1/24
1
CENTRAL ELECTRICITY AUTHORITY,
NEW DELHI
SCENARIO OF ASH UTILIZATION IN INDIA
A.K. JAINCHIEF ENGINEER
C.K.L. DAS
DIRECTOR
AMIT KUMAR
ASSISTANT DIRECTOR
7/28/2019 Paper 3 Scenario of Ash Utilization in India
2/24
2
INTRODUCTION
Coal/Lignite based Thermal Power Generation
has been backbone of power generation in India;
Coal is likely to remain the main fuel source for
the domestic energy market over the next fewdecades;
Indian coal is of low grade having high ash
content up to 40-45%;
Large quantity of ash is being generated at
Thermal Power Stations in the country.Cont.-
7/28/2019 Paper 3 Scenario of Ash Utilization in India
3/24
3
INTRODUCTION
Gainful utilization of ash in environment friendlymanner on continuous and sustainable basis isa matter of concern;
A large number of technologies have been
developed for gainful utilization and safemanagement of fly ash under efforts of Fly AshMission of GOI since 1994.
Fly ash has now been established as a
Resource Material and Useful Commodity. It has now become a saleable commodity.
Cont.-
7/28/2019 Paper 3 Scenario of Ash Utilization in India
4/24
4
INDRODUCTION
Central Electricity Authority is monitoring fly ash
generation and its utilization in the country since
1996;
This paper brings out the present status of ashgeneration and its utilization in the country
based on data being received in CEA.
7/28/2019 Paper 3 Scenario of Ash Utilization in India
5/24
5
INSTALLED CAPACITY(As on 31.03.2011)
Total : 1,73,626MW
Coal based : 93,918MW (54%)
Gas based : 17,706MW (10%) Hydro : 37,567MW (22%)
Others : 24,435MW (14%)
7/28/2019 Paper 3 Scenario of Ash Utilization in India
6/24
6
GROSS ELECTRICITY GENERATION
(2010-11)
Total : 8,44,846 GWh
Coal : 5,59,922 GWh (66%)
Gas : 1,00,257 GWh (12%) Hydro : 1,14,257 GWh (14%)
Others : 70,410 GWh (8%)
7/28/2019 Paper 3 Scenario of Ash Utilization in India
7/24
7
TARGETS FOR ASH UTILIZATION
AS PER MOEFS NOTIFICATION
Thermal Power Station in Operation as on
03.11.2009 shall achieve 100% utilization within
5 years from date of notification.
Thermal Power Station Commissioned after
03.11.2009 shall achieve 100% utilization within
4 years from date of commissioning.
7/28/2019 Paper 3 Scenario of Ash Utilization in India
8/24
8
PRESENT SCENARIO
OF ASH UTILIZATION (2010-11) Nos. of Coal/ Lignite based : 88 nos.
Thermal power Stations from
which data was received.
Installed capacity : 80458 MW
Coal consumed : 408 million tones
Average Ash content : 32.20%
Total Ash generated : 131 million tones
Total Ash utilized : 73 million tones Percentage Utilization : 56%
7/28/2019 Paper 3 Scenario of Ash Utilization in India
9/24
9
Mode of Fly Ash Utilization during
Year 2010-11
CEMENT (48.5%)
BRICKS (6.3%)
ROADS &EMBANKMENTS,
(11.65%)
RECLAIMATION OF
LOW LAYING AREA
(12.73%)
MINEFILLING.(8.26%)
AGRICULTU RE (1.73%)
OTHERS (10.82%)
7/28/2019 Paper 3 Scenario of Ash Utilization in India
10/24
10
STATUS OF FLY ASH UTILIZATION AS PER
MOEFS NOTIFICATION FOR 2010-11
Nos. of TPS which have achieved the
target of fly ash utilization as per MoEFs
Notification: 57 nos.
Nos. of TPS which have not been able to
achieve the target of fly ash utilization as
per MoEFs Notification: 31 nos.
7/28/2019 Paper 3 Scenario of Ash Utilization in India
11/24
11
RANGE OF PERCENTAGE ASH
UTILIZATION DURING THE YEAR 2010-11
100% and more than 100% : 13nos.
Less than 100% and up to 75% : 24nos.
Less than 75% and up to 50% : 20nos. Less than 50% : 31nos.
7/28/2019 Paper 3 Scenario of Ash Utilization in India
12/24
12
PROGRESSIVE FLY ASH GENERATION & UTILIZATION
(During 1996-2011)
Fly ash utilization has increased from 9.63% in
1996-97 to the highest level of 62.60% in 2009-
10 and it was about 56% during 2010-11; Quantity wise, fly ash utilization has increased
from 6.64 million tonne in 1996-97 to maximum
level of 77.34 million tonne in 2009-10 and it
was 73.13 million tonne in 2010-11.
7/28/2019 Paper 3 Scenario of Ash Utilization in India
13/24
13
PROGRESSIVE GENERATION AND UTILIZATION OF FLY ASH
DURING THE PERIOD FROM 1996-97 TO 2010-11
0
15
30
45
60
75
90
105
120
135
1
996-97
1
997-98
1
998-99
1
999-00
2
000-01
2
001-02
2
002-03
2
003-04
2
004-05
2
005-06
2
006-07
2
007-08
2
008-09
2
009-10
2
010-11
YEAR
FLYASHUTILIZATION(inmtpa)
Total Fly Ash GENERATION
Total Fly Ash Utilization
7/28/2019 Paper 3 Scenario of Ash Utilization in India
14/24
14
FLY ASH UTILIZATION IN VARIOUS MODES
(1998-99 TO 2010-11)
During 1998-99 to 2010-11, utilization of Fly ash hasincreased in various sectors significantly from:
2.45 million tonne to 35.47 million tonne in CementIndustry.
