capacity, Paksat Int'l has estimated it

as 40.36 TPUs in 2010-11,41.30 TPUs in 2017-18 and 43.71 TPUs in 2024-25 (see

Attachment,llC), assuming that all (100%) GoP users (sensitive and non-sensitive) and

80% of commercial users of Paksat-l will migrate to PakSat-lR. Of the total anticipated

demand of 40-43 TPUs, I l-15 TPUs are envisaged to be used by GoP sensitive users (see

Attachment-l lA), 3-4 TPUs by GoP non-sensitive users (see Attachment-1lB) and24-25

TPUs by commercial users, during the timeframe of 2010 to 2025.

Clearly, even if we base PakSat-lR payload configuration design on 70%o

forecasted demand figures given in Attachment-l lC, a 30-transponder C

configuration payload still seems justified.

10. Financial Plan and Sources of Financing

Beside PSDP funds allocated in the MTDF 2005-10 for SUPARCO (under Transport and

Communications Sector) and Space Technology (under Science and Technology Sector),

additional PSDP funds or a long-term (10-15 years) Chinese government concessional

loan, equivalent to about eighty five percent (85%) of the contract value, if available,

would be used to finance the project.

Given that the supplier / vendor will only be willing to arrange financing the project of

upto 85% of the value of the contract awarded, there are two different approaches /

options to consider.

of the

&Ku

Page 16

Page 18: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

{

First Apnroach

Procuring from CGWIC only the Space Segment (satellite) alongwith necessary

equipment and KHTT but without launch-plus-one-year insurance and the Ground

Segment equipment. The main advantage of this approach would be an overall saving in

the CAPEX. Whereas the disadvantages would be: (a) lower contract value for the

Chinese, implying lower amount of Chinese government concessional loan for the

project; (b) relatively higher amount of PSDP funds required to finance the project; and

(c) more work for SUPARCO.

Second Approach

Procuring both Space Segment and Ground Segment alongwith all necessary equipment

and KHTT from CGWIC. The advantages would be: (a) higher contract value for the

Chinese, implying higher amount of Chinese government concessional loan; (b) relatively

lower amount of PSDP funds required; and (c) less work for SUPARCO' The

disadvantage would be; (a) higher overall cost of the project, due to higher financing cost.

Specific details of both the approaches / options are shown in attachments 14,A and l48.

11. Benefits of the Project and Analysis

r Financial and economic analysis and benefits

Keeping in view that the proposed project has both tangible and intangible benefits,

business case of the project has been worked out for four (04) different scenarios. First,

taking total CAPEX of 279.271Million US$ into account and assuming a contract value

of 222.260 Million US$. Second, taking total CAPEX into account and assuming a

contract value of 241.174 Million US$. Third, disregarding the CAPEX of 28.829 Million

US$ which is related to the activities / items that do not generate revenue and assuming a

contract value of 222.260 Million US$. Fourth, salne as third but with a contract value of

241.174 Million US$.

Forecasted demand figures for these business case studies have been assumed as 70%o of

those given in Attachment-l lC and derived for three different cases (Best, Base and

Page 19: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

{'

3

Worst). The same are given in attachments I lC-I, I IC-II and I lC-IIL The corresponding

estimated anticipated revenues assuming base prices of 1.38 Million US$ for each C-band

and 1.29 Million US$ for each Ku-band 36-MHz transponder have been worked out, and

given in attachments l2A, l2B and l2C. These base prices are in line with the going

market trend (See Attachment-l0c). However, these base prices are not used as such in

calculating the expected revenues. Rather, a sophisticated pricing model developed and

provided by Detecon (during PakSat-lR FSDS) that takes into account discounts for bulk

sales, premiums for retail sales, pre-launch sales, long-duration contracts, and the nature

of application / service is applied to these base prices.

As per surnmary results of the business case analyses presented in attachments l3A-I,

I3A-II, l3BJ and I3B-II, the project is financially not viable, as evident from the

negative NPV in each case / scenario, which is understandable as all the OPEX and

CApEX overheads, such as cost of establishing and operating two (02) satellite ground

control stations, has to be met from the revenues generated by a single satellite.

Obviously, the business case will improve when the number of satellites controlled by the

same ground control stations increases.

Nevertheless, successful implementation of the PakSat'lR project will facilitate

introduction of a range of new services, including broadband Internet, digital TV

distribution / broadcasting, remote / rural telephony, Tele-education and Tele-medicine;

thus causing rapid growth in economic activity in the country. On the other hand, it will

facilitate establishment of cottage industry relating to design and development of

electronic equipment and video content production for video broadcasting / DTH and

advertising. Additionally, highly skilled and trained manpower will become available for

other hi-tech projects in the country.

r Social benefits

o Availabilify of telecommunication facilities in remote / rural areas

o Availability of additional training opportunities in hi-tech areas

Page 20: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

PC-l for PakSnl-lR April 2008

{

r')

o

o Availability of emergency communication facilities during natural and man-made

disasters

Availability of additional digital video / TV channels

Availability of the Internet and Wide-band Internet

Availability of better quality medical services in small towns / cities and rural /

remote areas (through e-Medicine / Tele-medicine services)

Availability of better quality education in small towns / cities and rural / remote

areas (through e-Learning / Tele-education service)

With the introduction of new/ additional satellite based applications/ services, there is

going to be a surge in indigenous design and development of electronic equipment for

supporting these applications / services, hence enhanced business activity and more

employment opportunities. A similar phenomenon is envisaged in the production of

multimedia content for presentation on TV and the advertising industry. Also, general

awareness about satellite technology is expected to increase at the national level.

Moreover, through this medium, our national viewpoint on certain geopolitical issues

could reach the intended audience beyond our geographic boundaries. No socio-

cconomic disadvantages of the project are foreseen.

Employment analysis

During the Execution Phase of the project, the requirement is 96 (86 officers and 10

staff) whereas the same during the Operations Phase is 140 (70 officers and 70 staff).

For details, see Attachment-15.

Against the total requirement of 236 persons (156 offrcers and 80 staff), 115 persons

(103 officers and 12 staff) are already available. To bridge the gap, an inductionplan

has been prepared and the same is given in Attachment-gA.

As regards indirect employment generation, it is anticipated that with the availability

of various new services (e.g., Wide-band Internet, DTH, e-Learning, e-Medicine, etc.)

suPAll(:o Page 19

Page 21: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

PC-l lor Pchsar-l R APril 2008

a host of new business activities will start and create, in due course of time, a large

number of indirect employment opportunities.

Environmental impact

None

Sensitivity analysis

All major activities and their time frames are indicated in the project implementation

plan depicted in Attachment-7. Out of a total of 24 different risk scenarios, falling in

five domains (project financing risks, regulatory risks, completion and performance

risks, market risks and political risks) and possibly impacting cost, schedule,

performance and know-how transfer, five (05) are envisaged to impact on the project

schedule. Risk analysis results and risk management /mitigation techniques in respect of

each of these five (05) scenarios are given in Attachment-I6.

12. a) Implementation schedule

Starting and completion date of the project

Start date: 03 May,2006

Completion date: 07 May, 201I (excluding operations phase)

Item-wise/year-wise implementation schedule in line chart co-related with the

phasing of physical activities.

See attachments 7, 8, 8A and 88

Page2O

Page 22: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

b) Result Based Monltoring (RBM) Indicators

S.

No.Input/Activity Output

OutcomeTargeted

ImpactBaselineIndicator

Targets afterCompletion of

ProiectI Approval of the

project.Projectkick-off.

PakSat-lRplaced at 38oE

by Mar/Apr201 l

Protection of 38oE

slot in the GeoStationary Orbit(cso)

Continued access

to the GSO, aunique resourceof great strategicvalue

2. Preparation andissuance of the

RFP for hiringSatelliteConsultants,and processingof bidsreceived.

Satelliteconsultant(s)hired.

PakSat-lR'sfrequency and

coverage plans

A newcommunicationSatellite (PakSat-lR) tailored to ournational needs up inSpace (at 38"E)before the expiry ofexisting / leasedsatellite (Paksat-l)

Availability oftelecommuni-cation facilities inremote / ruralareas

3. Hiring of civilworksconsultant(s).

Civil worksconsultant(s)hired.

r FullyoperationalPGCS Lahore.. FullyOperationalPGCS Karachi

Two (02) PakSat-lR Ground ControlStations, one inLahore and one inKarachi.

Availabilify ofadditionaltrainingopportunities inhi-tech areas

4. Preparation andissuance ofPakSat-lRSpace SegmentRFP, andprocessing ofthe bid(s)received.

FinalizedSpaceSegmentcontract.

o FullyfunctionalTelemetry CFIo FullyfunctionalTelecommandCFIr FullyfunctionalOBDH CFIr Fullyfunctional PDUCFI

In-orbit design and

technologyvalidation of four(04) SUPARCO -developed pieces ofequipment (CFIs)

Availability ofemergencycommunicationfacilities duringnatural and man-made disasters

5. Preparation andissuance ofPakSat-lRGroundSegment RFP,

FinalizedGroundSegmentcontract.

o Ninety one(el)appropriatelytrainedSUPARCO

o Know-how and

technology transfer(KHTT), toSUPARCO, relatingto:

Availability ofadditional digitalvideo / TVchannels

Page 23: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

and processingof bidsreceived.

scientists andengineers:F61 on

Satellitesystem andsubsystemlevel design,developmentand AIT

Dl0onProductAssurance(PA)

Fl0onSatellitecontrol.

Fl0onSatelliteOperations

D Satellite System -level design,assembly,integration andtesting (AIT)

F Satellitesubsystem - leveldesign and AIT

) Design anddevelopment ofselectedsubsystems/pieces of equipment

D ProductAssurance (PA)of Space/Satellitehardware andsoftware

D Satellite controland operations

6. Designing ofrequired civilworks andpreparation oftenderdocuments.

Tenderdocuments.

Availability ofInternet andWide-bandInternet

7. Issuance ofcivil workstenders andprocessing ofthe bidsreceived.

Signed civilworkscontract.

Availability ofbetter qualitymedical servicesin small towns /cities and rural /remote areas(through Tele-medicineservices)

8. Construction ofrequiredbuildings.

Completedbuildings.

Availability ofbetter qualityeducation insmall towns /cities and rural /remote areas(through Tele-educationservice)

9. Submission ofrevised PC-land itsapproval

Availabilityof funds.

Significantprogress towardsthe ultimate aimof achieving self-reliance (through

Page 24: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

indigenization) inthe field of space

technolosv.

10. Signing of theSpace Segmentcontract.

Signedcontract.

Enhancedawareness,amongst themasses of thecountry, of Space

Science andTechnoloev

t1 Signing of theGroundSegmentcontract.

Signedcontract.

12. Developmentof the GroundSegmentequipment andits installation/commissionins.

CompletedGroundSegment.

13. Developmentofthe Space

Segment(satellite),incorporationof CFIs,launching thesatellite and itsin-orbitcommissionins,

In-orbitsatellite (withCFIsonboard).

14. Acquisition ofPakSat-lRrelated know-how andtechnology tothe agreedextent.

61 engineerstrained onvariousaspects ofsatellitedesign anddevelopment,20 on satellitecontrol andoperations,and 10 onsatellitemanufacturingcontractmonitoring(productassurance)

Page 25: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

13. Management structure and manpower requirements

o The prevailing administrative, procurement and financial rules, regplations and

procedures of SUPARCO shall be followed in the execution of this project and

Project Director PakSat-lR shall exercise all administrative and financial powers

delegated to him by Chairman SUPARCO, The PD will work under the supervision

and guidance of Chairman SUPARCO and Member (Space Electronics) SUPARCO.

o Administrative arrangements for implementation of the project.

Implementation, operation and maintenance of the new facilities, specifically the

satellite and its ground control facility, will be the responsibility of SUPARCO.

Marketing of the satellite bandwidth capacity, however, will be the responsibility of

Paksat Int'l (Pvt) Ltd. whereas establishing satellite earth stations (e.g. Teleports,

VSAT Hubs, user terminals, etc) for supporting end-to-end communication services

will be the responsibility of respective users, which is typically the case with other

communication satellites. Proposed organisational structure of the project is shown in

attachments 17 A, l7B and l7C.

Financial arrangements for implementation of the project.

The project team will be led by a highly competent, experienced and qualified

SUPARCO engineer appointed as Project Director, answerable to Chairman

SUPARCO through Member (Space Electronics), who, for the execution of this

project, will exercise all financial powers delegated to him by Chairman SUPARCO.

Manpower requirements by skitls during execution and operation of the project

The requirement for professional and technical officials during the Execution Phase is

92 (82 officers and 10 staff) and the same during the Operations Phase is 132 (62

officers and 70 staff).

Page24

Page 26: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

PCJ lor PaNat-lR April 200E

Field-wise division of officers and staff in the two phases is as follows:

Table-4: Field-wise Division of Technical Officers and Staff

Sr.No.

FieldExecution Phase Oneration Phase

Officers Staff Officers StaffI Electronics 6l I 46 37

2 Mechanical t7 0 0 2

) Electrical I 0 2 2

4 Civil I 0 2 2

5 Information Technology 0 2 l5

6 Scientific Research I 0 9 0

Medical I I I

8 MTO 0 0 0 2

9Supporting Technicalstaff

0 I 0 9

Sub Total 82 10 62 70

l0 Admin 2 0 6 0

ll Finance 2 0 2 0

Total 86 l0 70 70

Page 27: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

PCJ lor PahStulR tPrit zoot

Skills / area-wise distribution of the required manpower is shown below.

Sr.No.

Area/Skills TotalStaff Officers Total

System Engineering

I o Programme Management 0 2 2

2 o Satellite System Engineering 0 6 6aJ r Platform Engineering 0 2 2

4 o Product Assurance 0 4 4

5 o Assembly, lntegration and Testing 0 6 6

Sub-system Engineering6 r Structure 0 6 6

7 o Mechanisms 0 I

8 r Thermal Control 0 4 4

9 o ADCS 0 4 4

0 r Propulsion 0 2 2

o Electrical Power 0 5 5

2 r Telemetry, Command and Ranging 0 7 7

3 o Payload 0 ll 11

4 r Antenna 0 2 2

5 o On-board Computer system 0 5 5

6 o RF Communications 0 2

r Software Development I I

Ground Control Segment

l8 r Ground Control Segment 9 8 t7t9 o Operators ll 9 20

20 r Controllers/Experts T2 9 2l2l r MCC/COCC operations l8 18 38

22 r SCC/TT&C operations 20 l8 40

Other Areas

23 r Pyro Techniques 0 2 2

24 r Digital Signal Processing 0 2 2

25 r Electronics 6 4 l026 r Secure Communications 0 2 2

27 r Civil 2 I 3

28 r Medical I 2

29 o General I l2 13

TOTAL 80 156 236

Table-S: Skills/Area-wise Division of Required Manpower

Page26

Page 28: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

PCJ lor PoWst-ll APrit ZooE

o Job description, qualification, experience' age and salary ofeach post

The details ofqualification, experience, age and salary for each post / position is as

follows:

Table-6: Manpower Qualifications, Expenditure, Age and Salary

The manpower to be deployed on this project of great national importance will be

selected on merit, according to the prevailing NCA recruitment rules.

Post / PositionSalary

(Pay Scale) QualificationRelevant

ExperienceAge

(Max.)

Chief Manager SPS-I2 Ph.DiMSiBS inElectrical/Electronics/ Telecom Ensg

a) 17 years for PhDb) 2l years for MSc) 23 years for BS

50

Depufy ChiefManager

SPS-I I Ph.D/IvlS/BS inElectrical/Electronics/ Telecom Ensg

a) 12 years for PhDb) 16 years for MSc) l8 years for BS

50

General Manager SPS-IO Ph.D&fS/BS inElectrical/Electronics/ Telecom Engg

a) 07 years for PhDb) I I years for MSc) 13 vears for BS

45

Manager SPS-09 Ph.DMS/BS inElectrical/Electronics

Mechanical/Aerospace Engg

a) Nil for PhDb) 03 years for MSc) 06 years for BS

35

Assistant Manager SPS-08 MS/BS inElectricaVElectronics

Mechanical/Aerospace Enss

Nil

30

Sub Eng-I/Sr.SA/Sr. ComputerTechnician

SPS-05 B.Tech Pass orDAE

a) Nil for B.Techb) 04 years for

DAE

28

Sub Eng-II/ SA/ComputerTechnician

sPs-04 B,Sc orF.Sc

a) Nil for B.Scb) 04 years for

F.Sc

26

JCO SPS-03 a. Matric, proficiencyin M.S. Officeb, Word ProcessingSpeed 35 WPM

Nil26

Dispenser-lI SPS-03 a. F.Sc. (Pre-

Medical)b. Matric withDisoenser's Course

Nil

26

Technical Helper-I SPS-02 Middle Nil 20

Page 27

Page 29: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

14. Additional projects/decisions required to optimize the investment being undertaken

on the project.

a. Development of Customer Furnished Instruments (CFIs)

b. Development of an Engineering Qualification Model (EQM) of a Small

Communication Satellite (SCS)

c. Development of Various Laboratories for National Space Programme

d. Development of Logistic Support Facilities for National Space Programme

Page28

Page 30: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

l'( -llir Pukor"lft

15. Cerlilied that the project prop{rsll has bs€n prepar€d on the basis ofinstrucliong

provided by the Pl*nnirg Commission for the preparation of PC-l for

Infrnstructurc Sector projects.

