    CENTRAL ELECTRICITY AUTHORITY,

    NEW DELHI

    SCENARIO OF ASH UTILIZATION IN INDIA

    A.K. JAINCHIEF ENGINEER

    C.K.L. DAS

    DIRECTOR

    AMIT KUMAR

    ASSISTANT DIRECTOR

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    2/24

    2

    INTRODUCTION

    Coal/Lignite based Thermal Power Generation

    has been backbone of power generation in India;

    Coal is likely to remain the main fuel source for

    the domestic energy market over the next fewdecades;

    Indian coal is of low grade having high ash

    content up to 40-45%;

    Large quantity of ash is being generated at

    Thermal Power Stations in the country.Cont.-

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    3/24

    3

    INTRODUCTION

    Gainful utilization of ash in environment friendlymanner on continuous and sustainable basis isa matter of concern;

    A large number of technologies have been

    developed for gainful utilization and safemanagement of fly ash under efforts of Fly AshMission of GOI since 1994.

    Fly ash has now been established as a

    Resource Material and Useful Commodity. It has now become a saleable commodity.

    Cont.-

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    4/24

    4

    INDRODUCTION

    Central Electricity Authority is monitoring fly ash

    generation and its utilization in the country since

    1996;

    This paper brings out the present status of ashgeneration and its utilization in the country

    based on data being received in CEA.

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    5/24

    5

    INSTALLED CAPACITY(As on 31.03.2011)

    Total : 1,73,626MW

    Coal based : 93,918MW (54%)

    Gas based : 17,706MW (10%) Hydro : 37,567MW (22%)

    Others : 24,435MW (14%)

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    6/24

    6

    GROSS ELECTRICITY GENERATION

    (2010-11)

    Total : 8,44,846 GWh

    Coal : 5,59,922 GWh (66%)

    Gas : 1,00,257 GWh (12%) Hydro : 1,14,257 GWh (14%)

    Others : 70,410 GWh (8%)

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    7/24

    7

    TARGETS FOR ASH UTILIZATION

    AS PER MOEFS NOTIFICATION

    Thermal Power Station in Operation as on

    03.11.2009 shall achieve 100% utilization within

    5 years from date of notification.

    Thermal Power Station Commissioned after

    03.11.2009 shall achieve 100% utilization within

    4 years from date of commissioning.

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    8/24

    8

    PRESENT SCENARIO

    OF ASH UTILIZATION (2010-11) Nos. of Coal/ Lignite based : 88 nos.

    Thermal power Stations from

    which data was received.

    Installed capacity : 80458 MW

    Coal consumed : 408 million tones

    Average Ash content : 32.20%

    Total Ash generated : 131 million tones

    Total Ash utilized : 73 million tones Percentage Utilization : 56%

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    9/24

    9

    Mode of Fly Ash Utilization during

    Year 2010-11

    CEMENT (48.5%)

    BRICKS (6.3%)

    ROADS &EMBANKMENTS,

    (11.65%)

    RECLAIMATION OF

    LOW LAYING AREA

    (12.73%)

    MINEFILLING.(8.26%)

    AGRICULTU RE (1.73%)

    OTHERS (10.82%)

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    10/24

    10

    STATUS OF FLY ASH UTILIZATION AS PER

    MOEFS NOTIFICATION FOR 2010-11

    Nos. of TPS which have achieved the

    target of fly ash utilization as per MoEFs

    Notification: 57 nos.

    Nos. of TPS which have not been able to

    achieve the target of fly ash utilization as

    per MoEFs Notification: 31 nos.

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    11/24

    11

    RANGE OF PERCENTAGE ASH

    UTILIZATION DURING THE YEAR 2010-11

    100% and more than 100% : 13nos.

    Less than 100% and up to 75% : 24nos.

    Less than 75% and up to 50% : 20nos. Less than 50% : 31nos.

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    12/24

    12

    PROGRESSIVE FLY ASH GENERATION & UTILIZATION

    (During 1996-2011)

    Fly ash utilization has increased from 9.63% in

    1996-97 to the highest level of 62.60% in 2009-

    10 and it was about 56% during 2010-11; Quantity wise, fly ash utilization has increased

    from 6.64 million tonne in 1996-97 to maximum

    level of 77.34 million tonne in 2009-10 and it

    was 73.13 million tonne in 2010-11.

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    13/24

    13

    PROGRESSIVE GENERATION AND UTILIZATION OF FLY ASH

    DURING THE PERIOD FROM 1996-97 TO 2010-11

    0

    15

    30

    45

    60

    75

    90

    105

    120

    135

    1

    996-97

    1

    997-98

    1

    998-99

    1

    999-00

    2

    000-01

    2

    001-02

    2

    002-03

    2

    003-04

    2

    004-05

    2

    005-06

    2

    006-07

    2

    007-08

    2

    008-09

    2

    009-10

    2

    010-11

    YEAR

    FLYASHUTILIZATION(inmtpa)

    Total Fly Ash GENERATION

    Total Fly Ash Utilization

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    14/24

    14

    FLY ASH UTILIZATION IN VARIOUS MODES

    (1998-99 TO 2010-11)

    During 1998-99 to 2010-11, utilization of Fly ash hasincreased in various sectors significantly from:

    2.45 million tonne to 35.47 million tonne in CementIndustry.