0.70 million tonne to 4.61 million tonne in fly ash basedBricks /Tiles
1.06 million tonne to 8.52 million tonne in Roads &Embankments.
4.17 million tonne to 9.31 million tonne in Reclamation oflow lying area. 0.65 million tonne to 6.04 million tonne in Mine filling. 0.13 million tonne to 1.27 million tonne in Agriculture.
7/28/2019 Paper 3 Scenario of Ash Utilization in India
15/24
15
PROGRESSIVE UTILIZATION OF FLY ASH IN CEMENT INDUSTRY
DURING THE PERIOD 1998-99 TO 2010-11
0
10
20
30
40
50
60
70
80
199
8-99
199
9-00
200
0-01
200
1-02
200
2-03
200
3-04
200
4-05
200
5-06
200
6-07
200
7-08
200
8-09
200
9-10
201
0-11
YEAR
FLYASHUTILIZATION(inmtpa)
Total F ly Ash Utilization
Utilization in Cement Industry
7/28/2019 Paper 3 Scenario of Ash Utilization in India
16/24
16
PROGRESSIVE UTILIZATION OF FLYASH IN RECLAMATION/ LAND FILLING
DURING THE PERIOD 1998-99 TO 2010-11
0
10
20
30
40
50
60
70
80
19
98-99
19
99-00
20
00-01
20
01-02
20
02-03
20
03-04
20
04-05
20
05-06
20
06-07
20
07-08
20
08-09
20
09-10
20
10-11
YEAR
FLYASHUT
ILIZATION(inmtpa)
Total Fly Ash Utilization
Utilization of Flyash in Reclamation of
low lying area/land filling
7/28/2019 Paper 3 Scenario of Ash Utilization in India
17/24
17
PROGRESSIVE UTILIZATION OF FLYASH IN CONSTRUCTION OF ROADS/EMBANKMENTS/
ASH DYKE RAISING DURING THE PERIOD 1998-99 TO 2010-11
0
10
20
30
40
50
60
70
80
1
998-99
1
999-00
2
000-01
2
001-02
2
002-03
2
003-04
2
004-05
2
005-06
2
006-07
2
007-08
2
008-09
2
009-10
2
010-11
YEAR
FLYASHUTILIZATION(inmtpa)
Total Fly Ash Utilization
Use of flyash in construction ofRoads/embankments/ash dyke raising
7/28/2019 Paper 3 Scenario of Ash Utilization in India
18/24
18
PROGRESSIVE UTILIZATION OF FLYASH IN MINE FILLING
DURING THE PERIOD 1998-99 TO 2010-11
0
10
20
30
40
50
60
70
80
1998-99
1999-00
2000-01
2001-02
2002-03
2003-04
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
YEAR
FLYASHUT
ILIZATION(inmtpa)
Total Fly Ash Utilization
Utilization of Flyash in Mine filling
7/28/2019 Paper 3 Scenario of Ash Utilization in India
19/24
19
PROGRESSIVE UTILIZATION OF FLY ASH IN MANUFACTURE OF FLYASH BASED
BRICKS/BLOCKS/TILES DURING THE PERIOD 1998-99 TO 2010-11
0
10
20
30
40
50
60
70
80
1998-99
1999-00
2000-01
2001-02
2002-03
2003-04
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
YEAR
FLYASHUTILIZ
ATION(inmtpa)
Total Fly Ash Utilization
Utilization of Flyash in manufacturing of
based Bricks,blocks,tiles
7/28/2019 Paper 3 Scenario of Ash Utilization in India
20/24
20
PROGRESSIVE UTILIZATION OF FLY ASH IN AGRICULTURE
DURING THE PERIOD 1998-99 TO 2010-11
0
10
20
30
40
50
60
70
80
19
98-99
19
99-00
20
00-01
20
01-02
20
02-03
20
03-04
20
04-05
20
05-06
20
06-07
20
07-08
20
08-09
20
09-10
20
10-11
YEAR
FLYASHUTILIZATION(inmtpa)
Total Fly Ash Utilization
Utilization of Flyash in Agriculture
7/28/2019 Paper 3 Scenario of Ash Utilization in India
21/24
21
CONCLUSION
We achieved the highest level of fly ashutilization of 63% in 2009-10 and it was about56% in 2010-11;
States and districts where thermal powerstations are located need to be sensitized to theneed for utilization of fly ash;
Use of fly ash in backfilling/stowing of closed/
abandoned/running open cast and undergroundmines has large potential for utilization of fly ash;
Cont.-
7/28/2019 Paper 3 Scenario of Ash Utilization in India
22/24
22
CONCLUSION
Use of fly ash in the construction of road
embankments/flyovers is gradually picking up.
However, its full potential is yet to be realized.
Use of fly ash in the construction of railwayembankments has potential for large scale
utilization of fly ash;
Cont.-
7/28/2019 Paper 3 Scenario of Ash Utilization in India
23/24
23
CONCLUSION
Use of fly ash based building materials, like fly
ash based bricks, blocks, tiles etc. by Govt.
agencies, both at Central and State level, is
required to be ensured.