M.:hammad lqbal RaoDirectr:rSatellite Ressarch & Development CentreSIJPARCO. LahorePh # (042) 54204 r 8

C'hecked by

Dr. Muhammad Riaz Suddle (S,l)Member Space Electron icsSUPARC0. KarachiPh # (021) ?iel227

Ph # (02 r) 4644q32

Mai Gen(R)Chairman SUPARCO

(Rrzr Eussain )Date :

\l P tR(.'()

Ilaza flussain (Retired)SI"JPARCO

Page 31: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

List of Attachments

S#

Att # Title No. ofPages

I I 1

7 23 -acATroNt',tAF pAKSAT GRoUND coNTRoL srATloN (pccQIa8acrtl

4 4 T-1R FSDS WORK PACKAGES

BRoADT DES|-N PARAMETERS oF REVISED coNFlcuR4rloN PAKSAT-1R 1

---6 1 PRESIDENT'S VISION FOR SUPARCO

7 'AKSAT-1 R IMPLEMENTATION PLAN

6 I iSTIMATED CAPITAL COST. BREAKDOWNY 8A 3APEX FOR SPACE SEGMENT10 8B11 8B-l =ururrnlc neouInEMENTS FoR CIVIL INFRASTRUCTURE FOR PGCS KARACHI AND ITS ALLIED FACILII IES 1

8B-rl RU.TUREFoRPGcSLAHoREAND|TSALt|EDFAc|L|T|ES 1

13 8B-l-a LAYOUT PLAN OF PGCS LAHORE AND KARACHI (GROUNIJ FL(JUK 1

14 8B-r-b uevilr pleu oF pccs LAHoRE ANo KARAoHI (MEZZANINE FLo( 'l

15 8B-l-c AYOIIT PtAN OF ADMIN/IS BLOCK AT PGCS LAHORE AND KARACHI 1

16 8B1-d .AYOUT PLAN OF STORE AT PGCS LAHORE AND KARACHI

8B-l-e @ovEnreeornHK(50,000GALLoN)'ATPGcSLAHoREANDKARAcHl 1

18 EB-I{ -qYOW PUI.I OT GUARD/ VISITOR ROOM AT PGCS LAHORE AND KARACHI 1

'19 8B-l-o ffiE & FixrURE FoR PGCs tlrEs (KARAcHI AND LAHORE) I

881-ol I1

21 8'B-6tl runlrrruRelrtxruRE REQUIRED FOR PGCS VILDING (MEZZANINE FLOOR) 1

22 8Blo3 :URNITURE/FIXTURE REQUIRED FOR PGCS (CANTEEN) 1

23 EB-l-q4 1TURE REQUIRED FOR PGCS BLOCK'I

24 :URNITURE/FIXTURE REQUIRED FOR PGCS (STORE)

25 8B-l-oo 'URI.TruRE/FXTURE REOUIRED FOR PGCS (GUARDA/ISITO 1

zo EB-t-h CIFICATIONS OF FURNITURgFIXTURE27 8C-l -TI]EMFA/T FoR pAr(sAT GRoUND coNTRoL srATtoN (PGcs) KARACHI

28 8C-tl :OLJIN'||ENT FOR PAKSAT GROUND CONTROL STATION (PGCS)LP\HqEE

29 ED -uuo|r.Ib REQUIREMENT FOR PARTICIPATION OF SUPARCO OFFICIATS IN VARIOUS KHTT RELAI hU

\CTIVITIES / MEETINGS30 8D-l ]UPARco MA''IPOWMBE OEPUOYEDNT THE SUPPLIER'S PREMISES

31 8E-l =II.TNI.ICINI EFFECT DUE TO SALARIES OF THE MANPOWER DEPLOYED

32 8E-tl =INANCIAL EFF T DUE TO DEPUTATION PAY OF THE MANPOWER DEPLOYED

33 8E-il1 SALARIES OF THE OPERATIONS TEAM 1

34 8F ]ONSULTANCYJ3 EG SENERAL IT INFMSTUCTURE30 8H )ETAILED BREAKDOWN OF CAPEX FOR 'MISCELLANEOUS . QTHERS" IIEMS/AC IIVIIIEs37 I {NNUAL RECURING COST

38 9A 3PFRATIONS TEAM INDUCTION PLAN

39 9B AVERAGE PAY AND ALLOWANCES FO TECHNICAL OFFICIALS

40 9C qVCNECE PNY END ALLOWANCES FOR NON-TECHNICAL OFFICIALS

41 9D paxsar rrur'r oVER 1s YEARS (FRoM 2010 oNWARDS)

42 10 iorn[ sRrelltrE cApActTy USAGE tN PAK|STAN (EXCLUDING SENSITIVE USERS) - PAS | .l l-u luKE

43 10A ffi{AsoFSEP2ooT)44 10c ffiTHEDOMESTIC PAKISTAN MARKET (AS OF SEP 2OO7)

10D ]osTPERTRANSPoNDERPERYEARFoRSoMESATELL|TESWlTH2o-2aC&KM46 r14 SENSITIVE USERS'C & KU BAND SATELLITE CAPACITY REOUIREMENTS. SUMMARY

-47 118 Iry REOUIREMENTS - BASED ON FSDS ESTIMATES

48 11C ;oRFcAsrFE DEMAND FoR A c & KU oNLY PAKSAT-1R - BASED oN PAKSAT INT'L ESTIMATES

49 11C-i ffioNLYPAKSAT.1R.D|R|VEDFRoMPAKsATlNT.L.SEST|MATES(BEsT:ASF\

50 11C-tl 'ORECRSTCO OEMAND FOR A C & KU ONLY PAKSAT.IR DERIVED FROM PAKSAT INT'L'S ESTIMATES (BASE

]ASE)

1

R1 11C-Ul =onecnsTeD DEMAND FoR A- & KU oNLY PAKSAT-IR DERIVED FROM PAKSAT INT.L'S EqTIMAIEq (WORST 1

JZ 12A @nsro ellpAxser tNlr PRoJEc53 128 @SED oN PAKSAT INT'L PROJEcTEo DEMAND ) BASE cAsE 1

54 12C {NNEIPATED REVEI.IUSE SNENUS (BASED ON PAKSAT INT.L PEgJECTED DEMAND ) WORST CASE,l

55 134-1 C 30 TMNSPONDERS' CONTRACT VALUSE:222'260ut rsg

1

56 13A-2 3tJStr.tESS CASE Sutr,lt'lRnV nESUlf -WITH KHTT ETC 30 TRANSPONDERS, CONTRACT VALUSE: 241.174

MUS$

1

57 138-1 BUSINESS CASE SUMMARY RESULT. WITHOUT KHTT ETC 30 TRANSPONDERS, UON I t(AU I VALUUE: ZZZ.ZOU

MUSS

1

5R 138-2 ffiUiKHTTETc30TRANSPoNDERS'coNTRAcTVALUsE:241'174\il tsg

59 14A /FAR.WI.SF Ft INDIruC NPOUNPUENTS 30 TXP - CONTRACT VALUE 222.260 MUS$ 1

OU 148 lFAR-wtsE FrrND|Nc REoUREMENTS 30 TXP - coNTRAcr VALUE 241.174 MUS$

61 1(

62 16 ffireGtes63 174 XCIruZITIOruIL STRUCTURE OF OF THE PROJECT

u 17817C-t vrh.lpowER REorxREr,tENT FbR PAKSAT-1R DURING EXEcurloN PHASE - DET ILS-

66 t7c-tl ;IfrFowER REor.xREr,,rENT FoR PAKSAT-1R DURNc oPERATIoNS PHASE - DETI\ILS

67 18 -IST OF ABBREVIATIONS 4

Page 32: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

dI

PtroE?Io,UP

oLo?-oJIo&,ovoLPcoI+ttroEctooooEcG?ILooooEo.ts-o+.Go

o.o

=troPIEIoJ

Page 33: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

4

NIPtroE.g(Jo,UP

oLosoJ/\o(Jc,cvco

t-*,IE+,o-oL+atroIEtrJoLI*tGoIGo

CLo

=tr.9PIE(,oJ

.iF"?

5Cg

;:.ii FE sEEEEEg;E

Page 34: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

(rtI

coEoart

EotgLoY@C)(9o.tro

.Jo

{JoElaJtroaE3I(,

IIE@J(go.

a.(u

=c.9+aGooJ

o

o

Page 35: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

*

WP-a :

WP.b :

WP-c

WP-d

WP-e

WP-f

WP.g

WP.h

WP-i

WP-J

WP-K

WP-I

Attachment4

Paksat-lR FSDS Work Packages

Definition and segmentation of relevant satellitecommunication markets

Assessment and analysis of the competitive environment andreg u latory constrai nts/considerations

: Marketing and sales plans

: Concept development and cost-benefit analysis

: System and mission definition

Development of Paksat-1R business plan

Risk analysis and managemenUmitigation

Know-how and technology transfer

Programme development plan

System architecture and design

: Preparation of RFP and bid/tender documents

: Know-how and technology transfer to/of SUPARCOpersonnel during the FSDS

Page 36: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

.*

c.oe6oEtL q)

gP ;-g =5

.co 'Y o j-c

PE 6i -g;$ i E [s*IE= F.g q;iEE= eF FEt F .s E i >i: 6:E 'E y o ri eE Ebif+:; $; ;EiE3€3 E;s EE:€;{g EEt srE 'o !r.S E ;3u ;E

IE;;f E E:E q:rEs; E$ i5E €;: e 3 € i:Y =E^&fr e;i 3sAE=E!8 EqE <.q;3?;E ;PE EC9.E b € ._X g .-EgF .!efrE+*E€ sri E$O- F E ZN TEE E,qfr EEE EF g[5 €so o o o c", O. Sit .Glcg.a EQf;ffE pi

F"-=' ffi: E 5 sE

F E P*r- lEA

.iE g:F i€-€E Ef;E FPg

=.; 5Fa gF;

3tro

€cr,.EFEI

cto.YGo-go

!-*J(EL5Ui;:Etr=Atr EF g

6 ="i 5rr I; ;o aEi

=.g fr?h .,

-q Pso NME'=-F-rF .Eofi Io €5: :O EE: gb PRH !{rO.cl.E=o, J:lr ;_F -o=; E gF ,S:E E EL " il;,iFS FE t n F o

oE

=x €EI:,q v, iEvtqoEgbo.g.t;E EE E-E20d,=Cro-

tr,9ooo!t(EoLE

Page 37: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

Attachment-G

President's Vision for SUPARCO

Page 38: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

-r\ troEt)IE

ottM

ffi

Il'Ii!;>

i6ta6E

I>;tbSF

ta

cgo-coIE

coE.Ect.Et,

I

lgoJGo,

o

P

d

EIot*l

E

t0to

tctc

INtoto

I

)a

ecq

,

t

Ni 3

jl6E

oto

tte N

N

o:

oa

)

DI?

E

ao

t

oR

a

3

oo ?te-' t!

-tv

El;

b

E

D

5L

t

Es3o

go

o

N\

e

N

Eo

ao

o Io

6o

0

6q 6o

oo F

!

oE6z:o.t

(t

a

I

o

I

d

B.

g

Iq

sqo

o

d

o

E

E

_9

qo

q

c

t

g

o

zXE9E;ts

E3oo

!tEe

d .lJc^gEb

!o

o

'-g*Fa4ix0E_sEiE69o9FO3=

EF,DZ

o

e

=

oE

5.

Ft

EeL

o

oD

I

o

L

o

e

E

2d

gEg

Egp

s

ooe

E

Eo

6

=plF !lEelF r'i- -l

I

.5

z

!

F

o

o

o

5

Y5z

9.e

I

E

e

.rE

3o3e

o

r()Dac9,I

9Ja;FN

3

L

x

t

o

U

Eo

JJ

Y

E

=tLI

I

&

;u

3

EF

Eo

oE

IJo

D 5

q t n I t t o ) I o a c D!

,!F

Page 39: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

rltl

clol"l

plolol"l

lFI0lol

l

I

,-lII

EB

oo

oN

3

bD

No7

?Ii

3tB

F=

t0

o

=

o

o-nt

ciatE0I

Ego

NN

ooo

:

F

n

o2

i 3o!

D

5

: o

-

o

=

tE

D

c.9o

o

go

t ! N

D

g,

3 NNN

t6 F !

Nts

! il

c

o

NN

6

oE6zJ

o

Eo

e

qs3

=

-=

cY

tJ='otoY.

e?

?

Lg

ooE

oo!

:E

oqooo

J

.asCAti

5Edgq

L

.6

6

EEo

c

E

Iu

L

o

goE

o

eo

6o

.9

,r4

o

pogq

&ec

2

e

o

oJ

@

zF

5

g

U

E

o

o

E

o2

v

E

o

=:)._ssE!5t

B.io:

u

o-o

z

Eo

o

tt

Y

'Io

e

EL

Y

a

o

6

o

o

q

e

=aoo

o

oE

U

=o

(

ao

a

Ec

ca

g

]o

ooE

o

(f

?oo

pAI=ceo

h

a

aoog

L

o

on

o

D

{o

a6

9lxnBF

e{

E:9^r3TogqE*i

oI(J

o

oEE

AF

c9g{di

=

=

od

o.9

E

o.z

+o

c

eo)=

do

e t DC t D

? aD?

DI

tt o o neo D o Do t

c

-{trcoE.coG

E

ffi

W.t

igia!!,ir

I!E

E6

l.

cso.co

flG*.coEoCL

su

I+a(EoJoA.

3Ef=

Page 40: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

?coE.g(,t!

c)@,iE,tl4@f

tts(Eoo

I

ooo(g,ECL(ItoE'o(g

Eotu

cq qqslqqNo ooFFoON

BE E 3 go- - o

CC € *nu E € .

Etc ?€sF9g-E-*ECec E"-stEEgeFE;

s€ E:.3si^=;eE9 a

E? s$:FdiUOk

Page 41: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

c,I

oE.coo

oo!eoc{mho€od€tF..trtrtoNFN€ddc{

ootoooTerqu?cga@ttF(ot(ocNtsN€d dt c.i

oo|n€N€IF@ol\qo!u)olthotoNOF'\Ncfj

oooooocoqqqc0coc

t p8 t\olqaOF(ll?n?t@N-Cr-TF

No@ots€- -+- a

ooooooooqqq?o900

3 33 3

t tt teqqqooco

?

3 E- {eE=3 Fe s; EiEg

EEeE;qsgB

gEiEgaigEi

goEEtoU'oooCLooxlUo.

o

Page 42: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

Na(\l

(oo

oo-i

s|l)

(c;@

t\N@v)c.{ F

oooocqO()

ooooqu?i-N@lr)

aaol(v) No$

oroONqc!olr)lir(r,

OEFtlq\r+Nro

N(O@t\N

oo

cio

o(v)o(oqqN (?'@t\(\

Fu?r\$l

oqqN

s\N

o

G)(\

ooo

Nq(o(o

F\q@ra,

oq$II)

\t o@b ooa qoio c)(0\i(o

t\c?€

FO $slo lr)NO O)nio (c;

ro coN

o(v)\o)

oqvt.c,

(f)

Fo(')so(o\qqNOd)to (oN

do(')o\tro

+EaFd)E09

EE9HsE-6:6coc99*=o;

= $; ;9dsaT FC E;F ; EI6.= ^E =

b b

ssfiEs6i o{c?nu?N 6INNN

E:6EcosF*gEEs ! v--

€ E ;EP p lr8+ Es?99,f .gFE6: 9,XE OI; \Y' a=h ut!E0r)

* =E; E:5e#tr135: ::::

{

ootgoE.CoG

oo(9

goEEDo.n

Egoo!ttr:oL(9l-oxUJo-

o

o

o

Page 43: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

EA!cI

= x :: x x- - ax x xx x xx t ts= P dF i= 5F F tF b Oo O oF o <a; Fj drt @ lj.i c,i oF o i- a

tt

tt

ttt

ttjtt

t

ttt0

ttD

tq9

dEo

EgEOL

I Xt< :i :<E- 5-5.6- 6-o tso o ob @N @ NF O@ O

ttt

o

oc

Ioo

0

0f

Eo4oa

U

!D!

oEo(aono

e:Eae

E

o

Iq

oe

o

ox

ts0

o

ee

o-of,1,N

0aEd

5

oI

Io

uc

-

od,Eo-e

8;=ocoio

ttt

.F?4!

J

tIt

iti' E E

tz

i.

dto

o!E:o)9

E

o ao o9 9P P R* @o o oo oo o @o Fo I6_

tt"t2

€oo!)F=i5!f,<c

ttt

ddEhtso

-o;E!3

t?toC.

3*3iFoc

5irF)dt2E

83t))

i;cg!gF6 E 55 E 6d st 'ist <i el6 ts O@ O F,j di

t?c

;o;oIoociiiss

oo o o ooo o o ooo o 6

tt

I

iieE*EggFct rt z

t

i9ssg

EE

igu

E53EaE5.3)

=39io: FT;E.'

ooo oo o@ NO Oo @0 @O FO ON ts@ I

?Bt"

9lc-E Cts bntgs

tt

9-E FqB< g

o N @q o@ o tso tci d .t{ .i

,"

oo

o

ttE99 E =

'99q96

:*sia,gge: H*H*E : d;

' EEEEiTESF i

,l929t!di!b6i5t;5 e;Eti?iiz )

En - {.! -iry a? lv? @ rN NN N C

Ttr€II

-E oFF

o(Eefl

oo

=IIElrttg

o;tro

oot!Yoo(,o-

eo

=IJfQog

.uoeotroEo'=crouED

.sEg5lr

O

o

Page 44: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

:c;Ns

9

E 6 55 5 66 5 a

o € No o oo o c6 N @6 @ o@ fl C- b 06 o o- o cd; N o.t ai rJc,t oi stsoo

t?t

9f

tto

tt"

a"

ttcc

t

tt

D

t

c

-dEo

NE!o

q g9 I :its EE 6" 6-o tso o ab @F @ NF Q@ Ort

tt

a

0

xo

o

o

tl

4o

!

0

?6

I

(ahda

E{E

E

o

o

!

o

f

I

0

o

o

g

E

e

=)!.iEoI50

Ca

t

I

aoF!I(,

z

I

dEoc

D6

EEi6

o)tt

EF;i

&fiJ

ttI

ErE. g

EeEt E 5

t

t

ttoo

0i€!o)! r

E. E.E. E. g3 38 3 3o No 3rt

€o,rEr5EEiL

a

ttt

d;E&Foc

EF

t,

-.+c;olFo4

ai;rF)da2E

H;3Ei g E

5 E d5 5 6o o No o oo 6 0N @ N

t,o

;Eoi€5eE e

l!;EE s H

oo o o ooo o o oo6 0 n o€-a{ N. t 9

ttt

9g.:t.eE a

l!€Eest g F

tt

rO9 t 9r ^6 -= O 6i,ii!E5E::85E;9fi 'JO

63

igu

5sBizEE.3(J

o5_3 SH.

; e-

E. H.E. E. E. E.6 NO O O O3. p.3- E F. $-N NO 3

ttD

9t oE BI.E boae

o.o@_

F

tt

E^g $qe< g

E R Ets ts@- o- ts-o.

6n N

oc

o

22 ;=B? i

s;fr ;?3E sEi ;d;;g r c E9 Eei

ii$iE!t?rgiF";;i F

tD

i q _-ry al 9v? @ F

=I

o€'![ *

otr.goclfly

o.9gool'|.t,eo=t,c.E

oooJ@(J(,q-

eo

=(,5oEg

':oootroEo'3EotrC"trEcalr

o

O

Page 45: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

l-I

+1.ol?l+.1cl

EI(rltEl

EI

o

o

tr

Jltoz

9qo

FzUUF5d@U

fi

ztreu

far

ooa

uII

UoEE

@II

uIr

utruo

;Eo

:zUIIF

=

$tz

EEU

I

Page 46: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

EooJIJJzzNNLrj

ff

uUL

ofiF

uoLL

UJILL

>o

IU'

3

Hi fli fliH: Hr Hr

Hi Hi Hi

Hr Hr HrHH;H;Hi Hi Hi

Hi Hi H:

Hi Hi HiH: H: H:

Hi Hi Hipd;U;d;F

9tr

;9(9

iqrH:Q:=HiHiHi

d, fl ft,

Hi Hi Hi

Hi Hr Hr

Hi Hi Hi

Hi Hi HiH: Hr Flr

Hi Hi Hi

Hr H: Fl:

Hi Hi Hi

iI

I

+1.EI€l

EIEI.cl(rl(El

fl

o

o

Page 47: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

phz4UP

rn o->o=O29e.on?

