Panhandle Renewable Energy Zone (PREZ) Study Preliminary Results ERCOT System Planning ERCOT CMWG 09-04-2013. Outlines. Needs and Purpose of PREZ study Generation Interconnection in Panhandle Overview Study Process Preliminary Results Observation and Discussion. Needs of PREZ Study. - PowerPoint PPT Presentation
Popular Tags:
18
Panhandle Renewable Energy Zone (PREZ) Study Preliminary Results ERCOT System Planning ERCOT CMWG 09-04-2013 Preliminary Results
Transcript
Page 1: Panhandle Renewable Energy Zone (PREZ) Study Preliminary Results ERCOT System Planning ERCOT CMWG

Panhandle Renewable Energy Zone (PREZ) Study

Preliminary Results

ERCOT System Planning

ERCOT CMWG

09-04-2013

Preliminary Results

Page 2: Panhandle Renewable Energy Zone (PREZ) Study Preliminary Results ERCOT System Planning ERCOT CMWG

Outlines

• Needs and Purpose of PREZ study

• Generation Interconnection in Panhandle Overview

• Study Process

• Preliminary Results

• Observation and Discussion

Preliminary Results

Page 3: Panhandle Renewable Energy Zone (PREZ) Study Preliminary Results ERCOT System Planning ERCOT CMWG

Needs of PREZ Study

• 2012 Long Term System Assessment– Significant expansion of wind resources in the Panhandle

under a range of future outcomes.– If the northwestern-most portion of the Panhandle CREZ

system becomes over-subscribed, voltage stability limits will constrain wind power delivery to the rest of the ERCOT system.

• Generation projects will exceed the CREZ design capacity for the Panhandle area (based on the CREZ Reactive Study “Initial Build” recommendations).

• No near-term Panhandle transmission projects being developed post CREZ 2013.

Preliminary Results

Page 4: Panhandle Renewable Energy Zone (PREZ) Study Preliminary Results ERCOT System Planning ERCOT CMWG

Purpose of PREZ Study

• To identify system constraints and upgrades to accommodate future wind generation projects.

• To provide a project roadmap for both ERCOT and TSPs to accommodate additional generation resources in the study area.– List of potential system upgrade projects.– Triggers for when those projects will be recommended.

Preliminary Results

Page 5: Panhandle Renewable Energy Zone (PREZ) Study Preliminary Results ERCOT System Planning ERCOT CMWG

Wind Projects GINR Overview

Preliminary Results

Page 6: Panhandle Renewable Energy Zone (PREZ) Study Preliminary Results ERCOT System Planning ERCOT CMWG

Signed Generation Interconnection Agreements in Panhandle (3489 MW as of July, 2013)

Preliminary Results

*With financial commitment** Projected commercial operation date

GINR ProjectName CountyCapacity

(MW) COD**

13INR0059 Hereford Wind Castro 499 10/1/2013

14INR0012 Miami Wind 1 Project Gray 401 5/1/2014

13INR0048* Spinning Spur Wind Two Oldham 161 6/1/2014

14INR0030a2* Panhandle Wind Carson 218 8/1/2014

11INR0050 Moore Wind 1 Crosby 149 8/8/2014

13INR0010a Mariah Wind Parmer 200 10/30/2014

14INR0023 Longhorn Energy Center Briscoe 361 12/1/2014

13INR0005* Conway Wind Farm Carson 600 12/15/2014

13INR0010b Mariah Wind Parmer 200 12/31/2015

12INR0029 Comanche Run Wind Swisher 500 12/31/2015

13INR0010c Mariah Wind Parmer 200 12/31/2016

Page 7: Panhandle Renewable Energy Zone (PREZ) Study Preliminary Results ERCOT System Planning ERCOT CMWG

Panhandle Grid Characteristics

• Minimal/no local load• Minimal/no sync

generation• 11 GW wind capacity in

GINR

• Voltage stability and grid strength challenges

Preliminary Results

Page 8: Panhandle Renewable Energy Zone (PREZ) Study Preliminary Results ERCOT System Planning ERCOT CMWG

GrayAlibates

Windmill

OgallalaTule Canyon

Cottonwood

41.5 miles

92.9 miles

66.36 miles

65.8 miles

26.53 miles

46.58 miles

Initial Build (2400 MW)

400400

761600

200

200

361600

149400

0

Preliminary Results

Page 9: Panhandle Renewable Energy Zone (PREZ) Study Preliminary Results ERCOT System Planning ERCOT CMWG

Study Process

• Reliability Analysis– Steady state and dynamic stability analysis– SSWG 2016 HWLL base case

• 8,946MW wind output, 36.5GW load• 0 MW in Panhandle

– Two scenarios• 5,000 MW wind output in Panhandle• 7,500 MW wind output in Panhandle

• Economic Analysis– 2017 UPLAN case from 2012 Five-Year Transmission Plan

Preliminary Results

Page 10: Panhandle Renewable Energy Zone (PREZ) Study Preliminary Results ERCOT System Planning ERCOT CMWG

Current Panhandle Design – 2,400 MW

Cotton Wood

Tule Canyon

Tesla

DermottLong Draw

Windmill

AlibatesGray

Preliminary Results

Ogallala

Page 11: Panhandle Renewable Energy Zone (PREZ) Study Preliminary Results ERCOT System Planning ERCOT CMWG