    0.70 million tonne to 4.61 million tonne in fly ash basedBricks /Tiles

    1.06 million tonne to 8.52 million tonne in Roads &Embankments.

    4.17 million tonne to 9.31 million tonne in Reclamation oflow lying area. 0.65 million tonne to 6.04 million tonne in Mine filling. 0.13 million tonne to 1.27 million tonne in Agriculture.

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    15/24

    15

    PROGRESSIVE UTILIZATION OF FLY ASH IN CEMENT INDUSTRY

    DURING THE PERIOD 1998-99 TO 2010-11

    0

    10

    20

    30

    40

    50

    60

    70

    80

    199

    8-99

    199

    9-00

    200

    0-01

    200

    1-02

    200

    2-03

    200

    3-04

    200

    4-05

    200

    5-06

    200

    6-07

    200

    7-08

    200

    8-09

    200

    9-10

    201

    0-11

    YEAR

    FLYASHUTILIZATION(inmtpa)

    Total F ly Ash Utilization

    Utilization in Cement Industry

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    16/24

    16

    PROGRESSIVE UTILIZATION OF FLYASH IN RECLAMATION/ LAND FILLING

    DURING THE PERIOD 1998-99 TO 2010-11

    0

    10

    20

    30

    40

    50

    60

    70

    80

    19

    98-99

    19

    99-00

    20

    00-01

    20

    01-02

    20

    02-03

    20

    03-04

    20

    04-05

    20

    05-06

    20

    06-07

    20

    07-08

    20

    08-09

    20

    09-10

    20

    10-11

    YEAR

    FLYASHUT

    ILIZATION(inmtpa)

    Total Fly Ash Utilization

    Utilization of Flyash in Reclamation of

    low lying area/land filling

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    17/24

    17

    PROGRESSIVE UTILIZATION OF FLYASH IN CONSTRUCTION OF ROADS/EMBANKMENTS/

    ASH DYKE RAISING DURING THE PERIOD 1998-99 TO 2010-11

    0

    10

    20

    30

    40

    50

    60

    70

    80

    1

    998-99

    1

    999-00

    2

    000-01

    2

    001-02

    2

    002-03

    2

    003-04

    2

    004-05

    2

    005-06

    2

    006-07

    2

    007-08

    2

    008-09

    2

    009-10

    2

    010-11

    YEAR

    FLYASHUTILIZATION(inmtpa)

    Total Fly Ash Utilization

    Use of flyash in construction ofRoads/embankments/ash dyke raising

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    18/24

    18

    PROGRESSIVE UTILIZATION OF FLYASH IN MINE FILLING

    DURING THE PERIOD 1998-99 TO 2010-11

    0

    10

    20

    30

    40

    50

    60

    70

    80

    1998-99

    1999-00

    2000-01

    2001-02

    2002-03

    2003-04

    2004-05

    2005-06

    2006-07

    2007-08

    2008-09

    2009-10

    2010-11

    YEAR

    FLYASHUT

    ILIZATION(inmtpa)

    Total Fly Ash Utilization

    Utilization of Flyash in Mine filling

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    19/24

    19

    PROGRESSIVE UTILIZATION OF FLY ASH IN MANUFACTURE OF FLYASH BASED

    BRICKS/BLOCKS/TILES DURING THE PERIOD 1998-99 TO 2010-11

    0

    10

    20

    30

    40

    50

    60

    70

    80

    1998-99

    1999-00

    2000-01

    2001-02

    2002-03

    2003-04

    2004-05

    2005-06

    2006-07

    2007-08

    2008-09

    2009-10

    2010-11

    YEAR

    FLYASHUTILIZ

    ATION(inmtpa)

    Total Fly Ash Utilization

    Utilization of Flyash in manufacturing of

    based Bricks,blocks,tiles

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    20/24

    20

    PROGRESSIVE UTILIZATION OF FLY ASH IN AGRICULTURE

    DURING THE PERIOD 1998-99 TO 2010-11

    0

    10

    20

    30

    40

    50

    60

    70

    80

    19

    98-99

    19

    99-00

    20

    00-01

    20

    01-02

    20

    02-03

    20

    03-04

    20

    04-05

    20

    05-06

    20

    06-07

    20

    07-08

    20

    08-09

    20

    09-10

    20

    10-11

    YEAR

    FLYASHUTILIZATION(inmtpa)

    Total Fly Ash Utilization

    Utilization of Flyash in Agriculture

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    21/24

    21

    CONCLUSION

    We achieved the highest level of fly ashutilization of 63% in 2009-10 and it was about56% in 2010-11;

    States and districts where thermal powerstations are located need to be sensitized to theneed for utilization of fly ash;

    Use of fly ash in backfilling/stowing of closed/

    abandoned/running open cast and undergroundmines has large potential for utilization of fly ash;

    Cont.-

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    22/24

    22

    CONCLUSION

    Use of fly ash in the construction of road

    embankments/flyovers is gradually picking up.

    However, its full potential is yet to be realized.

    Use of fly ash in the construction of railwayembankments has potential for large scale

    utilization of fly ash;

    Cont.-

  • 7/28/2019 Paper 3 Scenario of Ash Utilization in India

    23/24

    23

    CONCLUSION

    Use of fly ash based building materials, like fly

    ash based bricks, blocks, tiles etc. by Govt.

    agencies, both at Central and State level, is

    required to be ensured.