I

9l .Tl '.olTItrlgl-clotfirlEI<t

toodtrooI,IJoFO)

ftd)Lu

fftF

oo(,ztrLrJLIJ

IIOI<ltl<tYlolzl<luJlEIolII<l

sloto-l

3lOIolJlml@l

zl>l?lblzlJI

il:t

Fot(Ll!: r.t

Ffli)i a

=o

#<-cuootuuoc 30lM-,6 r'rr

Fz-Hwfit

F5da6t(L

uScHrol_Nf lI3UnCOUd

/ 3UOr-StooEtoOuJoFo)

UJO -.t7)2u2otr

t__uu9U<trZtLtro

Page 48: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

rrl+l-{trl0Pl

clEI.cloltgl

tl

CYrJr--t.t

Page 49: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115
Page 50: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

tlTl {ol0gl+rl

EIrlHI

H rI

I

aT

+,

-ul

Eooto.=.9

go

Page 51: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

tiutr.9

=

oic=;5tb88Eo

r0qo)

NNd

(os$

gta0aN

lr)oqo

t\c!

o(0\ot\

ci

(oF'F?N

o:sq$5iltYEfiEEoao

ooqo)

rc!\|.o

(osf

$

gtt0aN

1r)

oqo

Fc!

O(oc\o

N

c;

(o(vllr?(\l

goCL

(,ooo

E'|.g

==ooo(,4

eGo]C

eo).II

d]@O

I

coE-coo

c)o@

o-9l!Ect(,

.9.'6q)E

c\lg)I(naoI

gq)

Eoo

ooooolto.EoNNo

oo

C)otlo

I'(I'-

o!.o(aqlJ

I(n@O,Lq)

Eo(o

ooacooc(E

o

.9,ocosg,J

I

dI@o

I

coEEoo

ooa-vood]a.=

E

U'

oo!L.oroo)

I

IDooI

gq)

E-coo

ooaq)

oa

3(!o!

€(oo)fI

c0ooI

coEc()(E

oq)

@

Eooto'6

E(g

oGoF

oz.D

c! N $ic!N

a?N

nN

ctttTo@o

I

troEoIEE

o=ooo(9o.LorhoLT^voALi.l-OoUEq,Jlo F

-L'= tE

-&riO-GEKeY=vtottJGoL.o!,gG*,oo

o

o

Page 52: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

FE

Et

I

EE

gn

ttI

II6 g

E aa

aE

86 E

2

aR t

It

g g

I ilE

E6

I Y

E

F il

I6

to:

I €I

!

E

Et

!itl

t t

!Ia

t

r!

I 3

I

J

€t

9:9

6

IE

5

t53

a

a

a

tf

i_!

ttIaia

tt

15

EE

IE

.E

E

I

t!,ed

d

E

!

I

3I

td

t:

E.

tE{gi

o.9rvc:o(,o

=,ooo('Go!EEgoEI5xtrgJ

fE

Page 53: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

I

iiI

t I6 g

a

tilEt

R

s

I

III !

6

I

F

III

I

! I I

!;rI6

Ia

II

t!

F

t 5 Ed

fr:li'g

5tiI

I

E5

I

'EtlE I

;i a i E

ir?II

g il

ar ! E

t

It 3

cEE

1lPit g R

6

fi il

E

IE6

g

g

EE

tI

Ig

!It

ti

6

a

E

d!It I .! E

I

E9I

I

IdtI

IJ

oE

tg

Ia

e!

!

E!

i!

o0Eo

o

o.oI=ooo(,coE!qoEI

Ig

EtE

Page 54: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

o

5|ltoIE=

(r)xro(\xroto

@ (ooao()

(fooa(o

cooU)

EE;o

EGt,Ectu,

sl tfoooo

oooos

g.GlIE

u?NJ(roNx(o

\t taoolr)

oOoa(o

3b

FI

EfittttrIE

o

si tooooN

oooo€

9b

HH

EoEtroo

tit !cooolf)N

ooooo

CDr=Gcs5o

EoEc,ott

rO(f,

u)(9ooorO

ooC)rot\

gll.E

E'I.E.go

U?(\x(0x@

@ (oooooto

aaOoocf)

btl!:

EEo=P'i

oEocooC

o

oEo

ooL(L

=cfq)

o.Eolll

0,oL(L(u

oFo)

EEoLU

ouIE

o

Etrocl

troEtG'CLoo

(c't'gg'luauqclBDV)

uaolue9

(v)cDI.?o€oI+,coE.goG

fl+.

troo*,c(E

oQo(9o.Lol+-ttoL'5ETotE=fl.xl!ot=.'!icl-

=lr

o

o

Page 55: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

9llgEDcooE

hNJ1€xo

o o

oo

oooFN

o0o

ofixo.ixo

o o o o aoo

9o=6'FqJ

-c?

xc?(\,(a

N o n o oo@

o

5oI€I

oxoc,ixon

o o o NooN

o

EoIgl')Fo't

Ixcl

xn

o o N N \t FN

gEt! .:E€'tt a)

ax6

xn

o o o o N No

o

3b

HE

E6octro

o o NN s

3FHE

!oEoo

o N o N oN

o

aiE6)

IFtcoo

o o o o o a (o o (o o(o 6(o N{

o

6FoJe

oo

oNxao|xh

o € ooo

!t6

o9Eo

-c?Nx@x€

o o oN

oNts

p

=Io

o

0x

6o

oocoi!

oooooiI

g

tro

EIY

Eo

o

o

tIE

E

Eo

.goo5

opY

odlsF

ogoE

occ(L

E

(J

cdt:snE@€fi'sg

==eGO

.g .3

.go6:Y(L

uJ

'=ED

oo

o'=E

Fo6o

o'tr(L

=c

o

o6E

o

Fo

cF

tie.

a!0tEtq

co

6aoI

(+Fgg-lueuq.lP$V) tcolg uturPV

\tPoo?troE3(,(t

J(,I@(!!

EEtt

oooA

eIto'=EotrE5xito

=,=trtt!

o

o

Page 56: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

PE.0€o.)

(oxto

xu)3t,

C\ Noooo

ooooc!

oooo(0(\

;ig€xll':,

x(9

c! (\oooo

ooooN

b=La'E56o

ttottc,IE

oCO fi,

oorO(0

oorJ)o)

o?ocL.otrG6Fo

ro(\x

rDNxu)fit

ooLOCO

ooro(f)

e#OF

u)Nx(0x€

oooooo

bt|I=

EEo=&E

Go

o.o-o@

FgGot-

ootL=foo-!ooEolrl

o()Lo-(E

o

Eo$EU'trl

otGoFtcag

c'

tr6'EtIECLoo

(Freg-lueuqcteDv)

aJols

u)EDIT@ocIgtroEs(,(E#I

oLo+,oU'ooo.L

€EoL'5crouoL5*rxiIo5.=cL:tlt

Page 57: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

gtloF

nNxtflc.ix€

o C\ (\loootf)

oooo(v)

ooI

g6

$E

ttt!t,gGo

o (\I Noooro

oooo(f)

eb$E

ttotgoo

o (\ NooooN

oooosr

g6

HE

E.EttcGo

o N Noooto(\l

oooorr)

6oU'

!to!tct!o

r..c) o roooror

ooro

G

o

EIEttgt!o

(f) o (Y)ooo(f)

OoOo)

ottoFfiEoo

g?(\xtfl,erixg?(v,

oooro(f)

ooro(f)

-gl|oFooEo

u?(\xc,x€

ooooN

oooF*

b"lt:EE$,r

EootrEof(.'

tsoouo.=u,

Fo(E

o

ooL(L.=

fooEo(gEu,tU

ooILGoFpooEv)uJ

otrGoFT'trgc,

coEtGcLoo

(t't'gg-luauqclegy)

uroourol!s!A/pren0

., a0,( oi)IT

trc,oIfEoE.coIE€fl

Eootro:!noEEG5(,oo(9o'

et.g=crotr,o:xiIE5tc=t!

o

o

Page 58: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

s# ITEM NAME SPECIFICATION stzE

1 Multi-Computer Workstation - 25mm thick top Shisham veneered press on 700 densitychipboard, front side and back made of Shisham wood (seasoned),Provision Key Board Drawer and bottom for 08 Computers, footingmade of solid Shisham wood, all chipboard edges covered withShisham wood.

(approx. 47'5'2.51'orequivalent

2 Multi-Comouter Workstation - 25mm thick top Shisham veneered press on 700 densitychipboard, front side and back made of Shisham wood (seasoned),Provision Key Board Drawer and bottom for 06 Computer, footingmade of solid Shisham wood, all chipboard edges covered withShisham wood

(approx. 35'5'2.5)'orequivalent

3 MultFComputer Workstation - 25mm thick top Shisham veneered press on 700 densitychipboard, front side and back made of Shisham wood (seasoned),Provision Key Board Drawer and bottom for 04 Computers, footingmade of solid Shisham wood, all chipboard edges covered withShisham wood

(approx. 25'5-2.5)'orequivalent

4 Executive Chair - Seat Height Adjustable Gas Lift Type With Swivel Confirming TuvClass In 3 Standards, 5 Position Angle Control, Nylon WithReinforced Fiber Glass Base With Zinc Insert For Strength BifmaStandard, Wheel Castors Heavy Duty Nylon Tuv & BifmaStandards, Back Shell Height Adjustment Knob For PrecisionLumber Support.

Standard

5 Office Table - 25mm thick top Shisham veneered press on 700 densitychipboard, 02 sides Drawer boxes with superior quality handlesand lock, Drawer inside , front side and back made of Shishamwood (seasoned), Drawer bottom ply wood, footing made of solidShisham wood, all chipboard edges covered with Shisham woodN.C.lacouer flnished.

(approx. 8*6'2.5)'orequivalent.

6 Computer Table - Structure made of 700 density chipboard, both sides of formicapressed, key board tray running on imported channels, top edgescovered with Shisham wood beeding, footing made of solidShisham wood,N.C.lacquer, mate polish.

(approx. 3.5'2.5*2.5)'or equivalent.

7 Study Round Table - Structure made of 700 density chipboard, top edges covered withShisham wood beeding, footing made of solid Shishamwood.N.C.lacquer. mate polish.

(approx. Dia. 6'& 2.5'H) or equivalent.

I Computer Chair - Computer revolving chair, seat and back shell made of 15mm plywood, covered with a- grade foam and upholested in desired colorfabric, with revolving fitting mechanism, exitra length hydrauliccolumn, nylon base with PP arms.

Standard

9 Counter - With Side Rack, Counter Structure: In Laminated Board OfDesired Texture With Edging , Second Top And Front On SteelWrapped On Mdf, Side Rack In Complete Computer Provision AndLockable Drawers, Back Rack Having Drawers And Sliding Doors

(1 5-3'3) or equivalent.

10 Work Station - Table with Side Rack, Top 1'thick Lassani wood laminated withbeach formica. lower skeleton made of aluminum dicasting legsPVC covers alongwith low portioning with computer provision.Shutter and Drawer in Side Rack.

(approx. 5'5'2.5)'orequivalent

11 Workbench MS silver grey metallic powder coated tubler frame of 16 gauge'Top plastic laminate (tuff) pressed on chip board with importedPVC edging by REHAU. Back: fabric wrapped on soft board insideof back (texture as desired).

(approx. 4'3.25'5)'orequivalent

12 Storage Cabinets (lron) - lron Made with Adjustable shelves (approx. 6*1.5*8)'oreouivalent

13 Storage Cabinet - Top made of desire color wood VB stain matt finish'base in desirecolor VB stain matt finish with 04 open book shelves & 02shuttered cabinets for books keeping.

(approx. 3,5'1.5'6)' orequivalent

Specifications of Furniture/FixtureAttachment-88-l-h

Page I of2

Page 59: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

(D

(D

s# ITEM NAME SPECIFICATION SIZE

14 Ex. Storage Cabinet 1" thick solid Shisham wood seasoned structure, backside withShisham pressed ply wood polish with lacqured brown polish.Desired number of Shelves & Drawers

(approx. 3.5'1.5-5)' orequivalent

15 Visitor Chair - Shisham wood finish with arms, seat and back covered in fabricor Rexine.

Standard

16 Sofa(O2 Seater) - With arms, covered in cloth or Rexine with high quality Foam,wooden frame.

Standard

17 Sofa(O3 Seater) - With arms, covered in cloth or Rexine with high quality Foam,wooden frame.

Standard

18 Sofa (01 Seater) - With arms, covered in cloth or Rexine with high quality Foam,wooden frame.

Standard

19 Table - Solid Shisham Structure(Seasoned), Top Shisham VeneeredPressed On High Density Chipboard

(approx. 4.2.5.2.5)' orequivalent

20 Table - Solid Shisham Structure(Seasoned), Top Shisham VeneeredPressed On High Density Chipboard

(approx o''z.c'z.c) olequivalent

21 Table - Solid Shisham Structure(Seasoned), Top Shisham VeneeredPressed On High Density Chipboard

(approx. 6''4*2.5)'orequivalent

22 Table - Solid Shisham Structure(Seasoned), Top Shisham VeneeredPressed On High Density Chipboard

(approx. 6'2.5'2.5)' orequivalent

23 Equipment Table - 25mm thick top Shisham veneered press on 700 densitychipboard, Structure made of lron/Aluminum

(approx. 8' 2.5. 2.5)' orequivalent

24 Meeting Table - Solid Shisham Structure(Seasoned), Top Shisham VeneeredPressed On High Density Chipboard

(20"6'2.5)'orequivalent

25 Meeting Table - Solid Shisham Structure(Seasoned), Top Shisham VeneeredPressed On High Density Chipboard

(12',6',2.5)',orequivalent

26 Dinning Table - Solid Shisham Structure(Seasoned), Top Shisham VeneeredPressed On High Density Chipboard

(8'6-2.5)' or equivalent

27 Dinning Chair - Solid Shisham Wooden Structure, Top Quality Foam Seat AndBack, Top Quality Fabric Of Desired Color.

Standard

28 Rostrum - Structure made of Solid Shisham (Seasoned) with SUPARCOLogo embedded on front side.

(2-Z'C) or equrvarent

29 Chair - Shisham wood finish with arms, seat and back covered in fabricor Rexine.

Standard

30 Seminar Chairs - Shisham wood finish with arm for writing on right side, seat andback covered in fabric or Rexine.

Standard

31 Executive Meeting Chairs - Shisham wood structure and finish, with arms, high back withclassic design, seat and back covered in top quality foam, fabric orRexine.

Standard

32 Conference Table Spec: Frame: M.S. Frame with powder coating Top finish: InLaminated Board of Desired Texture With Pvc Edging

(4U'6'z.b)'orequivalent

33 Conference Chair - Revolving chair, Seat and back covered with top quality foam andupholested in desired color fabric, with revolving fitting mechanism,imported hydraulic column, Nylon base with PP arms.

Standard

34 Wall Cabinet Overhead filing cabinet, in laminated board with PVC edging. (approx. 5.5-2.5.3)' oreouivalent

35 Window Blinds Horizental Strip , Strip Size 1" (approx. 8'6)'orequivalent

36 Comer Table Wooden Structure with top clear imported glass of 08mm. Standard

Page 2 of 2

Page 60: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

Attachment{Cl

Equipment for Paksat Ground Control Station (PGCS) Karachi

o

o

in Million Rs.

s# Name of Equipment Estimated Cost

1 TT&C in C-band (including 13 m Full Motion Antenna,3.3 KW Klvstron HPA)

183.750 2.917

2 Satellite Control Centre (SCC) 21.000 0.333

3 Monitoring and Control System (MCS) 10.500 0.167

4 Ground Control Network (GCN) including Fibre and

VSAT link

10.500 0.167

5 Communication Operations Control Centre (C!qq 44.100 0.700

6 Communication Signal Monitoring (CSM) withInterference Detection and its Geolocation capability(including 9 m C-band as well as 9 m Ku'bandantennas with complete RF and base band chaineouioment)

166.950 2.650

7 toT 12.600 0.200

8 Test and Measurement Equipment 26.250 0.417

I Ground System Test Bed (GSTB) 21.000 0.333

10 Cabling/switches/d ucts/grou nd communication network

for PGCS Karachi

44.100 0.700

11 Antenna Calibration System 21.067 0.334

Sub-total (FE) 561.817 8.918

12 Essentialspares in FE (@ 5%) 24.833 0.394

13 Supporting machinery and equipment (e'9. UPS,

Power Distribution System, Switchgear System, PABX,

Aerial Work Platform, etc)

39.375 0.625

14 Safetv, Security and Surveillance equipment 15.435 0.245

Sub-total (LGl 54.810 0.870

15 Essentialspares in LC (@ 5%) 2.741 0.044

Total for Machinery/ EquiPment 616.627 9.788

TotalTotEssential Spares (S# 12 + 15) 27.573 0.438

Page 61: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

Attachment-8CJl

Equipment for Paksat Ground Control Station (PGCS) Lahore(in Million Rs. MU

s# Name of Equipment Estimated Cost

1 TT&C in C-band (including 13 m Limited Motion Antenna,3.3 KW Klystron HPA)

152.183 2.41C

2 Satellite Control Centre (SCC) 21.000 0.333

3 Monitoring and Control System (MCS) 10.500 0.16i

4 Ground Control Network (GCN)including Fibre and VSATink

10.500 0.16i

5 Oommunication Operations Control Centre (COCC) 44.100 0.70(

6 Communication Signal Monitoring (CSM) [Assuming thatthe existing Paksat-1 CSM equipment will be integratedinto this facilityl

18.900 0.30(

7 Test and Measurement Equipment 26.250 0.417I Antenna Calibration Svstem 21.067 0.3349 Cabl i ng/switches/ducts/ground communication network for

PGCS Lahore44.100 0.70c

Sub-Total (FE) 348.600 5.533

10 Essential Spares in FE (@ 5%) 15.225 0.242

11 Supporting machinery and equipment (e.9. UPS, PowerDistribution System, Switchgear System, PABX, AerialWork Platform, etc)

39.375 0.625

12 Safety, Security and Surveillance equipment 15.435 0.244

Sub-Total (LC) 54.810 0.87C

13 Essential Spares in LC (@ 5%) 2.741 0.044

Total for Machinery/ Equipmenl 403.410 6.403

Totalfor Essential Spares (S# 10 + 13) 17.966 0.285

Page 62: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

ooo(ooooooo@ooo,\qeqgs?qoNa(v)ooe

ooooooooooooooaqcYqo?ca?\toNoooo

o

Nr,

ooooooooooo*o@o@o@OtOFOOo(\io;oooo

!:

N

oo?

oo

bo)o

oooooooo

ooooooooooooooooctctooo

Eg g9

fl ;et EF gi

aEgi isaga;EgEfr Eg H qEI

?**s- g EEi*E? tggE3{*g:B*E€ iB-3E5EaaEsFHAgEs T iHE$i F!iH:F$ ia{

oI

a

;J

=poococq)

a)

oo.;ceq)

E

Eq)

on

aU)

oo(!3o

o

t!q)

.;E

Eq)

F

ooz

o€IgoEEOPCDEF

'E- €-oo

=oo:=o

ItogotFFTYo0o

E.goEoooEo.