Scenario 1 Upgrades - 5 GW PREZ

Cotton Wood

Ogallala Tule Canyon

Windmill – Ogallala (1ckt, 27miles)Windmill – Alibates (1ckt, 93miles)Ogallala – Tule Canyon (1ckt, 47miles)Ogallala - Long Draw(2ckt, 200 miles)Condenser: WM (350 MVAr), OG (350 MVAr)Reactors: TC(150MVAr), OG(150MVAr), LD(100MVAr)

Tesla

DermottLong Draw

Windmill

AlibatesGray

Preliminary Results

Page 12: Panhandle Renewable Energy Zone (PREZ) Study Preliminary Results ERCOT System Planning ERCOT CMWG

Scenario 2 Upgrades - 7.5 GW PREZ: Option 1

Cotton Wood

Ogallala Tule Canyon

345 kV projectsWindmill – Ogallala (1ckt, 27miles)Windmill – Alibates (1ckt, 93miles)Ogallala – Tule Canyon (1ckt, 47miles)Condenser: WM , OG 345/500 kV projectsOgallala - Long Draw (2ckts, 200 miles)Gray-Riley(2ckts, 175 miles)Windmill-EdithClarke (2ckts, 175 miles)

Tesla

DermottLong Draw

Windmill

AlibatesGray

Preliminary Results

Riley

Edith Clarke

Graham

W. Shackelford

Page 13: Panhandle Renewable Energy Zone (PREZ) Study Preliminary Results ERCOT System Planning ERCOT CMWG

Study Progress

5,000 MW0 MW 7,500 MW

SC1SC1 SC2SC2IAIA

3,489 MW

345/500 kV projects• Gray-Riley 2ckts• Windmill-EdithClarke 2ckts

345/500 kV projects• Gray-Riley 2ckts• Windmill-EdithClarke 2ckts

In ServiceIn Service Signed Interconnection Agreement

Signed Interconnection Agreement

• Alibates-Windmill (345kV)• Windmill-Ogallala(345kV)• Ogallala-TuleCanyon(345kV)• Ogallala-LongDraw 2ckts• Synchronous Condensers and

Reactors

• Alibates-Windmill (345kV)• Windmill-Ogallala(345kV)• Ogallala-TuleCanyon(345kV)• Ogallala-LongDraw 2ckts• Synchronous Condensers and

Reactors

TBDTBD

CREZCREZ

CREZCREZ

2,400 MW

Preliminary Results

Page 14: Panhandle Renewable Energy Zone (PREZ) Study Preliminary Results ERCOT System Planning ERCOT CMWG

Notes

• PREZ study focuses on the upgrade needs to increase Panhandle export capability. Other ERCOT regions may require further studies for potential thermal and stability challenges.

• The identified upgrades may be revised base on the actual implementation of wind projects in Panhandle.

• The upgrades identified in this study may still require RPG review.

Preliminary Results

Page 15: Panhandle Renewable Energy Zone (PREZ) Study Preliminary Results ERCOT System Planning ERCOT CMWG

Upgrades for PREZ

PanhandleLoad: 0MWWind: 7.5GWSG: 0MW

PanhandleLoad: 0MWWind: 7.5GWSG: 0MW

West Texas**Load: 2.9GWWind: 7.6GWSG*: 2.7GW

Existing link

Identified Panhandle Upgrades

Stability Constraint:•Voltage stability•Weak link•Low short circuit ratio•Controller challenge

*Include Comanche Peak units** not include Panhandle

Preliminary Results

Page 16: Panhandle Renewable Energy Zone (PREZ) Study Preliminary Results ERCOT System Planning ERCOT CMWG

Upgrades for West Texas wind generation

PanhandleLoad: 0MWWind: 7.5GWSG: 0MW

PanhandleLoad: 0MWWind: 7.5GWSG: 0MW

West Texas**Load: 2.9GWWind: 7.6GWSG*: 2.7GW

Existing link

Identified Panhandle Upgrades

ERCOTLoad Centers

Further Upgrades?

Stability Constraint:•Voltage stability•Low short circuit ratio•Voltage support for transfer

*Include Comanche Peak units** not include Panhandle

Preliminary Results

Page 17: Panhandle Renewable Energy Zone (PREZ) Study Preliminary Results ERCOT System Planning ERCOT CMWG

Study Observation – Voltage Ride Through

• Weak network conditions can cause transient overvoltage• Based on the modeled wind farms in the study, 973 MW

wind capacity tripped due to transient overvoltage.– More capacity can be tripped that can even lead to high voltage

collapse in the entire Panhandle area if wind farms are equipped with less voltage ride through capability.

Panhandle 345kV Bus Voltage Response

Page 18: Panhandle Renewable Energy Zone (PREZ) Study Preliminary Results ERCOT System Planning ERCOT CMWG

High Voltage Ride Through (HVRT): NOGRR 124

• Add HVRT base on PRC-024 (Adopted by the NERC Board of Trustees on May 9, 2013)

• No change to the low voltage ride through requirement in Operating Guide 2.9.1


Recommended