=at,

o

ooo.oEtgo-Lo

oEo'=ctouE)

E

lr

Page 63: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

otE5.EEoCLx

ttJ

k==o

ooooqq$sfo@Or- qrr

oooooooooooo ooooooooooooo oo_ o- o. o- q o- o- o- o- o_ o- (0- o-O) (Q l- f- F- @) N l() s !O C{ CO tO@-itOOO(gO)r(OrO)(g So- (o- o_ o- o- or- ry @- oq @- q .i: @-(f)Nrrr(v)tO@o)@tOF- O)rrrFr

E'oqNtoqo(\|

tl

+oox.9Fo

oooooooooooo o oooooooooooooo o ooo_ o- o- o- o- o- o- o- o- o_ o- o- o- o- qoooooooooooo o oo(o$@@@(o@o$o@N o oQcq c! o- o- o- ca $ @ @ @ $ ca- o- (o @

rrrFr

ooooNr,|,l}

o3oCLco

=

t,oocL^9uiuoozo()Fo

Nc\q919@(r)$rof-rrl$= P 93 ol

i€ iEE

=o

ooooooooooo$ o 6mca N co co co c{ N c{ N c! c{ N (f)

FaF

2-loIEo

U)'troo

=.gabitr6.'9, 9g*r*t-..F gt EE.[ s

Egggggggfiil;FEgi'EErooo.oooo.ooFo,io.YOozio

N(O

.ToctI

o

(,G

oo.9EoLo.oL.9CLCL5oo.c*J+,Gt,o

-9o.ooo

.Ct

o+,l-o;ocLcIE

=oOto.fU'

Oooo(ooEot.Eo

-c)=irJoo-co.og(Eooo- j.<G=o)datro)udOro- q)

-J9()s)EoFFg-qPoP3qlo5:tE r

Page 64: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

otru

U'o+,oLoo.!toooti ru

€o-=otrtro;i |ltFO,^ cLeoo(gLoctola-ooo

-g(gU'

IBIOI

9'oU'!tlc,J

€\gla0u?N

I6CD

d(n.(o

wtrffi(0€-o

F'o(eC"ol

ou,

,n(?N

N@

etN

ano(.,rdu)

99lf

td(oto-N

4a3a(0-o$(0

TToooro

(ll-oloz),t g

o)ara,ttro,

(0

\o)(og?

N

(9o\g)oqat

6,a?F.|t,Na.€

\t€ro{€o,c?

.ooqU)r?C\

NNqoIN

o)oct|olct

(tCD€_N

\o

rO(Y)(o-a!t(0

(\oo-oto-

(oL-eooz) rtg

I

mroq\toq

c0ooq

roc

@tr:c!ct

I I

roro19-U)(9-

I I

(eo-sooz),Ag

I INr+,(\Ig)

ctoolc,(o

co

rQl|)a9I

I I

N(tot(9

I I

ruBol suoperadg N € € 3?0c t t (,)

Nro(a co o)

|'Ueol uorlnsex3 N € roN

(0$ 0 t o ro o rO

r#N

Ioo.o

IoGo

oIo

o-o

o!Ioo

.t)

€oIoo-o

o0IQ0.o

@oIo

Go

rooIU'a-o

\loIoGo

(v)I

Ioo.o

NoIo4o

ooo.

ul

=(,

UJ

=C)o =(9

otri(!trc'

=

otrt!|lt

=

irEo:gt5;tflfEr6!!.: gi4'6r.g5fiEo -d.Ed5(Jovru)

(,

CL

Eoo\ro+obooj,=(!9'6r+r

=.oEaoCNP

C)

o)

{ootroCL.9oo()T

do

E+€cLt j

Ept

frEe6g >tr Etr;,n2 (\l G.t $ u) tr N 30 t

.?luc,

I+,coEo(E

Eoo-CLoot-o3oCL

^-. CI(E-=

oF-*.lFoIT,oLlg(uoo+,o5E+,oo){-

^rts-uJv

Eoc(ucll

Page 65: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

EruoFgot(,oxt!ooo.go

s5CLoo

IB}OI

c,oe€@N

I€qNt{)

Nal

!4

c,(0olooq(0

6ett|no|€

e 99

vd00t

q,\loo-N(oN

G'NF-cDNro

I €,(0\t(?

(ll-oloz),rr

ooo-N

ool\roc)

oNa"?

00

ctfc!oro(0

oN\€(ac!Al

I

N

NN

N

\Itt(o

oc,

c.idlt

I

oto^(o€

(ol-eooz) Ag

oeq(\|

o(\\toac

Nm

o\fo,leloq

N\€nNN

I

N

eriN

(\\ro(0

o€c{c)

o$o-(o€

(so-eooz) l,g

ooeN

e(\l\ro(Y)

Nrrl

o*s!oloq

cN\clctqN

I

N

-NN

(\lF-u)(o

oG'qN(9

e$sl@q,

(eo-eooz) ,,t'r

ooo-N

oN\U)et

N!tE

ott(\!oroq

N

toNN

I

(\|

NN

(\\(t(0

oc,

cf(?

It(D-(o@

ueol suogeradg (\l F c, c)(9 t t iiiii;

n(9N

rO(a (') ctt

ruEsl uollncaxf N € rO(\l t!!t c $ln

o |o o ro

Fg(\

too.o

Ioo.ca

oaoco

otoIo

o-u,

€oIo

o.o

oTo0.m

ooaoIo

roIoo-o

tIoGo

(vt

Ioo.o

NoI

U'o.o

ooo-

IJJ

=o

LrJ

=oo =o

otrioct!=

ooGtrG

=

Eoo.c, o

€;tflfEE gE

gHEo .c .Ed:oct u, ut

o

CL

Eot)o6+oboo,:.= .E

9'6iE5r cl5(l,u)j-

(,oI

oooCLoooo?

do-i+€cLt j

EEItsEg^*

Ffi*'EclJ(/,

a2 N (? t lt) o N art t

=Iulct

I+.troE.coaE!tqo

oa.ooLo

=oCLgIE

=o?+,rFo(Eo-co*,(u+.=ctooo+.o5E+,ooEIIJ

(E'6c(uclr

Page 66: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

Attachment-8E-lll

Salaries of the Operations Team

S.No

Post Pay Scale

GrossMonthly

Salary - Rs(Per post)

ogEoa!3b5oo- O't.g .E85'o

bP

$iEoo

1 CM (E) SPS.I2 128.759 1 1,545,109

2 DCM (E) sPs-l1 107.074 2 2.569,776

3 GM sPs.l0 75,202 I 7,219,4124 Manaqer sPS-09 56.575 18 12.220.254

5 AM sPs-08 4s,433 33 17.991.303

7 Manaoer sPs-09 48.990 4 2,351,506

8 AM sPs-08 40.027 4 1.921.298

1lSr. Gomputer Technician,Sub, Engineer-!, Sr.Scientific Assistant. etc

sPs-05 28,394 23 7,836,767

12Sub-EngineerJl, GomputerTechnician. CO. etc

sPS-04 23,269 35 9,772,893

13 JGO, Dispenser-ll, etc. sPs-03 17,795 3 640,635

14DEO, Technical Helper-|, Sr.Lab. Attendant, Techlll,Sanitary Attendant-|, etc.

sPs-02 13,982 I 1,510,A02

Page 67: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

tt.?coEsotE

o

ogG

=f6troo

o

Page 68: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

(,€goFE{()g

No

!)o(,

oLrlJ+,C)rtJL+,oGt-la-F--FG'Loe-o(,

EoqJ

99rf,ocu?Ft\

ooto Nci Fr

$t.C)oNOrf)q:a?ooo

roooF-SO(Olr)I*dcici

C)(o

ci

oo(\r

q

oo)oC'N

r

q

Gl rolO f*cid

gloa

00oo(\a

lt

q o@(\

ci F-

F-SO(o lr, l-ooci of

€oooNlt

q

oa0ooNlt.

q

ooogc3

Dc33f

ooooF- F-gqoo3H

OO

(o(o(oooooocqqooo

U9lr)sof-OOoorr)99a?ooo

bcog

rlr)N

oJ

so9rlOOtr) ofo0c\,1)o)o\(!

oot!o'6oCLotroo-

ooooEE

[*g[ FgiiiilE grig[EE

$[-Igi[Hl-iggi

oo)

Eo.coJ

.sF@Zo5€{sH9,u(, \JLZ-o.=ouBgo-gt.cFdq*s0t!ta6<zd

rs!o N('\f ro(oF-@(', o (\

Page 69: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

oNq)oo

"lloqJ

ou?o

Irooq(\l

t\c,EEoooqs

Ets0q€t,

ooN

l'|.

o

oq0

octreeN

l!

q

orf)o

Naoocoqoo

oN

tt

glIFeeN

oJ

(\Isooo@ci cini

tttN

€?ooN

lJ-

o

oqo

?(0ooNi

:oqo

ooogtrD

ot()F-ao

(\to$ooocaoo

ooo\o

IgoFo.9,

1.tto

bc(!5c,

(oss(g

ocoa0(.t

'6oaooctLIoooEE

Ei*E'' sn l E*,;,E

FlgE=raIgggurafigliil*Ex:tstrfr?5d$n;3li;?!:HFE;:"Fa

EggAFAE $E:l=36as?E-lEEAXn??=?i r$ssRgH q?6

g;ggi;fiaaltrgrga;g;,

gefr;frEHEEF E[gflHFF cgH$

:tto (ostrr(or-- -

(9c9

coI.e{{Jg

ro-L I

J+,ot)L.*.oGLrar?--ts-(ELoF-o(9

o

Page 70: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

qt

=

oo

:=I

oEo

Io=ootrgoC'.9FoxUJooo

'otlJ

ooo

5oF

( ! EEaEE EEEEE EgFESri OO-OO oOOOO OOOo C

'

FFNFF

5 H: 6 6 VK 6 6 6 ; 6 Uti Ne 6N rn a OF (o O N N O OF o; ;,: .j ci oo rt ai o o o od -O F-

sfiEEdEEgc-NoOoOtNF

IoqD o

3 sBsEs sEsas sEsEE) ooooo ooooo ooooc

EE Eoo csHgg g EEgE EEE

rj dcj o o oo o o o o o 3EgggEBE30'oooooo

Ior0o o

3 88588 88888 8888EI Oo@OO orOOO OS-oFEi dd-cid ririrtdai riciciai ct rFNF?

gNHH q EqHE HfiEgN5rj dt- F O OO O O O O O ()O

YBHtsdXdEtN@@oF9@c-ioidctoci*NF

sFOalcoo

i EEEEE EEEEE EEEESvi OnOO0 oFoOO OOOO CcF

ii ts6 ts v K6 6 6 E + E iE E4 qq i q -q q q 9 9 q qc? cO -$ O O OO N N O O O (){ C

iEEEEEEEFOOoo()O()oq oo

oo

L

EEEgE EEgE Eooooo oooo c

i EEEsE 5q E q q q qo oo o o o o oo o3 Hg E Et OO O O

EEoosEEEEEEE:iOooOoOo

cc}|t oo

i EEEEE EEEEE EFEEFri OO@Oo OFgOg OOOOa+F

H HE 5 X IE E E E I E ;H Eri -* o O oo N N O o o o.t' o

FEREEEEE-ooooooo

ff,Pc

0o0o

E

aci EEEEE EEEEg E=EgErj OO@OO oFOOO OOOOC{F

ft ts6 ; V X6 6 6 6 F 6 tF E5 66 i N Fo o o N - o oN {ri -ri ci o oo ; - o c, d oo c

FgEEEEECcjoo-oooN

oo o

i EEEEE EgEEE EEEEEj ooooo ooooo ooooc EEEE E EEgE EEgEEEd ct o o o oo o o o o o oo o EEEEgEooooooEEoo

INo

EEEEE EEEEE EFEEEoo<ooci ri-ciuid ciciciei c

3

f

oo,N AE ts V K6 66 lbq i ot .:g u?

F -O O O OO

o ts o q0 0N F O ON Io o o oo o

FEHEEEEqCjOO-OOON

ooo o

baooN(

aoF

i EEEEs EEEEE EEEEEJ oo@oo o-ooo oooo oH H5 H E FE F g E E Eci -c,i o o oci 'j o o o ci

EE Foai c

HFEAEEEq--O-OOnN

0o oo

II

3 EEEEE EEEEE EEFEEj ooooo ooooo oooo c

E E g E E EE Eo o o o o oo c

g Eg E Ecj OO O O

oooooo

SEEEEEEEjooooooo3'!) oo

3 EEEgE EEEEE EEEEE: OO@Oo OFOOO OOoO C

5 5 5 5 6 66 Eq q q q q cq cr O O O O OO C

H HH H Eai -N o o

ooNOoo

HHEHgEEq--OFOOON

fqf oo

ocFooNl!

(o

EEEBE 8EE8Eooooo oooo cDj

66666oooooociaicict

g H5 H 5 HE E E E E g EE Eo +- o o oo o o o o o ON c

IgREBBBBdoodocicict

D

o o

u1

c3 EEEEE EEEEEj ooooo ooooogEgsocioci

g HSEE EEEEEEci oo o o o o o oo c3 EE Eyi oo oEEEEEEEEciooooooo

flc

T EgEEE EEEEE EPEEErj OOoOO OOOOO OOOO C

SHER H HEEE EEEEEE; ;; o ci oo o o o o o oN o

PEEEEEEgcjoOOoOOo

@No asloo

tsI@oo

\

o6.d

totolF-tIr{

I'

I EEEgE EEEgE ggSgEi ooooo ooooo ooooc

id Hi: H E EE E E E E B E! €Et +- ct ci oo o o o o o oN c EsEEEEEEdooooooo t

3 HEHEH HEHsE sEEEEj ooooo ooooo o9oo cS HE E E EE E E g E E EE E- oici ci ci oo o o o o o oo c SEEEEEEEjooooooo

oIo o

qJ

3 EHEHS EEEsE EsgEEj ooooo ooooo oooo c: Nii H E EE E E E E E E! E; c,i- o cj oo o o o o o oN c

sEEEEEEEjoooooooo\ oo

E-E r E? teE - ;; rii i 6E 6

&& e pB A

o

ooo

9-_=o

Bfie&ta

er Hr ,8fi&- &.- ip

oo.Es .S€d: d=EE tsE,o ood oodu.

HHHEEEq-OFC)OnN c?f

N.9

e=

0

o PEFP ps**froBNN- -q95 p5 F *v g

!eE6E=3oo

-arg9giggsgse6o6009

€-oE' E"g* g"Eu5tq8q 5qq5s 5qqgid'r[ns 55ssr 666nY

* HHEEe HEHH{FHEFEE

i*$€$$E EEEEF$$$$EI3H $ -5

g.9G.9tEoEeop|Jp

E RE^CC5E a 6 6 ^= !E= :3.g Hp ep p ElsEsceR T; T':e =F r-? "E Ep Hgg ffE9., rs HB f.-8 E€ ip€ iE;€ E?A F6 J% :E 5:E

=3€ee,as F f;EpEg E EE EEE E# fiEefEfS I ?59F5 * +.? +:,? +i {

,€€c{r$

t;3iEFEEFEgEgsFS

Etr9tbgF:"" r,

(,)isiEr:T-(., IOT!n

Hi

o^oo

5goo

FE*r.?t-EEgff;EE;3E€sEEBFgii

*at, N o

5p

Ic,ItroEI(E

Page 71: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

tcE

==

ooI

oo'to

oEog

o

oI

o5ooc!oo

,t2

=oxlrlo.

oo

T'gctoo

.eGO

bgZpntsFE* EOOF()

I€I

goEIr!

Page 72: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

Annual Recurring Gostn Million Rs.

s# Item Description L.C F.E Total TotalM US$

1

2

3

4

5

Industry support during satellite llfetime

Salaries of the Operations team(For details see Attachment 8E-lll, 98 and 9C)

Frequency Coordination

Equipment maintenance

Miscellaneous

Utility Bills (electricity, gas, water, etc.)

Traveling (TAiDA)

Contract transport

POL and repair & maintenance of transport

Telep hone/fax/l nternet etc.

Stationary, documentation, etc.

Others (including building maintenance)

579

U.UUU

700

25.501

65.

0.

22.000

3.000

3.500

2.500

1.500

0.750

1.500

0

1U.gUU

0, 840

25.5Q1

.000

0.000

0.000

0.000

0.000

0.000

0.000

1E.900

65.57€

1.U(

il.402

22.00c

3.00c

3.50C

2.50C

1.50C

0.75C

1.50C

0.300

1.041

0.024

0.349

0.048

0.056

0.040

0.024

0.012

0.024

00.81

Attachment-9

Note-1: Recurring expenditure of Rs. 19.73 million in respect of Paksat International (Pvt)Ltd has not been included here. For details see Attachment-9D.

Page 73: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

tr-0v02 Al u!

luauroJ!nbau 'lppv N N € lf ro ({ o)(\a a.t o)

01,-6002 Al u!

luor,uor!nbou 'lppv e o c.t e o (\ o o

60-8002 AJ u!

luoruorlnbou 'lppv o 0 ae, o o o t o o

80'2002 AJ u!

lueuarlnbou 'lppv o o o c c o o o o o c

luor,uor!nboutPuoll!ppv lBlol

(\l t 4., !N t |o N

|lt0., ft ol

ptaH ^pBallv

N Ncl

UiU o 19 N to o ro

lueuaJ!nbauJO/\AOdueUU IEIOI

g{ tl (o FItt ol t oo(tN

(t!i ct t

ureol suolleJodo N @ ctt ct(,) \t t f9Nrrtc) .., gt

ueol uollnooxS (\l oo roN

t.o!i o rt o ro o ro

r$N

f.t)ao

a(r,o.@

oa

U'r@

o)oa

@o.o

@oI

@aU'

i

OroIo4o

q,o

I(tto.3n

looIo

o.(t,

lfoIo

o.o

|YltoI

@Go

NoI

@oo

ooo-

UJ

=()

lrJ

=oo =o

oC'ctc|ll

=

og(!trG'E

{jtra!

-d.9aooo4.9IJ 'E.FtrFOoaJ,q u,

b6E{EE9tre'6.d'Ef

gEL

o!)OE+oboo.:,= Gt

9'6raofou)F

oo

gootroTL.!2oooa

d(!.iav, l\l

*EdaP+E5i.9,o o

5.jrl!?ctr.e|!GF!t!d55IJJUSo<<

,n2 N (t) t lO F N (? tf

3

ola

trotr,gItg

tr(E

o-

=otF'o5E'EEIEoFoco*a(ELoa.o

Page 74: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

oe. (g

P

\tc!(r)t

o)tJ.)F.odN

sNFJ

NN|l)r

|f)F()_@ro

oa.ns

(o

r.r)(o

€D(f).

oo

so)(a@GI

CD

(\(f)

N

roo)r-r

ol€o)(ft

sC\.c\l

Egu

(f)

[email protected]

rJ)c{sot

@

o-os@_F

(?,(,@-o

o(oaro

(f)

Norr)

r.,(oro-s

olN(ort

Noot(f)

|ftrf_N

CD

ol>.EBootllot-, (D

(0Na9rol

os|f)_

vN

vct)

o.iolct)

N(o@-

F@.(o

()r)N.o

F

o,

o)(Y)rod;

tr,€od

ct)ootd

(f)

N(',1_

(f,

(Y)FN-(a

-(i

$joI

oo

ooo_N

oo()" Po

oltr

;qEoF

or)- o

(o

EJ:eo

tr)@(t)c.i

rf)|rtNsi

(ov (')ao-r|r)_

@o- @oF@

(oN

l*-Nr{)

oldi{ Ns

(0(a(a

!a*f6toooN

o()F-NN

otr)_g)

oo5!-t< |f)

otJ.)_

o

;

ocnoFJ:6<

o otti

or)N

oo@-

ErooA

oqs

oo.

ooc't

ooc.lN

ooN6i

(oFO2e

o)Nf--s

|r)s

o)rtcoNrt

3(t,o"(a

N(0

c.i

(f,

F-

SEU'A

Yo)

t-

s()r_@

No@_

lr)

6N

Lr)

()(,$

(osNd

ro)roc.i

r)g-N

Fo(t)

oi

c)(t)\

(ots-@ot_

F-

;

xo-vo\:<o

o(o. N

,5ootu:<uJ

rnror

ooro@

oo|()

9ss5 F<o

ovN.

stc!

oitN-

os(\J

o@

o@

o@\t @v

o(os s(,

Ego<-o)Nr-3

ooqY

o)@_

o

K'@ts(.)

sG)o

N@

oi(f)r-

ir@-

o(ao.

(atr)

oF

o oq

g+so)

F-

s@F.(o

F.o@d

F

|r)

n()-t

(avo{(f,

Iro)|r)-c!

nsoi

N(ac.i

(?)F

(09q

(o

N.roo"

aaFd'8o

rot@-(aN

os|r)ot$l

()ros_o,

oNOr"

@

oN

t{)

o@o

rr)rf)@_

@

or o(0-N

or.lr)

oN@-ir

o(\o.r

s|f)

rt

oro o N o o aO F (0 o $ m c{

oo)

oF

Ir!

a

o

o

Page 75: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

otc

oo

(o(\l$(r)

(ooatr

Irs(f)

F-ot

o)(f)N.|r)to

oo)o)-@$

t\(\ao-o\l

rr)o€_o(?)

Fsto)-f-c\,1

N@o"

C{

o,(')lo_

N

o)s(v)-(o

@t-N.N

@NN.

Fsu

(r)$N

F@_

orO(\l\t-o)

oooo,

ost(oF-

(')rO@-rO

o(ov,to

(Y)(\o_tr)

(r)a0rO-

sNt-(o_

(a

N(ary(t)

rO

s-N

@

o-

lD>.Epoo5IlOJ-4,

(oNN"N(\l

6$rf)$$l

sa,o-N(\

o)"o)

t-cr,@-(f,

t-(?@-(t)

loroN-o

C.lN

o

o)(v)1r).

@

(v)@

d

o)oo)-t

(at\ol(t,

(t)NN.(t

;-9 E

$!;ooo(\

oolo-

ooo-

o-nE$F Otr

C'!

oo|f)o

oooo

ooo(o

p-g *

fE=rO(o(f)N

rf)rory(\

(ostg)_

(to)@-

t-tr)-

@o-

(o(o€

NGO

o)(oF

t\f-lO

(\qt$

C!ov(o(t(')

lelooo(oN

o|r)N(\N

oolfr-o)

ootrOrg (,

E=oo1r,

ootr)_

ooo_

o

3g5<

ooo(oooort

oorf)_(\

ooo-

EOsg5<

ooo_(o

ooa.s

ooo-(Y)

ooo_(f)

ooo{(\l

ooo{N

;,n*o(f(o

ooc\t

oo-c'i

orEO

E<IJJ

r.|)l'.-q)

ooNoo(o

oo(,

Bt-c>g!

o o<o

osc\t-

o\fNJ

ogo{

oslN-

o@(o

oaO(o

o(oso(os

o(o\to\t(t)

Egt=E<

o)(\f-s

q,lo-!f

a@(')

ro@t*-(o

s(t)o-(')

(\(o

ni(t)F.

\?({)@-

@(f)

J

(r,(,I

ooo-ooo_

ooo-

ft\to,oI\

s@N@

t*(r>@

'rt

€t-(o-rf)

|l)lfr"\t

(Y)I(\t-(')

Nort)-C\'l

ros-(\

T\o(v)

ni

o(f)\

QstJ

(oo(\I-

i-oo_

; eFfitgU,

lr)\f(o(r)N

rovroNN

|f)(tsto)

roC!o)€

oF-r{)

o@o

(orO(o@

ot\@

oo,(oN

lO(ot\|r)

o(\@s

o(\losroaO(t,(')

oIq,(.) S,,l o ct) @ F- (o g) { (', N

oo)

I

troEoIE

a

Page 76: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

otc€c

lelor(9eoqau?(l,(r)N(oFr?C'FF

(ool€(o

c(\E

E

utt

.!s

o

.9

.;(!o

I(!

ooz

9Z-tZgZ

vz'ez$z

ez'zz0z

zz'rz0z

,z-0202

0z-6t02

6r'8102

8r'LV0Z

Lt'gtoz

9D'9t02

9r-vvoz

?t-tr0z

eu-zr0z

zt'rr0z

,r-0t02

N€€oq\g(f)oFsrNooNoqoqqo)@tf,C')rF

lf) I- Fc!:r(ot-sf(r)rr

@F(Ao?qqN|f)N(f)Fr

(oor(oO)r(od+-NFr

sooNO)(0F* o.i o(\lr

@(o\rt\ F- (O

S-o)NF

F(O@u?q\NO€Nr

@o)Nqqo?oq)NN

Arsf(o@NddF

-@o?qu?(o€(o

@oq)CDNO'dNri

@c\sro(o$ritod

FNIJ)\eqN(o$r

O,NNu?q-olos

N\€o)q\t

trftF(9

ea(o

6aoq|f)ln

t\(tro

ctt(0ttq{olcia)

(9€+(v'

u?

(a

rlq@N

{q(ool

q(aN

(a\o)

oQ'

IE'6tr(Etrl.l-

s(noq9Eooo)m.cEE-of.Eao92d();F5E

lgoF

,ott6)!

aicoEoG#+,

oE3

tottLo!coo--o(\EoL$-

oLGol()IFLooxIJJo.o

I

*,s+,GoJGo-

og)Eo

Page 77: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

ctN

s(oN (Y)

s@

3rl @N

o v ro@

rr) Nrool

NN

ulFi

c(\lr\s co

ND

NN r+ @ o

@o rt N

rr)N

o0(\

Fst

(o

Nts ov co (o (\

r{) Nrt r() N

rt)C!

ola

o0oN

F\t r (\lN

(,@

os o (, tf!f

o oo (o(\

!\

'o,

trN

@oena

Ns r)(\lN

@r. \f o (o(', ')

ro t\ oN

6no,

IEN

00N

Nq

roI a,

o)I

No N @ sl Do @ (o

(\ilo

t/it\

ttcoootro=EEll.

zfzD

3

zo

)3zD

Y

zo

3z

Y

lzIl

ozoY

ozdt

ozd))Y

z

)

z

g

z!)

ozofY

zd)(-)

lz!

ozdlo

z!

iI=(l

cF

a

IL€tICcaC(LFnI=c(rC!(':Eu

oo.Eof

E

E

-U)

Fo

o

Jc

fooc

oo

P

oq

e

c

oo

o

F

o)

ooJ0o.9o

zU)

'tro

o;zq)

=q)(Itg)

o)oo

oooo

xu(!co

oo

.uo

oG

(5

o

eo

.;

(Eo-idlo

()

o)oo

Eo

o=6

I

g

'Eox

o

l!

ooo.E

oo).FoooGY

F.

o'toEEooEE

o.9

ov,Eoof

g.

Eo)

Y

3

zGol

o

F

oo)

@

o

EuJ

oo

'6o

ooG'=

E

oQ)

j-

0)Eo

oo

I

() F

C'zN (r) $ to N

3ctI

troEo

HEya9-1+t-a Jtl

of*'or!o.

IAoLoo=o.tEotrooE)?-E5()xIUvcIE+ao.l(go-.goE'ooDtP'6G'CL(gooEo

*algU'(E+,oF

coo

INLa)g

U)

Page 78: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

aa,

Attachment-10A

Current Customers of Paksat-l (As of Sep 2007)

S.No. CUSTOMER LEASED CAPACITY (MHz)

TotalMedia Limited 52 Recorder Television Network 53 NADRA 1

4 PTV Corporation 18b Information System Associates 8.5o 24-Seven Media Networks (Pvt) Ltd. 6.57 Galaxv Broad Castinq Networks (Pvt) Ltd, 4.5B Independent Media Corporation II NLC Communication Proiect 3.510 Hiqher Education Commission 40.511 ARY diqital 912 Virtual University 1813 Special Communication Organization 3514 Special Communication Organization

Earthquake Relief Operation4

15 Labbaik TV 4.516 SUPERNET 5.2517 Sunbiz (Pvt) Ltd. 518 Speedcast 519 Puniab TV 4.520 STAR ASIA 4.522 MASALA TV 523 MCA 3624 Roshni TV 425 Dawn 10zo Sky Vision 10827 Mobilink 4028 Kashish TV Network 429 Wateen Telecom 1730 Pakdata Com 1031 ARY MCPC DVB Link 15.532 Troohi TV 4.533 TV Today 4.534 WAOT TV 4.5QE. lndus TV 11.536 Telemedicine 237 PERN 438 PITB/Suoernet 1039 Quick Link 240 GEO TV 22.541 SKY Links 3642 Stellon DBS Germany 3643 PTV DsNG 4.544 ARY DsNG 4.5

Total (MHz): 592.25Total (36 MHz TXP eq.): 16.45

(Source : Paksat lht'l)

Page 79: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

E'g(go5Y

LIEo

NI=(9(r)6of

I(.JOo-(0o)ry

qJOn@(o

-

L'oo^Nlool

I OO@-F-f-I-

oOo-$$o,-

o(o(f)-

oot

--oQ

-rzG(L

il.looa

?{Jco

=NI=oaf

I(ooo)aoOOco

O()f-N

(oIa

@zOOo)N

I oOo^

Ooro_

\r

O@o-N

!tc(E

oo

L(Eo

NI=(o(?qof

oOo-€N\

OOo-Nro^

oOo'lcf)N-

I I OOnOroo)

OOo-oN\

OO(0_

O)oc'l

I oOryroF-Cf)^

-c+,co

=Nt=a@

=

Ooo^$

OOLO"

cf)

OO@^

N

I I oOryN

oOo^$

OoO^N

I cf)@

Ca

otaotJIEa

aTL

U)

tuFz

Eo.oo I U)

U)z

ooo.g

O

oU)

.oU)

Eo).CQ

(Uv,o)

=[rJ

oElG'Lo

oo)Eq)

oooacoxq)

Ec(!oEooEL

o-oE.9)ooosq,

gU'

ti ..sr 5F>8,r9-o=>xE6>99oio(/)e.([0e(JEE'=oFEagoo!gct .=Etrgooo-.9 orFC:\ E'v)a<E;xVJ Q)

ogz.E<o.^ o.vJ, o<ce-E40)odoJOru .91-L:- o.:0)iiEb9z<

Foo(\CLo

3nrFoo

#o5LG

=LG*,o.YGo.o+,ooEooo

{J

.=oool-o.+,'6GCL(goo=o+aGoct).=(E

oL-o,

oC)

T+.goEo(g+,tJ

Page 80: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

c,gr

ao==

o,Fno

(oo)g?

o

t\qo

(oqo no

u?

u?o

oooool;o-GoF

6v,3=

R83$

iEa6?e p

=()(!.'

fiiEE

ss::i

Eu6?e g

=o(E"

H!EE

oototo3-.3jj,. .. (r,

8EdOd FIo-x=oG"

fiEEg

ooOrtON(\

;j.. ., al,;-o6 ROod 9lo-==(J(E"

fi!EE

easE

erE?e P=O(u"

figEE

tgo

oCL

otttroCLocG

LoctooooC')IE

oG

.E

oo

o;oo.

tt,

o

=

ooNlO

ooNro

oO$(o z

oo(o(f)

gE PGot

Nr Nrror

ror

ro

fgooOE

F'g=2EE

$N

=Yod

o

tts:t\<od

O

ON

=Y€O

oN

Yod

O

sC\l

JVod

o

gH ej= v

oO(f)

OOr(a

ooN(f)

OO(oN

NF$N

E:oJ{tsttE6zd

+

=t)z

\ifFU)2

9<o-5(D(l)ooo(E0o-so

ooN

=v.flo

iE9trJtrG'iG

=Ez??iu) gA $E s

=<o i$EoU)o

E* 360 0

roOoNNr

N

ooN(oO

r

ooN

IN

I

(\l sg*n

cbEs-(i)FoEgRo-5

oEC',oo

sO=o,\()vo

J

JIir)D

I.JJ

U?(f)

o)

LulooqN

[!(\(f)

trlu?

o)

EIEz

.gac(It

E p= $F 5

Eoco

.qah

so

ogogE$2,o

so(t

dl$oatc

E F€#nf;

rI

oo(! gug

oo{;troE€egd<Tt

F-octo?IELFvoU

o\t(\

I

oNF.=ioo.=oPGooFooL€LIEol-oCLLoItF

oCLo?(ELFLoo-+,ooo

Page 81: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

E6EEbtsou)ss.-.- N?hEoc>S.=

tiJoF

lf)oq

(0sfqN

(0$oo.i

c\$olo

(0sfc?

(?qo

o(os(0

0t\cr)dF

E5trYf; I I I

C\sfo)ci

(0sfc?

(f)

qo

o@n@

rFolaot

ttoFo

rf)oq

(osgc\t

(o$qc\

I I

o)totro

P6HEO6g55I1G!,oc>(!o.=

E+aoF

q @\

€\

oc{@o

NI

(o@u?o

sfNqr.r)

o€c?(Y)

-

E5gYS t I

oC\too

c\I

(o@roci

sC\tqlO

(toc!€

EoFo

q o\

a\tF-

I I I I

o)Fd

PC

HEOeg5EI-1 Gttoc>(E_o.=

G*,oF

o@c?

o(\Iu?

ONqr

oo\o

ooqooqo

oo@+

o(\aF

-

E=gYS I I

ooo

ooqooroc,

oo@+

ooqF

ttoFo

O@a?

oNq

oNu? I I I I

o(\$$

o ctf

35 E

s€o-o

.9,>.9E .q,<u)

:tO

E

$zgIz

lt0-oI o(L

U)

o-oF

boo)o(uo-o

oTIo*io.97oEc=EgfoIEo5V E.=o(aE+aEE(!

.9,Our.=gNNnEeFgo(LOFNs6

c)s=foo-o!(usANEQ)bE=o=ioJ o.i

lloooozz

l-G'

EE5aI

o*,goEo

,=

=crot,

.=o(ItCLc'OoEI

o*,ctaT'cftlm5Y€o-oLoofo.z.=ocoa

rFl. I+,coEo|!

+a.J

o

o

Page 82: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

oILntEot

:GaJAE ui

EC

8FfESEohE..o(1r-*€cc$EsEL

EtJcbcr(Eq, -cEo

5s'Fe^o_u8.g!>$9g(LO

'oc)aE;'.9 9"': G)=a.>OE c>oJE

'gF5'E ec=.=

€Hfi;PEE s{b EEEgs.bsE.=CO= o!gF

E

: esfiEe*E€#

E'6C'5oLo-o)-c

=3otrc)E$fuEooTaoFoL

.9.oct)CoocCEE\J .=!O.e (Uu-o

coL

.c)

ag,coo=cooJ.o.c

€f(LFIocoEI'=9EgoEE86E.9 o-EOs(9

.cooo)g'5oocr)ov)oc)ooov,c.9$.9cEEoooo\a5, (EopPFicro_=r- (D

tttrGE:o!o.c, t-EY.9t,

rONoGI

o)qO

COlrC)cf)ci

!O(\l

c;

t(on

oono

coq60

€oGI

orOqo

loo.lo

O)@qo

rO)I

oosoeoU?(\

oFoN

ooqo

oo

o(oqo

oso?o

oono

ooqN

goo.9CLctEooD

aAa>ofs=(uxoL I>g

oC.

.g!q)

Io(',.gc

r-OtD qt

-T2A

oc:aEo

Ic)*tcoE

(Do)-->=odo

IFg

cc)E

c)

o9('29

ooo)c)

o)oEox.::

a', Il"=2s

GoF

oa

o

()o

.=o(E4o,r-c otl fl-(lUotryL

= '{=

9,frliOnP6FtrOs5ovTt-ooooof;orb.gog3o?dttr

r-b*f rr.- rto=e9;io6t

Igoz

Page 83: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

:ooc

oN@o\tqqu?NN$t' N

oF$o.\u?l!tsNOl

$NF€Fosltoirtr N

EqE{t'NOl

qqaq@NOl

ONF€\ae?a@NOt

@€o€aclo?q@N@F

to@FoNoectc,iNt

FOt€ry':\\@NNF

ooeNqr':sl.@N@N

tsF@oo?':v?qoN@R

sNFC|:qu?c?oNoF

oNsc?cqv?@N(pF

@@oocqqoloNoR

oorqq

NO@o

@0qqoo

oOFhqolg\DFOn FN

ftlflL(L&eFFFF

to

'o

=od-Lo-9:dFE=.Y:=oEe b

HE I Eqc6ea;>e'rE6E5!:i:=5G

o

o

I

oEo

oE

roNttoao(\tN(n(tcl(\l

(rtNNG'oN(!(\|

NoNfloNoc{

ctnJo)oNot

@

oN00

o(\l

O

rjlcoE.C{)Soeo#

GFtrEollJ:n'{-tr-+,(EoJ(Eo.gottooIEoI

tF

I+,IEosGG.>tro5Yod

oGLortsttgoEootto*,oG'()oLoll.

utoNr,)

toNIt(v,

C.l

oN

C'oa\a

c

Page 84: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

oqN

ttd(\

tE10N

\ro(\a

o)c!to(\

(9qt(\

0t,at(\

oq$N

rofitN

{I(')(\l

\NN

(y) (! tOu?:c?r(aNrr

OF*-a?qo{r(aNr

@roqeeF (f) c!rr

(o(oo)oqo?qC)OlrFF

IOF(Oqo?\ONF

F

vlr)(o!tr@lr)ci c.i ;r

\too)c!qa?a(\rFT

(oF\c!NF

(f)

\qN

@sfqoqNO

FllrqqNO

F. tO gtn?n.lNO(Y

F(\

(\ r.r) t0u? c\l oqNO

-Ol

@sd)\l9tfoi ci -F6l

s(f)onoqqc\o) N

frlE E

ttea

lrrqo)

roqO)

.qo,

t\c!o,

o)oo

o?@

s\@

PRE+-NERFAEOt o tS JR[i

oAt (?dr

YN ooNoENe:.=s+.NoUJos:-sflN

= eEg9FG0.oE*OR

ttstr3o*

N

ooit(t

T,FI

'"@G';OPtRGh

=F-ooNrtE+

morFoGPr- ct

.gFIt?Nag+?FO6NoFEEO=6FGoEolr

uJcF

Page 85: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

(9NrOOrqloqu?(f) o rorrN

Of-rFc?q\qcDOrOrrN

Orl()tqqu?qF(r)Otr (\l

(o(oo)oq o? c? o!o(\totrN

(or(9O)qo?c.l\ONO(''rFN

$ro@(9noqqe?ONO(ArN

sfoorctqoqoqolONo)NF(\

$(oroq\\qONq,N N

s(f)Foq\rqqO)NO'C\ (\l

ro(o$tqqc?qo)No) (\

(or*ifnqrc!o, (\t o,

N

Ff-rootc!u?o?\q)N€E

N

o)olro(l)qu?\a?o)N@o

N

@$c)o?au?ol€NO6) rF

\tsf(f)O\nc?u?@NOCtl

F

EiE !

EKI

E g.FE 8*H oFt o Fq|E eioson

E!'EgoNul-og-!EFESPF.uo.?F€

6R€€EE'trOr\OErE

T,NF(o'l.;EPtnRJlE roo.5>5

Ngo:.qP-R06.nOFrEFL,PqE: oGtrFo6oFIto*,o(EooL-olr

lrJ4

Page 86: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

(f) (\ lo eu?ra?qF (r) O) t'F (\l

Ot\FFc?qc\u?e(aOrCtF(\

@FtOtqqqq(f) o c)rN

(o(0o)Foqo?q\oc!€$lr(\|

TOF(r)CD(0o)N(\o c.i d c,iF(\

$lfr(.o(0Yoqu?eON€rFrN

$oo)(9N€(f)!too.i ci-e(l

t(o0e\c!eON@,F (\

$F(Y)t\0o f- O I'J)

oio,ide (\

to(o$tqqoqrorc!t\o

N

(o-$tFnqqq\O) N l'- gt

F

NFrOO)qu?nc!o)NNOr

o)c\lrjc,qqc!oqO,NN€

o$fi)qaqaONNC'

ss(f)ol\\tOCoN(o@

fi i ; E

EE E ;3 2 6 P

{=OR

+rN* AR6d,Eo!E(U.t|Lt og vst 6 N

LOR=N{/Roo+r iaiG:.EH*roIJJ F_o8-N+,tr

F.JdO=ON5.Eo-io-FO-NoL

@

Irio5'trOtro;5rE

tNT9EPORJ$hEE-{AE

NLo

!t

\1 I6o.'NoqGSr-Rola-TrqFFgRtrooEEEo*,o(EooLolr

Page 87: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

U)FOecO(v)(v)t$l(v)lJ)OC..|c)FF+ @+ct do.i-a;N-NFF0NtCDC\IF@Fl\-Nor\tt-c.{Oul.A d+d 'de.i -dNTNTFoN

GII

tr{PE

lJG

(DtNFrO@@(octo$toNtO$OIO(\FO

N-F

tsFt(OlOolt(OC!(Oo)Fg)Odsoi+e.lod

FFF

l-O)(orfo)loolOTNcOO@t\dsstsnicir-

FFF

(v,

TNN0NN$-n|oN

Fr!cNo

4'NOotg c,{oc

C'6NOo)o5r5

AN

P@LE(E'-F

Fct6NoF!rdOE6N.gL 9O' ,;^LEENtre?-!t iJO(g .\lO,r

-qfE ",o.5C6|oP?r fto5on|-q ..lIIJ !..YF

o5eGltr(g=srdoRo==ooE.!to(ECL.J.5g

O@Ot---6t1c!o?r nolqo!$(').Er$-O19

FFF

Nr.vtstsf(OFo)o)€cDcolr)F(v)(v)F\teO(O

FFF

tr)$o)o6$a\@cOtNr\$$ridF+-cidrFFF

F-No)Otc)r\(t\rcq \q\u!\f$o\tGloFFF

@tf)ctot\o)10aqs? qo?qqsf$@sfeOFF F T F

oONIOFTF$N(Y)r\rONd)Fc,tctr-+-cjdrFrF

(\tON('$r.r)NFN@O)(Oc!€(9(')lD(v)FOlr,

F F F

(o\tcol)colf,Fco(o||)I\IOFU)Gt(V)(ocOrOl''

FF

r€€Ol')\i€(O|J)Flr)S(oll)Na'r('f.rrOr\f

f

(gF€l')Od)@(7)lf)00r(r)o)ctNr)ut(')-€C)

fe.E.OEF;E€aE2?F.gE bE Ec E rr E-6 F E! EIgPPfrSr E o3E*.EoEq,'Eotfri!r9E d '6;iE

Efi€ EHgS>vt-tr,E.. 6<",

Page 88: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

IOFOF$rO@(eN(Y)rO€@Ot\rt+ d$d +o.iddNOlroNto)(\tFsCDFtf$ caa qo?\c!oolfrsoSFOI(oNa\a?oNtYlO$Nstsf(v)Cc] qc?q aolqqNrr)$OSFO(9(\tn|FctN

oN

I

grgE

oo

(Y) CO r') l0c?oqu?\\irO)L,

F

N(f)(grc!qau?\tFo)u)

t\N$(tN(od+oi

FOrlogrqlr)$gr

N(\IOr\l09ttsfo

Ff\qtl.t-tr(v)N{-dut

F

O)eO)('to?\c!o!(Y)Fo)t

lslr)O)-@(oFF(v)Fo)t

F

rooortFll)Otf<trOrt

F

c!aoort(glf)O)F(rrF@t -o)F-o)rOn.qoqcq(rrFOc)

F

(oFcOrn('\tt\u)(r)F@c, -(Y) tt) (0 tc!o?q.!(OrCOCI

$tosa:\0q(Y) (') (l)

@\tO@(olr,c.ieid

r6!Oqu?rN(tro

F(9OFoN(\tloi-dri

FON{(O F lt) (v,

c.i -F- F

(OrOc?u?e(\l (t to

€roa"act?\ttA

o@6c!o?rs(o€

(\IF('ro? ol oq(Y) (t, N

ro*gr(ootdriF:

@t-tOc?\I(o(tN

.\|$FNC'N

FoNooNoG{og

9Rv,G6!oEr5

ANIt oo

=E(EFF

6^loirr9gR(,o:'oidR-|o+,Fc+

o6NO{J'!!PIIR6PESd'oahNGtNO.;v2FtS96aRo5cooE.T'o(Ecto.Ec

ts €.o€F;s€aE2?F.sE FE $s E e X:5 E: E;ggHE5Ec''Eotfttrr9.E0 '0€;E

Ff;E Hgg.E>vJ-c.

3.. 6<"t

Page 89: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

IOFCtFO(g(Y)O)OlfDtD@OF$F+ @*d +_d+NNroN!to)c\tFoFrotoci caa ot\c?o!cttf)sle(Y)r@(YNr(\aFoN

(J(\I

tr-otr()o

f|t@$N-(9(OC)N@(ocro(o61 1\ci'r,+do"i;driNOlroN

Nl\l\teeNO)N(")N(oN{O-:f: rri+oi ri-driN-Fc,NFt*o)(DO(oOtNO-N(oIOONd '.i+oi c.i-dr"iNTFFoNoF(\toroo@@NF\FOlOrOOlo)oi ++qt ai-F-ni

FoN(tr@rr,cto)lf)@FE ncu? c?aoq\6S<.€(v)FNN

-FFoN@o@at\or\!trNOrFc\lt\qll+<'idcrjsr'-nrFFFFon|FC!Fc)@$(o(oFOrO)€FcD(OFdri<'iF-d-^-niool(olI)+o)sfA|f)FE qqa cc\u?oqrO(f)(v)N(V)FNFFToNLt@r-utC\|crrc')€(Y) l.- F O) (\l .cf Lt+atdF.cri-N-FFFooltNoNoNO€

Ft\@@F(r)C.l.i<.j<'jdej-r--

FFoN(vt(O<'CcoFl\l\F@(OrO(OFrCtlrt c.i <"rd oi;F-ct

rFFoN(\|e@0Olr)N(Oaqt(oloF{(3t-N: e.i <"i .r; ai ; Gt c;

FoN

oaG'oot-o3

I

E=t\tEooIto€oo'dLo-

s+a(Eo.S(E

Gco!tooGooEGooo5coouItoa.r(ucto.5tr

(OF€O)OFCtF(')loaorO)Ng)d e.idui oictdoi

IctA'

$".E.oEF;E€fF|'t,oE-v-F.gE bE BE E E aE 5 EE EgEPg=ED .265i-i; p6

EE'EetffKlE€g HEEEEfiE E€6qE.. 6<".

Page 90: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

E(uo

Pii'9cOYIL IL?uEilg8cf(UF

-3 Q)

@U)?*1U)oI)c?>-o)rtN@;

E,er-OOEEC=o8,8@cc(EO ,t-.E'Etrg(E

$:o)l

5,4 a

5-g E

(oo!(Y)t

o)o?u?

olI(!

oo\(o

I

00r(tF

I

u?(\|rtfi)

I

vloJ

a0

'!'i +rE3SU

f-.E

(0o?NI

oto+t

t6lNc

1\qtt

6rtol(\cF

(v)o+t,F

F:EgAoo-==-'F1 g5;a

NoloGT'

(\0?€00

(\lo?€oo

(\ol€€

(!o?€€

(\olcrto

a(aJ

-

(oq@o)

(oc!oto

o)c?oo

(0olc

(\c.ic

0aol(\

v4(a

-E

b0

9X=Q)Ez-

ctu?F€N

oc;ofN

eotc,N

€qo)ot(\

rtq-gt(\

(0qoc{)

?=6tEr 3=Z- E

ot\ctt|r)t

GIqNo

I

oqcN

I

Noq(oF

I

q(ocrt

I

€t(r(v)

I

E B ! 9eg e 5 sc

soq|I:t

soqN

soqtl:,

soqt\

soqtf,

soqN

X E E BAag; zZ

\fqtf,(o

$qrat(o

tqro(o

aaJ

Xtr1

-U

NNo;N(!

f-qotFN

Fc!CDNN

o)AAc!U

o)^6 i gONEobEoll

9)^

ms€@R.E

Q)^-6eP6sc=RE

r. 5ct

It?oF

ooeI

I

Far3E=VETN*,r'=NtN

sgEstu>g6EFO=eF-\aglodgEfroe*otrOGo.LtrT'6oJfnE

Page 91: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

--Aat) v6ttreb.?e3 3EE€F,:Evt>

q30(Y'

r\qF

tc!lftrF

c)oU)

t

(Y)|rtN

I

o)n!u)Y

U)

oq)

!o

it.9o(L

.Efo

coo

f@c?roafQ)c)Ecoo.acg

€cooI

O

eaa>J

E

b0

'!'l r;8Ee

T

N(Y)a?(olf,

o)(t?

oc?(9lO

t\q-

t\q(9lO

F 3 E easBESe

oqtf,oN

oqu)oN

oqlt)oN

oqu)oN

eqtf,cN

oqu)oN

v,0J

E

@

rric,

C!q(l,o

ol(o€

(v)

a@o)

(rtq@00

rta(r)o!F

e+U)t-

e

b0

=e)ezH

€Iool(\

NqFo(v)

ool

otN

(Y)

a(vtofit

(vlt(9ctto)N

$vdoclt

rE; g=Z- E

NNFu7

I

C\a?FoF

I

(v)

\(ftN

I

rfaN(\

I

(ou?ocD

I

oqot

I

EiF Il&Eseqrji,

soqt\

soqtft

soqr\

soqro

soqF

H E E EA6 e! E a

I

rfqro(0

tqrolo

tqrt€

vloY

e

Xr-'t-U

t\c!o)1\N

Nc!g)N(\l

t\c!g)FC\

Q)(A

I sSg $ggO)a

:oegg €E

tYL(Y)(otl

@af,

a)

@al

O)c\lr

oo)ocoo.U'col--oco-oI=Y

(,

,6w!-3EEYxSFI+,r'=sIN

sgI I

}GUtEII

FE=eF-\5prndgErfOri CL-aotrOGo.LtrT'6o5fno

o

o

Page 92: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

9.oo)

Iit?xOY(L(L

EEEtlssc:)(ur-3 Q)

@a?*1A@fc?>-o)g+Na:6eL (l)OEcc58o.U)U' E.c(Eo,L'oECc(uo -cl+3()!l

-H;Gut: 2

5'a a

@ogo(o

ofulut(a

ot\o$

FIGrt

c,i

Ne@

(vtol?

6a,-

b0

'!-r r,E3Er)i:-

No?Nc

o€tt

rool(\o

Nq!rt

(f,qNo

(t,qtrt

5 6g33Nol€o

(\olo€

No?o€

(\{o?€G'-

Nol@€

No!c9c,F

ao

rq

(\qr\

F'ao€

g)u?

t\ ci€

C)e(ftF

00qtct

aU)

b,

9X=eEz

?=E

tao(o(\l

(o(fto;(ON

qct(o(\l

(Y)qFN

(f,c!N(9(\

oq(rtt\N

rEr A=Z- ao?N3A

I

No!r\N

T

(ftq(oT

Nr(tc.i?

c,o?N(0

T

U?

Nof

E *- !.9e!f;.3Ec

sctqu)

;eoqN

soetr)

sctqF

sogro

socF

EEE HAa e; Aa

tqu)(9

rtqu)(o

tqro(o

FEI As gE a

ttctrON

ttctloN

ttdlON

q)eh

U

o)^-o!.9o xE" HE

o)^E!g(gSEofoE

F- ll

9)^-g,6 ?o>ga

=BE

o(9I

oEEot!

FFr+:!oy3+,=lo!4tof,NArt t'=NrNeuIJrlrrr, G6>E,t>!rL-GZE6-(JI\

=!'rnboEocrEoe8.O=u.se,|?

trtoo3mo

o

o

Page 93: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

d

--tt) vcttrvi-UI? R.\tv-EEfi:e\J iti

qNrft

I\(\!NN

t€+(Y)

rFu?lf

l\qN

0€!F

I

9,oo

ro

v}V)-l

a

bo

'!r +rE3EQi:E

N\

(t,c(0u)

ot\ oc(0u)

N(0 u)q(l'tft

s 8g33oorrtoN

oqloo3\

oouto(\

oqu)cN

oorrtoN

oodoN

a(t),-5

h

-l

oe(0|r)

CT'

\r\(o

g)q@u)

00u?o)€

o0qg)rO

@atN

$r a- V

=€),J,EZr,. vE

C')c?

(0(\

N\NT\N

g)or"tr0(\

cttf,+t\N

ooqt(0N

Fag)r\C\

@c?

6U)[email protected](ucl

Io

rE; g=Z- a

€\(?(v)

I

(Y)o?N€

I

C'

os:t

I

s)ctl-g)

I

g)q(0(o

I

Fo(r)

I

EfF 8l&Esoqlr)

sogt\

sog()

sogF

sood

sogF

EEE HAs eg ze

rfqg?(o

rtqlt)(o

$qlo(o

FEg Es 5U a

taou)(\

rlaotf,N

taorON

I9A

U

o)^-E i EO BE

q'^

fi igo pg

u)^U,egs €E

a\Iio

G'F

IgoEIa!€ IP

ob{}LU,rqT-E=

tY(LCA(otl

@U):)rQ)

Lfo

.t\f=Nt:#$

=N

@af

o,ry

@opcoo.ocg

Ec(!.ct

If}<

r iri

E.;=EE4,8>:l-L

EEEe3(ut/,t,fF8g8EO'r=o.6 fYl

=o

Page 94: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

6l

t-r

tr

(\olo@

ort(Y)

G,or

f!o)N

tY(L(?(otl6U'f,

NI(oo

c>N

lro

No?@o

srr)q@@

lr,f-rQrOrf)N

(.).'r

(oq)

atN

@oq(f)N

I

N

Fr

6l

tr

ssa?(\(o

c!Nc!(oN

@@u?@@

rcfrss(t,c.i(o

o(f,

.fN

*l'-a@@

Ul I

No,gC\I

NO)

c.i

Io\

FI

6t

F

o(t)c!Ns

Nq@

N@c(0(o

o(r)c!r\s

(tC!oqrJ)

\rrJ)q(0

Qj oq(f)

o)oc'i

g\I€

N

F

t\\tc?o)N

t-oq@N

sroc?

t*stc?o)t\

sou?N

lr)oq

o)

Qrl

(e<>rf,

'rt

(t,orOd

*FIt\

N

6l

Fcc;

o)@c!F

o)oc!F

cc.i

(c,o)

+

(o

UtJ

(t)o)q(f,

(Y'o)o('t

q)(,Lau)

oQI=o(oqcl(lNo

FSxrtYO

Eootro(t,o-

o.!o

E.gJ

EXr.uIL

o0)

Et-

o

o

=

3

cotrs()o

glo3=octo

xn!FN

ENl11

sg--=rEEigH

rrL

=Er:oE9E

Et gl.EqE=Jdtt t\of!oo.;N| ..til

-YC- I

-IE+,oF

@oo€NOONFoi6iciorNNN

E-Eoeolo5if,6Fc 9*.9€e:'AC, Y .i.L=>c=Pvoi

E'Fins i-66REFrE,EtEE E Ep+ * d g

oo5o,;!ooE

oItt

Page 95: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

cl

F

6l

F

@oto).toN

(v,

c!*

c!ct)

(\ t\<IL(t)(oll

@O)o?$ON

Nfru?

ro

lf)Nu?1r)loC\I

Uj(oo,q(f)N

(oo,q(f,C\

,

N

F

o,tfqF-(o

No?aN

(o(ou?@@

EItL

o,rit(oF.(o

rONoq@

rcNa(oa

Q't

CNq)

o.i

No)qN

I€\

N

cl

Fr

otr,c!tJ)

<f)

$

c\I(oq(o(o

Ei9otf)c!lr)

$oqrifr(,Ica(o

Ujo,q(t)

o)oc(f)

g\I€

N

F

o,o)q(o@

lorOc!

c{

v('?t\o

ft1o,o,q@@

Nrr)\lO

tr'qo,

r\F1

(t,ou?rO

(f,oU?

ro

rFaI

F-

N

F

ooqo

o)@NFr

o)@c\lF-

ooco

@o)F

$

(oo)Is

Qr.l

(?O)q(t)

(Y)o,q(',

c)IL

U)

e,aD

==tlq\fNo

tr\9Xn-i9

E.E

oo.oQo.

an

oo

a)

@o

==

tr{>.;EoEofit

g)6==tCNr:

Bxt;ooP=l?t

9Etr,POeLO'=!SEdn

@oO(o-t\NO$NO'FN .ici.,id-O - N- r?N(\tC{

g'itro!rt

-E=frftL t\of!oo=r\5NI ..

=x:Y UJ

-YlL- I

-IE+toF

={a€9(') q'if,6F zc e* go= o x

*E: F =Qts.gg lu

Q.s il. E

FFge^^ r t

;ieEai;i€'EE'= lto()LCx';Lll in==(E

^>oP!i:

Eb:lh r

Page 96: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

Attachment-15

Summary of Manpower Requirement(For details see attachments 17C-l and 17c-lll

Page 97: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

Attachment-l6

oRisk Analysis

&Mitigation Strategies

o

Page 98: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

-T

oo(,Eo5crstooEtr(!o(,elrlo

eotro

e-I

Etrv

Ico)

.=

z

q)

€go)(Dc.bLoq)a

(D

.ctpo,(,citooa

cIIFc.9an

;Lo)

oo

o(,troE

€or

Eq)c.o(uSo.bfo)!9oSar

oo=o )'(

e=&t tr =g8h6->-q(L>.^zE:E sorE t=ifrH c

.95tto(,o

ro).Yo

ooE

.co-c

oE(9o

Eo

ooo

5(Uq9,Ef

OgEE@-oE8XPH'A6SEEgc.9 .o!EEE

c(5()!Eco)o;.Eooa

o(,cE5IJ()ooItoo

=o.Y

i

* seE

EE$gE;E

tE esrs fl

gg*il*

E{ggEEE

EgiE$fig,Eg g#€E H€

fiEggEEEF

iEEgtigE?€ FgEi EEr E E;E; Eg

xc)Eslz.9

J.9,t=oJ

oU'ooE.Yo&.

L

.gE-

o-o

o=oE

I

=-oLoI

'o

=boLo(EJ

.EooolloE

-vu,EoooE

€oo-

c(E

o-9

EoO

ozootrooo o

oJ.9,t

Page 99: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

'co.IIEo-a

.9*5PEE P g

f,p I =s=c

*mq-_' €E{e E

F{E $; *: E=-C

X6-= =6bB 3qfrF 'iEE+ $e H'E =6FFt s.io? €eE€ f;$Bg g

€EE E=a€ Eg€; €'HEs 3;fi4 #c$r E

slg*frte=E*q3; E!E; F flEg#e EsEsF 5t

E4* Efi frE6 E€PZP {E Ef - :PE$; fiEgE5 ;FEFfr +pegi ighiE< €6;?!o! x9gEE €E;.9: U=Ee; IE:eq {5EgE EEe*$ f;E

E:$EEEEE$fi6aE 6Ek9'r ."s

:i a t;sg+ EaEg F EE?,-gl!s: EE*ef es'

-;;E .*= *gu E.E

;Ef: FtE gEE E;E 5:E g .EE:

E HE 98gEEg g,E gE:E sEE€85 EEEEEE;3E

=EE EEUU EE E SEFE; EeEEF; orE.

q+ Es qEtEt€ iEAds- 6=.5oEir- !.=

oo)cq)oEooEo)Io.,cc.9

'6Eoo-Ec$otoIq)

oco,FOo-cg_oooo.9:o-orE5o=vt;- >\-(U;o6E=oEEENEOooEoqr,o

5g:(uQO';+€5P4O

*9Uo)izo,f5orE

,9.s.=aLT

,€gOGEn.e -EooOOttt(L(Llf'aa

o

o

Page 100: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

to:q)Eooot(LfaeE8.gg

EEoU'o)! ri'xEx IJJ

vU,G'ErF.gt2I 8Eo)uJrCuO'5 li yr

: EUYaanf; P€E;ildp9*bo)g t a-Ep s683

-*$aE FEE3e[ s EE*tesE:5hE8In ; !;'=E R 1l

=x{u) rt.E-c6o ,!, E;fE8HR6o,E IEF.C K Fd'=i y 6

EH*:i gEOQ !g F

9*E; =EE= b b

EEE' g.g

fiAF F F

U'ooo(E

otroGoE(J (u.OOE

o(D(,goJctoocooEtrt!gIgut

E

e6gE

tTEtrY op

ooz

o.ctp(t,(Dc.booU'

ootrIEE

oo

o-c.co(ttrt9cH'oag)cEE€=tv8a*

EE2.$o>o(Loz

q)

_-ogo,oc;tc)oo

gJItoao

tNoou,o

'-o

-oo

;-ccoE(''

gco)o;o'o@

Itoo

ooQE()EP-omo.95)<G!J9r+oo(LEEooDEEE

.E€

.s,o)oc.

Lo)

BU'

o(,trE5()oootogo!:

o-coE

o(')*Go-cFE69Ets

3PSEL(U

P=€OFOE';n.Op56tEEoo(Jsoo':ooll.ij=oo€:oo(J-co--co^oSFr,l-o,:E.Enr .Y

=:gk€..g?ipeE(5Qf--ooEcJo6FO

.=L!oEoE8d.g

'g.E'6.=.EEpFi6gYo=.i:p't9'oo.9(U-C-cFOe99E()<ga6

oocoto.'..()

,Q,oEoo€oJ

=

xott5got

.ra

.9tr

=oJbQ)

tro0oouJ!2t

6Eooofoo.9E-o-Joo

oo

L

o(u

;Yo)>EO:>:ho)!uE.aL65:Foc([tsio

.EoEooJ.9,t

JoEo(JcoEoEo(LEcoc.9-9o-E

o

ozo'cGtro(Ja

(oo

o

o

@oJ.9t

Page 101: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

ooolot!@coIEol

.o

.9

.9()oEo

xogE6eEggEr\) cd'a!5=CoogEotrJ.oo,=3t8:P=o(E$Eo=€dPoiz5(00)trlEIoEF.2,@6E8b:gEiP E

.9 .s .E!Qo.9

=sEEHKE;E

U'.oHB-g;o 5E(DO9Faor(|) oro-o(E-O()

rno()trotroogoottgootIlrJ

o

gotr(t

e+EtrY

()gooz

oopctoCeoov,

o()cG

E

€oA

C)

oC2tgcii.-d-r OEg,oFE-u

=tUoa

EE;n (l

seaz

-9€gq)oc>q)

oU)

-gfEot)o

-sooCoE

(f,

c.gc.9)@

Looa

o0o

'tID(/)a>E(JEo,oC

= '-oN(f) o

e5)<(oitc8EEEooE!EE

-g€o,o)q)c>ooo

:g!ofie4EEEblE38Ful 6665<(EiE*E5XE{D;HUEE,Pe-e

ai85'0'oo*E

_y. v9tFgia9b'no€pEEHq)

=oo'FBEOroo9-cF€.=oof*qHaiE!yeds9.90E8CO

Rgilg6-gOeeE5S€rlEEoq?=*s*

Ee€Il-ECL

:.,.'

s.9E

o(,tro3(,Iootoos=o:l!

xoItgI.9t

x.at3J

cooa!otJ.t2tr

oE

oo(,o!o)coo-ooo.9o(UEOoIU

GtrooJo0t

Y,otq)octE

€o(L!coo-gEoO

ozooo(,U'

oo

oovox,

Page 102: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

o.9ogIE

otro(E

.9

.o

q)

E

.scoEEoog)q)

.oNFtr€.gb(!ooooo

=ope0-

a0o(J=o3roogooIttrGo(,#lrJ

o

eotrE

e+BcY

gooz

o)€o,=o)o

tlIoo

oogG'

E.9goo.

oc.9,

0)

_g

oc)

o

drE-v g)

s"0€=Yvt>59

-9€o)o)(l)tr5Loo)a

.9=to(,o

I

6fi8;.F€l;aEb>o.E-v-Doco

EEfihE>E!6s h.zFp€>6.9

F'g=

zsooa

ooo

ooC)

=coE!

oz

o€go)o)

;c)o)a

siotrFEb89eooo-Eb:eEEE;UEo!9dEr9E8'oO55*E.EeU' ?.obotro.E

#E6eEv.etagEo-a.g=€Fq

t8.E"-EE-o-oo.otup

E€'F(EYo)o.EoogEo:!x_>oo6i

'Eeo9

y:

5'=U)oEO)6Eo_-o9o--c ,xP oY-=llrNo-# o-iEEeo€c€o.96

==JY)Y: ly

<F'-

(Dotro:toooo

3osoJ5

xoEc!.2E

.Y

.at3oEq)

eodt.Eot!od,

ocotrq)

oocGo=()'o

6Ni'o-N-OOilC=f1,.-6.9Po(sOn-O;No2.o-)Eoo.=lloEo-o9z*

c(!Eoo!ot

J.9,x.q)o(E

E.9Lo)(LEC(E

co-9Eoo

ozo.E(!Coo(t

No

(\o.xoc

Page 103: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

oo()co=oootrooE'trIEoo

uJ

qu

s]oa]o

gEr*

# igEfi*E;R8 8EVrEP< c=v(L > tr.=a Eee

o

t)

oot)

E

r!

oEoI

Eco(LzcooGo..E

o

oO, tV

ZL

a

Q)

goo)

too)'A

o

o

un

oco

=o

ooEoa

g

Eo0)

tcoot)

aN.co)G

oo(g

Eo.g

=otnoC)

a

oeeootoon

oopo

o-ocoo(Jo(!-q()oEoo=o.E

Go

Dco

='6eF

o()

(Lf0

eg3ouEEgF E:f -

(0

F5A:>(99lJ- uJ.-oE.o h'5H5E'6HbdEasaEP-g E697E= F.E E:;€eEs g

EE E?.e p-E-9>66€EAEH(5rvJtr= q_vObloro-'- =sG9:EegEE; e'E

e9EEe>gF;r?*'60.9ip;EffbL- >\cdEuE.Hdud!+= Ik66- cLc

o EeO-Fs.b E:s= (,

3+Xa 60-

o).E

oo-o-foEo'6

Loooo-o-Y()

=-o!6c)

='o,i:F

oouTLfa.F.oxo)o)

oc.9oEoo,o

oE.c

.GoE(U

irt

E.;oEoo5()=c)E-oo(L

xolC

!oE

3oJ

cooooxx.9,E

€aHF€I

FEF

e!EoF -€< b-v.E; Pg

E;St

.E(5

ooI.2

ooc(E

EL

EoLEc(It

co

-q)o-F-Y6.9ot

ozot!tro(,o

rO

o

o

o

u)

oJotr

Page 104: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

ooEo;EO

ogoC)oL

i5oq)'9(L

c6EY.O-cF,CPv6ItE

(90oa

Yco9.

I *.:=

Ee€o.avouJ

NrF

I+,goE()ag

{J(Jo'dLo-oF-*ralFooL5flo=L+.a(Ego

a-flG.Ng(EE)Lo

o

o

Page 105: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

EoFE 9agEdfiEggodI@

te.E 3^sE 3sqeoc0,E

c0)

6 9r^=Eeo(!lLcvn- tl- (9-_I

v

E-B@

E18.!O.L l^so *=-€ g

Eq eoctrE

m1{

JcoEso(E

oco

l-{J(gLoCLo€-oL+,Co

C)o.=-o*,G.4,

/\ r-Ycllll v(9lf-ooL5u(J=L+,o-(Ego

.I*afit.Nc(!E)Lo

o

o

Page 106: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

rrcJoct Dt€ Jte onic€ -:M (b) :l6clncaIHecronEs/ | €

ecom

loaponsibl€ for overall manag€mont ot Po,(aaFlR Spaca Sggmenlleveloomont activitbs durino exacution ohas€

trcjact Dte )te Oflio€ vlanagsr (E) :lstri€l/Eloctronics I ror tschnical coordination, Liaison and to assist CM in day to day

trolect DlB Ite Oflice T 1 iuDDortinq stafl of CM oflicerhisct Dle Oflica ;al er{ romrt Stafi ortino steff ot CM ofli6

troject Dte rmlect Oflice )cM (E) :ltrtricaUEloctronics/T€6@m

'l lssponsible for ov€rall prolect managemont and planning sctivities

'roject Dls troject Ofti€ 3M (E) :or monitoring and exocution of overell proloct activities

)rojsct Ote rrcj@t Oflic€ lranagor (E) :lectrical/Electronics 2 'or technical mordination of th€ prcject monitoring and exedtion

'roject Dta trojtrt Ofli@ \M (E) :lectricauElectronics 2 o provide technical suPport in Prcjsct monitoring actvity and

)roject Dte trcject Offi€ \M (EL) :lectdcal/E16ctronics I ;or tedrnical support ol elsbic€l intrastructure develoPmsnt and

)rcject Dt€ ,rcject Ofii€ \M (Civ) livil 1ror tochnical support of civil infrastructu6 derclopment and

oiect Dte trci€ct Ofli€ vlsdiml ) omvide medical smeroencv suDpon)rciacl Dte \MI \dmin fo handl€gdmin related aclvitios

Dte 'rctecl Otli@ 4M (Fin) :inence lo handle Budget and FinanG Blsled aclNities

t Dte iuh EndJl {E)

Diect Dte olect Offi€ T ,uoDortino stafl of Proiect ofiic€

olact Ote rroioct Offi€tmiect Oflie

iledical ra medical 6tatr of Proigct c

troiect D!8tdiect Dte

)EO T 4 st€ bied otfud

rct Otti@trolecl Dlreclortto fohll 25,aksat-1R )on Mon Team lus, P/L & GS )cM (E)

'aksat-lR lon Mon Taam lus, P/L & GS iM (E) :loctri€l/Ebctronics/T. 3 'o suporuiso tha monitoring snd control activities for Bus' Payloadlaval^bmant a.fivities

taksat-1 R :on Mon Tsam tus. P/L & GS vlanager (E) :lectrical/Eloctronics 2 'o manage ths technioal monitoring of Bus and Payload d6si9n and

,aksat-1R )d Mon Team lN, P,tL & GS vlanager (SR) )R 'o manage ths toohnical monitoring of Bus and Payload dssign andlAval^hdant r.fivitb<

raksat-1R :on Mon Team lus. P/L & GS \M (E) :letdcal/Eleclroni6 3 lo prcvids monitoring support for design and doveloPmsnt activites6r BrF and Pavload

ksat-1R Mon Team $. P/L & GS)aksat-1 t< (HTT Tem trcg Mgmt 3M (E) :lectrical/Eloctronics/T€

acom1 (now how aoquisition for pmjet management

rnager ( (now how acquisition for prolgct management

(mw how acouisitjon tor Mbsion schodulino and Dlanninqaksat-1R (Hfi Team Eo Momt

sot-1R HTT T l.}l & Pl l)taksal-tR (HTT Tsam sch & Planner \M (M) vlechanical 1 (now how acquisition tor Mission schoduling and Planning tor a

!^mmIni.rti6h RAtal{if e

l(sat-1 tt (HTT Toam Sch & Plann€rtaksst-1R (HTT Team 3C Sys Eng 3M (E) :lsctrical/E16ctronicsIT€

6COm

(now how acquisition for Spacocraft system enginsering lor a, ^

m 6 "ht^-n^^

E atdltiJa

,aksat-1R lHr I team 5C Sys Eng vlanager (E) :lectrical/Electronics 2 (now how acquisition lor SPac€cran systsm enginearing lor a.^hh'hi..ii^h cet.lliie

taksat-1R (HTT Team SC Sys Eng \M (E) :l€ctri€l/Elactronica 3 (now how acquisition lor Spacacraft syslem sngineering for a'^6h,r^i--ti^^ ..tallit.

,aksat-tR <HTT Team Structure Eng i4anager (M) vlachani€l 2 (now how acquisitign for indigenous devalopmsnt of sttucture andnochenism sub-svstem for e communication satEllit€

'aksat-1R (HTT TSam 5trctur6 Eng \M (M) irechani€l 4 (now how acquistion for indigenous devslopment ol structur6 andnechanism sub-svatom for a communication satallit8

takst-1R (HTT TBaD 'ro Sys & ACS vlanager (M) ilschani@l 2 (now how acquisition for indigsnous d€volopment for Prcpulsion and

\ttitud€ & Control Systom (ACS) sub*ystems for E @mmoni@tion

)aksat-1R (HTT T6am 'ro Sys & ACS \M (M) vlechanical 3 (now how ecquisition for indigonous d€volopmsnt for Propulsion 8nd\CS sub-svstems td a cmmnimtion satcllito

taksaFlR (HTT Team tro Sys & ACS \M (E) :lectrical/Elsctronics (now how acquisition for indigenous devalopment tor Prcpulsion and\^a .'rh-.valaha t^r q .^m6"^i^.ti^n ..t.lliia

taksat-1R (HTT T€am lamess Enq \M IFI al,/Electronics inow how acoursl lnr harnsss enoin€

taksat-1R lnr I toam fhemal Eng Vlanager (M) vlechanical (now how acquisition for indigenous devslopm€nt of thermal sub'ivatsm for a communi€tion stellite

,aksat-1R (HlT teem 'hsrmalEng \M (M) Uechani€l (now how acguisition for indig€nous devolopment of thormal sub-

taksat-1R <HTT T6amtakat-lR KHTTTeam :lect Power Eng 3M (E)

=lectrical/Electronics/Trscom1 (now how acquisition lor indig€nous dsvelopment of Electrical Power

rub.svst€m for s communistion stollite)aksal-1R <HTT Team :lsct Powsr Eng Vlanager (E) :lecti@|/Eleclronics I inow how acquisition for indigsnous d€volopmont ol Elecuical Power

ub-svstsm for a @mmuni€tion satgllitetaksat-1 R (HTT Team :lect Power Eng \M (E) :lectrical/Electronics imw how acquisition tor indig8nous devoloPmont ol Electri€l F

"h -v.ran l^. . ^^mh"^i^.fi^h

c.t6llila

k6at-lR <HTT Tsam iC&R Eng t{anagaf (E) :lactrical/Eleclronics 3 i.now how acquisition for indigenous develoPment ol Telsmotry,)ommand and Ranging (TC&R) sub-syslem for a @mmuni€tion

Attachm€nt.17C.lManpower Requirement for Paksat-1R During Execution Phase - Details

Pags I of 2

Page 107: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

taksal-1R (HTT Taam tC&R Eng \M (E) a (now how acquisition for indigsnous development of Telemetry,

)ommand and Ranging (TC&R) sub-8yst€m tor a @mmunication

:sat-1R <HTT T Rtaksat-1 R (HTT T6am )BDH&RTU Eng vlanager (E) 2 (now how acquisition for indig€nous dsv€lopment ol on-boad Dala

landling (OBDH) and RTU sub-systsms for a communietion satellite

taksal-1R <HTT Team )BDH&RTU Eng \M (E) :lectrical/Elsctronics 3 (now how acquisilion for indigenous dovelopmsnt ol On-board Oata

landling (OBDH) and RTU 9ub€ystems for o communi€tion satellita

,aksat-1R <HTT Team,aksat-1R (HTT Tgam Sofhilare Oev. vlanager (E) :lectrical/Electronics 1 (now how acquisition for indigenous devslopmont of on'board &

,aksat-1R (HTT Team Software Dev, \M (E) :lactricauElectronics 3 (now how acquisition for indigenous develoPm€nt of on{oard &

trdhd radhenl soltwere for a @mmunkntion satellito

€at-lR (HTT Team D6vtaksat-'lR (HTT T€am ,ayload 3M (E) 1 (now how acquisition for indigenous devsloPment of Payload sub-

r,.tah f^' . .^hhrr^i.tfi^n .atellita

,aksat-tR (HTT Tgam tayload \ilanager (E)=lectrical/Elsctronics

3 (now how acquisition for indigenous devslopment of Payload Sub'ivstem for a mmmuni€tion saiallite

)ak$t-'lR KHTT Team )ayload \M (E) inow how acquisition for indigenous developmenl ol Payload Sub'w.tah f^' o

^^mh,,niefinn.etallite

oa0,aksat-1R )ont & Oper )peratore iM (E)

900m

0

'aksat-1R Cont & Oper iM (sf 0oet graIoE r {E) ctronics 0

oet )DeElors\M

0,IR Cont & Omr

Eksat.llt lont & ODer'Rtaksat-l R lont & Ooer toB

,aksat-1R )ont & Oper iontrcll€G iM (E) 0

1R Cont & Orer :onlmJIeB R 0

tnaoer :allElscl 0

F' ers R} R 0)aksat-1R Cont & OD€r loniroll66 \M 0

\M'Rrnt & Ooer :ontrclleE

3ub-Toill ITT Totel: t1

. T6irl fFr.crftlon Phsal 96

Attachment-17C-1

Manpower Requirement for Paksat.l R During Execution Phase - Details

Page 2 ol 2

Page 108: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

Attachm€nt-17C-llManpower Requirement for Paksat-lR During Operations Phase - Details

:^q _;M Llrnce JM (E)

tecomlesponsible for overall managemgnl of Paksat-1R Ground Controllegm€nt infrastructure devslopment initially and opsrational actMliesrfleturrds

:aq lM Omce \4anager (SR) iR 1 ror technical eoordination, Liaison and to assisl CM in day to dayrctivitios

)M Office T 1 ;uDDortina slafl ot CM omca

ics vIGCS )CM Offrce )cM (E) :l gctricaVElec|I onicsf)lecom

lesponsibls lor design & implementation of Main Ground Controlieoment and to manaoe ths oDerational activities of Paksat-lR

CM Ofiica 1 iuDoortino staff of DCM oftica

)cs ,tGCS 3CC iM (E)

xecom1 fo sup€ryiso and manage the Satgllile Control Center (SCC) activitiel

^r P.k..t-iP ^^arrti^hc:ac MGCS 5CC vlanager (E) :lgctricauElsctronics 3 to manage the Paksal-lR operations monitoring and Control

|ctiviliss round tho clock3CS MGCS scc \M (E) :lsctricaUEleclronics 2 to perform Satellilo conlrol and operations shifi dulies round the

MGCS scc \M (SR)'R

'o p€rform salellits conlrol and oporations shifl duties round lhe{mk

JUD MGCS 3CC ;ub Eng-l (E) :leclronics 3 -o provide technical supporl in routine activiliss tor round lhe clockmralions

3CS vrGcs tcc lub Eng-ll (E) :lectronics ? ? provide technic€l support in roulins aclivitios for round the olock

)cs MGCS lechnical Heloer-l ;uDoorl Stafi ruooorlino stafl of SCC

lcs vtGcs rT&c ;M (E)=lectricaUEbclronicsf3locom

-o suporviso and manage the Telemetry, Tracking & CommandTT&Cl ectivitias lof Paksat-tR oodretions

,llanader ectronics 'o manaqs the Paksal-1R TT&C operations round ths clock.s \IGCS TT&C \M {E)

=lsctricauEleclronic3 -o oerform TT&C ooeralions shifl dulies round the dor

ics \,tGcs rT&c \M (SR) operations shin dutiss round lhs clock.ics \rGcs rT&c Sub Eng-l (E) :lectronics 3

-o provide tschnical support in routine activities for round th6 clock

,9D vlGcs fi&c 3ub Ens-ll (E) !leclronics 2 o provide technical support in routrns aotivilies lor round the clock

s "echnical Helosr{ luDoorl Stafi 'upporting staff of TT&C

rcs \,lcCS 3M (E)

)lecom1 'o superviss and manage lhe Communication Opsrations conlrol

:enter (COCC) rclivities for Paksal-lR omhlimsics tnaoet ) manaoe the cuslomer seryims and suooort centar activitiesics tIGCS :occ \M (E)

=lectricavEbctronics3

-o perform Communication Operations Conlrol Csnlar (COCC) shinluties for Paksa!1 R operations round tho dock.

ics I,IGCS \M (SR} SR 1'o porform Communication Operations conlrol Cenler (COCC) shnlutios for Paksat-1 R ooerations

ics vtccs ;occ lub Eng-l (E) :lectronics 3 'o provide lechnical supporl in routine aotivitles for round the clock

ics yIGCS ;occ Sub Eng-ll (E) :leclronics 3 o provide tochnicsl support in routine activitiss for round the clock

vtGcs iSM !M (E)

,l&om'l 'o superuise and manage thg communication Signals Monitoring

eSMl ectivitios for Paksal-lR oavload omretlons,9D i,IGCS iSM \4anager (E) :lectricaUEleclronics 2 o manage the acliviliss of CSM facilily operations round the clock

,9D i,lGCS ]SM \M (E) :leclricaUElectronics 'o p€rform cSM operations shift duties for Paksat-lR opsrationsound lhe clock.

>9D $GCS ]SM \M (SR) !K t o perform CSM operations shifi duties tof Paksa!1R operations

,LS VTGCS lsM lub Eng-l (E) :lectronics 3 'o provide technical suppott in toutine activities lol round the dock

VIGCS ]SM Sub Engll (E) :lectronics 2 o provide lechnical support in routine activities for round lhs clock

]cs \,IGCS M

ics \4GCS ?ep & Maint Vlanager (E) :lsclrical/Elsctronics 1 b manage the repair and maintenance of MGCS's equipment,il

'ilai^^- .hd incr.ll.ti^hc

ics \4GCS lep & Mainl {M (EL) :lectricaYElectmnics 1'o executs the repalr and maintenan€ work gf electronic squipment

rnd eleclrical installations

ics \,lGCS lep & Maint \M (Civ) livil 1 o execute the repair and maintenance work of buildings and civil

UGCS tl iub Eno-ll (E) =lecJtonics 1'o Drovide technical assistanca for electronics aquipmsnl

3CS VGCS tep & Maint tub Eng-ll (EL) :lectrical-o provide technical assistanca in rePair and maintenance for

3CS VIGCS tep & Mainl iub Eng-ll (M) ,lechanical 1 'o provide technical assigtanca in repglr and mainlgnEnce fornlsnhas. oenerators etc,

rLS MGCS iep & Maint 1ub Eng-ll (Civ) )ivil io provide technical assistance in repair and maintenancs for civilvofks

tcs leo & Maint :al HelDsr-l iuoDorl Staff irrbdd.lino sleff of rcoair & maintenance

so & Mainlics 'oc & Fin \M (Fin) tance r orovide suoDori in linancial and budgsling mattgrq

in r Drovide auDmrl in ac@unts matleF

vIGCS roc & Fin T iuoDortino staff

rIGCS itr. Proc & Fin JCO T iuDDorlino st€

Pags I of 3

Page 109: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

Aftachmont.l7C-11Manpower Reguirement for Paksat-lR During Operations phase - Details

s Admn/ EsU Prol \dmin ) manaqe adminisf.rativ€ matterscs \dmrt EsU Prot rnaoer (A) :stablishment o manaoe eslablishment matteE

rtGcs dmn/ rot \M (MBBS} )al t :o providg medical emetgenciss supgortMGCS qdmrv EsU Pfot JDDortino st,

ac {dmr/ Est/ Prol isDenser-ll !tedi€l upportino modical staftics !l|GCS dmrv EsU Prot Sub Eno-ll (MTO) uT 1 :or vehicles maintenancs and transporlation seryicgs!cs MGCS

^c lomm & lT T 1 o suogrutse )n and lT servic€sics VIGCS lomm & lT Sr. Computer

fechnicianT Io Provide communication and lT supporl

ics lmm& lT lomDutsr Technicii T o provide communicalion and lT suDoorlS lomm & lT -ab. Attendant ,omn 1 o Drovide suooorl to @mmunication an

trorect Dlrectorate Iotol: tf:CS tGcs )CM Offc€ )cM (E)

)lecom1 lesponsible tor dssign & implementation of Backup Ground Control

)egment and lo manage the operational sctivities of Paksat- lR

BGCS MOfii€ T 1 no stE E

ics tGcs 3M (E) 1 fo supervise and manage the Satellite Control Centor (SCC) activitie:or Paksal-1 R operationsn9com

ics tGcs scc i,lanager (E) :lectrical/Electronics 2 fo manage the Paksat-tR operalions moniloring and Conlrolhrivitiae r il^.| thA

^l^^kics BGCS scc \M (E) :lsctrical/Electronics 2 fo perform Salellile conlrol and operations shifr duties round the:lock

3CS BGCS >UU \M (SR) )R "o perform satellite control and operations shin dufies round lhetmk

3CS BGCS ;ub Eng-l (E) !lectronics 2 -o provids technical support in routine activitias for round the clockmralions

3CS BGCS tcc ;ub EngJl (E) :leclronics 2 -o prcvids techni€l supporl in routine activilies for round lhe clock

;cs 3ccs fechnical HelDer-l ;uooorl Stafi 1 ,uoDortino stafi of SCC

3CS 3GCS rT&c lM (E)=lectri€l/Elsctronicsf!lecom

-o superviss and manage the TBlsmelry, Tracking & CommandTT&C) ectivities for Paksat-1R ooeralions

ics BGCS TT&C ,lanaoer (E) lElectricaUElectronics 2 'o manaoe the Paksa!1R TT&c operafions round lhe dock3CS aq rT&c \M IE) Bctronics 2 'o oerform TT&C ooerations shift duties round the clock.

&l o oerfom TT&C ooerations shift duties round the clock.

3CS 3GCS rT&c jub Eng-l (E) :lectronlcs 2 b provide technical supporl in routine activiliss for round the clock

3CS BGCS TT&C 9ub Ens-ll (E) :leclronics 1 b provide technical supporl in routine activilies for round the clock

ics lGcs TT&C technical Heloor-l JDDorl StE ro sb

ics 3GCS locc rM (E) :teclncautrt9clt9trrcvrle@m

I -o supervise and manage the communicallon op€ratlons gontrol

:cnter ((:OC(:\ mtiviti* for Paksat-1R ooerations

lcs 3GCS )ctronics 1 "o manade the customer geryices and sugporl cenler aclivitios

]GCS \M (E) :loctricavElectronics 2 'o porform Communication Operations Contol Center (COCC) thtnlutiss for Paksal-l R ooerations round tho dock.

tcs SGCS tocc \M (SR) 'o psrtofm Communication Operations control cenler (cocc) shiflluties for Paksat-1 R operations

AGCS locc iub Engl (E) :lectronics 2 'o provide technical supporl in routino activities for mund the docl(

:cq BGCS iub Ens-ll (E) ilectronics 'o provide technical support in routine aclivities for round the dock

J BGCS;CS BGCS ]SM 3M (E)

,le@m

-o superviso and manage lhe Communicalion Signals Monitoring

csMl activities for Paksat-1R Davload operations

lcs BGCS rsM vlanager (E) :lectrical/Electronics 2 'o mansge the activilies ol CSM facility operalions round the clock

;cs ]GCS ]SM \M (E) :lectrical/Elactronacs z :o pertorm CSM op€rations shifl duties for Paksat-1R operations

ound the clock.

lcs rGcs :SM \M (SR) iR l-o perform GSM operations shifl dulios for Paksal-1R oPerationsound the clock.

ics ]GCS )SM lub Eng-l (E) :leclronics 3 fo proviOo teCt'nical suppotl in toutine aclivities fol tound the dock

ics lGcs )SM iub Engll (E) :lectronics o provido technical suPport in routine activities for round the clock

lGcs fechnical Holoer. luoood E staff of CSM

]SMtcs ]GCS isp & Maint vlanager (E) :lectricaUElectronics 1 lo manage the repair and malntenancs of MGCS'S squiPmsnt,

rril.linds and inslalleliona

3CS 3GCS lep & Maint AM (EL) :leclrical/Eleclronios b exocutelhelepatrind maintenance work of olactronic equipmsnt

'nd aledriel installalions

3CS 3GCS lep & Maint AM (Civ) livil-o execute the repait and mainlenance work of buildings and civil

!cs BGCS leD & Maint lo-ll (E) ryovide tschniel assistan@ for elsctronic's eqqlPqgl!

Page 2 of 3

Page 110: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

Attachmont-l7CJlManpower Reguirement for Paksat-iR During Operations Phase - Details

Page 3 of 3

Page 111: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

ABMADCEADCSADPAITAITCAMASICBAPTABERBWcCAPEXCDRCDUCDWPCFlsCGWICCMcococccoDcoECOTSCRFCSMcwoD&DDADAUDCMDFCFDSPDSPsDTHEEBITEBITDAEBTEDCEIRPELEMEMIEQMES&S

List of Abbreviations

Apogee Boost MotorAttitude Determination and Control ElectronicsAttitude Determination & Control SystemAnnual Development PlanAssembly Integration & TestAssembly lntegration and Test CentreAssistant ManagerApplication Specifi c lntegrated CircuitBearing And Power Transfer AssemblyBit Error RateBand WidthCivilCAPital EXpenditureCritical Design ReviewCommand Distributor UnitCentral Development Working PartyCustomer Furnished lnstrumentsChina Great Wall Industry CorporationChief ManagerComputer OperatorCommunication Operations Control CentreCost Of DebtCost Of EquityCommercial Of The ShelfCarbon Reinforced FibberCommunication Signal/System MonitoringCivil Works OrganizationDesign & DevelopmentDaily AllowanceData Acquisition UnitDeputy Chief ManagerDiscounted Free Cash FlowDigital Signal ProcessingDigital Signal ProcessorsDirect To HomeElectronicsEarning Before Interest and TaxEarning Before Interest Tax Depreciation and AmortizationEarning Before TaxEffective Date of ContractEquivalent lsotropic Radiated PowerElectricalEngineering ModelElectro Magnetic I nterferenceEngineering Qualifi cation ModelEngineering Support and Services

Attachment-l8

Page I of4

Page 112: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

o

ESDEVTFCFFEFLUINTFMFPGAFPGAsFSDSFSSG/TG2SSGCNGCSGISGMGoPGPSGSOGSTBHDLHGSHORTHPCHVACrcTINVARIOARtoTtoTIRRITITARITUJCOJTAGKHTTLCLEOPLibLolMMATLABMCCMCSMEMSMTCRMLIMoCMoU

Electro Static DischargeEnvironmental Validation TestFree Cash FlowForeign ExchangeFluid Analysis SoftwareFlight ModelField Programmable Gate ArraYField Programmeable Gate ArraYsFeasibility and System Definition StudyFixed Satellite ServiceGainffemperatureG2 Satellite SolutionsGround Control NetworkGround Control StationGeographic Information SYstemGeneral ManagerGovernment of PakistanGlobal Positioning SystemGeo-Stationary OrbitGround System Test BedHardware Descriptive LanguageHughes Global ServicesHorticultureHigh Powered CommitteeHeating Ventilation and Air Conditioninglnformation and Communication TechnologylNVARiable (lron - Nickle AlloY)ln Orbit Acceptance Reviewln Orbit TestingIn Orbit Testslnternal Rate of ReturnI nformation Tech nologYlnternational Traffic in Arms Regulationslnternational Telecommunication UnionJunior ComPuter OPeratorJoint Test Action GrouPKnow-How Transfer and TrainingLocal CurrencYLaunch and EarlY OPerations Phase

LibraryLetter of IntentMechanicalMATrix LaboratoriesMission Control CentreMonitoring and Control SYstem

Micro Electro Mechanical SYstems

Missile Technology Control RegimeMulti Layer InsulationMinistry of CommunicationMemorandum of Understanding

Attachment-l8

I

Page 2 of 4

Page 113: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

MTDFMTOMWNANPVNSDPNTCoBcOBDHOMTOPCATOPEXPAPCBPDPDPDRPGCSPOLPPCProc.PSDPPSTNPTAocR&DRCSRFRFIRFPRWSATSINDA/GsccSCSSGCSSLVSMDssocSOESOPCSPLCSRSRDCSTKSTRTATBCTBDTBP

Medium Term Development FrameworkMechanical Transport OfficerMomentum WheelNot ApplicableNet Present ValueNational Satellite Development ProgramNational Telecommunication CorporationOn Board ComputerOn-Board Data HandlerOrthoMode TransducerName of a Software used for System EngineeringOPerating EXpenditureProduct AssurancePrinted Circuit BoardPower DistributorProject DirectorPreliminary Design ReviewPakSat Ground Control StationPetroleum Oils and LubricantsPower Port ConnectorProcurementPublic Sector Development ProgrammePublic Switched Telephone NetworkPakistan Telecommunication AuthorityQuality ControlResearch and DevelopmentReaction Control SystemRadio FrequencyRequest For InformationRequest For ProposalReaction WheelName of Software used for Satellite Antenna DesignHeat Transfer Analysis SoftwareSatellite Control CentreSmall Communication SatelliteSatellite Ground Control SegmentSatellite Launch VehicleSurface Mounted DevicesSatellite Operations CentreShare Of EquitySystem Onboard Programmable ChipStandard Payload ComputerScientific ResearchSatellite Research and Development CentreSatellite Tool KitStoreTravelling AllowanceTo Be ConfirmedTo Be DeterminedTo Be Provided or Proposed

Attachment-18

Page 3 of4

Page 114: Pakistan Communication Satellite System PAKSAT -IR PC-I Page 1-115

TCTC&RTCRTMTPUTT&CTVUGSUPSUPSUSDVSATWACCWBS

Tele-commandTelemetry Command and RangingTelemetry Command and RangingTelemetryTransPonder UnitTracking Telemetry & CommandTerminalValueA Software used for System DesignUnified Propulsion SystemUninterrupted Power SupplyUnited States DollarVery Small Aperture TerminalWeighted Average Cost of CapitalWork Breakdown Structure

Attachment-18

Page 4 of4